Proposal:H.010909.6
Parish:Ascension
Routes:LA 44, LA 941
Description:LA 44: WIDENING AND ROUNDABOUT AT LA 941
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, SUBGRADE TREATMENT, PAVEMENT WIDENING, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$5,341,537.76
| Rank | License | Bidder | Construction Bid |
| 1 | 57931 | KCR CONTRACTORS, LLC | $6,212,673.05 |
| 2 | 06276 | Barriere Construction Co., LLC | $6,324,496.90 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $6,668,988.55 |
| 4 | 54896 | Magee Excavation & Development LLC | $6,780,177.77 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - KCR CONTRACTORS, LLC | - 2 - Barriere Construction Co., LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - Magee Excavation & Development LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 13 | LUMP | 75,887.74 | 75,887.74 | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 232,000.00 | 232,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 17,250.00 | 17,250.00 | 5,000.00 | 5,000.00 | 32,000.00 | 32,000.00 | 54,000.00 | 54,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 375 | SQYD | 3.72 | 1,395.00 | 20.00 | 7,500.00 | 16.00 | 6,000.00 | 10.00 | 3,750.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 2,072.7 | SQYD | 12.88 | 26,696.38 | 12.00 | 24,872.40 | 8.00 | 16,581.60 | 15.00 | 31,090.50 | | 0005 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 10,817.8 | SQYD | 3.20 | 34,616.96 | 6.00 | 64,906.80 | 13.00 | 140,631.40 | 15.00 | 162,267.00 | | 0006 | 202-02-06020 | Removal of Concrete Box Culverts Removal of existing 2' x 3' RCBC at station 128+70.48 | 1 | EACH | 17,490.91 | 17,490.91 | 5,500.00 | 5,500.00 | 1,275.00 | 1,275.00 | 2,000.00 | 2,000.00 | | 0007 | 202-02-06040 | Removal of Concrete Box Headwall Removal of existing RCBC headwalls for extension | 4 | EACH | 2,532.02 | 10,128.08 | 4,000.00 | 16,000.00 | 275.00 | 1,100.00 | 1,800.00 | 7,200.00 | | 0008 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,985 | SQYD | 3.51 | 6,967.35 | 15.00 | 29,775.00 | 28.00 | 55,580.00 | 15.00 | 29,775.00 | | 0009 | 202-02-14500 | Removal of Guard Rail | 285 | LNFT | 16.74 | 4,770.90 | 12.00 | 3,420.00 | 8.00 | 2,280.00 | 12.00 | 3,420.00 | | 0010 | 202-02-32120 | Removal of Pipe (Side Drain) UNDER AGGREGATE DRIVE AT STA. 104+06.46 | 74 | LNFT | 60.79 | 4,498.46 | 25.00 | 1,850.00 | 17.00 | 1,258.00 | 10.00 | 740.00 | | 0011 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 208 | SQYD | 12.80 | 2,662.40 | 15.00 | 3,120.00 | 32.00 | 6,656.00 | 15.00 | 3,120.00 | | 0012 | 202-02-38240 | Removal of Signs and Supports | 4 | EACH | 165.00 | 660.00 | 10.00 | 40.00 | 55.00 | 220.00 | 11.00 | 44.00 | | 0013 | 202-03-38020 | Relocation of Sign Pole Sloan Young Lane | 2 | EACH | 1,100.00 | 2,200.00 | 10.00 | 20.00 | 16.25 | 32.50 | 11.00 | 22.00 | | 0014 | 203-01-00100 | General Excavation | 12,428 | CUYD | 1.00 | 12,428.00 | 8.00 | 99,424.00 | 24.00 | 298,272.00 | 20.00 | 248,560.00 | | 0015 | 203-03-00100 | Embankment | 13,122 | CUYD | 31.22 | 409,668.84 | 35.00 | 459,270.00 | 30.00 | 393,660.00 | 25.00 | 328,050.00 | | 0016 | 203-10-00100 | Cleaning Existing Ditches | 613 | LNFT | 11.44 | 7,012.72 | 5.00 | 3,065.00 | 6.00 | 3,678.00 | 10.00 | 6,130.00 | | 0017 | 204-02-00100 | Temporary Hay Bales | 321 | EACH | 27.50 | 8,827.50 | 20.00 | 6,420.00 | 25.00 | 8,025.00 | 10.00 | 3,210.00 | | 0018 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 165.00 | 330.00 | 155.00 | 310.00 | 185.00 | 370.00 | 40.00 | 80.00 | | 0019 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 17 | EACH | 500.25 | 8,504.25 | 350.00 | 5,950.00 | 550.00 | 9,350.00 | 500.00 | 8,500.00 | | 0020 | 204-06-00100 | Temporary Silt Fencing | 11,951 | LNFT | 2.04 | 24,380.04 | 2.00 | 23,902.00 | 1.75 | 20,914.25 | 1.50 | 17,926.50 | | 0021 | 204-07-00100 | Temporary Stone Construction Entrance | 5 | EACH | 6,095.54 | 30,477.70 | 3,500.00 | 17,500.00 | 3,550.00 | 17,750.00 | 4,000.00 | 20,000.00 | | 0022 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 31,656 | SQYD | 10.67 | 337,769.52 | 13.00 | 411,528.00 | 22.00 | 696,432.00 | 22.00 | 696,432.00 | | 0023 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 134 | CUYD | 120.75 | 16,180.50 | 150.00 | 20,100.00 | 95.00 | 12,730.00 | 80.00 | 10,720.00 | | 0024 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 1,200 | CUYD | 88.55 | 106,260.00 | 1.00 | 1,200.00 | 85.00 | 102,000.00 | 80.00 | 96,000.00 | | 0025 | 502-01-00100 | Asphalt Concrete | 9,457.8 | TON | 114.30 | 1,081,026.54 | 107.00 | 1,011,984.60 | 98.00 | 926,864.40 | 116.00 | 1,097,104.80 | | 0026 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 58.9 | TON | 269.48 | 15,872.37 | 325.00 | 19,142.50 | 200.00 | 11,780.00 | 228.00 | 13,429.20 | | 0027 | 502-03-00250 | Asphalt Concrete (5" Thick) | 32,696 | SQYD | 26.21 | 856,962.16 | 21.45 | 701,329.20 | 28.00 | 915,488.00 | 33.50 | 1,095,316.00 | | 0028 | 509-01-00100 | Milling Asphalt Pavement | 23,445 | SQYD | 3.47 | 81,354.15 | 5.00 | 117,225.00 | 3.25 | 76,196.25 | 3.35 | 78,540.75 | | 0029 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -709 | CUYD | 0.01 | -7.09 | 10.00 | -7,090.00 | 0.00 | 0.00 | 0.10 | -70.90 | | 0030 | 510-01-00001 | Pavement Patching 11" Minimum Thickness | 1,383 | SQYD | 88.94 | 123,004.02 | 87.00 | 120,321.00 | 85.00 | 117,555.00 | 106.00 | 146,598.00 | | 0031 | 510-02-00100 | Pavement Widening 11" Minimum Thickness | 357 | SQYD | 102.55 | 36,610.35 | 130.00 | 46,410.00 | 185.00 | 66,045.00 | 206.00 | 73,542.00 | | 0032 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 19.6 | SQYD | 115.00 | 2,254.00 | 240.00 | 4,704.00 | 230.00 | 4,508.00 | 110.00 | 2,156.00 | | 0033 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) 9" Truck Apron | 652.8 | SQYD | 375.89 | 245,380.99 | 112.00 | 73,113.60 | 195.00 | 127,296.00 | 120.00 | 78,336.00 | | 0034 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 72 | LNFT | 213.53 | 15,374.16 | 180.00 | 12,960.00 | 115.00 | 8,280.00 | 110.00 | 7,920.00 | | 0035 | 701-02-02080 | Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) | 64 | LNFT | 230.00 | 14,720.00 | 2,400.00 | 153,600.00 | 146.00 | 9,344.00 | 140.00 | 8,960.00 | | 0036 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 92 | LNFT | 77.24 | 7,106.08 | 75.00 | 6,900.00 | 72.00 | 6,624.00 | 75.00 | 6,900.00 | | 0037 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 218 | LNFT | 80.52 | 17,553.36 | 85.00 | 18,530.00 | 85.00 | 18,530.00 | 80.00 | 17,440.00 | | 0038 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 352 | LNFT | 101.61 | 35,766.72 | 100.00 | 35,200.00 | 100.00 | 35,200.00 | 85.00 | 29,920.00 | | 0039 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 60 | LNFT | 210.89 | 12,653.40 | 270.00 | 16,200.00 | 212.00 | 12,720.00 | 150.00 | 9,000.00 | | 0040 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 177 | LNFT | 100.96 | 17,869.92 | 100.00 | 17,700.00 | 92.00 | 16,284.00 | 85.00 | 15,045.00 | | 0041 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 513 | LNFT | 117.89 | 60,477.57 | 115.00 | 58,995.00 | 109.00 | 55,917.00 | 100.00 | 51,300.00 | | 0042 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 408 | LNFT | 76.10 | 31,048.80 | 80.00 | 32,640.00 | 81.00 | 33,048.00 | 80.00 | 32,640.00 | | 0043 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 528 | LNFT | 104.97 | 55,424.16 | 95.00 | 50,160.00 | 100.00 | 52,800.00 | 85.00 | 44,880.00 | | 0044 | 701-05-01081 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW/CMP) | 126 | LNFT | 135.91 | 17,124.66 | 130.00 | 16,380.00 | 135.00 | 17,010.00 | 100.00 | 12,600.00 | | 0045 | 701-05-01101 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CMP) | 94 | LNFT | 175.67 | 16,512.98 | 160.00 | 15,040.00 | 172.00 | 16,168.00 | 110.00 | 10,340.00 | | 0046 | 701-07-00300 | Yard Drain Pipe (8") | 8 | LNFT | 31.20 | 249.60 | 45.00 | 360.00 | 195.00 | 1,560.00 | 150.00 | 1,200.00 | | 0047 | 701-14-00100 | Cleaning Existing Pipes | 96 | LNFT | 21.60 | 2,073.60 | 12.00 | 1,152.00 | 45.00 | 4,320.00 | 15.00 | 1,440.00 | | 0048 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 432 | LNFT | 6.47 | 2,795.04 | 15.00 | 6,480.00 | 10.00 | 4,320.00 | 1.00 | 432.00 | | 0049 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 8,054.35 | 8,054.35 | 12,500.00 | 12,500.00 | 9,000.00 | 9,000.00 | 5,000.00 | 5,000.00 | | 0050 | 702-03-00100 | Catch Basins (CB-01) | 10 | EACH | 3,651.66 | 36,516.60 | 4,500.00 | 45,000.00 | 5,600.00 | 56,000.00 | 3,000.00 | 30,000.00 | | 0051 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 7,161.49 | 14,322.98 | 9,000.00 | 18,000.00 | 8,200.00 | 16,400.00 | 4,200.00 | 8,400.00 | | 0052 | 702-03-00400 | Catch Basins (CB-05) | 1 | EACH | 2,185.00 | 2,185.00 | 1,000.00 | 1,000.00 | 3,250.00 | 3,250.00 | 825.00 | 825.00 | | 0053 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 181.3 | LNFT | 32.45 | 5,883.19 | 25.00 | 4,532.50 | 32.00 | 5,801.60 | 24.50 | 4,441.85 | | 0054 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 114.40 | 5,720.00 | 125.00 | 6,250.00 | 113.00 | 5,650.00 | 117.00 | 5,850.00 | | 0055 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 2 | EACH | 3,465.00 | 6,930.00 | 300.00 | 600.00 | 3,450.00 | 6,900.00 | 2,900.00 | 5,800.00 | | 0056 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 110 | LNFT | 20.35 | 2,238.50 | 25.00 | 2,750.00 | 27.00 | 2,970.00 | 55.00 | 6,050.00 | | 0057 | 706-02-00200 | Concrete Drive (6" Thick) | 1,196.8 | SQYD | 73.99 | 88,551.23 | 85.00 | 101,728.00 | 108.00 | 129,254.40 | 55.00 | 65,824.00 | | 0058 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) 5" Thick | 653.6 | SQYD | 321.28 | 209,988.61 | 65.00 | 42,484.00 | 108.00 | 70,588.80 | 65.00 | 42,484.00 | | 0059 | 707-01-00100 | Concrete Curb | 7,866.2 | LNFT | 2.34 | 18,406.91 | 28.00 | 220,253.60 | 20.00 | 157,324.00 | 15.00 | 117,993.00 | | 0060 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,686.2 | LNFT | 35.77 | 60,315.37 | 35.00 | 59,017.00 | 50.00 | 84,310.00 | 25.00 | 42,155.00 | | 0061 | 708-01-00100 | Right-of-Way Monument | 55 | EACH | 330.00 | 18,150.00 | 500.00 | 27,500.00 | 400.00 | 22,000.00 | 1.00 | 55.00 | | 0062 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 134,026.89 | 134,026.89 | 430,000.00 | 430,000.00 | 325,000.00 | 325,000.00 | 94,000.00 | 94,000.00 | | 0063 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 1,863 | LNFT | 0.55 | 1,024.65 | 0.60 | 1,117.80 | 0.50 | 931.50 | 0.45 | 838.35 | | 0064 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,600 | LNFT | 0.83 | 1,328.00 | 0.80 | 1,280.00 | 1.00 | 1,600.00 | 0.89 | 1,424.00 | | 0065 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 3,250 | LNFT | 1.10 | 3,575.00 | 1.00 | 3,250.00 | 1.00 | 3,250.00 | 3.35 | 10,887.50 | | 0066 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.569 | MILE | 770.00 | 1,978.13 | 700.00 | 1,798.30 | 700.00 | 1,798.30 | 725.00 | 1,862.53 | | 0067 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 25.712 | MILE | 1,320.00 | 33,939.84 | 1,300.00 | 33,425.60 | 1,300.00 | 33,425.60 | 1,674.00 | 43,041.89 | | 0068 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 12 | EACH | 55.00 | 660.00 | 1.00 | 12.00 | 55.00 | 660.00 | 89.00 | 1,068.00 | | 0069 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 24 | EACH | 82.50 | 1,980.00 | 1.00 | 24.00 | 80.00 | 1,920.00 | 500.00 | 12,000.00 | | 0070 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,300.00 | 25,300.00 | 25,000.00 | 25,000.00 | 3,325.00 | 3,325.00 | 28,000.00 | 28,000.00 | | 0071 | 725-01-00100 | Temporary Detour Roads | 1,244 | SQYD | 143.29 | 178,252.76 | 115.00 | 143,060.00 | 50.00 | 62,200.00 | 62.00 | 77,128.00 | | 0072 | 726-01-00100 | Bedding Material | 317.8 | CUYD | 95.89 | 30,473.84 | 80.00 | 25,424.00 | 72.00 | 22,881.60 | 80.00 | 25,424.00 | | 0073 | 727-01-00100 | Mobilization | 1 | LUMP | 583,222.45 | 583,222.45 | 430,000.00 | 430,000.00 | 400,000.00 | 400,000.00 | 415,000.00 | 415,000.00 | | 0074 | 729-01-00100 | Sign (Type A) | 160.7 | SQFT | 24.20 | 3,888.94 | 20.00 | 3,214.00 | 24.00 | 3,856.80 | 17.50 | 2,812.25 | | 0075 | 729-02-00100 | Sign (Type B) | 270.9 | SQFT | 33.00 | 8,939.70 | 20.00 | 5,418.00 | 32.00 | 8,668.80 | 17.50 | 4,740.75 | | 0076 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 49.50 | 396.00 | 80.00 | 640.00 | 48.00 | 384.00 | 85.00 | 680.00 | | 0077 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 82.50 | 165.00 | 120.00 | 240.00 | 81.00 | 162.00 | 94.50 | 189.00 | | 0078 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 21 | EACH | 165.00 | 3,465.00 | 150.00 | 3,150.00 | 163.00 | 3,423.00 | 140.00 | 2,940.00 | | 0079 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 19 | EACH | 192.50 | 3,657.50 | 150.00 | 2,850.00 | 190.00 | 3,610.00 | 140.00 | 2,660.00 | | 0080 | 731-02-00100 | Reflectorized Raised Pavement Markers | 677 | EACH | 7.00 | 4,739.00 | 8.00 | 5,416.00 | 7.50 | 5,077.50 | 11.00 | 7,447.00 | | 0081 | 732-05-00100 | Removal of Existing Markings | 0.064 | MILE | 50,000.00 | 3,200.00 | 60,000.00 | 3,840.00 | 51,000.00 | 3,264.00 | 55,825.00 | 3,572.80 | | 0082 | 735-01-00100 | Mailboxes | 25 | EACH | 18.70 | 467.50 | 1.00 | 25.00 | 18.00 | 450.00 | 1.00 | 25.00 | | 0083 | 735-02-00100 | Mailbox Supports (Single) | 17 | EACH | 165.00 | 2,805.00 | 200.00 | 3,400.00 | 160.00 | 2,720.00 | 178.00 | 3,026.00 | | 0084 | 735-03-00100 | Mailbox Supports (Double) | 4 | EACH | 258.50 | 1,034.00 | 400.00 | 1,600.00 | 255.00 | 1,020.00 | 357.00 | 1,428.00 | | 0085 | 736-09-00100 | Loop Detector | 86 | LNFT | 31.90 | 2,743.40 | 60.00 | 5,160.00 | 32.00 | 2,752.00 | 32.00 | 2,752.00 | | 0086 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 825.00 | 825.00 | 1,300.00 | 1,300.00 | 800.00 | 800.00 | 835.00 | 835.00 | | 0087 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 1 | LNFT | 88.00 | 88.00 | 12.00 | 12.00 | 9.00 | 9.00 | 90.00 | 90.00 | | 0088 | 737-04-00001 | Painted Curbs and Islands | 7 | LNFT | 80.00 | 560.00 | 2,000.00 | 14,000.00 | 22.00 | 154.00 | 111.00 | 777.00 | | 0089 | 739-01-00100 | Hydro-Seeding | 8.76 | ACRE | 2,090.00 | 18,308.40 | 2,200.00 | 19,272.00 | 1,800.00 | 15,768.00 | 2,500.00 | 21,900.00 | | 0090 | 740-01-00100 | Construction Layout | 1 | LUMP | 89,285.64 | 89,285.64 | 75,000.00 | 75,000.00 | 50,000.00 | 50,000.00 | 55,000.00 | 55,000.00 | | 0091 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) 2' x 2' | 60 | LNFT | 702.87 | 42,172.20 | 1,100.00 | 66,000.00 | 720.00 | 43,200.00 | 400.00 | 24,000.00 | | 0092 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) 2' x 3' | 64 | LNFT | 718.75 | 46,000.00 | 1,100.00 | 70,400.00 | 725.00 | 46,400.00 | 450.00 | 28,800.00 | | 0093 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 103,034 | INLF | 0.36 | 37,092.24 | 0.50 | 51,517.00 | 1.00 | 103,034.00 | 1.00 | 103,034.00 | | 0094 | NS-702-00100 | Paved Gutter Drain | 26 | EACH | 2,933.79 | 76,278.54 | 4,000.00 | 104,000.00 | 3,500.00 | 91,000.00 | 3,825.00 | 99,450.00 | | 0095 | NS-729-00031 | Breakaway Square Tubing Sign Support (Surface Mount) | 10 | EACH | 357.50 | 3,575.00 | 55.00 | 550.00 | 350.00 | 3,500.00 | 279.00 | 2,790.00 | | 0096 | NS-DEV-73206 | MMA Pavement Striping (Dotted)(4 inch Width)(2' L) | 452 | LNFT | 11.00 | 4,972.00 | 11.00 | 4,972.00 | 11.00 | 4,972.00 | 22.00 | 9,944.00 | | 0097 | NS-DEV-73210 | MMA Pavement Striping (Dotted)(8 inch Width)(2' L) | 272 | LNFT | 16.50 | 4,488.00 | 15.00 | 4,080.00 | 16.00 | 4,352.00 | 33.50 | 9,112.00 | | 0098 | NS-DEV-73214 | MMA Pavement Striping (Dotted)(24 inch Width)(2' L) | 202 | LNFT | 49.50 | 9,999.00 | 45.00 | 9,090.00 | 48.00 | 9,696.00 | 67.00 | 13,534.00 | | 0099 | NS-DEV-73216 | MMA Pavement Striping (Dotted)(4 inch Width)(3' L) | 1,411 | LNFT | 11.00 | 15,521.00 | 10.00 | 14,110.00 | 11.00 | 15,521.00 | 22.00 | 31,042.00 | | 0100 | NS-DEV-73230 | MMA Pavement Striping (Solid Line) (4 inch Width) | 25,944 | LNFT | 6.60 | 171,230.40 | 6.00 | 155,664.00 | 6.25 | 162,150.00 | 10.00 | 259,440.00 | | 0101 | NS-DEV-73232 | MMA Pavement Striping (Solid Line) (8 inch Width) | 1,328 | LNFT | 16.50 | 21,912.00 | 15.00 | 19,920.00 | 15.50 | 20,584.00 | 16.75 | 22,244.00 | | 0102 | NS-DEV-73236 | MMA Pavement Striping (Solid Line) (24 inch Width) | 3,035 | LNFT | 49.50 | 150,232.50 | 55.00 | 166,925.00 | 46.00 | 139,610.00 | 44.50 | 135,057.50 | | 0103 | NS-DEV-73240 | MMA Pavement Striping (Broken Line) (4 inch Width) | 7,945 | LNFT | 6.60 | 52,437.00 | 7.00 | 55,615.00 | 6.25 | 49,656.25 | 5.50 | 43,697.50 | | 0104 | NS-DEV-73250 | MMA Pavement Legends and Symbols (Type) DOUBLE ARROW | 4 | EACH | 1,650.00 | 6,600.00 | 2,500.00 | 10,000.00 | 1,625.00 | 6,500.00 | 2,225.00 | 8,900.00 | | 0105 | NS-DEV-73250 | MMA Pavement Legends and Symbols (Type) MERGE ARROW | 2 | EACH | 2,750.00 | 5,500.00 | 3,000.00 | 6,000.00 | 2,700.00 | 5,400.00 | 2,225.00 | 4,450.00 | | 0106 | NS-DEV-73250 | MMA Pavement Legends and Symbols (Type) ROUNDABOUT FISH HOOK (LTC) | 2 | EACH | 2,750.00 | 5,500.00 | 3,000.00 | 6,000.00 | 2,700.00 | 5,400.00 | 2,225.00 | 4,450.00 | | 0107 | NS-DEV-73250 | MMA Pavement Legends and Symbols (Type) ROUNDABOUT FISH HOOK (LTUC) | 2 | EACH | 2,750.00 | 5,500.00 | 3,000.00 | 6,000.00 | 2,700.00 | 5,400.00 | 2,225.00 | 4,450.00 | | 0108 | NS-DEV-73250 | MMA Pavement Legends and Symbols (Type) ROUNDABOUT FISH HOOK (T) | 2 | EACH | 2,750.00 | 5,500.00 | 3,000.00 | 6,000.00 | 2,700.00 | 5,400.00 | 2,225.00 | 4,450.00 | | 0109 | NS-DEV-73250 | MMA Pavement Legends and Symbols (Type) ROUNDABOUT FISH HOOK (TR) | 2 | EACH | 2,750.00 | 5,500.00 | 3,000.00 | 6,000.00 | 2,700.00 | 5,400.00 | 2,225.00 | 4,450.00 | | 0110 | NS-DEV-73250 | MMA Pavement Legends and Symbols (Type) STRAIGHT ARROW | 2 | EACH | 1,650.00 | 3,300.00 | 2,500.00 | 5,000.00 | 1,600.00 | 3,200.00 | 2,225.00 | 4,450.00 | | 0111 | NS-DEV-73250 | MMA Pavement Legends and Symbols (Type) U-TURN | 2 | EACH | 2,750.00 | 5,500.00 | 3,000.00 | 6,000.00 | 2,700.00 | 5,400.00 | 3,000.00 | 6,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,212,673.05 | | 6,324,496.90 | | 6,668,988.55 | | 6,780,177.77 |
|