Proposal:H.013151.6
Parish:St. Tammany
Routes:US 190
Description:US 190 (GAUSE BLVD.) SIDEWALK IMPROVEMENTS
Type Construction:CLEARING AND GRUBBING, GRADING, CLASS II BASE COURSE, SIDEWALKS, PLASTIC PAVEMENT STRIPING, AND RELATED WORK.
Estimated Construction Cost:$521,269.40
| Rank | License | Bidder | Construction Bid |
| 1 | 54896 | Magee Excavation & Development LLC | $569,000.00 |
| 2 | 69714 | Roadwrxx, LLC | $751,726.35 |
| 3 | 14914 | Kass Bros. Inc. | $1,045,374.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Magee Excavation & Development LLC | - 2 - Roadwrxx, LLC | - 3 - Kass Bros. Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 68,000.00 | 68,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 5,600.00 | 5,600.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 40 | SQYD | 15.00 | 600.00 | 15.00 | 600.00 | 45.00 | 1,800.00 | | 0004 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | 45 | SQYD | 15.00 | 675.00 | 15.00 | 675.00 | 40.00 | 1,800.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 3,688 | SQYD | 20.00 | 73,760.00 | 15.00 | 55,320.00 | 30.00 | 110,640.00 | | 0006 | 202-02-06140 | Removal of Curbs (Concrete) | 554.1 | LNFT | 15.00 | 8,311.50 | 5.00 | 2,770.50 | 20.00 | 11,082.00 | | 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 31 | SQYD | 20.00 | 620.00 | 50.00 | 1,550.00 | 89.00 | 2,759.00 | | 0008 | 202-02-38300 | Removal of Sign and U-Channel Post | 2 | EACH | 11.00 | 22.00 | 15.00 | 30.00 | 72.00 | 144.00 | | 0009 | 202-03-38000 | Relocation of Sign STA. 101+72.00 LT. | 16 | EACH | 39.00 | 624.00 | 50.00 | 800.00 | 47.00 | 752.00 | | 0010 | 203-04-00200 | Nonplastic Embankment (Sand) | 50 | CUYD | 40.00 | 2,000.00 | 45.66 | 2,283.00 | 100.00 | 5,000.00 | | 0011 | 204-02-00100 | Temporary Hay Bales | 168 | EACH | 12.00 | 2,016.00 | 5.00 | 840.00 | 28.00 | 4,704.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 7,031 | LNFT | 1.50 | 10,546.50 | 0.35 | 2,460.85 | 1.00 | 7,031.00 | | 0013 | 302-02-12020 | Class II Base Course (12" Thick) (Crushed Stone) | 45 | SQYD | 60.00 | 2,700.00 | 150.00 | 6,750.00 | 118.00 | 5,310.00 | | 0014 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 230.9 | CUYD | 60.00 | 13,854.00 | 45.00 | 10,390.50 | 85.00 | 19,626.50 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 23.1 | TON | 550.00 | 12,705.00 | 250.00 | 5,775.00 | 250.00 | 5,775.00 | | 0016 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 30.5 | SQYD | 100.00 | 3,050.00 | 300.00 | 9,150.00 | 585.00 | 17,842.50 | | 0017 | 702-04-00100 | Adjusting Manholes | 3 | EACH | 1,100.00 | 3,300.00 | 1,500.00 | 4,500.00 | 1,400.00 | 4,200.00 | | 0018 | 702-04-00200 | Adjusting Catch Basins DROP INLET | 4 | EACH | 1,100.00 | 4,400.00 | 1,500.00 | 6,000.00 | 4,500.00 | 18,000.00 | | 0019 | 706-01-00100 | Concrete Walk (4" Thick) | 2,344.6 | SQYD | 45.00 | 105,507.00 | 75.00 | 175,845.00 | 90.00 | 211,014.00 | | 0020 | 706-01-00300 | Concrete Walk (6" Thick) | 136.5 | SQYD | 80.00 | 10,920.00 | 85.00 | 11,602.50 | 103.00 | 14,059.50 | | 0021 | 706-02-00300 | Concrete Drive (8" Thick) | 1,317.5 | SQYD | 65.00 | 85,637.50 | 95.00 | 125,162.50 | 109.00 | 143,607.50 | | 0022 | 706-04-00100 | Handicapped Curb Ramps | 28 | EACH | 1,400.00 | 39,200.00 | 2,750.00 | 77,000.00 | 4,700.00 | 131,600.00 | | 0023 | 707-01-00100 | Concrete Curb | 554.1 | LNFT | 18.00 | 9,973.80 | 25.00 | 13,852.50 | 54.00 | 29,921.40 | | 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,500.00 | 5,500.00 | 80,000.00 | 80,000.00 | 35,500.00 | 35,500.00 | | 0025 | 714-01-00600 | Slab Sodding (St. Augustine) | 1,140 | SQYD | 8.00 | 9,120.00 | 8.00 | 9,120.00 | 14.00 | 15,960.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 78,491.45 | 78,491.45 | 75,000.00 | 75,000.00 | 104,000.00 | 104,000.00 | | 0027 | 729-02-00100 | Sign (Type B) | 77 | SQFT | 30.00 | 2,310.00 | 30.00 | 2,310.00 | 36.00 | 2,772.00 | | 0028 | 729-21-00100 | U-Channel Post | 2 | EACH | 150.00 | 300.00 | 150.00 | 300.00 | 180.00 | 360.00 | | 0029 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 137 | LNFT | 4.25 | 582.25 | 5.00 | 685.00 | 26.00 | 3,562.00 | | 0030 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,642 | LNFT | 16.50 | 27,093.00 | 18.00 | 29,556.00 | 21.00 | 34,482.00 | | 0031 | 732-05-00100 | Removal of Existing Markings | 0.328 | MILE | 28,000.00 | 9,184.00 | 25,000.00 | 8,200.00 | 33,500.00 | 10,988.00 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,500.00 | 5,500.00 | 10,000.00 | 10,000.00 | 3,200.00 | 3,200.00 | | 0033 | 741-11-00100 | Adjusting Water Valve | 4 | EACH | 550.00 | 2,200.00 | 250.00 | 1,000.00 | 521.00 | 2,084.00 | | 0034 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 576 | INLF | 1.50 | 864.00 | 1.00 | 576.00 | 1.00 | 576.00 | | 0035 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 11,622 | INLF | 1.50 | 17,433.00 | 1.00 | 11,622.00 | 1.00 | 11,622.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 569,000.00 | | 751,726.35 | | 1,045,374.40 |
|