Proposal:H.001707.6
Parish:Bienville
Routes:LA 507
Description:LA 507: SALINE BAYOU RELIEF BRIDGE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$1,624,480.36
| Rank | License | Bidder | Construction Bid |
| 1 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $1,554,114.90 |
| 2 | 14788 | Louisiana Bridge, Inc. | $1,610,572.85 |
| 3 | 59705 | David Temple dba Northern State Construction, LLC | $1,888,969.15 |
| 4 | 39462 | JB JAMES CONSTRUCTION LLC | $1,949,012.30 |
| 5 | 49239 | WL Bass Construction Inc. | $2,007,580.53 |
| 6 | 12487 | Diamond B Construction Co., L.L.C. | $2,058,817.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SPECIALTY TRACKHOE & DOZER SERV.INC | - 2 - Louisiana Bridge, Inc. | - 3 - David Temple dba Northern State Construction, LLC | - 4 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.95 | LUMP | 15,000.00 | 15,000.00 | 19,000.00 | 19,000.00 | 40,000.00 | 40,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 4,500.00 | 4,500.00 | 10,000.00 | 10,000.00 | 6,000.00 | 6,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 1,507.8 | SQYD | 8.75 | 13,193.25 | 5.00 | 7,539.00 | 2.00 | 3,015.60 | 4.00 | 6,031.20 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 746.2 | SQYD | 8.75 | 6,529.25 | 5.00 | 3,731.00 | 2.00 | 1,492.40 | 7.00 | 5,223.40 | | 0005 | 202-02-04501 | Removal of Bridge (STA. 117+37.00 to STA. 118+52.00; 24.5ft X 115ft Concrete Precast Slab Unit Bridge) | 2,817.5 | LUMP | 25,000.00 | 25,000.00 | 19,000.00 | 19,000.00 | 50,000.00 | 50,000.00 | 350,000.00 | 350,000.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 476.3 | LNFT | 9.50 | 4,524.85 | 10.00 | 4,763.00 | 1.00 | 476.30 | 5.00 | 2,381.50 | | 0007 | 203-01-00100 | General Excavation | 515 | CUYD | 15.00 | 7,725.00 | 10.00 | 5,150.00 | 10.00 | 5,150.00 | 16.00 | 8,240.00 | | 0008 | 203-02-00100 | Drainage Excavation | 464 | CUYD | 18.00 | 8,352.00 | 12.00 | 5,568.00 | 25.00 | 11,600.00 | 19.00 | 8,816.00 | | 0009 | 203-03-00100 | Embankment | 714 | CUYD | 24.00 | 17,136.00 | 28.00 | 19,992.00 | 25.00 | 17,850.00 | 40.00 | 28,560.00 | | 0010 | 203-04-00300 | Nonplastic Embankment (Stone) | 4 | CUYD | 125.00 | 500.00 | 300.00 | 1,200.00 | 100.00 | 400.00 | 500.00 | 2,000.00 | | 0011 | 203-08-00100 | Geotextile Fabric | 23 | SQYD | 3.00 | 69.00 | 5.00 | 115.00 | 5.00 | 115.00 | 10.00 | 230.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 740 | LNFT | 3.00 | 2,220.00 | 5.00 | 3,700.00 | 2.50 | 1,850.00 | 3.00 | 2,220.00 | | 0013 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 1,645.5 | SQYD | 30.00 | 49,365.00 | 36.00 | 59,238.00 | 100.00 | 164,550.00 | 25.00 | 41,137.50 | | 0014 | 304-01-00100 | Lime | 23.31 | TON | 240.00 | 5,594.40 | 250.00 | 5,827.50 | 300.00 | 6,993.00 | 300.00 | 6,993.00 | | 0015 | 304-05-00100 | Lime Treatment (Type E) | 1,645 | SQYD | 4.50 | 7,402.50 | 7.00 | 11,515.00 | 5.00 | 8,225.00 | 5.50 | 9,047.50 | | 0016 | 502-01-00100 | Asphalt Concrete | 362.9 | TON | 145.00 | 52,620.50 | 165.00 | 59,878.50 | 200.00 | 72,580.00 | 145.00 | 52,620.50 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 113.7 | TON | 180.00 | 20,466.00 | 170.00 | 19,329.00 | 300.00 | 34,110.00 | 180.00 | 20,466.00 | | 0018 | 510-01-00001 | Pavement Patching 14.5" Minimum Thickness | 82 | SQYD | 135.00 | 11,070.00 | 150.00 | 12,300.00 | 200.00 | 16,400.00 | 227.00 | 18,614.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 137.5 | LNFT | 30.00 | 4,125.00 | 32.00 | 4,400.00 | 28.00 | 3,850.00 | 28.00 | 3,850.00 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 100.00 | 10,000.00 | 103.00 | 10,300.00 | 100.00 | 10,000.00 | 90.00 | 9,000.00 | | 0021 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 3,800.00 | 15,200.00 | 3,300.00 | 13,200.00 | 3,750.00 | 15,000.00 | 2,850.00 | 11,400.00 | | 0022 | 708-01-00100 | Right-of-Way Monument | 16 | EACH | 200.00 | 3,200.00 | 200.00 | 3,200.00 | 425.00 | 6,800.00 | 425.00 | 6,800.00 | | 0023 | 708-02-00100 | Right-of-Way Monument Witness Post | 16 | EACH | 650.00 | 10,400.00 | 200.00 | 3,200.00 | 425.00 | 6,800.00 | 425.00 | 6,800.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,981 | SQYD | 60.00 | 178,860.00 | 72.00 | 214,632.00 | 70.00 | 208,670.00 | 65.00 | 193,765.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 2,981 | SQYD | 1.35 | 4,024.35 | 3.00 | 8,943.00 | 5.00 | 14,905.00 | 3.00 | 8,943.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 19,000.00 | 19,000.00 | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 | | 0027 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 11,500.00 | 11,500.00 | 10,000.00 | 10,000.00 | 18,500.00 | 18,500.00 | 20,000.00 | 20,000.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 115,000.00 | 115,000.00 | 119,000.00 | 119,000.00 | 150,000.00 | 150,000.00 | 137,500.00 | 137,500.00 | | 0029 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 110.00 | 440.00 | 120.00 | 480.00 | 100.00 | 400.00 | 105.00 | 420.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 19 | EACH | 50.00 | 950.00 | 23.00 | 437.00 | 10.00 | 190.00 | 20.00 | 380.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.267 | MILE | 15,000.00 | 4,005.00 | 11,500.00 | 3,070.50 | 4,000.00 | 1,068.00 | 10,000.00 | 2,670.00 | | 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.134 | MILE | 20,000.00 | 2,680.00 | 7,500.00 | 1,005.00 | 4,000.00 | 536.00 | 7,000.00 | 938.00 | | 0033 | 739-01-00100 | Hydro-Seeding | 1.48 | ACRE | 3,950.00 | 5,846.00 | 3,500.00 | 5,180.00 | 2,500.00 | 3,700.00 | 2,500.00 | 3,700.00 | | 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 12,000.00 | 12,000.00 | 26,500.00 | 26,500.00 | 15,000.00 | 15,000.00 | | 0035 | 804-01-00400 | Precast Concrete Piles (18") | 2,400 | LNFT | 100.00 | 240,000.00 | 110.00 | 264,000.00 | 120.00 | 288,000.00 | 150.00 | 360,000.00 | | 0036 | 805-01-00100 | Class A1 Concrete (Slab Span) | 223.65 | CUYD | 870.00 | 194,575.50 | 1,000.00 | 223,650.00 | 1,350.00 | 301,927.50 | 600.00 | 134,190.00 | | 0037 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 63.5 | CUYD | 1,675.00 | 106,362.50 | 1,600.00 | 101,600.00 | 1,350.00 | 85,725.00 | 1,200.00 | 76,200.00 | | 0038 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,882 | SQFT | 3.00 | 5,646.00 | 3.00 | 5,646.00 | 2.00 | 3,764.00 | 1.00 | 1,882.00 | | 0039 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,882 | SQFT | 3.00 | 5,646.00 | 3.00 | 5,646.00 | 2.00 | 3,764.00 | 5.00 | 9,410.00 | | 0040 | 806-01-00100 | Deformed Reinforcing Steel | 52,289 | LB | 1.20 | 62,746.80 | 1.15 | 60,132.35 | 1.15 | 60,132.35 | 1.30 | 67,975.70 | | 0041 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 280 | LNFT | 140.00 | 39,200.00 | 135.00 | 37,800.00 | 140.00 | 39,200.00 | 100.00 | 28,000.00 | | 0042 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 80.00 | 204,800.00 | 75.00 | 192,000.00 | 65.00 | 166,400.00 | 50.00 | 128,000.00 | | 0043 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 175 | SFIN | 102.00 | 17,850.00 | 115.00 | 20,125.00 | 50.00 | 8,750.00 | 100.00 | 17,500.00 | | 0044 | 815-03-00300 | Joint Seal (Poured) | 256 | LNFT | 19.00 | 4,864.00 | 16.00 | 4,096.00 | 20.00 | 5,120.00 | 20.00 | 5,120.00 | | 0045 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 13.50 | 2,592.00 | 12.00 | 2,304.00 | 5.00 | 960.00 | 1.50 | 288.00 | | 0046 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 320 | LNFT | 3.00 | 960.00 | 4.00 | 1,280.00 | 5.00 | 1,600.00 | 1.00 | 320.00 | | 0047 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 380 | INLF | 2.30 | 874.00 | 5.00 | 1,900.00 | 5.00 | 1,900.00 | 1.00 | 380.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,554,114.90 | | 1,610,572.85 | | 1,888,969.15 | | 1,949,012.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - WL Bass Construction Inc. | - 6 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.95 | LUMP | 77,000.00 | 77,000.00 | 35,000.00 | 35,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 1,507.8 | SQYD | 2.00 | 3,015.60 | 11.00 | 16,585.80 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 746.2 | SQYD | 2.75 | 2,052.05 | 19.00 | 14,177.80 | | 0005 | 202-02-04501 | Removal of Bridge (STA. 117+37.00 to STA. 118+52.00; 24.5ft X 115ft Concrete Precast Slab Unit Bridge) | 2,817.5 | LUMP | 123,000.00 | 123,000.00 | 45,000.00 | 45,000.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 476.3 | LNFT | 5.00 | 2,381.50 | 8.00 | 3,810.40 | | 0007 | 203-01-00100 | General Excavation | 515 | CUYD | 10.85 | 5,587.75 | 23.00 | 11,845.00 | | 0008 | 203-02-00100 | Drainage Excavation | 464 | CUYD | 11.10 | 5,150.40 | 11.00 | 5,104.00 | | 0009 | 203-03-00100 | Embankment | 714 | CUYD | 35.00 | 24,990.00 | 25.00 | 17,850.00 | | 0010 | 203-04-00300 | Nonplastic Embankment (Stone) | 4 | CUYD | 140.00 | 560.00 | 500.00 | 2,000.00 | | 0011 | 203-08-00100 | Geotextile Fabric | 23 | SQYD | 4.60 | 105.80 | 3.50 | 80.50 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 740 | LNFT | 3.50 | 2,590.00 | 2.55 | 1,887.00 | | 0013 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 1,645.5 | SQYD | 44.00 | 72,402.00 | 33.00 | 54,301.50 | | 0014 | 304-01-00100 | Lime | 23.31 | TON | 295.00 | 6,876.45 | 245.00 | 5,710.95 | | 0015 | 304-05-00100 | Lime Treatment (Type E) | 1,645 | SQYD | 10.00 | 16,450.00 | 5.00 | 8,225.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 362.9 | TON | 150.00 | 54,435.00 | 160.00 | 58,064.00 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 113.7 | TON | 180.00 | 20,466.00 | 160.00 | 18,192.00 | | 0018 | 510-01-00001 | Pavement Patching 14.5" Minimum Thickness | 82 | SQYD | 272.00 | 22,304.00 | 195.00 | 15,990.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 137.5 | LNFT | 28.00 | 3,850.00 | 30.00 | 4,125.00 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 90.00 | 9,000.00 | 95.00 | 9,500.00 | | 0021 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 2,850.00 | 11,400.00 | 2,950.00 | 11,800.00 | | 0022 | 708-01-00100 | Right-of-Way Monument | 16 | EACH | 450.00 | 7,200.00 | 450.00 | 7,200.00 | | 0023 | 708-02-00100 | Right-of-Way Monument Witness Post | 16 | EACH | 450.00 | 7,200.00 | 450.00 | 7,200.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,981 | SQYD | 80.00 | 238,480.00 | 67.50 | 201,217.50 | | 0025 | 711-04-00100 | Geotextile Fabric | 2,981 | SQYD | 3.50 | 10,433.50 | 3.25 | 9,688.25 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 120,000.00 | 120,000.00 | 47,000.00 | 47,000.00 | | 0027 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 15,000.00 | 15,000.00 | 8,000.00 | 8,000.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | | 0029 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 105.00 | 420.00 | 110.00 | 440.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 19 | EACH | 20.00 | 380.00 | 22.00 | 418.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.267 | MILE | 10,000.00 | 2,670.00 | 9,800.00 | 2,616.60 | | 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.134 | MILE | 6,500.00 | 871.00 | 6,500.00 | 871.00 | | 0033 | 739-01-00100 | Hydro-Seeding | 1.48 | ACRE | 2,600.00 | 3,848.00 | 3,400.00 | 5,032.00 | | 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 65,000.00 | 65,000.00 | 35,250.00 | 35,250.00 | | 0035 | 804-01-00400 | Precast Concrete Piles (18") | 2,400 | LNFT | 112.00 | 268,800.00 | 125.00 | 300,000.00 | | 0036 | 805-01-00100 | Class A1 Concrete (Slab Span) | 223.65 | CUYD | 350.00 | 78,277.50 | 1,275.00 | 285,153.75 | | 0037 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 63.5 | CUYD | 350.00 | 22,225.00 | 2,650.00 | 168,275.00 | | 0038 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,882 | SQFT | 2.20 | 4,140.40 | 2.00 | 3,764.00 | | 0039 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,882 | SQFT | 3.30 | 6,210.60 | 2.00 | 3,764.00 | | 0040 | 806-01-00100 | Deformed Reinforcing Steel | 52,289 | LB | 1.82 | 95,165.98 | 1.50 | 78,433.50 | | 0041 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 280 | LNFT | 260.00 | 72,800.00 | 190.00 | 53,200.00 | | 0042 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 112.00 | 286,720.00 | 99.00 | 253,440.00 | | 0043 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 175 | SFIN | 160.00 | 28,000.00 | 145.00 | 25,375.00 | | 0044 | 815-03-00300 | Joint Seal (Poured) | 256 | LNFT | 15.00 | 3,840.00 | 17.00 | 4,352.00 | | 0045 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 6.00 | 1,152.00 | 14.00 | 2,688.00 | | 0046 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 320 | LNFT | 2.50 | 800.00 | 14.00 | 4,480.00 | | 0047 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 380 | INLF | 3.50 | 1,330.00 | 4.50 | 1,710.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,007,580.53 | | 2,058,817.55 |
|