Proposal:H.001166.6
Parish:Caddo
Routes:LA 1
Description:CADDO LAKE BRIDGE (HBI)
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, PAVEMENT PATCHING, SUBGRADE TREATMENT, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGE AND RELATED WORK.
Estimated Construction Cost:$16,100,819.33
| Rank | License | Bidder | Construction Bid |
| 1 | 12395 | Jensen Construction Co. | $18,239,377.40 |
| 2 | 39462 | JB JAMES CONSTRUCTION LLC | $18,679,181.75 |
| 3 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $20,505,343.70 |
| 4 | 34567 | James Construction Group LLC | $22,416,418.32 |
| 5 | 49239 | WL Bass Construction Inc. | $23,415,995.95 |
| 6 | 47488 | OCCI INC of Missouri | $27,573,919.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Jensen Construction Co. | - 2 - JB JAMES CONSTRUCTION LLC | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 4 - James Construction Group LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3 | LUMP | 107,200.00 | 107,200.00 | 2,000,000.00 | 2,000,000.00 | 700,000.00 | 700,000.00 | 65,000.00 | 65,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 40,000.00 | 40,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 10,863.7 | SQYD | 15.00 | 162,955.50 | 5.00 | 54,318.50 | 6.00 | 65,182.20 | 4.75 | 51,602.58 | | 0004 | 202-02-04501 | Removal of Bridge Structure No. 04090450112421, 24'x965' Steel Truss Bridge w/ Approaches & Approach Slabs | 23,160 | LUMP | 1,000,000.00 | 1,000,000.00 | 400,000.00 | 400,000.00 | 325,000.00 | 325,000.00 | 1,500,000.00 | 1,500,000.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 69 | SQYD | 25.00 | 1,725.00 | 12.00 | 828.00 | 25.00 | 1,725.00 | 12.00 | 828.00 | | 0006 | 202-02-12020 | Removal of Fence (Chain Link) | 452 | LNFT | 20.00 | 9,040.00 | 4.50 | 2,034.00 | 12.00 | 5,424.00 | 4.50 | 2,034.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 250 | LNFT | 20.00 | 5,000.00 | 15.00 | 3,750.00 | 16.00 | 4,000.00 | 15.00 | 3,750.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) (10" - 15") | 69 | LNFT | 20.00 | 1,380.00 | 12.00 | 828.00 | 25.00 | 1,725.00 | 12.00 | 828.00 | | 0009 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 6,107 | SQYD | 20.00 | 122,140.00 | 10.00 | 61,070.00 | 9.00 | 54,963.00 | 8.50 | 51,909.50 | | 0010 | 202-02-38240 | Removal of Signs and Supports | 34 | EACH | 15.00 | 510.00 | 75.00 | 2,550.00 | 35.00 | 1,190.00 | 75.00 | 2,550.00 | | 0011 | 203-01-00100 | General Excavation | 4,971 | CUYD | 20.00 | 99,420.00 | 8.00 | 39,768.00 | 12.00 | 59,652.00 | 7.50 | 37,282.50 | | 0012 | 203-03-00100 | Embankment | 16,477 | CUYD | 18.00 | 296,586.00 | 24.00 | 395,448.00 | 32.00 | 527,264.00 | 24.00 | 395,448.00 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 14 | EACH | 200.00 | 2,800.00 | 125.00 | 1,750.00 | 150.00 | 2,100.00 | 220.00 | 3,080.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 5,673 | LNFT | 2.50 | 14,182.50 | 3.00 | 17,019.00 | 2.50 | 14,182.50 | 3.26 | 18,493.98 | | 0015 | 302-02-12060 | Class II Base Course (12" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 7,583.7 | SQYD | 40.00 | 303,348.00 | 40.00 | 303,348.00 | 45.00 | 341,266.50 | 40.00 | 303,348.00 | | 0016 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 7,582 | SQYD | 13.00 | 98,566.00 | 16.00 | 121,312.00 | 20.00 | 151,640.00 | 15.50 | 117,521.00 | | 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 36 | CUYD | 75.00 | 2,700.00 | 150.00 | 5,400.00 | 100.00 | 3,600.00 | 150.00 | 5,400.00 | | 0018 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 61.5 | CUYD | 75.00 | 4,612.50 | 150.00 | 9,225.00 | 80.00 | 4,920.00 | 150.00 | 9,225.00 | | 0019 | 502-01-00100 | Asphalt Concrete | 2,355.2 | TON | 300.00 | 706,560.00 | 160.00 | 376,832.00 | 160.00 | 376,832.00 | 158.50 | 373,299.20 | | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 180.9 | TON | 300.00 | 54,270.00 | 170.00 | 30,753.00 | 160.00 | 28,944.00 | 170.00 | 30,753.00 | | 0021 | 510-01-00001 | Pavement Patching (12.5" Minimum Thickness) | 102 | SQYD | 180.00 | 18,360.00 | 140.00 | 14,280.00 | 160.00 | 16,320.00 | 142.00 | 14,484.00 | | 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 143.8 | LNFT | 28.50 | 4,098.30 | 30.00 | 4,314.00 | 34.00 | 4,889.20 | 30.00 | 4,314.00 | | 0023 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 90.00 | 9,000.00 | 110.00 | 11,000.00 | 120.00 | 12,000.00 | 110.00 | 11,000.00 | | 0024 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 3,300.00 | 3,300.00 | 3,200.00 | 3,200.00 | 3,600.00 | 3,600.00 | 3,200.00 | 3,200.00 | | 0025 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 3,750.00 | 11,250.00 | 2,900.00 | 8,700.00 | 3,200.00 | 9,600.00 | 2,900.00 | 8,700.00 | | 0026 | 706-02-00200 | Concrete Drive (6" Thick) | 69.1 | SQYD | 105.00 | 7,255.50 | 100.00 | 6,910.00 | 135.00 | 9,328.50 | 140.00 | 9,674.00 | | 0027 | 708-01-00100 | Right-of-Way Monument | 2 | EACH | 500.00 | 1,000.00 | 400.00 | 800.00 | 1,000.00 | 2,000.00 | 750.00 | 1,500.00 | | 0028 | 708-02-00100 | Right-of-Way Monument Witness Post | 2 | EACH | 600.00 | 1,200.00 | 300.00 | 600.00 | 1,000.00 | 2,000.00 | 750.00 | 1,500.00 | | 0029 | 711-02-00100 | Riprap (2 lb) | 38 | CUYD | 100.00 | 3,800.00 | 160.00 | 6,080.00 | 200.00 | 7,600.00 | 215.92 | 8,204.96 | | 0030 | 711-04-00100 | Geotextile Fabric | 150 | SQYD | 17.00 | 2,550.00 | 2.00 | 300.00 | 5.00 | 750.00 | 10.30 | 1,545.00 | | 0031 | 712-04-00100 | Flexible Revetment | 2,282 | SQYD | 52.00 | 118,664.00 | 60.00 | 136,920.00 | 110.00 | 251,020.00 | 60.00 | 136,920.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 87,300.00 | 87,300.00 | 200,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | 150,000.00 | 150,000.00 | | 0033 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.248 | MILE | 700.00 | 2,273.60 | 1,500.00 | 4,872.00 | 1,600.00 | 5,196.80 | 650.00 | 2,111.20 | | 0034 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 2.421 | MILE | 6,000.00 | 14,526.00 | 20,000.00 | 48,420.00 | 21,000.00 | 50,841.00 | 650.00 | 1,573.65 | | 0035 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 640 | EACH | 7.00 | 4,480.00 | 7.00 | 4,480.00 | 8.00 | 5,120.00 | 6.50 | 4,160.00 | | 0037 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 89 | EACH | 150.00 | 13,350.00 | 100.00 | 8,900.00 | 135.00 | 12,015.00 | 200.00 | 17,800.00 | | 0038 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 30,000.00 | 60,000.00 | 25,000.00 | 50,000.00 | 30,000.00 | 60,000.00 | 30,000.00 | 60,000.00 | | 0039 | 716-01-00100 | Mulch (Vegetative) | 2.8 | TON | 850.00 | 2,380.00 | 850.00 | 2,380.00 | 900.00 | 2,520.00 | 850.00 | 2,380.00 | | 0040 | 717-01-00100 | Seeding | 55 | LB | 20.00 | 1,100.00 | 12.00 | 660.00 | 13.00 | 715.00 | 12.00 | 660.00 | | 0041 | 718-01-00100 | Fertilizer | 1,832 | LB | 0.75 | 1,374.00 | 0.45 | 824.40 | 0.50 | 916.00 | 0.45 | 824.40 | | 0042 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 71 | SQYD | 4.00 | 284.00 | 5.00 | 355.00 | 5.50 | 390.50 | 5.00 | 355.00 | | 0043 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 63,000.00 | 63,000.00 | 60,000.00 | 60,000.00 | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | | 0044 | 724-01-00100 | Rumble Strips (Centerline) | 0.301 | MILE | 5,000.00 | 1,505.00 | 10,000.00 | 3,010.00 | 600.00 | 180.60 | 500.00 | 150.50 | | 0045 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.601 | MILE | 5,000.00 | 3,005.00 | 10,000.00 | 6,010.00 | 600.00 | 360.60 | 500.00 | 300.50 | | 0046 | 725-01-00100 | Temporary Detour Roads | 3,212.4 | SQYD | 80.00 | 256,992.00 | 100.00 | 321,240.00 | 100.00 | 321,240.00 | 89.00 | 285,903.60 | | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 1,800,000.00 | 1,800,000.00 | 1,900,000.00 | 1,900,000.00 | 1,900,000.00 | 1,900,000.00 | 2,240,000.00 | 2,240,000.00 | | 0048 | 729-01-00100 | Sign (Type A) | 65.8 | SQFT | 20.00 | 1,316.00 | 50.00 | 3,290.00 | 38.00 | 2,500.40 | 50.00 | 3,290.00 | | 0049 | 729-02-00100 | Sign (Type B) | 10 | SQFT | 21.00 | 210.00 | 50.00 | 500.00 | 42.00 | 420.00 | 50.00 | 500.00 | | 0050 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 105.00 | 420.00 | 100.00 | 400.00 | 85.00 | 340.00 | 75.00 | 300.00 | | 0051 | 729-21-00100 | U-Channel Post | 14 | EACH | 160.00 | 2,240.00 | 125.00 | 1,750.00 | 210.00 | 2,940.00 | 125.00 | 1,750.00 | | 0052 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 5,477 | EACH | 10.00 | 54,770.00 | 15.00 | 82,155.00 | 17.00 | 93,109.00 | 9.00 | 49,293.00 | | 0053 | 731-02-00100 | Reflectorized Raised Pavement Markers | 186 | EACH | 6.00 | 1,116.00 | 10.00 | 1,860.00 | 11.00 | 2,046.00 | 5.50 | 1,023.00 | | 0054 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.815 | MILE | 4,000.00 | 11,260.00 | 10,000.00 | 28,150.00 | 10,500.00 | 29,557.50 | 3,493.78 | 9,834.99 | | 0055 | 732-05-00100 | Removal of Existing Markings | 0.363 | MILE | 4,000.00 | 1,452.00 | 20,000.00 | 7,260.00 | 21,000.00 | 7,623.00 | 4,958.68 | 1,800.00 | | 0056 | 735-01-00100 | Mailboxes | 6 | EACH | 200.00 | 1,200.00 | 15.00 | 90.00 | 15.00 | 90.00 | 15.00 | 90.00 | | 0057 | 735-02-00100 | Mailbox Supports (Single) | 6 | EACH | 300.00 | 1,800.00 | 150.00 | 900.00 | 150.00 | 900.00 | 150.00 | 900.00 | | 0058 | 740-01-00100 | Construction Layout | 1 | LUMP | 500,000.00 | 500,000.00 | 292,000.00 | 292,000.00 | 500,000.00 | 500,000.00 | 310,000.00 | 310,000.00 | | 0059 | 802-03-00100 | Temporary Sheeting (Steel) | 7,140 | SQFT | 24.00 | 171,360.00 | 20.00 | 142,800.00 | 48.00 | 342,720.00 | 100.00 | 714,000.00 | | 0060 | 804-01-00200 | Precast Concrete Piles (14") | 60 | LNFT | 130.00 | 7,800.00 | 200.00 | 12,000.00 | 350.00 | 21,000.00 | 893.00 | 53,580.00 | | 0061 | 804-01-00400 | Precast Concrete Piles (18") | 1,048 | LNFT | 75.00 | 78,600.00 | 110.00 | 115,280.00 | 150.00 | 157,200.00 | 181.00 | 189,688.00 | | 0062 | 804-01-00700 | Precast Concrete Piles (30") | 6,804 | LNFT | 340.00 | 2,313,360.00 | 210.00 | 1,428,840.00 | 280.00 | 1,905,120.00 | 280.00 | 1,905,120.00 | | 0063 | 804-10-00700 | Precast Concrete Indicator Piles (30") | 1 | EACH | 200,000.00 | 200,000.00 | 1,500,000.00 | 1,500,000.00 | 190,000.00 | 190,000.00 | 200,000.00 | 200,000.00 | | 0064 | 804-14-00100 | Dynamic Monitoring Assistance | 7 | EACH | 2,500.00 | 17,500.00 | 3,000.00 | 21,000.00 | 3,000.00 | 21,000.00 | 6,000.00 | 42,000.00 | | 0065 | 805-01-00200 | Class A1 Concrete (Deck) | 2,979.3 | CUYD | 1,200.00 | 3,575,160.00 | 1,000.00 | 2,979,300.00 | 1,400.00 | 4,171,020.00 | 1,550.00 | 4,617,915.00 | | 0066 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 444.15 | CUYD | 1,500.00 | 666,225.00 | 1,500.00 | 666,225.00 | 2,500.00 | 1,110,375.00 | 3,300.00 | 1,465,695.00 | | 0067 | 805-08-01200 | Precast-Prestressed Concrete Girder (Type LG-36) | 1,390 | LNFT | 295.00 | 410,050.00 | 320.00 | 444,800.00 | 325.00 | 451,750.00 | 490.00 | 681,100.00 | | 0068 | 805-08-01400 | Precast-Prestressed Concrete Girder (Type LG-54) | 6,766 | LNFT | 350.00 | 2,368,100.00 | 330.00 | 2,232,780.00 | 325.00 | 2,198,950.00 | 500.00 | 3,383,000.00 | | 0069 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 28,101 | SQFT | 3.00 | 84,303.00 | 0.65 | 18,265.65 | 2.00 | 56,202.00 | 2.00 | 56,202.00 | | 0070 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 28,101 | SQFT | 2.50 | 70,252.50 | 1.00 | 28,101.00 | 3.00 | 84,303.00 | 0.71 | 19,951.71 | | 0071 | 806-01-00100 | Deformed Reinforcing Steel | 839,704 | LB | 1.25 | 1,049,630.00 | 1.30 | 1,091,615.20 | 1.60 | 1,343,526.40 | 1.70 | 1,427,496.80 | | 0072 | 807-01-00200 | Structural Metalwork (Grade 50) | 1,404 | LUMP | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 | 10,000.00 | 10,000.00 | 40,000.00 | 40,000.00 | | 0073 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 32 | LUMP | 10,000.00 | 10,000.00 | 2,000.00 | 2,000.00 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | | 0074 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 4,176 | LNFT | 95.00 | 396,720.00 | 85.00 | 354,960.00 | 120.00 | 501,120.00 | 105.00 | 438,480.00 | | 0075 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 52.00 | 166,400.00 | 65.00 | 208,000.00 | 105.00 | 336,000.00 | 110.00 | 352,000.00 | | 0076 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 1,146 | SFIN | 100.00 | 114,600.00 | 70.00 | 80,220.00 | 75.00 | 85,950.00 | 115.00 | 131,790.00 | | 0077 | 815-02-00200 | Sealed Expansion Joint (End Dams and Preformed Silicone Seal) | 400 | LNFT | 200.00 | 80,000.00 | 250.00 | 100,000.00 | 2,300.00 | 920,000.00 | 120.00 | 48,000.00 | | 0078 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 240 | LNFT | 20.00 | 4,800.00 | 3.00 | 720.00 | 16.00 | 3,840.00 | 5.00 | 1,200.00 | | 0079 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 400 | LNFT | 20.00 | 8,000.00 | 2.00 | 800.00 | 9.00 | 3,600.00 | 2.00 | 800.00 | | 0080 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 1,207 | INLF | 20.00 | 24,140.00 | 3.00 | 3,621.00 | 4.00 | 4,828.00 | 0.75 | 905.25 | | 0081 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 4 | EACH | 9,175.00 | 36,700.00 | 20,000.00 | 80,000.00 | 12,000.00 | 48,000.00 | 9,175.00 | 36,700.00 | | 0082 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 3 | EACH | 1,750.00 | 5,250.00 | 1,750.00 | 5,250.00 | 500.00 | 1,500.00 | 1,750.00 | 5,250.00 | | 0083 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 174 | EACH | 400.00 | 69,600.00 | 240.00 | 41,760.00 | 400.00 | 69,600.00 | 750.00 | 130,500.00 | | 0084 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 200,000.00 | 200,000.00 | 50,000.00 | 50,000.00 | 200,000.00 | 200,000.00 | 21,650.00 | 21,650.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 18,239,377.40 | | 18,679,181.75 | | 20,505,343.70 | | 22,416,418.32 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - WL Bass Construction Inc. | - 6 - OCCI INC of Missouri | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3 | LUMP | 1,000,000.00 | 1,000,000.00 | 145,145.00 | 145,145.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,500.00 | 5,500.00 | 29,029.00 | 29,029.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 10,863.7 | SQYD | 6.00 | 65,182.20 | 12.00 | 130,364.40 | | 0004 | 202-02-04501 | Removal of Bridge Structure No. 04090450112421, 24'x965' Steel Truss Bridge w/ Approaches & Approach Slabs | 23,160 | LUMP | 2,500,000.00 | 2,500,000.00 | 1,281,681.00 | 1,281,681.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 69 | SQYD | 7.00 | 483.00 | 12.00 | 828.00 | | 0006 | 202-02-12020 | Removal of Fence (Chain Link) | 452 | LNFT | 1.50 | 678.00 | 12.00 | 5,424.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 250 | LNFT | 5.00 | 1,250.00 | 15.00 | 3,750.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) (10" - 15") | 69 | LNFT | 20.00 | 1,380.00 | 10.00 | 690.00 | | 0009 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 6,107 | SQYD | 4.00 | 24,428.00 | 10.00 | 61,070.00 | | 0010 | 202-02-38240 | Removal of Signs and Supports | 34 | EACH | 300.00 | 10,200.00 | 60.00 | 2,040.00 | | 0011 | 203-01-00100 | General Excavation | 4,971 | CUYD | 8.50 | 42,253.50 | 15.00 | 74,565.00 | | 0012 | 203-03-00100 | Embankment | 16,477 | CUYD | 22.00 | 362,494.00 | 24.00 | 395,448.00 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 14 | EACH | 130.00 | 1,820.00 | 200.00 | 2,800.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 5,673 | LNFT | 3.75 | 21,273.75 | 3.00 | 17,019.00 | | 0015 | 302-02-12060 | Class II Base Course (12" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 7,583.7 | SQYD | 42.00 | 318,515.40 | 53.00 | 401,936.10 | | 0016 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 7,582 | SQYD | 9.50 | 72,029.00 | 29.00 | 219,878.00 | | 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 36 | CUYD | 100.00 | 3,600.00 | 116.00 | 4,176.00 | | 0018 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 61.5 | CUYD | 70.00 | 4,305.00 | 87.00 | 5,350.50 | | 0019 | 502-01-00100 | Asphalt Concrete | 2,355.2 | TON | 210.00 | 494,592.00 | 176.00 | 414,515.20 | | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 180.9 | TON | 285.00 | 51,556.50 | 131.00 | 23,697.90 | | 0021 | 510-01-00001 | Pavement Patching (12.5" Minimum Thickness) | 102 | SQYD | 250.00 | 25,500.00 | 98.00 | 9,996.00 | | 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 143.8 | LNFT | 28.50 | 4,098.30 | 30.00 | 4,314.00 | | 0023 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 92.00 | 9,200.00 | 110.00 | 11,000.00 | | 0024 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 3,500.00 | 3,500.00 | 3,200.00 | 3,200.00 | | 0025 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 3,750.00 | 11,250.00 | 2,900.00 | 8,700.00 | | 0026 | 706-02-00200 | Concrete Drive (6" Thick) | 69.1 | SQYD | 200.00 | 13,820.00 | 116.00 | 8,015.60 | | 0027 | 708-01-00100 | Right-of-Way Monument | 2 | EACH | 1,000.00 | 2,000.00 | 3,484.00 | 6,968.00 | | 0028 | 708-02-00100 | Right-of-Way Monument Witness Post | 2 | EACH | 1,000.00 | 2,000.00 | 3,484.00 | 6,968.00 | | 0029 | 711-02-00100 | Riprap (2 lb) | 38 | CUYD | 195.00 | 7,410.00 | 116.00 | 4,408.00 | | 0030 | 711-04-00100 | Geotextile Fabric | 150 | SQYD | 5.50 | 825.00 | 3.00 | 450.00 | | 0031 | 712-04-00100 | Flexible Revetment | 2,282 | SQYD | 75.00 | 171,150.00 | 100.00 | 228,200.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 596,000.00 | 596,000.00 | 45,500.00 | 45,500.00 | | 0033 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.248 | MILE | 1,500.00 | 4,872.00 | 1,730.00 | 5,619.04 | | 0034 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 2.421 | MILE | 21,000.00 | 50,841.00 | 23,070.00 | 55,852.47 | | 0035 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 640 | EACH | 7.00 | 4,480.00 | 7.00 | 4,480.00 | | 0037 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 89 | EACH | 185.00 | 16,465.00 | 508.00 | 45,212.00 | | 0038 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 60,000.00 | 120,000.00 | 27,250.00 | 54,500.00 | | 0039 | 716-01-00100 | Mulch (Vegetative) | 2.8 | TON | 860.00 | 2,408.00 | 850.00 | 2,380.00 | | 0040 | 717-01-00100 | Seeding | 55 | LB | 12.00 | 660.00 | 20.00 | 1,100.00 | | 0041 | 718-01-00100 | Fertilizer | 1,832 | LB | 0.50 | 916.00 | 1.00 | 1,832.00 | | 0042 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 71 | SQYD | 5.50 | 390.50 | 4.00 | 284.00 | | 0043 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 45,000.00 | 45,000.00 | 17,417.00 | 17,417.00 | | 0044 | 724-01-00100 | Rumble Strips (Centerline) | 0.301 | MILE | 10,000.00 | 3,010.00 | 11,574.00 | 3,483.77 | | 0045 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.601 | MILE | 10,000.00 | 6,010.00 | 11,554.00 | 6,943.95 | | 0046 | 725-01-00100 | Temporary Detour Roads | 3,212.4 | SQYD | 130.00 | 417,612.00 | 119.00 | 382,275.60 | | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 2,340,000.00 | 2,340,000.00 | 2,751,654.00 | 2,751,654.00 | | 0048 | 729-01-00100 | Sign (Type A) | 65.8 | SQFT | 25.00 | 1,645.00 | 35.00 | 2,303.00 | | 0049 | 729-02-00100 | Sign (Type B) | 10 | SQFT | 36.00 | 360.00 | 35.00 | 350.00 | | 0050 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 105.00 | 420.00 | 75.00 | 300.00 | | 0051 | 729-21-00100 | U-Channel Post | 14 | EACH | 125.00 | 1,750.00 | 100.00 | 1,400.00 | | 0052 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 5,477 | EACH | 16.00 | 87,632.00 | 15.00 | 82,155.00 | | 0053 | 731-02-00100 | Reflectorized Raised Pavement Markers | 186 | EACH | 10.00 | 1,860.00 | 10.00 | 1,860.00 | | 0054 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.815 | MILE | 10,000.00 | 28,150.00 | 11,535.00 | 32,471.03 | | 0055 | 732-05-00100 | Removal of Existing Markings | 0.363 | MILE | 20,000.00 | 7,260.00 | 23,261.00 | 8,443.74 | | 0056 | 735-01-00100 | Mailboxes | 6 | EACH | 15.00 | 90.00 | 102.00 | 612.00 | | 0057 | 735-02-00100 | Mailbox Supports (Single) | 6 | EACH | 150.00 | 900.00 | 102.00 | 612.00 | | 0058 | 740-01-00100 | Construction Layout | 1 | LUMP | 700,000.00 | 700,000.00 | 436,152.00 | 436,152.00 | | 0059 | 802-03-00100 | Temporary Sheeting (Steel) | 7,140 | SQFT | 38.00 | 271,320.00 | 100.00 | 714,000.00 | | 0060 | 804-01-00200 | Precast Concrete Piles (14") | 60 | LNFT | 620.00 | 37,200.00 | 841.00 | 50,460.00 | | 0061 | 804-01-00400 | Precast Concrete Piles (18") | 1,048 | LNFT | 140.00 | 146,720.00 | 298.00 | 312,304.00 | | 0062 | 804-01-00700 | Precast Concrete Piles (30") | 6,804 | LNFT | 420.00 | 2,857,680.00 | 414.00 | 2,816,856.00 | | 0063 | 804-10-00700 | Precast Concrete Indicator Piles (30") | 1 | EACH | 375,500.00 | 375,500.00 | 75,462.00 | 75,462.00 | | 0064 | 804-14-00100 | Dynamic Monitoring Assistance | 7 | EACH | 850.00 | 5,950.00 | 11,264.00 | 78,848.00 | | 0065 | 805-01-00200 | Class A1 Concrete (Deck) | 2,979.3 | CUYD | 350.00 | 1,042,755.00 | 1,999.00 | 5,955,620.70 | | 0066 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 444.15 | CUYD | 350.00 | 155,452.50 | 4,540.00 | 2,016,441.00 | | 0067 | 805-08-01200 | Precast-Prestressed Concrete Girder (Type LG-36) | 1,390 | LNFT | 557.00 | 774,230.00 | 465.00 | 646,350.00 | | 0068 | 805-08-01400 | Precast-Prestressed Concrete Girder (Type LG-54) | 6,766 | LNFT | 707.00 | 4,783,562.00 | 420.00 | 2,841,720.00 | | 0069 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 28,101 | SQFT | 3.00 | 84,303.00 | 8.50 | 238,858.50 | | 0070 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 28,101 | SQFT | 4.00 | 112,404.00 | 5.50 | 154,555.50 | | 0071 | 806-01-00100 | Deformed Reinforcing Steel | 839,704 | LB | 1.70 | 1,427,496.80 | 1.70 | 1,427,496.80 | | 0072 | 807-01-00200 | Structural Metalwork (Grade 50) | 1,404 | LUMP | 50,000.00 | 50,000.00 | 8,327.00 | 8,327.00 | | 0073 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 32 | LUMP | 5,000.00 | 5,000.00 | 562.00 | 562.00 | | 0074 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 4,176 | LNFT | 145.00 | 605,520.00 | 113.00 | 471,888.00 | | 0075 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 115.00 | 368,000.00 | 91.00 | 291,200.00 | | 0076 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 1,146 | SFIN | 120.00 | 137,520.00 | 104.00 | 119,184.00 | | 0077 | 815-02-00200 | Sealed Expansion Joint (End Dams and Preformed Silicone Seal) | 400 | LNFT | 270.00 | 108,000.00 | 1,001.00 | 400,400.00 | | 0078 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 240 | LNFT | 11.00 | 2,640.00 | 25.00 | 6,000.00 | | 0079 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 400 | LNFT | 3.00 | 1,200.00 | 3.00 | 1,200.00 | | 0080 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 1,207 | INLF | 2.50 | 3,017.50 | 2.00 | 2,414.00 | | 0081 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 4 | EACH | 20,000.00 | 80,000.00 | 17,500.00 | 70,000.00 | | 0082 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 3 | EACH | 7,500.00 | 22,500.00 | 3,250.00 | 9,750.00 | | 0083 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 174 | EACH | 500.00 | 87,000.00 | 867.00 | 150,858.00 | | 0084 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 200,000.00 | 200,000.00 | 1,256,345.00 | 1,256,345.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 23,415,995.95 | | 27,573,919.80 |
|