Proposal:H.009482.6
Parish:Beauregard
Routes:LA 113
Description:LA 113: JIM BURNEY BRANCH BRIDGE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, PAVEMENT PATCHING, CLASS II BASE COURSE, SUBGRADE TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$1,892,339.80
| Rank | License | Bidder | Construction Bid |
| 1 | 00009 | Coastal Contractors, Inc. | $1,997,585.28 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $2,024,042.10 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $2,197,947.40 |
| 4 | 00044 | Guinn Construction, LLC | $2,310,707.05 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Coastal Contractors, Inc. | - 2 - Diamond B Construction Co., L.L.C. | - 3 - JB JAMES CONSTRUCTION LLC | - 4 - Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 50,000.00 | 50,000.00 | 9,000.00 | 9,000.00 | 250,000.00 | 250,000.00 | 70,000.00 | 70,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 8,000.00 | 8,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 14 | SQYD | 10.00 | 140.00 | 67.00 | 938.00 | 30.00 | 420.00 | 10.00 | 140.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 3,136.5 | SQYD | 5.75 | 18,034.88 | 5.00 | 15,682.50 | 3.00 | 9,409.50 | 7.00 | 21,955.50 | | 0005 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 2,916.7 | SQYD | 6.25 | 18,229.38 | 3.50 | 10,208.45 | 5.00 | 14,583.50 | 7.00 | 20,416.90 | | 0006 | 202-02-04501 | Removal of Bridge (STA. 109+91.28 TO 110+67.28 28.6 FT X 76 FT CONCRETE SLAB BRIDGE) | 2,175 | LUMP | 50,000.00 | 50,000.00 | 35,000.00 | 35,000.00 | 200,000.00 | 200,000.00 | 40,000.00 | 40,000.00 | | 0007 | 202-02-12000 | Removal of Fence | 365 | LNFT | 5.00 | 1,825.00 | 6.50 | 2,372.50 | 1.00 | 365.00 | 5.00 | 1,825.00 | | 0008 | 202-02-14500 | Removal of Guard Rail | 498.4 | LNFT | 15.00 | 7,476.00 | 12.00 | 5,980.80 | 5.00 | 2,492.00 | 10.00 | 4,984.00 | | 0009 | 203-01-00100 | General Excavation | 952 | CUYD | 17.00 | 16,184.00 | 5.55 | 5,283.60 | 14.00 | 13,328.00 | 20.00 | 19,040.00 | | 0010 | 203-02-00100 | Drainage Excavation | 1,190 | CUYD | 30.00 | 35,700.00 | 27.00 | 32,130.00 | 15.00 | 17,850.00 | 22.00 | 26,180.00 | | 0011 | 203-03-00100 | Embankment | 3,742 | CUYD | 35.00 | 130,970.00 | 28.50 | 106,647.00 | 30.00 | 112,260.00 | 35.00 | 130,970.00 | | 0012 | 203-04-00300 | Nonplastic Embankment (Stone) | 6 | CUYD | 120.00 | 720.00 | 365.00 | 2,190.00 | 300.00 | 1,800.00 | 250.00 | 1,500.00 | | 0013 | 203-08-00100 | Geotextile Fabric | 52 | SQYD | 4.00 | 208.00 | 1.00 | 52.00 | 6.00 | 312.00 | 10.00 | 520.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 22 | EACH | 150.00 | 3,300.00 | 135.00 | 2,970.00 | 150.00 | 3,300.00 | 250.00 | 5,500.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 2,194 | LNFT | 2.00 | 4,388.00 | 4.00 | 8,776.00 | 2.00 | 4,388.00 | 4.00 | 8,776.00 | | 0016 | 302-02-08560 | Class II Base Course (8-1/2" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 3,258.3 | SQYD | 30.00 | 97,749.00 | 37.00 | 120,557.10 | 25.00 | 81,457.50 | 35.50 | 115,669.65 | | 0017 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 3,258 | SQYD | 13.00 | 42,354.00 | 11.00 | 35,838.00 | 12.00 | 39,096.00 | 20.00 | 65,160.00 | | 0018 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 85.00 | 4,250.00 | 25.00 | 1,250.00 | 100.00 | 5,000.00 | 150.00 | 7,500.00 | | 0019 | 502-01-00100 | Asphalt Concrete | 699.1 | TON | 170.00 | 118,847.00 | 135.00 | 94,378.50 | 125.00 | 87,387.50 | 175.00 | 122,342.50 | | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 158.6 | TON | 220.00 | 34,892.00 | 150.00 | 23,790.00 | 190.00 | 30,134.00 | 225.00 | 35,685.00 | | 0021 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 82 | SQYD | 250.00 | 20,500.00 | 175.00 | 14,350.00 | 160.00 | 13,120.00 | 150.00 | 12,300.00 | | 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 275 | LNFT | 42.00 | 11,550.00 | 30.00 | 8,250.00 | 28.00 | 7,700.00 | 35.00 | 9,625.00 | | 0023 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 150.00 | 15,000.00 | 95.00 | 9,500.00 | 90.00 | 9,000.00 | 120.00 | 12,000.00 | | 0024 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 3,750.00 | 15,000.00 | 3,200.00 | 12,800.00 | 3,150.00 | 12,600.00 | 4,500.00 | 18,000.00 | | 0025 | 708-01-00100 | Right-of-Way Monument | 8 | EACH | 625.00 | 5,000.00 | 325.00 | 2,600.00 | 300.00 | 2,400.00 | 500.00 | 4,000.00 | | 0026 | 708-02-00100 | Right-of-Way Monument Witness Post | 8 | EACH | 225.00 | 1,800.00 | 325.00 | 2,600.00 | 300.00 | 2,400.00 | 500.00 | 4,000.00 | | 0027 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 2,954 | SQYD | 72.00 | 212,688.00 | 85.00 | 251,090.00 | 75.00 | 221,550.00 | 100.00 | 295,400.00 | | 0028 | 711-04-00100 | Geotextile Fabric | 2,954 | SQYD | 2.25 | 6,646.50 | 1.00 | 2,954.00 | 3.00 | 8,862.00 | 4.00 | 11,816.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | 25,700.00 | 25,700.00 | 20,000.00 | 20,000.00 | | 0030 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,205 | SQYD | 2.25 | 2,711.25 | 2.00 | 2,410.00 | 2.00 | 2,410.00 | 2.00 | 2,410.00 | | 0031 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 411 | SQYD | 4.00 | 1,644.00 | 2.00 | 822.00 | 3.50 | 1,438.50 | 3.00 | 1,233.00 | | 0032 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.34 | MILE | 1,100.00 | 374.00 | 5,200.00 | 1,768.00 | 1,000.00 | 340.00 | 2,000.00 | 680.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 172,000.00 | 172,000.00 | 195,000.00 | 195,000.00 | 216,000.00 | 216,000.00 | 220,000.00 | 220,000.00 | | 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 110.00 | 440.00 | 105.00 | 420.00 | 125.00 | 500.00 | | 0035 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 308 | EACH | 13.00 | 4,004.00 | 12.00 | 3,696.00 | 12.00 | 3,696.00 | 15.00 | 4,620.00 | | 0036 | 731-02-00100 | Reflectorized Raised Pavement Markers | 27 | EACH | 10.00 | 270.00 | 9.00 | 243.00 | 9.00 | 243.00 | 15.00 | 405.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.408 | MILE | 10,400.00 | 4,243.20 | 9,500.00 | 3,876.00 | 9,000.00 | 3,672.00 | 12,500.00 | 5,100.00 | | 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.204 | MILE | 4,250.00 | 867.00 | 3,900.00 | 795.60 | 3,700.00 | 754.80 | 6,000.00 | 1,224.00 | | 0039 | 739-01-00100 | Hydro-Seeding | 2.14 | ACRE | 2,250.00 | 4,815.00 | 2,500.00 | 5,350.00 | 2,200.00 | 4,708.00 | 3,000.00 | 6,420.00 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 32,000.00 | 32,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | | 0041 | 804-01-00600 | Precast Concrete Piles (24") | 1,360 | LNFT | 150.00 | 204,000.00 | 185.00 | 251,600.00 | 250.00 | 340,000.00 | 200.00 | 272,000.00 | | 0042 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 8,000.00 | 8,000.00 | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | 8,500.00 | 8,500.00 | | 0043 | 804-18-00100 | Vibration Monitoring | 5 | DAY | 1,600.00 | 8,000.00 | 2,100.00 | 10,500.00 | 1,000.00 | 5,000.00 | 1,500.00 | 7,500.00 | | 0044 | 805-01-00100 | Class A1 Concrete (Slab Span) | 185.56 | CUYD | 1,250.00 | 231,950.00 | 940.00 | 174,426.40 | 700.00 | 129,892.00 | 1,250.00 | 231,950.00 | | 0045 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 54.44 | CUYD | 1,500.00 | 81,660.00 | 2,075.00 | 112,963.00 | 900.00 | 48,996.00 | 1,750.00 | 95,270.00 | | 0046 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,512 | SQFT | 1.96 | 2,963.52 | 3.25 | 4,914.00 | 1.00 | 1,512.00 | 3.00 | 4,536.00 | | 0047 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,512 | SQFT | 2.25 | 3,402.00 | 5.00 | 7,560.00 | 5.00 | 7,560.00 | 3.00 | 4,536.00 | | 0048 | 806-01-00100 | Deformed Reinforcing Steel | 45,717 | LB | 1.15 | 52,574.55 | 1.45 | 66,289.65 | 1.30 | 59,432.10 | 1.50 | 68,575.50 | | 0049 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 200 | LNFT | 160.00 | 32,000.00 | 195.00 | 39,000.00 | 100.00 | 20,000.00 | 150.00 | 30,000.00 | | 0050 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 72.00 | 184,320.00 | 85.00 | 217,600.00 | 50.00 | 128,000.00 | 70.00 | 179,200.00 | | 0051 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 100 | SFIN | 150.00 | 15,000.00 | 210.00 | 21,000.00 | 100.00 | 10,000.00 | 300.00 | 30,000.00 | | 0052 | 815-03-00300 | Joint Seal (Poured) | 165 | LNFT | 30.00 | 4,950.00 | 23.00 | 3,795.00 | 20.00 | 3,300.00 | 30.00 | 4,950.00 | | 0053 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 15.00 | 2,880.00 | 13.00 | 2,496.00 | 10.00 | 1,920.00 | 10.00 | 1,920.00 | | 0054 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 320 | LNFT | 8.00 | 2,560.00 | 5.00 | 1,600.00 | 1.00 | 320.00 | 10.00 | 3,200.00 | | 0055 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 709 | INLF | 5.00 | 3,545.00 | 1.00 | 709.00 | 2.00 | 1,418.00 | 8.00 | 5,672.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,997,585.28 | | 2,024,042.10 | | 2,197,947.40 | | 2,310,707.05 |
|