Proposal:H.012073.6
Parish:St. James
Routes:LA 20
Description:LA 20: IMPROVEMENTS AT LA 3127
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$556,856.32
| Rank | License | Bidder | Construction Bid |
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $438,944.38 |
| 2 | 05693 | Industrial Enterprises, Inc. | $467,191.10 |
| 3 | 06276 | Barriere Construction Co., LLC | $499,038.79 |
| 4 | 55950 | Brown Industrial Construction, LLC | $534,827.64 |
| 5 | 34263 | La Contracting Enterprise LLC | $561,799.19 |
| 6 | 02179 | Boh Bros. Construction Co., LLC. | $619,126.99 |
| 7 | 44013 | M. Trak, LLC | $675,425.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barber Bros. Contracting Co., L.L.C | - 2 - Industrial Enterprises, Inc. | - 3 - Barriere Construction Co., LLC | - 4 - Brown Industrial Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 44 | SQYD | 15.00 | 660.00 | 12.20 | 536.80 | 40.00 | 1,760.00 | 14.00 | 616.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 73 | SQYD | 18.00 | 1,314.00 | 12.20 | 890.60 | 35.00 | 2,555.00 | 14.00 | 1,022.00 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 800.00 | 1,600.00 | 793.00 | 1,586.00 | 1,100.00 | 2,200.00 | 500.00 | 1,000.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 315 | SQYD | 19.00 | 5,985.00 | 15.25 | 4,803.75 | 7.25 | 2,283.75 | 15.00 | 4,725.00 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 76.58 | LNFT | 1.00 | 76.58 | 6.10 | 467.14 | 30.00 | 2,297.40 | 10.00 | 765.80 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) 24" CMP | 88 | LNFT | 16.00 | 1,408.00 | 12.20 | 1,073.60 | 28.00 | 2,464.00 | 18.00 | 1,584.00 | | 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) 24" RCP, 18" RCP | 120 | LNFT | 16.00 | 1,920.00 | 12.20 | 1,464.00 | 28.00 | 3,360.00 | 18.00 | 2,160.00 | | 0008 | 202-03-38000 | Relocation of Sign . | 3 | EACH | 150.00 | 450.00 | 73.20 | 219.60 | 85.00 | 255.00 | 75.00 | 225.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 | 30,500.00 | 30,500.00 | 21,000.00 | 21,000.00 | 50,000.00 | 50,000.00 | | 0010 | 204-02-00100 | Temporary Hay Bales | 16 | EACH | 25.00 | 400.00 | 18.00 | 288.00 | 12.00 | 192.00 | 40.00 | 640.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 80.00 | 480.00 | 180.00 | 1,080.00 | 150.00 | 900.00 | 135.00 | 810.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 752 | LNFT | 1.50 | 1,128.00 | 2.64 | 1,985.28 | 1.50 | 1,128.00 | 3.00 | 2,256.00 | | 0013 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 1,358.3 | SQYD | 35.00 | 47,540.50 | 34.68 | 47,105.84 | 30.00 | 40,749.00 | 30.00 | 40,749.00 | | 0014 | 304-01-00100 | Lime | 4.82 | TON | 250.00 | 1,205.00 | 275.00 | 1,325.50 | 525.00 | 2,530.50 | 400.00 | 1,928.00 | | 0015 | 304-05-00100 | Lime Treatment (Type E) | 340 | SQYD | 10.00 | 3,400.00 | 16.25 | 5,525.00 | 50.00 | 17,000.00 | 16.00 | 5,440.00 | | 0016 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 150 | CUYD | 30.00 | 4,500.00 | 78.00 | 11,700.00 | 5.00 | 750.00 | 90.00 | 13,500.00 | | 0017 | 502-01-00100 | Asphalt Concrete | 681.1 | TON | 100.00 | 68,110.00 | 102.00 | 69,472.20 | 125.00 | 85,137.50 | 125.00 | 85,137.50 | | 0018 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 16.2 | TON | 240.00 | 3,888.00 | 244.80 | 3,965.76 | 125.00 | 2,025.00 | 125.00 | 2,025.00 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 2,667 | SQYD | 3.50 | 9,334.50 | 3.57 | 9,521.19 | 3.75 | 10,001.25 | 3.75 | 10,001.25 | | 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -111 | CUYD | 0.00 | 0.00 | 0.01 | -1.11 | 0.01 | -1.11 | 0.01 | -1.11 | | 0021 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 552 | LNFT | 120.00 | 66,240.00 | 99.73 | 55,050.96 | 105.00 | 57,960.00 | 110.00 | 60,720.00 | | 0022 | 701-10-01120 | Reinforced Concrete Pipe (Extension) (42") | 80 | LNFT | 205.00 | 16,400.00 | 193.88 | 15,510.40 | 275.00 | 22,000.00 | 190.00 | 15,200.00 | | 0023 | 701-14-00100 | Cleaning Existing Pipes | 600 | LNFT | 17.50 | 10,500.00 | 12.00 | 7,200.00 | 40.00 | 24,000.00 | 10.00 | 6,000.00 | | 0024 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,700.00 | 3,400.00 | 1,200.00 | 2,400.00 | 2,600.00 | 5,200.00 | 1,200.00 | 2,400.00 | | 0025 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 676 | LNFT | 0.00 | 0.00 | 6.00 | 4,056.00 | 1.00 | 676.00 | 4.00 | 2,704.00 | | 0026 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 10,000.00 | 10,000.00 | 10,200.00 | 10,200.00 | 7,500.00 | 7,500.00 | 12,000.00 | 12,000.00 | | 0027 | 702-03-00100 | Catch Basins (CB-01) | 7 | EACH | 5,400.00 | 37,800.00 | 4,320.00 | 30,240.00 | 4,500.00 | 31,500.00 | 3,800.00 | 26,600.00 | | 0028 | 706-02-00400 | Concrete Drive (10" Thick) | 128 | SQYD | 120.00 | 15,360.00 | 116.53 | 14,915.84 | 125.00 | 16,000.00 | 100.00 | 12,800.00 | | 0029 | 707-01-00100 | Concrete Curb | 57 | LNFT | 50.00 | 2,850.00 | 14.40 | 820.80 | 28.00 | 1,596.00 | 17.00 | 969.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 27,160.61 | 27,160.61 | 12,000.00 | 12,000.00 | 50,000.00 | 50,000.00 | | 0031 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 5,680 | LNFT | 0.15 | 852.00 | 0.17 | 965.60 | 0.25 | 1,420.00 | 0.25 | 1,420.00 | | 0032 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,984 | LNFT | 0.25 | 496.00 | 0.28 | 555.52 | 0.75 | 1,488.00 | 0.60 | 1,190.40 | | 0033 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 356 | LNFT | 0.50 | 178.00 | 0.55 | 195.80 | 2.50 | 890.00 | 2.00 | 712.00 | | 0034 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 4 | EACH | 25.00 | 100.00 | 27.50 | 110.00 | 1.00 | 4.00 | 40.00 | 160.00 | | 0035 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 4 | EACH | 25.00 | 100.00 | 27.50 | 110.00 | 1.00 | 4.00 | 40.00 | 160.00 | | 0036 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 4 | EACH | 25.00 | 100.00 | 27.50 | 110.00 | 1.00 | 4.00 | 40.00 | 160.00 | | 0037 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 330 | EACH | 5.00 | 1,650.00 | 5.50 | 1,815.00 | 12.00 | 3,960.00 | 6.00 | 1,980.00 | | 0038 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 500.00 | 1,000.00 | 1,650.00 | 3,300.00 | 2,100.00 | 4,200.00 | 3,000.00 | 6,000.00 | | 0039 | 726-01-00100 | Bedding Material | 127.9 | CUYD | 105.00 | 13,429.50 | 90.00 | 11,511.00 | 105.00 | 13,429.50 | 100.00 | 12,790.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 35,000.00 | 35,000.00 | 54,838.78 | 54,838.78 | 34,000.00 | 34,000.00 | 53,000.00 | 53,000.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 330 | EACH | 6.12 | 2,019.60 | 6.60 | 2,178.00 | 12.00 | 3,960.00 | 10.00 | 3,300.00 | | 0042 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 2,840 | LNFT | 1.05 | 2,982.00 | 1.10 | 3,124.00 | 1.75 | 4,970.00 | 1.50 | 4,260.00 | | 0043 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 480 | LNFT | 2.55 | 1,224.00 | 2.75 | 1,320.00 | 4.00 | 1,920.00 | 3.00 | 1,440.00 | | 0044 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 178 | LNFT | 11.25 | 2,002.50 | 12.10 | 2,153.80 | 15.00 | 2,670.00 | 12.00 | 2,136.00 | | 0045 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.1 | MILE | 5,110.00 | 511.00 | 5,500.00 | 550.00 | 4,800.00 | 480.00 | 4,000.00 | 400.00 | | 0046 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 358.00 | 716.00 | 385.00 | 770.00 | 400.00 | 800.00 | 350.00 | 700.00 | | 0047 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 358.00 | 716.00 | 385.00 | 770.00 | 400.00 | 800.00 | 350.00 | 700.00 | | 0048 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 358.00 | 716.00 | 385.00 | 770.00 | 400.00 | 800.00 | 350.00 | 700.00 | | 0049 | 739-01-00100 | Hydro-Seeding | 0.24 | ACRE | 3,070.00 | 736.80 | 12,000.00 | 2,880.00 | 2,100.00 | 504.00 | 11,000.00 | 2,640.00 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,813.00 | 2,813.00 | 9,000.00 | 9,000.00 | 8,500.00 | 8,500.00 | 20,000.00 | 20,000.00 | | 0051 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 8,604 | INLF | 0.60 | 5,162.40 | 0.96 | 8,259.84 | 4.00 | 34,416.00 | 0.70 | 6,022.80 | | 0052 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 700 | INLF | 0.70 | 490.00 | 1.20 | 840.00 | 4.00 | 2,800.00 | 1.40 | 980.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 438,944.38 | | 467,191.10 | | 499,038.79 | | 534,827.64 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - La Contracting Enterprise LLC | - 6 - Boh Bros. Construction Co., LLC. | - 7 - M. Trak, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 44 | SQYD | 20.00 | 880.00 | 25.00 | 1,100.00 | 50.00 | 2,200.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 73 | SQYD | 25.00 | 1,825.00 | 25.00 | 1,825.00 | 35.00 | 2,555.00 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 2,100.00 | 4,200.00 | 900.00 | 1,800.00 | 550.00 | 1,100.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 315 | SQYD | 25.00 | 7,875.00 | 25.00 | 7,875.00 | 25.00 | 7,875.00 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 76.58 | LNFT | 20.00 | 1,531.60 | 20.00 | 1,531.60 | 25.00 | 1,914.50 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) 24" CMP | 88 | LNFT | 30.00 | 2,640.00 | 20.00 | 1,760.00 | 25.00 | 2,200.00 | | 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) 24" RCP, 18" RCP | 120 | LNFT | 28.00 | 3,360.00 | 20.00 | 2,400.00 | 40.00 | 4,800.00 | | 0008 | 202-03-38000 | Relocation of Sign . | 3 | EACH | 300.00 | 900.00 | 120.00 | 360.00 | 150.00 | 450.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 45,000.00 | 45,000.00 | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | | 0010 | 204-02-00100 | Temporary Hay Bales | 16 | EACH | 24.00 | 384.00 | 40.00 | 640.00 | 40.00 | 640.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 270.00 | 1,620.00 | 135.00 | 810.00 | 110.00 | 660.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 752 | LNFT | 4.50 | 3,384.00 | 3.00 | 2,256.00 | 3.00 | 2,256.00 | | 0013 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 1,358.3 | SQYD | 41.00 | 55,690.30 | 45.00 | 61,123.50 | 65.00 | 88,289.50 | | 0014 | 304-01-00100 | Lime | 4.82 | TON | 600.00 | 2,892.00 | 500.00 | 2,410.00 | 250.00 | 1,205.00 | | 0015 | 304-05-00100 | Lime Treatment (Type E) | 340 | SQYD | 20.00 | 6,800.00 | 5.00 | 1,700.00 | 25.00 | 8,500.00 | | 0016 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 150 | CUYD | 121.00 | 18,150.00 | 10.00 | 1,500.00 | 10.00 | 1,500.00 | | 0017 | 502-01-00100 | Asphalt Concrete | 681.1 | TON | 130.00 | 88,543.00 | 150.00 | 102,165.00 | 110.00 | 74,921.00 | | 0018 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 16.2 | TON | 170.00 | 2,754.00 | 500.00 | 8,100.00 | 150.00 | 2,430.00 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 2,667 | SQYD | 7.00 | 18,669.00 | 9.00 | 24,003.00 | 5.00 | 13,335.00 | | 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -111 | CUYD | 0.01 | -1.11 | 0.01 | -1.11 | 0.01 | -1.11 | | 0021 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 552 | LNFT | 82.00 | 45,264.00 | 150.00 | 82,800.00 | 150.00 | 82,800.00 | | 0022 | 701-10-01120 | Reinforced Concrete Pipe (Extension) (42") | 80 | LNFT | 214.00 | 17,120.00 | 260.00 | 20,800.00 | 250.00 | 20,000.00 | | 0023 | 701-14-00100 | Cleaning Existing Pipes | 600 | LNFT | 17.00 | 10,200.00 | 20.00 | 12,000.00 | 15.00 | 9,000.00 | | 0024 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,500.00 | 3,000.00 | 2,250.00 | 4,500.00 | 1,250.00 | 2,500.00 | | 0025 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 676 | LNFT | 11.00 | 7,436.00 | 1.50 | 1,014.00 | 25.00 | 16,900.00 | | 0026 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 13,000.00 | 13,000.00 | 9,500.00 | 9,500.00 | 15,000.00 | 15,000.00 | | 0027 | 702-03-00100 | Catch Basins (CB-01) | 7 | EACH | 4,500.00 | 31,500.00 | 5,000.00 | 35,000.00 | 3,500.00 | 24,500.00 | | 0028 | 706-02-00400 | Concrete Drive (10" Thick) | 128 | SQYD | 132.00 | 16,896.00 | 170.00 | 21,760.00 | 115.00 | 14,720.00 | | 0029 | 707-01-00100 | Concrete Curb | 57 | LNFT | 35.00 | 1,995.00 | 30.00 | 1,710.00 | 100.00 | 5,700.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 60,000.00 | 60,000.00 | 73,000.00 | 73,000.00 | | 0031 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 5,680 | LNFT | 0.50 | 2,840.00 | 0.10 | 568.00 | 1.00 | 5,680.00 | | 0032 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,984 | LNFT | 1.00 | 1,984.00 | 0.10 | 198.40 | 1.00 | 1,984.00 | | 0033 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 356 | LNFT | 2.40 | 854.40 | 0.20 | 71.20 | 2.00 | 712.00 | | 0034 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 4 | EACH | 45.00 | 180.00 | 5.00 | 20.00 | 50.00 | 200.00 | | 0035 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 4 | EACH | 45.00 | 180.00 | 5.00 | 20.00 | 50.00 | 200.00 | | 0036 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 4 | EACH | 45.00 | 180.00 | 5.00 | 20.00 | 50.00 | 200.00 | | 0037 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 330 | EACH | 7.00 | 2,310.00 | 0.50 | 165.00 | 10.00 | 3,300.00 | | 0038 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 4,000.00 | 8,000.00 | 1,200.00 | 2,400.00 | 1,500.00 | 3,000.00 | | 0039 | 726-01-00100 | Bedding Material | 127.9 | CUYD | 150.00 | 19,185.00 | 100.00 | 12,790.00 | 90.00 | 11,511.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 56,000.00 | 56,000.00 | 60,000.00 | 60,000.00 | 65,000.00 | 65,000.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 330 | EACH | 11.00 | 3,630.00 | 7.00 | 2,310.00 | 10.00 | 3,300.00 | | 0042 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 2,840 | LNFT | 2.00 | 5,680.00 | 1.10 | 3,124.00 | 1.25 | 3,550.00 | | 0043 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 480 | LNFT | 3.50 | 1,680.00 | 2.75 | 1,320.00 | 4.00 | 1,920.00 | | 0044 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 178 | LNFT | 13.00 | 2,314.00 | 12.00 | 2,136.00 | 15.00 | 2,670.00 | | 0045 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.1 | MILE | 4,500.00 | 450.00 | 5,500.00 | 550.00 | 10,000.00 | 1,000.00 | | 0046 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 400.00 | 800.00 | 375.00 | 750.00 | 500.00 | 1,000.00 | | 0047 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 400.00 | 800.00 | 375.00 | 750.00 | 500.00 | 1,000.00 | | 0048 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 400.00 | 800.00 | 375.00 | 750.00 | 500.00 | 1,000.00 | | 0049 | 739-01-00100 | Hydro-Seeding | 0.24 | ACRE | 11,000.00 | 2,640.00 | 12,000.00 | 2,880.00 | 11,000.00 | 2,640.00 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,200.00 | 8,200.00 | 15,000.00 | 15,000.00 | 22,504.86 | 22,504.86 | | 0051 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 8,604 | INLF | 1.00 | 8,604.00 | 0.60 | 5,162.40 | 1.00 | 8,604.00 | | 0052 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 700 | INLF | 1.40 | 980.00 | 1.00 | 700.00 | 5.00 | 3,500.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 561,799.19 | | 619,126.99 | | 675,425.75 |
|