Proposal:H.014505.6
Parish:Iberville
Routes:LA 30
Description:LA 30: LEFT TURN LANE AT LA 3115
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRET OVERLAY AND RELATED WORK
Estimated Construction Cost:$737,003.43
| Rank | License | Bidder | Construction Bid |
| 1 | 14807 | Richard Price Contracting Co, Llc | $838,903.09 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $852,138.00 |
| 3 | 69570 | Bridging The Gap, L.L.C. | $983,068.20 |
| 4 | 12031 | R.J. Daigle & Sons Contractors, Inc | $1,245,142.86 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Richard Price Contracting Co, Llc | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - Bridging The Gap, L.L.C. | - 4 - R.J. Daigle & Sons Contractors, Inc | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 2,820 | SQYD | 8.50 | 23,970.00 | 6.00 | 16,920.00 | 30.00 | 84,600.00 | 8.20 | 23,124.00 | | 0002 | 202-02-06040 | Removal of Concrete Box Headwall 28’-10” x 8’-8” | 2 | EACH | 3,000.00 | 6,000.00 | 3,500.00 | 7,000.00 | 5,000.00 | 10,000.00 | 3,708.31 | 7,416.62 | | 0003 | 202-02-06040 | Removal of Concrete Box Headwall 34’ x 8’-7 ½” | 2 | EACH | 3,300.00 | 6,600.00 | 4,500.00 | 9,000.00 | 10,000.00 | 20,000.00 | 5,053.63 | 10,107.26 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) 15" EQUIV. RCPA | 48 | LNFT | 60.00 | 2,880.00 | 19.00 | 912.00 | 62.00 | 2,976.00 | 20.70 | 993.60 | | 0005 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 1,200.00 | 2,400.00 | 3,400.00 | 6,800.00 | 1,500.00 | 3,000.00 | 3,708.31 | 7,416.62 | | 0006 | 202-03-38000 | Relocation of Sign . | 17 | EACH | 200.00 | 3,400.00 | 185.00 | 3,145.00 | 150.00 | 2,550.00 | 201.25 | 3,421.25 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 38,000.00 | 38,000.00 | 55,000.00 | 55,000.00 | 150,000.00 | 150,000.00 | 51,006.25 | 51,006.25 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 100 | LNFT | 3.00 | 300.00 | 2.50 | 250.00 | 12.00 | 1,200.00 | 5.75 | 575.00 | | 0009 | 302-02-07000 | Class II Base Course (7" Thick) (Asphalt Concrete Base) | 3,275 | SQYD | 49.00 | 160,475.00 | 43.00 | 140,825.00 | 40.00 | 131,000.00 | 55.00 | 180,125.00 | | 0010 | 304-01-00100 | Lime | 12 | TON | 250.00 | 3,000.00 | 230.00 | 2,760.00 | 200.00 | 2,400.00 | 248.46 | 2,981.52 | | 0011 | 304-05-00100 | Lime Treatment (Type E) | 819 | SQYD | 6.75 | 5,528.25 | 7.00 | 5,733.00 | 25.00 | 20,475.00 | 2.00 | 1,638.00 | | 0012 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 105 | CUYD | 99.00 | 10,395.00 | 102.00 | 10,710.00 | 100.00 | 10,500.00 | 117.30 | 12,316.50 | | 0013 | 502-01-00100 | Asphalt Concrete | 1,478.7 | TON | 137.00 | 202,581.90 | 110.00 | 162,657.00 | 110.00 | 162,657.00 | 115.00 | 170,050.50 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 13.7 | TON | 150.00 | 2,055.00 | 260.00 | 3,562.00 | 150.00 | 2,055.00 | 125.00 | 1,712.50 | | 0015 | 509-01-00100 | Milling Asphalt Pavement | 3,801 | SQYD | 4.00 | 15,204.00 | 4.00 | 15,204.00 | 7.50 | 28,507.50 | 3.50 | 13,303.50 | | 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -158 | CUYD | 15.00 | -2,370.00 | 0.00 | 0.00 | 1.00 | -158.00 | 0.01 | -1.58 | | 0017 | 701-06-00040 | Side Drain Pipe Arch (24" Equiv. RCPA) | 48 | LNFT | 175.00 | 8,400.00 | 155.00 | 7,440.00 | 180.00 | 8,640.00 | 175.72 | 8,434.56 | | 0018 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 16 | LNFT | 250.00 | 4,000.00 | 480.00 | 7,680.00 | 260.00 | 4,160.00 | 535.65 | 8,570.40 | | 0019 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,300.00 | 2,600.00 | 1,200.00 | 2,400.00 | 1,800.00 | 3,600.00 | 869.69 | 1,739.38 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 24,000.00 | 24,000.00 | 85,000.00 | 85,000.00 | 20,000.00 | 20,000.00 | 215,000.00 | 215,000.00 | | 0021 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 850 | LNFT | 0.24 | 204.00 | 1.00 | 850.00 | 1.25 | 1,062.50 | 0.23 | 195.50 | | 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 238 | LNFT | 0.72 | 171.36 | 2.00 | 476.00 | 2.00 | 476.00 | 0.69 | 164.22 | | 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.98 | MILE | 360.78 | 353.56 | 4,000.00 | 3,920.00 | 4,000.00 | 3,920.00 | 345.00 | 338.10 | | 0024 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 6 | EACH | 30.07 | 180.42 | 75.00 | 450.00 | 75.00 | 450.00 | 28.75 | 172.50 | | 0025 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 6 | EACH | 24.05 | 144.30 | 75.00 | 450.00 | 75.00 | 450.00 | 23.00 | 138.00 | | 0026 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 132 | EACH | 3.61 | 476.52 | 1.00 | 132.00 | 10.00 | 1,320.00 | 3.45 | 455.40 | | 0027 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.48 | MILE | 10,823.33 | 5,195.20 | 525.00 | 252.00 | 100,000.00 | 48,000.00 | 575.00 | 276.00 | | 0028 | 726-01-00100 | Bedding Material | 32 | CUYD | 50.00 | 1,600.00 | 100.00 | 3,200.00 | 55.00 | 1,760.00 | 114.29 | 3,657.28 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 | 90,000.00 | 90,000.00 | 100,000.00 | 100,000.00 | 270,000.00 | 270,000.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 132 | EACH | 18.00 | 2,376.00 | 12.50 | 1,650.00 | 12.00 | 1,584.00 | 17.25 | 2,277.00 | | 0031 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 72 | LNFT | 24.05 | 1,731.60 | 26.00 | 1,872.00 | 25.00 | 1,800.00 | 23.00 | 1,656.00 | | 0032 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 210 | LNFT | 7.22 | 1,516.20 | 6.00 | 1,260.00 | 6.00 | 1,260.00 | 6.90 | 1,449.00 | | 0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 238 | LNFT | 21.65 | 5,152.70 | 26.00 | 6,188.00 | 25.00 | 5,950.00 | 20.70 | 4,926.60 | | 0034 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 640 | LNFT | 7.22 | 4,620.80 | 5.25 | 3,360.00 | 5.00 | 3,200.00 | 6.90 | 4,416.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.98 | MILE | 12,025.92 | 11,785.40 | 8,000.00 | 7,840.00 | 7,500.00 | 7,350.00 | 11,500.00 | 11,270.00 | | 0036 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 6 | EACH | 901.94 | 5,411.64 | 700.00 | 4,200.00 | 650.00 | 3,900.00 | 862.50 | 5,175.00 | | 0037 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 481.04 | 2,886.24 | 526.00 | 3,156.00 | 500.00 | 3,000.00 | 460.00 | 2,760.00 | | 0038 | 739-01-00100 | Hydro-Seeding | 0.25 | ACRE | 17,000.00 | 4,250.00 | 2,000.00 | 500.00 | 16,000.00 | 4,000.00 | 5,750.00 | 1,437.50 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 18,000.00 | 18,000.00 | 10,880.00 | 10,880.00 | | 0040 | 805-16-00600 | Reinforced Concrete Box Culverts (Extension) (5' x 5') | 48 | LNFT | 1,350.00 | 64,800.00 | 1,240.00 | 59,520.00 | 550.00 | 26,400.00 | 1,351.61 | 64,877.28 | | 0041 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall quantity of steel = 2798.12 pounds, quantity of concrete 24.14 cubic yards | 6 | EACH | 15,000.00 | 90,000.00 | 17,000.00 | 102,000.00 | 11,000.00 | 66,000.00 | 18,488.88 | 110,933.28 | | 0042 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 7,728 | INLF | 1.00 | 7,728.00 | 0.50 | 3,864.00 | 0.65 | 5,023.20 | 0.94 | 7,264.32 | | 0043 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 4 | EACH | 975.00 | 3,900.00 | 1,000.00 | 4,000.00 | 2,500.00 | 10,000.00 | 5,123.25 | 20,493.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 838,903.09 | | 852,138.00 | | 983,068.20 | | 1,245,142.86 |
|