Proposal:H.012676.6-R1
Parish:Orleans
Routes:I-10, LA 3019
Description:I-10 RAMPS @ LA 3019 INT IMP
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, PORTLAND CEMENT CONCRETE PAVEMENT, DRILLED SHAFT FOUNDATIONS, TRAFFIC SIGNALIZATION AND RELATED WORK.
Estimated Construction Cost:$1,197,379.50
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $1,650,777.77 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $1,899,532.87 |
| 3 | 69714 | Roadwrxx, LLC | $2,058,693.41 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Boh Bros. Construction Co., LLC. | - 3 - Roadwrxx, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of Paved Gutter Drain | 4 | EACH | 1,600.00 | 6,400.00 | 600.00 | 2,400.00 | 1,000.00 | 4,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 1,635.9 | SQYD | 15.00 | 24,538.50 | 11.25 | 18,403.88 | 15.00 | 24,538.50 | | 0003 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 1,635.9 | SQYD | 11.00 | 17,994.90 | 11.25 | 18,403.88 | 15.00 | 24,538.50 | | 0004 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 56 | LNFT | 11.00 | 616.00 | 20.00 | 1,120.00 | 10.00 | 560.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 218 | SQYD | 30.00 | 6,540.00 | 20.00 | 4,360.00 | 15.00 | 3,270.00 | | 0006 | 202-02-06120 | Removal of Curbs (Asphalt) | 160 | LNFT | 4.00 | 640.00 | 25.00 | 4,000.00 | 10.00 | 1,600.00 | | 0007 | 202-02-06140 | Removal of Curbs (Concrete) | 685 | LNFT | 12.00 | 8,220.00 | 20.00 | 13,700.00 | 10.00 | 6,850.00 | | 0008 | 202-02-12020 | Removal of Fence (Chain Link) | 140 | LNFT | 12.00 | 1,680.00 | 12.00 | 1,680.00 | 15.00 | 2,100.00 | | 0009 | 202-02-14500 | Removal of Guard Rail | 323 | LNFT | 11.00 | 3,553.00 | 10.00 | 3,230.00 | 10.00 | 3,230.00 | | 0010 | 202-02-26000 | Removal of Manholes Brick | 1 | EACH | 1,400.00 | 1,400.00 | 1,500.00 | 1,500.00 | 850.00 | 850.00 | | 0011 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 1,800.00 | 1,800.00 | 1,500.00 | 1,500.00 | 850.00 | 850.00 | | 0012 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 54 | SQYD | 75.00 | 4,050.00 | 25.00 | 1,350.00 | 25.00 | 1,350.00 | | 0013 | 202-02-38240 | Removal of Signs and Supports | 14 | EACH | 22.00 | 308.00 | 35.00 | 490.00 | 50.00 | 700.00 | | 0014 | 202-02-38260 | Removal of Sign Support Footings | 2 | EACH | 225.00 | 450.00 | 200.00 | 400.00 | 250.00 | 500.00 | | 0015 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 6,000.00 | 6,000.00 | 5,500.00 | 5,500.00 | 10,000.00 | 10,000.00 | | 0016 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 60,000.00 | 60,000.00 | 100,000.00 | 100,000.00 | 55,000.00 | 55,000.00 | | 0017 | 203-10-00100 | Cleaning Existing Ditches | 130 | LNFT | 20.00 | 2,600.00 | 16.50 | 2,145.00 | 10.00 | 1,300.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 2,259 | TON | 124.00 | 280,116.00 | 170.00 | 384,030.00 | 135.00 | 304,965.00 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 48.5 | TON | 400.00 | 19,400.00 | 300.00 | 14,550.00 | 375.00 | 18,187.50 | | 0020 | 509-01-00100 | Milling Asphalt Pavement | 5,531 | SQYD | 4.00 | 22,124.00 | 5.50 | 30,420.50 | 5.00 | 27,655.00 | | 0021 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -309 | CUYD | 0.01 | -3.09 | 0.01 | -3.09 | 0.01 | -3.09 | | 0022 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 56 | SQYD | 150.00 | 8,400.00 | 175.00 | 9,800.00 | 175.00 | 9,800.00 | | 0023 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 82.7 | SQYD | 275.00 | 22,742.50 | 165.00 | 13,645.50 | 120.00 | 9,924.00 | | 0024 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 20 | SQYD | 275.00 | 5,500.00 | 275.00 | 5,500.00 | 250.00 | 5,000.00 | | 0025 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 18 | LNFT | 145.00 | 2,610.00 | 300.00 | 5,400.00 | 250.00 | 4,500.00 | | 0026 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 338 | LNFT | 185.00 | 62,530.00 | 150.00 | 50,700.00 | 250.00 | 84,500.00 | | 0027 | 701-07-00200 | Yard Drain Pipe (6") | 8 | LNFT | 11.00 | 88.00 | 200.00 | 1,600.00 | 40.00 | 320.00 | | 0028 | 701-07-00300 | Yard Drain Pipe (8") | 26 | LNFT | 35.00 | 910.00 | 250.00 | 6,500.00 | 50.00 | 1,300.00 | | 0029 | 701-09-00100 | Pipe Fittings | 1 | EACH | 1,750.00 | 1,750.00 | 500.00 | 500.00 | 850.00 | 850.00 | | 0030 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,000.00 | 2,000.00 | 1,850.00 | 1,850.00 | 1,000.00 | 1,000.00 | | 0031 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 7,400.00 | 7,400.00 | 11,000.00 | 11,000.00 | 10,000.00 | 10,000.00 | | 0032 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 4,500.00 | 13,500.00 | 6,500.00 | 19,500.00 | 10,000.00 | 30,000.00 | | 0033 | 702-03-00400 | Catch Basins (CB-05) | 3 | EACH | 2,000.00 | 6,000.00 | 3,000.00 | 9,000.00 | 2,000.00 | 6,000.00 | | 0034 | 702-04-00100 | Adjusting Manholes | 4 | EACH | 2,800.00 | 11,200.00 | 4,500.00 | 18,000.00 | 1,500.00 | 6,000.00 | | 0035 | 702-04-00200 | Adjusting Catch Basins | 7 | EACH | 3,800.00 | 26,600.00 | 6,500.00 | 45,500.00 | 1,500.00 | 10,500.00 | | 0036 | 702-08-00100 | Side Drain Safety End (Type 1) | 2 | EACH | 3,800.00 | 7,600.00 | 4,000.00 | 8,000.00 | 5,000.00 | 10,000.00 | | 0037 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 25 | LNFT | 130.00 | 3,250.00 | 70.00 | 1,750.00 | 75.00 | 1,875.00 | | 0038 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 18.8 | LNFT | 120.00 | 2,256.00 | 145.00 | 2,726.00 | 150.00 | 2,820.00 | | 0039 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 193.8 | LNFT | 45.00 | 8,721.00 | 30.00 | 5,814.00 | 30.00 | 5,814.00 | | 0040 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 18.8 | LNFT | 125.00 | 2,350.00 | 50.00 | 940.00 | 55.00 | 1,034.00 | | 0041 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 25 | LNFT | 125.00 | 3,125.00 | 100.00 | 2,500.00 | 115.00 | 2,875.00 | | 0042 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 2 | EACH | 3,000.00 | 6,000.00 | 2,950.00 | 5,900.00 | 3,000.00 | 6,000.00 | | 0043 | 706-01-00300 | Concrete Walk (6" Thick) | 1,102.9 | SQYD | 95.00 | 104,775.50 | 90.00 | 99,261.00 | 70.00 | 77,203.00 | | 0044 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 55.1 | SQYD | 95.00 | 5,234.50 | 60.00 | 3,306.00 | 50.00 | 2,755.00 | | 0045 | 706-04-00100 | Handicapped Curb Ramps Type 10 | 8 | EACH | 2,500.00 | 20,000.00 | 3,000.00 | 24,000.00 | 2,200.00 | 17,600.00 | | 0046 | 706-04-00100 | Handicapped Curb Ramps Type 13 | 1 | EACH | 3,500.00 | 3,500.00 | 4,000.00 | 4,000.00 | 6,000.00 | 6,000.00 | | 0047 | 706-04-00100 | Handicapped Curb Ramps Type 2 | 18 | EACH | 2,800.00 | 50,400.00 | 3,000.00 | 54,000.00 | 2,400.00 | 43,200.00 | | 0048 | 706-04-00100 | Handicapped Curb Ramps Type 5 | 2 | EACH | 3,000.00 | 6,000.00 | 3,000.00 | 6,000.00 | 3,700.00 | 7,400.00 | | 0049 | 706-04-00100 | Handicapped Curb Ramps Type 7 | 8 | EACH | 3,000.00 | 24,000.00 | 3,000.00 | 24,000.00 | 2,600.00 | 20,800.00 | | 0050 | 707-01-00100 | Concrete Curb | 434.5 | LNFT | 40.00 | 17,380.00 | 65.00 | 28,242.50 | 25.00 | 10,862.50 | | 0051 | 707-03-00100 | Combination Concrete Curb and Gutter | 399 | LNFT | 70.00 | 27,930.00 | 80.00 | 31,920.00 | 35.00 | 13,965.00 | | 0052 | 707-04-00100 | Asphalt Curb | 160 | LNFT | 50.00 | 8,000.00 | 50.00 | 8,000.00 | 50.00 | 8,000.00 | | 0053 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 120,000.00 | 120,000.00 | 145,000.00 | 145,000.00 | 350,000.00 | 350,000.00 | | 0054 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,425 | LNFT | 0.10 | 142.50 | 1.00 | 1,425.00 | 3.00 | 4,275.00 | | 0055 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 70 | LNFT | 0.10 | 7.00 | 1.00 | 70.00 | 20.00 | 1,400.00 | | 0056 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.759 | MILE | 0.10 | 0.08 | 650.00 | 493.35 | 7,500.00 | 5,692.50 | | 0057 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.45 | MILE | 1,500.00 | 2,175.00 | 1,500.00 | 2,175.00 | 1,800.00 | 2,610.00 | | 0058 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 2 | EACH | 0.10 | 0.20 | 50.00 | 100.00 | 150.00 | 300.00 | | 0059 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 2 | EACH | 0.10 | 0.20 | 50.00 | 100.00 | 110.00 | 220.00 | | 0060 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 5 | EACH | 0.10 | 0.50 | 50.00 | 250.00 | 110.00 | 550.00 | | 0061 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 7 | EACH | 0.10 | 0.70 | 30.00 | 210.00 | 150.00 | 1,050.00 | | 0062 | 717-01-00100 | Seeding | 12 | LB | 12.50 | 150.00 | 60.00 | 720.00 | 60.00 | 720.00 | | 0063 | 718-01-00100 | Fertilizer | 482 | LB | 5.00 | 2,410.00 | 2.50 | 1,205.00 | 2.50 | 1,205.00 | | 0064 | 726-01-00100 | Bedding Material | 79.5 | CUYD | 100.00 | 7,950.00 | 95.00 | 7,552.50 | 60.00 | 4,770.00 | | 0065 | 727-01-00100 | Mobilization | 1 | LUMP | 149,471.43 | 149,471.43 | 180,000.00 | 180,000.00 | 200,000.00 | 200,000.00 | | 0066 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 133.8 | SQFT | 11.00 | 1,471.80 | 25.00 | 3,345.00 | 25.00 | 3,345.00 | | 0067 | 729-01-00103 | Sign (Type A)(Relocate) | 28.8 | SQFT | 16.00 | 460.80 | 25.00 | 720.00 | 30.00 | 864.00 | | 0068 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 85.4 | SQFT | 23.00 | 1,964.20 | 30.00 | 2,562.00 | 40.00 | 3,416.00 | | 0069 | 729-08-00100 | Mounting (2 1/2" Size Post) | 2 | EACH | 2,800.00 | 5,600.00 | 1,350.00 | 2,700.00 | 1,500.00 | 3,000.00 | | 0070 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 17 | EACH | 255.00 | 4,335.00 | 180.00 | 3,060.00 | 225.00 | 3,825.00 | | 0071 | 731-02-00100 | Reflectorized Raised Pavement Markers | 142 | EACH | 17.00 | 2,414.00 | 15.50 | 2,201.00 | 20.00 | 2,840.00 | | 0072 | 731-03-00100 | Removal of Raised Pavement Markers | 0.418 | MILE | 1,100.00 | 459.80 | 1,100.00 | 459.80 | 10,000.00 | 4,180.00 | | 0073 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,109 | LNFT | 5.50 | 11,599.50 | 6.00 | 12,654.00 | 5.00 | 10,545.00 | | 0074 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 220 | LNFT | 21.00 | 4,620.00 | 19.00 | 4,180.00 | 15.00 | 3,300.00 | | 0075 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,464 | LNFT | 23.00 | 33,672.00 | 21.00 | 30,744.00 | 18.00 | 26,352.00 | | 0076 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.868 | MILE | 9,000.00 | 16,812.00 | 7,800.00 | 14,570.40 | 7,500.00 | 14,010.00 | | 0077 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.085 | MILE | 2,850.00 | 3,092.25 | 2,600.00 | 2,821.00 | 4,500.00 | 4,882.50 | | 0078 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.077 | MILE | 11,500.00 | 885.50 | 9,600.00 | 739.20 | 3,500.00 | 269.50 | | 0079 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.134 | MILE | 11,000.00 | 1,474.00 | 10,500.00 | 1,407.00 | 10,000.00 | 1,340.00 | | 0080 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.045 | MILE | 11,500.00 | 517.50 | 9,500.00 | 427.50 | 14,000.00 | 630.00 | | 0081 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 4 | EACH | 550.00 | 2,200.00 | 525.00 | 2,100.00 | 650.00 | 2,600.00 | | 0082 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 12 | EACH | 475.00 | 5,700.00 | 425.00 | 5,100.00 | 650.00 | 7,800.00 | | 0083 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 450.00 | 2,250.00 | 425.00 | 2,125.00 | 650.00 | 3,250.00 | | 0084 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 12 | EACH | 550.00 | 6,600.00 | 500.00 | 6,000.00 | 650.00 | 7,800.00 | | 0085 | 732-05-00100 | Removal of Existing Markings | 0.93 | MILE | 23,000.00 | 21,390.00 | 21,000.00 | 19,530.00 | 25,000.00 | 23,250.00 | | 0086 | 736-01-00100 | Trenching and Backfilling | 705 | LNFT | 7.00 | 4,935.00 | 6.00 | 4,230.00 | 10.00 | 7,050.00 | | 0087 | 736-03-00100 | Jacking or Boring | 520 | LNFT | 13.00 | 6,760.00 | 12.00 | 6,240.00 | 30.00 | 15,600.00 | | 0088 | 736-04-00001 | Signal Pole (Pedestal Pole) | 6 | EACH | 950.00 | 5,700.00 | 850.00 | 5,100.00 | 1,100.00 | 6,600.00 | | 0089 | 736-04-10350 | Signal Pole (Single Mast Arm, 35ft) | 2 | EACH | 15,500.00 | 31,000.00 | 14,250.00 | 28,500.00 | 18,000.00 | 36,000.00 | | 0090 | 736-04-10400 | Signal Pole (Single Mast Arm, 40ft) | 1 | EACH | 17,000.00 | 17,000.00 | 16,000.00 | 16,000.00 | 19,000.00 | 19,000.00 | | 0091 | 736-04-10450 | Signal Pole (Single Mast Arm, 45ft) | 1 | EACH | 18,000.00 | 18,000.00 | 16,000.00 | 16,000.00 | 20,000.00 | 20,000.00 | | 0092 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 7 | EACH | 1,400.00 | 9,800.00 | 1,250.00 | 8,750.00 | 1,500.00 | 10,500.00 | | 0093 | 736-05-35001 | Signal Heads (3 Sec, 12 inch Led Lens, RT. R, RT. Y, RT. G) | 2 | EACH | 1,400.00 | 2,800.00 | 1,250.00 | 2,500.00 | 1,500.00 | 3,000.00 | | 0094 | 736-05-45200 | Signal Heads (4 Section, 12" Led Lens, RT. R, SRT. Y, FRT. Y, RT. G) | 1 | EACH | 1,500.00 | 1,500.00 | 1,250.00 | 1,250.00 | 1,500.00 | 1,500.00 | | 0095 | 736-06-00100 | Signal Service | 1 | EACH | 7,200.00 | 7,200.00 | 6,500.00 | 6,500.00 | 6,500.00 | 6,500.00 | | 0096 | 736-06-00500 | Signal Service Pedestal Disconnect | 1 | EACH | 2,000.00 | 2,000.00 | 1,800.00 | 1,800.00 | 2,000.00 | 2,000.00 | | 0097 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 1 | EACH | 7,900.00 | 7,900.00 | 7,650.00 | 7,650.00 | 10,000.00 | 10,000.00 | | 0098 | 736-09-00100 | Loop Detector | 400 | LNFT | 28.00 | 11,200.00 | 25.00 | 10,000.00 | 30.00 | 12,000.00 | | 0099 | 736-10-00300 | Underground Junction Box (Type F) | 12 | EACH | 700.00 | 8,400.00 | 625.00 | 7,500.00 | 800.00 | 9,600.00 | | 0100 | 736-10-00400 | Underground Junction Box (Type G) | 1 | EACH | 1,200.00 | 1,200.00 | 1,000.00 | 1,000.00 | 1,250.00 | 1,250.00 | | 0101 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 40 | LNFT | 4.00 | 160.00 | 4.00 | 160.00 | 5.00 | 200.00 | | 0102 | 736-11-00100 | Conduit (1" HDPE, Schedule 80) | 190 | LNFT | 3.25 | 617.50 | 3.00 | 570.00 | 4.00 | 760.00 | | 0103 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 145 | LNFT | 5.00 | 725.00 | 3.00 | 435.00 | 6.00 | 870.00 | | 0104 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 850 | LNFT | 8.50 | 7,225.00 | 8.00 | 6,800.00 | 10.00 | 8,500.00 | | 0105 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 1,385 | LNFT | 3.00 | 4,155.00 | 3.00 | 4,155.00 | 4.00 | 5,540.00 | | 0106 | 736-12-02014 | Conductor (2c, #14 awg) | 1,245 | LNFT | 3.00 | 3,735.00 | 3.00 | 3,735.00 | 4.00 | 4,980.00 | | 0107 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 145 | LNFT | 9.00 | 1,305.00 | 8.50 | 1,232.50 | 10.00 | 1,450.00 | | 0108 | 736-12-06014 | Conductor (6c, #14 awg) | 1,665 | LNFT | 4.50 | 7,492.50 | 4.25 | 7,076.25 | 5.00 | 8,325.00 | | 0109 | 736-12-10014 | Conductor (10c, #14 awg) | 1,122 | LNFT | 6.50 | 7,293.00 | 6.00 | 6,732.00 | 8.00 | 8,976.00 | | 0110 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 6 | EACH | 1,250.00 | 7,500.00 | 1,150.00 | 6,900.00 | 1,500.00 | 9,000.00 | | 0111 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 4 | EACH | 4,400.00 | 17,600.00 | 4,000.00 | 16,000.00 | 5,000.00 | 20,000.00 | | 0112 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 10 | EACH | 1,100.00 | 11,000.00 | 1,000.00 | 10,000.00 | 1,200.00 | 12,000.00 | | 0113 | 740-01-00100 | Construction Layout | 1 | LUMP | 16,000.00 | 16,000.00 | 40,000.00 | 40,000.00 | 100,000.00 | 100,000.00 | | 0114 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 5 | EACH | 1,000.00 | 5,000.00 | 950.00 | 4,750.00 | 3,000.00 | 15,000.00 | | 0115 | NS-201-00005 | Arborist Services | 1 | LUMP | 5,000.00 | 5,000.00 | 5,700.00 | 5,700.00 | 10,000.00 | 10,000.00 | | 0116 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 11,292 | INLF | 0.75 | 8,469.00 | 0.60 | 6,775.20 | 1.00 | 11,292.00 | | 0117 | NS-702-00100 | Paved Gutter Drain | 3 | EACH | 1,800.00 | 5,400.00 | 9,500.00 | 28,500.00 | 5,000.00 | 15,000.00 | | 0118 | NS-705-00006 | Polymer Chain Link Fence (Black) (5-Foot Height) | 40 | LNFT | 75.00 | 3,000.00 | 90.00 | 3,600.00 | 25.00 | 1,000.00 | | 0119 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 1 | EACH | 28,500.00 | 28,500.00 | 26,000.00 | 26,000.00 | 30,000.00 | 30,000.00 | | 0120 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 9 | EACH | 1,200.00 | 10,800.00 | 1,100.00 | 9,900.00 | 1,200.00 | 10,800.00 | | 0121 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 1 | EACH | 5,500.00 | 5,500.00 | 4,700.00 | 4,700.00 | 5,000.00 | 5,000.00 | | 0122 | NS-ITS-04035 | Fiber Optic Fan Out Kits, SM, 12 Strand, Furnish & Install | 1 | EACH | 250.00 | 250.00 | 230.00 | 230.00 | 250.00 | 250.00 | | 0123 | NS-ITS-04180 | Fiber Optic Connection, Install, Splice | 12 | EACH | 125.00 | 1,500.00 | 115.00 | 1,380.00 | 135.00 | 1,620.00 | | 0124 | NS-ITS-04200 | Fiber Optic Connection, Termination, Furnish & Install | 12 | EACH | 105.00 | 1,260.00 | 95.00 | 1,140.00 | 135.00 | 1,620.00 | | 0125 | NS-ITS-04250 | Fiber Optic Drop Cable, SM, 12 Strand, Furnish & Install | 30 | LNFT | 13.00 | 390.00 | 12.00 | 360.00 | 15.00 | 450.00 | | 0126 | NS-ITS-04290 | Fiber Optic Patch Cord, SM, 2 Strand, Furnish & Install | 2 | EACH | 100.00 | 200.00 | 100.00 | 200.00 | 115.00 | 230.00 | | 0127 | NS-ITS-04425 | Fiber Optic Connection Patch Panel, Outdoor, Furnish & Install | 1 | EACH | 2,000.00 | 2,000.00 | 1,800.00 | 1,800.00 | 2,000.00 | 2,000.00 | | 0128 | NS-ITS-09080 | Local Ethernet Switch, Furnish & Install | 1 | EACH | 3,300.00 | 3,300.00 | 2,900.00 | 2,900.00 | 3,000.00 | 3,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,650,777.77 | | 1,899,532.87 | | 2,058,693.41 |
|