Proposal:H.011895.6
Parish:Ouachita
Description:CITY OF MONROE GUARDRAIL INSTALLATION
Type Construction:DRAINAGE STRUCTURES, GUARD RAIL, SIGNING AND RELATED WORK.
Estimated Construction Cost:$61,083.80
| Rank | License | Bidder | Construction Bid |
| 1 | 34068 | Alpha Service And Products, Inc. | $128,305.70 |
| 2 | 67594 | Traffic Commander, LLC | $183,525.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Alpha Service And Products, Inc. | - 2 - Traffic Commander, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 20,000.00 | 20,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 35 | LNFT | 20.00 | 700.00 | 30.00 | 1,050.00 | | 0003 | 202-02-38300 | Removal of Sign and U-Channel Post | 16 | EACH | 50.00 | 800.00 | 5.00 | 80.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 75 | CUYD | 50.00 | 3,750.00 | 150.00 | 11,250.00 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 680 | LNFT | 5.00 | 3,400.00 | 1.00 | 680.00 | | 0006 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 250.00 | 2,000.00 | 250.00 | 2,000.00 | | 0007 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 24 | LNFT | 350.00 | 8,400.00 | 350.00 | 8,400.00 | | 0008 | 701-15-00100 | Concrete Collar | 2 | EACH | 2,500.00 | 5,000.00 | 6,000.00 | 12,000.00 | | 0009 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 443.8 | LNFT | 28.00 | 12,426.40 | 50.00 | 22,190.00 | | 0010 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 3 | EACH | 5,000.00 | 15,000.00 | 5,000.00 | 15,000.00 | | 0011 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 3,650.00 | 10,950.00 | 5,000.00 | 15,000.00 | | 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | | 0013 | 717-01-00100 | Seeding | 5 | LB | 50.00 | 250.00 | 150.00 | 750.00 | | 0014 | 718-01-00100 | Fertilizer | 150 | LB | 15.00 | 2,250.00 | 5.00 | 750.00 | | 0015 | 726-01-00100 | Bedding Material | 3 | CUYD | 300.00 | 900.00 | 400.00 | 1,200.00 | | 0016 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 18,000.00 | 18,000.00 | | 0017 | 729-01-00100 | Sign (Type A) | 76.7 | SQFT | 29.00 | 2,224.30 | 80.00 | 6,136.00 | | 0018 | 729-01-00103 | Sign (Type A)(Relocate) | 9 | SQFT | 25.00 | 225.00 | 1.00 | 9.00 | | 0019 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 105.00 | 630.00 | 130.00 | 780.00 | | 0020 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 2,750.00 | 2,750.00 | 1,000.00 | 1,000.00 | | 0021 | 729-21-00100 | U-Channel Post | 15 | EACH | 110.00 | 1,650.00 | 150.00 | 2,250.00 | | 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 128,305.70 | | 183,525.00 |
|