Rank License BidderConstruction Bid
158815Simmons Erosion Control, Inc.$807,469.00
259016MASSANA CONSTRUCTION INC.$823,019.00
367594Traffic Commander, LLC$897,134.10
469714Roadwrxx, LLC$1,022,880.00
564826Highway Safety Systems LLC$1,028,135.25
654928Womack And Sons Constr. Group LLC$1,152,957.75
763313BRIGGS BROTHERS ENTERPRISES CORPORATION$1,254,701.47
869570Bridging The Gap, L.L.C.$1,926,374.81


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Simmons Erosion Control, Inc.
- 2 -
MASSANA CONSTRUCTION INC.
- 3 -
Traffic Commander, LLC
- 4 -
Roadwrxx, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001203-07-00100Borrow (Vehicular Measurement) 47     CUYD50.002,350.0055.002,585.00125.005,875.00100.004,700.00
0002204-06-00100Temporary Silt Fencing 2,460     LNFT1.002,460.003.007,380.000.0124.601.002,460.00
0003713-01-00100Temporary Signs and Barricades 1     LUMP19,000.0019,000.0064,321.0064,321.0050,000.0050,000.00100,000.00100,000.00
0004727-01-00100Mobilization 1     LUMP57,710.0057,710.0042,508.0042,508.0085,000.0085,000.00100,000.00100,000.00
0005739-01-00100Hydro-Seeding 18.2   ACRE500.009,100.002,600.0047,320.001,000.0018,200.00100.001,820.00
0006740-01-00100Construction Layout 1     LUMP18,500.0018,500.002,500.002,500.0050,000.0050,000.005,000.005,000.00
0007NS-704-00001High Tension Cable Barrier 12,335     LNFT23.00283,705.0024.00296,040.0021.50265,202.5030.00370,050.00
0008NS-704-00002Cable Barrier Gated End Terminal 8     EACH5,000.0040,000.005,000.0040,000.004,075.0032,600.0010,000.0080,000.00
0009NS-704-00003Concrete Strip 6,897     SQYD52.00358,644.0045.00310,365.0056.00386,232.0050.00344,850.00
0010NS-713-00009Portable Changeable Message Sign (with communications) 4     EACH4,000.0016,000.002,500.0010,000.001,000.004,000.003,500.0014,000.00
             
  CONTRACTOR TOTAL   807,469.00 823,019.00 897,134.10 1,022,880.00



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
Highway Safety Systems LLC
- 6 -
Womack And Sons Constr. Group LLC
- 7 -
BRIGGS BROTHERS ENTERPRISES CORPORATION
- 8 -
Bridging The Gap, L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001203-07-00100Borrow (Vehicular Measurement) 47     CUYD100.004,700.00100.004,700.0025.001,175.001,367.1864,257.46
0002204-06-00100Temporary Silt Fencing 2,460     LNFT3.007,380.006.1015,006.002.085,116.8016.5040,590.00
0003713-01-00100Temporary Signs and Barricades 1     LUMP74,000.0074,000.0088,000.0088,000.0015,000.0015,000.00205,753.43205,753.43
0004727-01-00100Mobilization 1     LUMP110,000.00110,000.0024,580.0024,580.00100,000.00100,000.0068,584.4868,584.48
0005739-01-00100Hydro-Seeding 18.2   ACRE2,575.0046,865.005,150.0093,730.002,940.0053,508.007,809.89142,140.00
0006740-01-00100Construction Layout 1     LUMP30,000.0030,000.003,725.003,725.0010,000.0010,000.00102,876.71102,876.71
0007NS-704-00001High Tension Cable Barrier 12,335     LNFT21.15260,885.2530.05370,666.7538.43474,034.0537.29459,972.15
0008NS-704-00002Cable Barrier Gated End Terminal 8     EACH4,750.0038,000.006,720.0053,760.007,691.2561,530.0011,635.1293,080.96
0009NS-704-00003Concrete Strip 6,897     SQYD65.00448,305.0070.00482,790.0069.46479,065.62100.66694,252.02
0010NS-713-00009Portable Changeable Message Sign (with communications) 4     EACH2,000.008,000.004,000.0016,000.0013,818.0055,272.0013,716.9054,867.60
             
  CONTRACTOR TOTAL   1,028,135.25 1,152,957.75 1,254,701.47 1,926,374.81