Proposal:H.010634.6-R2
Parish:Jefferson, Orleans
Routes:LA 428, US 90-Z
Description:US90Z (BODENGER BLVD - STUMPF BLVD)
Type Construction:REMOVAL OF BRIDGE (HYDRODEMOLITION), SIGNING, MOUNTING, BRIDGE REPAIRS AND RELATED WORK.
Estimated Construction Cost:$7,286,163.10
Maximum Number of Days Allowed for Construction:9999
Calculated Daily User Cost:$12,000.00
| Rank | License | Bidder | Construction Bid |
| 1 | 26435 | C.E.C., Inc. | $9,895,169.47 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - C.E.C., Inc. | | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | | 0002 | 202-02-00030 | Removal of Median Barrier | 254 | LNFT | 300.00 | 76,200.00 | | 0003 | 202-02-04510 | Removal of Bridge Deck (Hydro Demolition) Hydro Blast | 5,913 | SFIN | 40.00 | 236,520.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 75 | LNFT | 24.00 | 1,800.00 | | 0005 | 202-02-38220 | Removal of Sign Supports | 35 | EACH | 300.00 | 10,500.00 | | 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 19 | EACH | 12.00 | 228.00 | | 0007 | 202-02-38330 | Removal of Sign Cantilever and Footing | 11 | EACH | 7,900.00 | 86,900.00 | | 0008 | 202-02-38360 | Removal of Sign Faces | 93 | EACH | 125.00 | 11,625.00 | | 0009 | 202-02-38380 | Removal of Sign Truss and Footings | 7 | EACH | 9,800.00 | 68,600.00 | | 0010 | 602-15-00100 | Dowel Bar Retrofit | 264 | EACH | 40.00 | 10,560.00 | | 0011 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 543.75 | LNFT | 35.00 | 19,031.25 | | 0012 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 49.69 | LNFT | 174.00 | 8,646.06 | | 0013 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 5 | EACH | 3,840.00 | 19,200.00 | | 0014 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 1,117 | SQYD | 68.00 | 75,956.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 350,000.00 | 350,000.00 | | 0016 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 435 | EACH | 80.00 | 34,800.00 | | 0017 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,000.00 | 5,000.00 | | 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 950,000.00 | 950,000.00 | | 0019 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 1,366.1 | SQFT | 33.60 | 45,900.96 | | 0020 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 84.2 | SQFT | 54.00 | 4,546.80 | | 0021 | 729-04-00102 | Sign (Type D)(Furnish and Install) | 281.5 | SQFT | 42.00 | 11,823.00 | | 0022 | 729-05-00102 | Sign (Type E)(Furnish and Install) | 224 | SQFT | 45.60 | 10,214.40 | | 0023 | 729-06-00102 | Sign (Overhead Mounted)(Furnish and Install) | 6,183 | SQFT | 42.00 | 259,686.00 | | 0024 | 729-08-00100 | Mounting (2 1/2" Size Post) | 10 | EACH | 1,644.00 | 16,440.00 | | 0025 | 729-08-00200 | Mounting (3 1/2" Size Post) | 5 | EACH | 1,830.00 | 9,150.00 | | 0026 | 729-08-00300 | Mounting (5" Size Post) | 12 | EACH | 2,400.00 | 28,800.00 | | 0027 | 729-08-00310 | Mounting (5" Size Post)(Structure Mount) | 35 | EACH | 5,000.00 | 175,000.00 | | 0028 | 729-08-00410 | Mounting (6" Size Post)(Structure Mount) | 2 | EACH | 9,000.00 | 18,000.00 | | 0029 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 6 | EACH | 1,860.00 | 11,160.00 | | 0030 | 729-09-00200 | Mounting (Overhead Truss) (Ground Mounted) (66' Span) | 1 | EACH | 115,000.00 | 115,000.00 | | 0031 | 729-09-00400 | Mounting (Overhead Truss) (Ground Mounted) (78' Span) | 2 | EACH | 200,000.00 | 400,000.00 | | 0032 | 729-09-00700 | Mounting (Overhead Truss) (Ground Mounted) (96' Span) | 1 | EACH | 160,000.00 | 160,000.00 | | 0033 | 729-10-00100 | Mounting (Overhead Truss) (Structure Mounted) (60' Span) | 3 | EACH | 136,000.00 | 408,000.00 | | 0034 | 729-10-00200 | Mounting (Overhead Truss) (Structure Mounted) (66' Span) | 2 | EACH | 180,000.00 | 360,000.00 | | 0035 | 729-10-00300 | Mounting (Overhead Truss) (Structure Mounted) (72' Span) | 2 | EACH | 105,000.00 | 210,000.00 | | 0036 | 729-10-00500 | Mounting (Overhead Truss) (Structure Mounted) (84' Span) | 1 | EACH | 170,000.00 | 170,000.00 | | 0037 | 729-11-00100 | Mounting (Overhead Cantilever) (Ground Mounted) | 4 | EACH | 65,000.00 | 260,000.00 | | 0038 | 729-12-00100 | Mounting (Overhead Cantilever) (Structure Mounted) | 7 | EACH | 140,000.00 | 980,000.00 | | 0039 | 729-13-00100 | Mounting (Bridge Fascia Mounted) | 4 | EACH | 30,000.00 | 120,000.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 10 | EACH | 100.00 | 1,000.00 | | 0041 | 729-18-00100 | Milepost Assembly (Structure Mounted) | 4 | EACH | 420.00 | 1,680.00 | | 0042 | 729-18-00200 | Milepost Assembly (Structure Mounted) (Secondary) | 6 | EACH | 420.00 | 2,520.00 | | 0043 | 729-20-00600 | Footings for Overhead Mountings (Cantilever) | 4 | EACH | 35,000.00 | 140,000.00 | | 0044 | 729-20-00700 | Footings for Overhead Mountings (Truss) | 8 | EACH | 44,000.00 | 352,000.00 | | 0045 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 2 | EACH | 200.00 | 400.00 | | 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | | 0047 | 805-01-00900 | Class A1 Concrete (Bridge deck) | 189 | CUYD | 8,000.00 | 1,512,000.00 | | 0048 | 806-01-00100 | Deformed Reinforcing Steel | 37,961 | LB | 2.00 | 75,922.00 | | 0049 | 807-01-00200 | Structural Metalwork (Grade 50) (AASHTO M270) | 102,187 | LUMP | 1,100,000.00 | 1,100,000.00 | | 0050 | 810-01-00100 | Concrete Bridge Railing (Standard) | 254 | LNFT | 380.00 | 96,520.00 | | 0051 | 830-11-00100 | Bolt-Rivet Replacement (Structural Steel) | 48 | EACH | 400.00 | 19,200.00 | | 0052 | NS-700-00800 | Impact Attenuator (Construction Zone)(Test Level 2) | 10 | EACH | 3,000.00 | 30,000.00 | | 0053 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 19 | EACH | 6,000.00 | 114,000.00 | | 0054 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 6 | EACH | 3,000.00 | 18,000.00 | | 0055 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 4 | EACH | 5,000.00 | 20,000.00 | | 0056 | NS-729-00009 | Bridge-Mounted Sign Struct Found Retrofit (Steel) Sign Truss | 4 | EACH | 15,000.00 | 60,000.00 | | 0057 | NS-729-00011 | Bridge-Mounted Sign Struct Found Retrofit (Conc) Sign Truss | 12 | EACH | 30,000.00 | 360,000.00 | | 0058 | NS-729-00012 | Bridge-Mounted Sign Struct Found Retrofit (Conc) Sign Cant | 7 | EACH | 25,000.00 | 175,000.00 | | 0059 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad | 24 | EACH | 735.00 | 17,640.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,895,169.47 |
|