Proposal:H.004435.6
Parish:St. Tammany
Routes:LA 3241
Description:LA 3241: LA 36 TO LA 435
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, PRECAST PRESTRESSED CONCRETE GIRDER SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$66,171,309.55
Maximum Number of Days Allowed for Construction:9999
Calculated Daily User Cost:$10,500.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 34567 | James Construction Group LLC | $62,565,356.72 | 510.00 | $67,920,356.72 |
| 2 | 55950 | Brown Industrial Construction, LLC | $66,399,032.76 | 720.00 | $73,959,032.76 |
| 3 | 36961 | Cycle Construction Co. L.L.C. | $68,887,484.20 | 1080.00 | $80,227,484.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - James Construction Group LLC | - 2 - Brown Industrial Construction, LLC | - 3 - Cycle Construction Co. L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 243 | LUMP | 1,480,000.00 | 1,480,000.00 | 3,550,000.00 | 3,550,000.00 | 3,205,500.00 | 3,205,500.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 73,000.00 | 73,000.00 | 75,000.00 | 75,000.00 | 500,000.00 | 500,000.00 | | 0003 | 202-02-00010 | Removal of 2 Connected Wood Decks 8' x 4' (Lt. of Sta. 521+63) | 1 | EACH | 6,000.00 | 6,000.00 | 800.00 | 800.00 | 1,200.00 | 1,200.00 | | 0004 | 202-02-00010 | Removal of 2' x 2' x 20' Timber Box Culvert (Sta. 290+15) | 1 | EACH | 4,050.00 | 4,050.00 | 1,000.00 | 1,000.00 | 2,000.00 | 2,000.00 | | 0005 | 202-02-00010 | Removal of 2' x 2' x 24' Timber Box Culvert (Sta. 409+04) | 1 | EACH | 4,000.00 | 4,000.00 | 1,200.00 | 1,200.00 | 2,000.00 | 2,000.00 | | 0006 | 202-02-00010 | Removal of 2' x 3' x 20' Timber Box Culvert (Sta. 275+17) | 1 | EACH | 4,000.00 | 4,000.00 | 1,200.00 | 1,200.00 | 2,000.00 | 2,000.00 | | 0007 | 202-02-00010 | Removal of 3' x 2' x 45' Timber Box Culvert (Sta. 525+63) | 1 | EACH | 7,000.00 | 7,000.00 | 2,400.00 | 2,400.00 | 3,400.00 | 3,400.00 | | 0008 | 202-02-00010 | Removal of 4' x 3' x 28' Timber Box Culvert (Sta. 235+21) | 1 | EACH | 7,000.00 | 7,000.00 | 2,000.00 | 2,000.00 | 2,800.00 | 2,800.00 | | 0009 | 202-02-02000 | Removal of Asphalt Drives | 368 | SQYD | 30.00 | 11,040.00 | 6.50 | 2,392.00 | 11.00 | 4,048.00 | | 0010 | 202-02-02020 | Removal of Asphalt Pavement | 8,502.4 | SQYD | 7.00 | 59,516.80 | 3.70 | 31,458.88 | 11.00 | 93,526.40 | | 0011 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | 8,502.4 | SQYD | 3.00 | 25,507.20 | 4.90 | 41,661.76 | 6.00 | 51,014.40 | | 0012 | 202-02-04501 | Removal of Bridge (40' Metal) (Lt. of Sta. 309+23) | 400 | LUMP | 12,000.00 | 12,000.00 | 6,000.00 | 6,000.00 | 40,000.00 | 40,000.00 | | 0013 | 202-02-04501 | Removal of Bridge (40' Metal) (Lt. of Sta. 352+06) | 400 | LUMP | 12,000.00 | 12,000.00 | 6,000.00 | 6,000.00 | 40,000.00 | 40,000.00 | | 0016 | 203-01-00100 | General Excavation | 37,915 | CUYD | 9.00 | 341,235.00 | 5.50 | 208,532.50 | 15.00 | 568,725.00 | | 0017 | 203-03-00100 | Embankment | 856,524 | CUYD | 18.00 | 15,417,432.00 | 17.50 | 14,989,170.00 | 19.00 | 16,273,956.00 | | 0018 | 203-04-00300 | Nonplastic Embankment (Stone) | 490 | CUYD | 230.00 | 112,700.00 | 190.00 | 93,100.00 | 154.00 | 75,460.00 | | 0019 | 203-08-00100 | Geotextile Fabric | 1,477 | SQYD | 6.00 | 8,862.00 | 2.50 | 3,692.50 | 3.00 | 4,431.00 | | 0020 | 203-11-00100 | Settlement Plate Installation and Monitoring | 12 | EACH | 1,850.00 | 22,200.00 | 3,500.00 | 42,000.00 | 3,700.00 | 44,400.00 | | 0021 | 204-02-00100 | Temporary Hay Bales | 500 | EACH | 30.00 | 15,000.00 | 12.50 | 6,250.00 | 15.00 | 7,500.00 | | 0022 | 204-04-00100 | Temporary Sediment Basins | 40 | EACH | 300.00 | 12,000.00 | 135.00 | 5,400.00 | 150.00 | 6,000.00 | | 0023 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 97 | EACH | 170.00 | 16,490.00 | 140.00 | 13,580.00 | 150.00 | 14,550.00 | | 0024 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 8 | EACH | 790.00 | 6,320.00 | 1,000.00 | 8,000.00 | 700.00 | 5,600.00 | | 0025 | 204-06-00100 | Temporary Silt Fencing | 117,562 | LNFT | 3.00 | 352,686.00 | 1.80 | 211,611.60 | 3.00 | 352,686.00 | | 0026 | 204-07-00100 | Temporary Stone Construction Entrance | 6 | EACH | 12,500.00 | 75,000.00 | 7,500.00 | 45,000.00 | 7,300.00 | 43,800.00 | | 0027 | 302-01-00200 | Class II Base Course (Soil Cement) | 16,013.5 | CUYD | 40.00 | 640,540.00 | 66.00 | 1,056,891.00 | 52.00 | 832,702.00 | | 0028 | 302-02-04000 | Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) | 380,843.6 | SQYD | 12.00 | 4,570,123.20 | 13.00 | 4,950,966.80 | 13.50 | 5,141,388.60 | | 0029 | 302-02-06010 | Class II Base Course (6" Thick) (Soil Cement) | 292,510.3 | SQYD | 7.00 | 2,047,572.10 | 10.40 | 3,042,107.12 | 8.25 | 2,413,209.98 | | 0030 | 304-01-00100 | Lime | 800 | TON | 25.00 | 20,000.00 | 1.00 | 800.00 | 295.00 | 236,000.00 | | 0031 | 304-05-00100 | Lime Treatment (Type E) | 56,450 | SQYD | 0.15 | 8,467.50 | 0.01 | 564.50 | 4.00 | 225,800.00 | | 0032 | 401-01-00100 | Aggregate Surface Course (Net Section) | 171.1 | CUYD | 170.00 | 29,087.00 | 160.00 | 27,376.00 | 113.00 | 19,334.30 | | 0033 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 3,000 | SQYD | 35.00 | 105,000.00 | 32.00 | 96,000.00 | 38.00 | 114,000.00 | | 0034 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 500 | CUYD | 140.00 | 70,000.00 | 125.00 | 62,500.00 | 100.00 | 50,000.00 | | 0035 | 502-01-00100 | Asphalt Concrete | 161,465.7 | TON | 88.85 | 14,346,227.45 | 89.00 | 14,370,447.30 | 95.00 | 15,339,241.50 | | 0036 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 100.2 | TON | 88.85 | 8,902.77 | 89.00 | 8,917.80 | 95.00 | 9,519.00 | | 0037 | 701-01-01004 | Cross Drain Pipe (24" RCP/RPVCP) | 462 | LNFT | 105.00 | 48,510.00 | 110.00 | 50,820.00 | 85.00 | 39,270.00 | | 0038 | 701-01-01043 | Cross Drain Pipe (36" RCP/RPVCP) | 8,072 | LNFT | 125.00 | 1,009,000.00 | 160.00 | 1,291,520.00 | 150.00 | 1,210,800.00 | | 0039 | 701-01-01103 | Cross Drain Pipe (54" RCP/RPVCP) | 192 | LNFT | 215.00 | 41,280.00 | 264.00 | 50,688.00 | 280.00 | 53,760.00 | | 0040 | 701-01-01120 | Cross Drain Pipe (60" RCP) | 768 | LNFT | 220.00 | 168,960.00 | 298.00 | 228,864.00 | 320.00 | 245,760.00 | | 0041 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 5,585 | LNFT | 145.00 | 809,825.00 | 180.00 | 1,005,300.00 | 150.00 | 837,750.00 | | 0042 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 1,344 | LNFT | 175.00 | 235,200.00 | 210.00 | 282,240.00 | 185.00 | 248,640.00 | | 0043 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 580 | LNFT | 110.00 | 63,800.00 | 88.00 | 51,040.00 | 62.00 | 35,960.00 | | 0044 | 702-03-00100 | Catch Basins (CB-01) | 19 | EACH | 5,800.00 | 110,200.00 | 3,500.00 | 66,500.00 | 5,200.00 | 98,800.00 | | 0045 | 702-03-00200 | Catch Basins (CB-02) | 13 | EACH | 4,500.00 | 58,500.00 | 4,000.00 | 52,000.00 | 7,100.00 | 92,300.00 | | 0046 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,100 | LNFT | 20.00 | 22,000.00 | 21.00 | 23,100.00 | 25.00 | 27,500.00 | | 0047 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 85.00 | 17,000.00 | 86.00 | 17,200.00 | 115.00 | 23,000.00 | | 0048 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 8 | EACH | 2,500.00 | 20,000.00 | 2,550.00 | 20,400.00 | 3,000.00 | 24,000.00 | | 0049 | 705-01-00100 | Barbed Wire Fence | 710 | LNFT | 10.00 | 7,100.00 | 8.70 | 6,177.00 | 9.50 | 6,745.00 | | 0050 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 78,167 | LNFT | 8.00 | 625,336.00 | 7.30 | 570,619.10 | 8.00 | 625,336.00 | | 0051 | 705-03-00100 | Single Swinging Walk Gates | 11 | EACH | 450.00 | 4,950.00 | 570.00 | 6,270.00 | 600.00 | 6,600.00 | | 0052 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 539 | LNFT | 50.00 | 26,950.00 | 63.00 | 33,957.00 | 69.00 | 37,191.00 | | 0053 | 705-09-00100 | Rebuilt Fence | 130 | LNFT | 70.00 | 9,100.00 | 65.00 | 8,450.00 | 72.00 | 9,360.00 | | 0054 | 706-03-00750 | Incidental Concrete Paving (11" Thick) | 2,067.2 | SQYD | 110.00 | 227,392.00 | 90.00 | 186,048.00 | 140.00 | 289,408.00 | | 0055 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,787.4 | LNFT | 20.00 | 35,748.00 | 30.00 | 53,622.00 | 38.00 | 67,921.20 | | 0056 | 708-01-00100 | Right-of-Way Monument | 78 | EACH | 250.00 | 19,500.00 | 275.00 | 21,450.00 | 100.00 | 7,800.00 | | 0057 | 708-02-00100 | Right-of-Way Monument Witness Post | 78 | EACH | 250.00 | 19,500.00 | 275.00 | 21,450.00 | 300.00 | 23,400.00 | | 0058 | 709-01-00100 | Steel Cattle Guard | 1 | EACH | 8,000.00 | 8,000.00 | 24,000.00 | 24,000.00 | 51,000.00 | 51,000.00 | | 0059 | 712-02-00100 | Sacked Concrete Revetment | 3,609.28 | SQYD | 80.00 | 288,742.40 | 68.00 | 245,431.04 | 92.00 | 332,053.76 | | 0060 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 55,000.00 | 55,000.00 | 200,000.00 | 200,000.00 | 50,000.00 | 50,000.00 | | 0061 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 4,000 | LNFT | 1.00 | 4,000.00 | 0.40 | 1,600.00 | 0.94 | 3,760.00 | | 0062 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 50 | LNFT | 2.00 | 100.00 | 5.00 | 250.00 | 11.00 | 550.00 | | 0063 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 100 | EACH | 15.00 | 1,500.00 | 8.00 | 800.00 | 8.00 | 800.00 | | 0064 | 716-01-00100 | Mulch (Vegetative) | 184.5 | TON | 550.00 | 101,475.00 | 540.00 | 99,630.00 | 582.00 | 107,379.00 | | 0065 | 717-01-00100 | Seeding | 3,243 | LB | 10.00 | 32,430.00 | 11.40 | 36,970.20 | 12.00 | 38,916.00 | | 0066 | 718-01-00100 | Fertilizer | 70,102 | LB | 0.50 | 35,051.00 | 0.58 | 40,659.16 | 0.75 | 52,576.50 | | 0067 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 14,500 | SQYD | 1.00 | 14,500.00 | 1.45 | 21,025.00 | 1.50 | 21,750.00 | | 0068 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 40,000.00 | 40,000.00 | 15,000.00 | 15,000.00 | 175,000.00 | 175,000.00 | | 0069 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 32.4 | MILE | 260.00 | 8,424.00 | 400.00 | 12,960.00 | 600.00 | 19,440.00 | | 0070 | 726-01-00100 | Bedding Material | 4,417.3 | CUYD | 105.00 | 463,816.50 | 80.00 | 353,384.00 | 140.00 | 618,422.00 | | 0071 | 727-01-00100 | Mobilization | 1 | LUMP | 6,250,000.00 | 6,250,000.00 | 6,500,000.00 | 6,500,000.00 | 3,800,000.00 | 3,800,000.00 | | 0072 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 639.7 | SQFT | 22.00 | 14,073.40 | 22.00 | 14,073.40 | 24.00 | 15,352.80 | | 0073 | 729-08-00100 | Mounting (2 1/2" Size Post) | 10 | EACH | 1,150.00 | 11,500.00 | 1,200.00 | 12,000.00 | 1,250.00 | 12,500.00 | | 0074 | 729-08-00200 | Mounting (3 1/2" Size Post) | 9 | EACH | 1,650.00 | 14,850.00 | 1,700.00 | 15,300.00 | 1,800.00 | 16,200.00 | | 0075 | 729-16-00200 | Object Marker Assembly (Type 2) | 152 | EACH | 55.00 | 8,360.00 | 45.00 | 6,840.00 | 49.00 | 7,448.00 | | 0076 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 90.00 | 720.00 | 90.00 | 720.00 | 105.00 | 840.00 | | 0077 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 51 | EACH | 150.00 | 7,650.00 | 150.00 | 7,650.00 | 165.00 | 8,415.00 | | 0078 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 6 | EACH | 150.00 | 900.00 | 150.00 | 900.00 | 165.00 | 990.00 | | 0079 | 731-02-00100 | Reflectorized Raised Pavement Markers | 4,488 | EACH | 8.50 | 38,148.00 | 7.50 | 33,660.00 | 8.00 | 35,904.00 | | 0080 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 72 | LNFT | 50.00 | 3,600.00 | 20.00 | 1,440.00 | 21.00 | 1,512.00 | | 0081 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 33.007 | MILE | 4,900.45 | 161,749.15 | 4,500.00 | 148,531.50 | 4,900.00 | 161,734.30 | | 0082 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.397 | MILE | 30,000.00 | 11,910.00 | 10,000.00 | 3,970.00 | 11,000.00 | 4,367.00 | | 0083 | 732-02-02060 | Plastic Pavement Striping (Solid Line) (12" Width) (Thermoplastic 90 mil) | 0.07 | MILE | 40,000.00 | 2,800.00 | 25,000.00 | 1,750.00 | 26,000.00 | 1,820.00 | | 0084 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 16.313 | MILE | 1,650.00 | 26,916.45 | 3,000.00 | 48,939.00 | 3,100.00 | 50,570.30 | | 0085 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.266 | MILE | 12,600.00 | 3,351.60 | 7,600.00 | 2,021.60 | 8,000.00 | 2,128.00 | | 0086 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 650.00 | 2,600.00 | 400.00 | 1,600.00 | 410.00 | 1,640.00 | | 0087 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 6 | EACH | 650.00 | 3,900.00 | 400.00 | 2,400.00 | 410.00 | 2,460.00 | | 0088 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 6 | EACH | 850.00 | 5,100.00 | 750.00 | 4,500.00 | 800.00 | 4,800.00 | | 0089 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 850.00 | 3,400.00 | 600.00 | 2,400.00 | 610.00 | 2,440.00 | | 0090 | 735-01-00100 | Mailboxes | 4 | EACH | 15.00 | 60.00 | 10.00 | 40.00 | 80.00 | 320.00 | | 0091 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 125.00 | 500.00 | 250.00 | 1,000.00 | 210.00 | 840.00 | | 0092 | 740-01-00100 | Construction Layout | 1 | LUMP | 200,000.00 | 200,000.00 | 400,000.00 | 400,000.00 | 600,000.00 | 600,000.00 | | 0093 | 804-01-00300 | Precast Concrete Piles (16") | 7,124 | LNFT | 87.00 | 619,788.00 | 80.00 | 569,920.00 | 110.00 | 783,640.00 | | 0094 | 804-01-00700 | Precast Concrete Piles (30") | 9,700 | LNFT | 175.00 | 1,697,500.00 | 210.00 | 2,037,000.00 | 210.00 | 2,037,000.00 | | 0095 | 804-10-00700 | Precast Concrete Indicator Piles (30") | 5 | EACH | 45,000.00 | 225,000.00 | 50,000.00 | 250,000.00 | 70,000.00 | 350,000.00 | | 0096 | 804-14-00100 | Dynamic Monitoring Assistance | 24 | EACH | 5,000.00 | 120,000.00 | 3,000.00 | 72,000.00 | 5,400.00 | 129,600.00 | | 0097 | 805-01-00200 | Class A1 Concrete (Deck) | 2,282.86 | CUYD | 950.00 | 2,168,717.00 | 1,050.00 | 2,397,003.00 | 1,136.00 | 2,593,328.96 | | 0098 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 632.16 | CUYD | 1,250.00 | 790,200.00 | 1,200.00 | 758,592.00 | 1,300.00 | 821,808.00 | | 0099 | 805-08-00400 | Precast-Prestressed Concrete Girders (Type III) | 9,521 | LNFT | 165.00 | 1,570,965.00 | 155.00 | 1,475,755.00 | 172.00 | 1,637,612.00 | | 0100 | 805-13-00300 | Reinforced Concrete Box Culverts (Cast-In-Place or Precast) (6' x 4') | 384 | LNFT | 572.00 | 219,648.00 | 540.00 | 207,360.00 | 720.00 | 276,480.00 | | 0101 | 805-13-00700 | Reinforced Concrete Box Culverts (Cast-In-Place or Precast) (6' x 5') | 768 | LNFT | 608.00 | 466,944.00 | 560.00 | 430,080.00 | 740.00 | 568,320.00 | | 0102 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (Stations 309+24 and 485+49) | 4 | EACH | 23,500.00 | 94,000.00 | 22,000.00 | 88,000.00 | 69,000.00 | 276,000.00 | | 0103 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 25,414 | SQFT | 2.00 | 50,828.00 | 1.50 | 38,121.00 | 4.50 | 114,363.00 | | 0104 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 71,494 | SQFT | 1.00 | 71,494.00 | 2.00 | 142,988.00 | 4.50 | 321,723.00 | | 0105 | 806-01-00100 | Deformed Reinforcing Steel | 807,432 | LB | 1.50 | 1,211,148.00 | 1.30 | 1,049,661.60 | 1.50 | 1,211,148.00 | | 0106 | 807-01-00200 | Structural Metalwork (Grade 50) | 120 | LUMP | 7,000.00 | 7,000.00 | 3,000.00 | 3,000.00 | 30,000.00 | 30,000.00 | | 0107 | 807-01-00500 | Structural Metalwork (Grade HPS 50W) | 1,036 | LUMP | 12,500.00 | 12,500.00 | 25,000.00 | 25,000.00 | 70,000.00 | 70,000.00 | | 0108 | 810-01-00100 | Concrete Bridge Railing (Standard) | 2,466 | LNFT | 110.00 | 271,260.00 | 115.00 | 283,590.00 | 211.00 | 520,326.00 | | 0109 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 1,370 | LNFT | 100.00 | 137,000.00 | 116.00 | 158,920.00 | 211.00 | 289,070.00 | | 0110 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 12,160.8 | SQFT | 100.00 | 1,216,080.00 | 75.00 | 912,060.00 | 48.00 | 583,718.40 | | 0111 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 918.72 | SFIN | 110.00 | 101,059.20 | 120.00 | 110,246.40 | 115.00 | 105,652.80 | | 0112 | 815-02-00200 | Sealed Expansion Joint (End Dams and Preformed Silicone Seal) | 324 | LNFT | 250.00 | 81,000.00 | 240.00 | 77,760.00 | 288.00 | 93,312.00 | | 0113 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 400 | LNFT | 2.00 | 800.00 | 22.00 | 8,800.00 | 22.00 | 8,800.00 | | 0114 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 288 | INLF | 1.00 | 288.00 | 2.00 | 576.00 | 2.00 | 576.00 | | 0115 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 4 | EACH | 13,900.00 | 55,600.00 | 3,500.00 | 14,000.00 | 22,000.00 | 88,000.00 | | 0116 | NS-729-00031 | Breakaway Square Tubing Sign Support (Surface Mount) | 4 | EACH | 225.00 | 900.00 | 230.00 | 920.00 | 246.00 | 984.00 | | 0117 | 202-02-00010 | Removal of Removal of Single Family Residence (Wood Frame), (Sta. 530+98.97, Lt.) (1,028 sqft) | 1 | EACH | 12,200.00 | 12,200.00 | 3,500.00 | 3,500.00 | 10,000.00 | 10,000.00 | | 0118 | 202-02-00010 | Removal of Removal of Single Family Residence (Wood Frame), (Sta. 533+03, Rt.) (1,783 sqft) | 1 | EACH | 12,500.00 | 12,500.00 | 5,000.00 | 5,000.00 | 14,500.00 | 14,500.00 | | 0119 | 202-02-00010 | Removal of Removal of Manufactured Home (Sta. 537+37.24, Rt. 16'x80') (1,280 sqft) | 1 | EACH | 7,500.00 | 7,500.00 | 4,000.00 | 4,000.00 | 6,500.00 | 6,500.00 | | 0120 | 202-02-00010 | Removal of Removal of Manufactured Home w\2 Sets of Front Steps (Sta. 509+64.49, Rt.) (500 sqft) | 1 | EACH | 7,500.00 | 7,500.00 | 2,000.00 | 2,000.00 | 4,000.00 | 4,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 62,565,356.72 | | 66,399,032.76 | | 68,887,484.20 |
|