Proposal:H.010000.6
Parish:Calcasieu
Routes:US 171
Description:US 171: CALCASIEU RIVER BRIDGE REPAIRS (HBI)
Type Construction:BRIDGE REPAIRS, CLEANING AND PAINTING, ELECTRICAL SYSTEM, EPOXY-URETHANE OVERLAY AND RELATED WORK.
Estimated Construction Cost:$6,472,976.00
| Rank | License | Bidder | Construction Bid |
| 1 | 62559 | Seminole Equipment, Inc. | $4,750,162.00 |
| 2 | C0001 | Cekra, Inc | $5,742,722.76 |
| 3 | 59114 | SOUTHERN ROAD & BRIDGE, LLC | $6,101,044.80 |
| 4 | 68126 | Champion Painting Specialty Services Corp. | $6,654,998.28 |
| 5 | 47645 | Olympus Painting Contractors, Inc. | $6,779,288.20 |
| 6 | 39452 | M&J Construction Company of Pinellas County Inc. | $8,614,488.58 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Seminole Equipment, Inc. | - 2 - Cekra, Inc | - 3 - SOUTHERN ROAD & BRIDGE, LLC | - 4 - Champion Painting Specialty Services Corp. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00050 | Removal of Debris (Bridge Substructure) | 1 | LUMP | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | 58,500.00 | 58,500.00 | 5,000.00 | 5,000.00 | | 0002 | 202-02-04560 | Removal of Bridge Joint (Joint Sealants) | 4,088 | LNFT | 17.25 | 70,518.00 | 17.00 | 69,496.00 | 10.00 | 40,880.00 | 16.65 | 68,065.20 | | 0003 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 500,000.00 | 500,000.00 | 250,000.00 | 250,000.00 | 372,000.00 | 372,000.00 | | 0004 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 2.175 | MILE | 12,000.00 | 26,100.00 | 11,000.00 | 23,925.00 | 10,000.00 | 21,750.00 | 10,878.00 | 23,659.65 | | 0005 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 4.35 | MILE | 16,000.00 | 69,600.00 | 17,000.00 | 73,950.00 | 15,000.00 | 65,250.00 | 15,484.50 | 67,357.58 | | 0006 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 3,000.00 | 12,000.00 | 15,000.00 | 60,000.00 | 5,000.00 | 20,000.00 | 12,375.00 | 49,500.00 | | 0007 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 39,600.00 | 39,600.00 | | 0008 | 727-01-00100 | Mobilization | 1 | LUMP | 250,000.00 | 250,000.00 | 560,000.00 | 560,000.00 | 600,000.00 | 600,000.00 | 650,000.00 | 650,000.00 | | 0009 | 731-02-00100 | Reflectorized Raised Pavement Markers | 288 | EACH | 10.00 | 2,880.00 | 20.00 | 5,760.00 | 9.00 | 2,592.00 | 7.77 | 2,237.76 | | 0010 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.35 | MILE | 5,000.00 | 21,750.00 | 5,500.00 | 23,925.00 | 5,000.00 | 21,750.00 | 4,717.50 | 20,521.13 | | 0011 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.175 | MILE | 3,000.00 | 6,525.00 | 3,500.00 | 7,612.50 | 3,000.00 | 6,525.00 | 2,442.00 | 5,311.35 | | 0012 | 732-05-00100 | Removal of Existing Markings | 2.175 | MILE | 15,000.00 | 32,625.00 | 27,500.00 | 59,812.50 | 15,000.00 | 32,625.00 | 14,430.00 | 31,385.25 | | 0013 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | | 0014 | 811-01-00100 | Cleaning and Painting (Span A & E) | 1 | LUMP | 600,000.00 | 600,000.00 | 600,000.00 | 600,000.00 | 900,000.00 | 900,000.00 | 837,580.00 | 837,580.00 | | 0015 | 811-01-00100 | Cleaning and Painting (Span B & D) | 1 | LUMP | 700,000.00 | 700,000.00 | 600,000.00 | 600,000.00 | 1,050,000.00 | 1,050,000.00 | 1,149,678.00 | 1,149,678.00 | | 0016 | 811-01-00100 | Cleaning and Painting (Span C) | 1 | LUMP | 400,000.00 | 400,000.00 | 600,000.00 | 600,000.00 | 400,000.00 | 400,000.00 | 1,020,053.00 | 1,020,053.00 | | 0017 | 815-03-00200 | Joint Seal (Preformed Silicone) | 1,400 | LNFT | 52.00 | 72,800.00 | 50.85 | 71,190.00 | 50.00 | 70,000.00 | 49.95 | 69,930.00 | | 0018 | 815-03-00300 | Joint Seal (Poured) | 2,688 | LNFT | 30.00 | 80,640.00 | 27.12 | 72,898.56 | 38.00 | 102,144.00 | 26.64 | 71,608.32 | | 0019 | 815-03-00300 | Joint Seal (Poured) (Polyurethane Chemical Grout) | 20 | LNFT | 150.00 | 3,000.00 | 130.00 | 2,600.00 | 300.00 | 6,000.00 | 127.65 | 2,553.00 | | 0020 | 822-09-00100 | Electrical System | 1 | LUMP | 200,000.00 | 200,000.00 | 80,000.00 | 80,000.00 | 144,500.00 | 144,500.00 | 128,370.00 | 128,370.00 | | 0021 | 822-09-00100 | Electrical System (Temporary Navigation Lighting) | 1 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 5,500.00 | 5,500.00 | | 0022 | 822-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 15,000.00 | 15,000.00 | 100,000.00 | 100,000.00 | 12,000.00 | 12,000.00 | 2,200.00 | 2,200.00 | | 0023 | 830-07-00100 | Structural Concrete Patching | 241 | SQFT | 100.00 | 24,100.00 | 100.00 | 24,100.00 | 250.00 | 60,250.00 | 120.00 | 28,920.00 | | 0024 | 830-10-00100 | Epoxy Injection | 72 | LNFT | 45.00 | 3,240.00 | 50.00 | 3,600.00 | 150.00 | 10,800.00 | 58.50 | 4,212.00 | | 0025 | 830-11-00100 | Bolt-Rivet Replacement (Structural Steel) | 200 | EACH | 200.00 | 40,000.00 | 290.00 | 58,000.00 | 180.00 | 36,000.00 | 150.00 | 30,000.00 | | 0026 | NS-830-00900 | Epoxy-Urethane Overlay | 321,564 | SQFT | 6.00 | 1,929,384.00 | 6.30 | 2,025,853.20 | 6.70 | 2,154,478.80 | 6.11 | 1,964,756.04 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,750,162.00 | | 5,742,722.76 | | 6,101,044.80 | | 6,654,998.28 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Olympus Painting Contractors, Inc. | - 6 - M&J Construction Company of Pinellas County Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00050 | Removal of Debris (Bridge Substructure) | 1 | LUMP | 50,000.00 | 50,000.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-04560 | Removal of Bridge Joint (Joint Sealants) | 4,088 | LNFT | 20.00 | 81,760.00 | 17.55 | 71,744.40 | | 0003 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 350,000.00 | 350,000.00 | 307,585.00 | 307,585.00 | | 0004 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 2.175 | MILE | 11,760.00 | 25,578.00 | 11,466.00 | 24,938.55 | | 0005 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 4.35 | MILE | 16,740.00 | 72,819.00 | 16,321.00 | 70,996.35 | | 0006 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 14,000.00 | 56,000.00 | 14,625.00 | 58,500.00 | | 0007 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 35,000.00 | 35,000.00 | 10,000.00 | 10,000.00 | | 0008 | 727-01-00100 | Mobilization | 1 | LUMP | 560,000.00 | 560,000.00 | 544,893.00 | 544,893.00 | | 0009 | 731-02-00100 | Reflectorized Raised Pavement Markers | 288 | EACH | 8.40 | 2,419.20 | 8.19 | 2,358.72 | | 0010 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.35 | MILE | 5,100.00 | 22,185.00 | 4,972.00 | 21,628.20 | | 0011 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.175 | MILE | 2,640.00 | 5,742.00 | 2,574.00 | 5,598.45 | | 0012 | 732-05-00100 | Removal of Existing Markings | 2.175 | MILE | 15,600.00 | 33,930.00 | 15,210.00 | 33,081.75 | | 0013 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 5,000.00 | 5,000.00 | | 0014 | 811-01-00100 | Cleaning and Painting (Span A & E) | 1 | LUMP | 725,000.00 | 725,000.00 | 1,450,000.00 | 1,450,000.00 | | 0015 | 811-01-00100 | Cleaning and Painting (Span B & D) | 1 | LUMP | 1,085,000.00 | 1,085,000.00 | 2,200,000.00 | 2,200,000.00 | | 0016 | 811-01-00100 | Cleaning and Painting (Span C) | 1 | LUMP | 650,000.00 | 650,000.00 | 1,250,000.00 | 1,250,000.00 | | 0017 | 815-03-00200 | Joint Seal (Preformed Silicone) | 1,400 | LNFT | 60.00 | 84,000.00 | 52.65 | 73,710.00 | | 0018 | 815-03-00300 | Joint Seal (Poured) | 2,688 | LNFT | 38.00 | 102,144.00 | 28.08 | 75,479.04 | | 0019 | 815-03-00300 | Joint Seal (Poured) (Polyurethane Chemical Grout) | 20 | LNFT | 450.00 | 9,000.00 | 134.55 | 2,691.00 | | 0020 | 822-09-00100 | Electrical System | 1 | LUMP | 145,526.00 | 145,526.00 | 209,100.00 | 209,100.00 | | 0021 | 822-09-00100 | Electrical System (Temporary Navigation Lighting) | 1 | LUMP | 25,500.00 | 25,500.00 | 25,075.00 | 25,075.00 | | 0022 | 822-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 15,655.00 | 15,655.00 | 15,394.00 | 15,394.00 | | 0023 | 830-07-00100 | Structural Concrete Patching | 241 | SQFT | 300.00 | 72,300.00 | 93.60 | 22,557.60 | | 0024 | 830-10-00100 | Epoxy Injection | 72 | LNFT | 250.00 | 18,000.00 | 45.63 | 3,285.36 | | 0025 | 830-11-00100 | Bolt-Rivet Replacement (Structural Steel) | 200 | EACH | 600.00 | 120,000.00 | 250.00 | 50,000.00 | | 0026 | NS-830-00900 | Epoxy-Urethane Overlay | 321,564 | SQFT | 7.50 | 2,411,730.00 | 6.44 | 2,070,872.16 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,779,288.20 | | 8,614,488.58 |
|