Proposal:H.012157.6
Parish:Winn
Routes:LA 1228
Description:LA 1228:CROSS DRAIN REPLACEMENT (WINN)
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$908,551.84
| Rank | License | Bidder | Construction Bid |
| 1 | 35849 | T.L. CONSTRUCTION LLC | $928,217.46 |
| 2 | 15099 | Amethyst Construction, Inc. | $998,261.60 |
| 3 | 59705 | David Temple dba Northern State Construction, LLC | $1,028,789.50 |
| 4 | 49239 | WL Bass Construction Inc. | $1,212,811.18 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - T.L. CONSTRUCTION LLC | - 2 - Amethyst Construction, Inc. | - 3 - David Temple dba Northern State Construction, LLC | - 4 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 2,813.3 | SQYD | 6.25 | 17,583.13 | 1.50 | 4,219.95 | 5.00 | 14,066.50 | 3.00 | 8,439.90 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 2,813.3 | SQYD | 6.25 | 17,583.13 | 1.50 | 4,219.95 | 5.00 | 14,066.50 | 4.00 | 11,253.20 | | 0005 | 203-04-00300 | Nonplastic Embankment (Stone) | 34 | CUYD | 100.00 | 3,400.00 | 110.00 | 3,740.00 | 100.00 | 3,400.00 | 156.00 | 5,304.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 165,000.00 | 165,000.00 | 150,000.00 | 150,000.00 | 100,000.00 | 100,000.00 | 147,000.00 | 147,000.00 | | 0007 | 203-08-00100 | Geotextile Fabric | 107.9 | SQYD | 10.00 | 1,079.00 | 3.00 | 323.70 | 5.00 | 539.50 | 3.20 | 345.28 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 36 | EACH | 146.00 | 5,256.00 | 160.00 | 5,760.00 | 150.00 | 5,400.00 | 150.00 | 5,400.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 2,532 | LNFT | 3.20 | 8,102.40 | 3.00 | 7,596.00 | 2.00 | 5,064.00 | 2.75 | 6,963.00 | | 0010 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 3,872 | SQYD | 30.00 | 116,160.00 | 29.00 | 112,288.00 | 25.00 | 96,800.00 | 44.00 | 170,368.00 | | 0011 | 304-01-00100 | Lime | 1.22 | TON | 2,300.00 | 2,806.00 | 200.00 | 244.00 | 300.00 | 366.00 | 2,700.00 | 3,294.00 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 774 | SQYD | 22.00 | 17,028.00 | 2.00 | 1,548.00 | 10.00 | 7,740.00 | 10.70 | 8,281.80 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) (3-1/2" THICK) | 88 | CUYD | 155.00 | 13,640.00 | 145.00 | 12,760.00 | 100.00 | 8,800.00 | 121.00 | 10,648.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 702.6 | TON | 120.00 | 84,312.00 | 145.00 | 101,877.00 | 200.00 | 140,520.00 | 255.00 | 179,163.00 | | 0015 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 32 | LNFT | 145.00 | 4,640.00 | 85.00 | 2,720.00 | 75.00 | 2,400.00 | 82.00 | 2,624.00 | | 0016 | 708-01-00100 | Right-of-Way Monument | 12 | EACH | 300.00 | 3,600.00 | 300.00 | 3,600.00 | 300.00 | 3,600.00 | 350.00 | 4,200.00 | | 0017 | 708-02-00100 | Right-of-Way Monument Witness Post | 12 | EACH | 300.00 | 3,600.00 | 300.00 | 3,600.00 | 300.00 | 3,600.00 | 350.00 | 4,200.00 | | 0018 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 878 | SQYD | 70.00 | 61,460.00 | 62.00 | 54,436.00 | 95.00 | 83,410.00 | 110.00 | 96,580.00 | | 0019 | 711-04-00100 | Geotextile Fabric | 878 | SQYD | 2.00 | 1,756.00 | 3.00 | 2,634.00 | 5.00 | 4,390.00 | 2.80 | 2,458.40 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,000.00 | 12,000.00 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 42,000.00 | 42,000.00 | | 0021 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.48 | MILE | 3,500.00 | 1,680.00 | 2,000.00 | 960.00 | 5,000.00 | 2,400.00 | 1,350.00 | 648.00 | | 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.48 | MILE | 1,500.00 | 720.00 | 1,300.00 | 624.00 | 5,000.00 | 2,400.00 | 1,370.00 | 657.60 | | 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.225 | MILE | 1,760.00 | 2,156.00 | 1,500.00 | 1,837.50 | 5,000.00 | 6,125.00 | 1,500.00 | 1,837.50 | | 0024 | 716-01-00100 | Mulch (Vegetative) | 4.4 | TON | 1,170.00 | 5,148.00 | 850.00 | 3,740.00 | 700.00 | 3,080.00 | 720.00 | 3,168.00 | | 0025 | 717-01-00100 | Seeding | 176 | LB | 21.00 | 3,696.00 | 15.00 | 2,640.00 | 15.00 | 2,640.00 | 15.00 | 2,640.00 | | 0026 | 718-01-00100 | Fertilizer | 2,200 | LB | 1.75 | 3,850.00 | 1.00 | 2,200.00 | 0.50 | 1,100.00 | 0.55 | 1,210.00 | | 0027 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 476 | SQYD | 2.40 | 1,142.40 | 3.50 | 1,666.00 | 2.00 | 952.00 | 2.50 | 1,190.00 | | 0028 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 485 | SQYD | 2.40 | 1,164.00 | 3.50 | 1,697.50 | 3.00 | 1,455.00 | 3.50 | 1,697.50 | | 0029 | 726-01-00100 | Bedding Material | 125.5 | CUYD | 120.00 | 15,060.00 | 110.00 | 13,805.00 | 100.00 | 12,550.00 | 180.00 | 22,590.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | 121,000.00 | 121,000.00 | | 0031 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 90.00 | 720.00 | 500.00 | 4,000.00 | 100.00 | 800.00 | 125.00 | 1,000.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 32 | EACH | 12.00 | 384.00 | 10.00 | 320.00 | 10.00 | 320.00 | 10.00 | 320.00 | | 0033 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.613 | MILE | 5,800.00 | 3,555.40 | 5,000.00 | 3,065.00 | 5,000.00 | 3,065.00 | 5,000.00 | 3,065.00 | | 0034 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.24 | MILE | 2,900.00 | 696.00 | 2,500.00 | 600.00 | 5,000.00 | 1,200.00 | 2,500.00 | 600.00 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,600.00 | 11,600.00 | 18,000.00 | 18,000.00 | 15,000.00 | 15,000.00 | 32,000.00 | 32,000.00 | | 0036 | 805-15-00200 | Reinforced Concrete Box Culverts (Precast) (5' x 4') | 192 | LNFT | 465.00 | 89,280.00 | 700.00 | 134,400.00 | 875.00 | 168,000.00 | 600.00 | 115,200.00 | | 0037 | 805-15-00600 | Reinforced Concrete Box Culverts (Precast) (5' x 5') | 192 | LNFT | 490.00 | 94,080.00 | 750.00 | 144,000.00 | 950.00 | 182,400.00 | 620.00 | 119,040.00 | | 0038 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (573 LBS OF STEEL AND 7.3 CU. YDS. OF CONCRETE PER HEADWALL) | 2 | EACH | 16,500.00 | 33,000.00 | 25,000.00 | 50,000.00 | 10,000.00 | 20,000.00 | 12,000.00 | 24,000.00 | | 0039 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (673 LBS OF STEEL AND 9.0 CU. YDS. OF CONCRETE PER HEADWALL) | 2 | EACH | 18,500.00 | 37,000.00 | 26,000.00 | 52,000.00 | 10,000.00 | 20,000.00 | 13,000.00 | 26,000.00 | | 0040 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 570 | INLF | 4.00 | 2,280.00 | 2.00 | 1,140.00 | 2.00 | 1,140.00 | 2.50 | 1,425.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 928,217.46 | | 998,261.60 | | 1,028,789.50 | | 1,212,811.18 |
|