Proposal:H.011915.6
Parish:Lafourche
Routes:LA 1, LA 308, LA 3235
Description:AIRPORT CONNECTOR ROAD AND BRIDGE
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, TRAFFIC SIGNALIZATION, PERMANENT SHEETING, PRECAST CONCRETE PILES, TREATED TIMBER PILES, LIFT SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$33,353,620.75
| Rank | License | Bidder | Construction Bid |
| 1 | 33678 | Sealevel Construction Inc. | $30,956,316.07 |
| 2 | 34567 | James Construction Group LLC | $37,142,023.90 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $40,579,285.66 |
| 4 | 39462 | JB JAMES CONSTRUCTION LLC | $43,326,055.71 |
| 5 | 01029 | Traylor Bros., Inc. | $49,804,132.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Sealevel Construction Inc. | - 2 - James Construction Group LLC | - 3 - Boh Bros. Construction Co., LLC. | - 4 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 274,000.00 | 274,000.00 | 112,500.00 | 112,500.00 | 400,000.00 | 400,000.00 | 1,000,000.00 | 1,000,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 195,000.00 | 195,000.00 | 119,200.00 | 119,200.00 | 100,000.00 | 100,000.00 | 1,000,000.00 | 1,000,000.00 | | 0003 | 202-02-00010 | Removal of Overhead Crossing for Lighting | 2 | EACH | 1,850.00 | 3,700.00 | 762.00 | 1,524.00 | 900.00 | 1,800.00 | 770.00 | 1,540.00 | | 0004 | 202-02-02000 | Removal of Asphalt Drives | 417 | SQYD | 22.00 | 9,174.00 | 33.00 | 13,761.00 | 14.00 | 5,838.00 | 20.00 | 8,340.00 | | 0005 | 202-02-02020 | Removal of Asphalt Pavement | 5,815.6 | SQYD | 15.00 | 87,234.00 | 5.00 | 29,078.00 | 9.50 | 55,248.20 | 20.00 | 116,312.00 | | 0006 | 202-02-06060 | Removal of Concrete Catch Basin | 18 | EACH | 1,600.00 | 28,800.00 | 335.00 | 6,030.00 | 1,300.00 | 23,400.00 | 1,300.00 | 23,400.00 | | 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 493 | SQYD | 25.00 | 12,325.00 | 9.00 | 4,437.00 | 20.00 | 9,860.00 | 21.00 | 10,353.00 | | 0008 | 202-02-12000 | Removal of Fence | 200 | LNFT | 5.00 | 1,000.00 | 20.00 | 4,000.00 | 8.50 | 1,700.00 | 7.00 | 1,400.00 | | 0009 | 202-02-12020 | Removal of Fence (Chain Link) | 1,070 | LNFT | 10.00 | 10,700.00 | 7.00 | 7,490.00 | 8.00 | 8,560.00 | 5.00 | 5,350.00 | | 0010 | 202-02-14500 | Removal of Guard Rail | 17 | LNFT | 75.00 | 1,275.00 | 360.00 | 6,120.00 | 9.00 | 153.00 | 25.00 | 425.00 | | 0011 | 202-02-32100 | Removal of Pipe (Cross Drain) (See Summary of Drainage Structures for size and material of existing pipe to be removed) | 601 | LNFT | 40.00 | 24,040.00 | 18.00 | 10,818.00 | 40.00 | 24,040.00 | 33.00 | 19,833.00 | | 0012 | 202-02-32120 | Removal of Pipe (Side Drain) (See Summary of Drainage Structures for size and material of existing pipe to be removed) | 1,254 | LNFT | 40.00 | 50,160.00 | 9.00 | 11,286.00 | 40.00 | 50,160.00 | 33.00 | 41,382.00 | | 0013 | 202-02-38300 | Removal of Sign and U-Channel Post | 15 | EACH | 15.00 | 225.00 | 10.00 | 150.00 | 12.00 | 180.00 | 10.00 | 150.00 | | 0014 | 202-03-00010 | Relocation of Existing Electric Utility Pole | 1 | EACH | 3,000.00 | 3,000.00 | 1,912.00 | 1,912.00 | 2,350.00 | 2,350.00 | 10,000.00 | 10,000.00 | | 0015 | 203-01-00100 | General Excavation | 16,954.6 | CUYD | 14.00 | 237,364.40 | 13.50 | 228,887.10 | 16.00 | 271,273.60 | 14.00 | 237,364.40 | | 0016 | 203-02-00100 | Drainage Excavation (Bayou Lafourche) | 2,543 | CUYD | 32.00 | 81,376.00 | 22.00 | 55,946.00 | 240.00 | 610,320.00 | 50.00 | 127,150.00 | | 0017 | 203-03-00100 | Embankment | 5,437.7 | CUYD | 38.00 | 206,632.60 | 39.00 | 212,070.30 | 45.00 | 244,696.50 | 75.00 | 407,827.50 | | 0018 | 203-04-00300 | Nonplastic Embankment (Stone) (22" Thick) | 181.3 | CUYD | 165.00 | 29,914.50 | 127.00 | 23,025.10 | 140.00 | 25,382.00 | 150.00 | 27,195.00 | | 0019 | 203-10-00100 | Cleaning Existing Ditches | 280 | LNFT | 18.00 | 5,040.00 | 23.00 | 6,440.00 | 20.00 | 5,600.00 | 19.00 | 5,320.00 | | 0020 | 204-02-00100 | Temporary Hay Bales | 602 | EACH | 15.00 | 9,030.00 | 21.00 | 12,642.00 | 14.00 | 8,428.00 | 12.00 | 7,224.00 | | 0021 | 204-06-00100 | Temporary Silt Fencing | 9,235.2 | LNFT | 2.00 | 18,470.40 | 3.00 | 27,705.60 | 2.00 | 18,470.40 | 3.00 | 27,705.60 | | 0022 | 302-02-18000 | Class II Base Course (18" Thick) (Stone) | 20,880.1 | SQYD | 50.00 | 1,044,005.00 | 53.00 | 1,106,645.30 | 65.00 | 1,357,206.50 | 52.00 | 1,085,765.20 | | 0023 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 56.4 | CUYD | 170.00 | 9,588.00 | 160.00 | 9,024.00 | 125.00 | 7,050.00 | 110.00 | 6,204.00 | | 0024 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 87.1 | CUYD | 96.00 | 8,361.60 | 105.00 | 9,145.50 | 140.00 | 12,194.00 | 140.00 | 12,194.00 | | 0025 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 261.3 | SQYD | 70.00 | 18,291.00 | 100.00 | 26,130.00 | 70.00 | 18,291.00 | 50.00 | 13,065.00 | | 0026 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 110.9 | CUYD | 115.00 | 12,753.50 | 126.50 | 14,028.85 | 140.00 | 15,526.00 | 150.00 | 16,635.00 | | 0027 | 502-01-00100 | Asphalt Concrete | 15,696.2 | TON | 102.00 | 1,601,012.40 | 100.00 | 1,569,620.00 | 120.00 | 1,883,544.00 | 100.00 | 1,569,620.00 | | 0028 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 4,251 | TON | 115.00 | 488,865.00 | 110.00 | 467,610.00 | 130.00 | 552,630.00 | 110.00 | 467,610.00 | | 0029 | 509-01-00100 | Milling Asphalt Pavement | 8,561.9 | SQYD | 4.00 | 34,247.60 | 4.00 | 34,247.60 | 5.00 | 42,809.50 | 4.00 | 34,247.60 | | 0030 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -476 | CUYD | 0.10 | -47.60 | 0.01 | -4.76 | 0.01 | -4.76 | 0.01 | -4.76 | | 0031 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 261.3 | SQYD | 210.00 | 54,873.00 | 106.00 | 27,697.80 | 135.00 | 35,275.50 | 115.00 | 30,049.50 | | 0032 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 4 | LNFT | 425.00 | 1,700.00 | 374.00 | 1,496.00 | 460.00 | 1,840.00 | 375.00 | 1,500.00 | | 0033 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 328 | LNFT | 345.00 | 113,160.00 | 319.00 | 104,632.00 | 400.00 | 131,200.00 | 320.00 | 104,960.00 | | 0034 | 701-02-01080 | Cross Drain Pipe Arch (48" Equiv. RCPA) | 424 | LNFT | 425.00 | 180,200.00 | 385.00 | 163,240.00 | 475.00 | 201,400.00 | 385.00 | 163,240.00 | | 0035 | 701-02-01100 | Cross Drain Pipe Arch (54" Equiv. RCPA) | 8 | LNFT | 445.00 | 3,560.00 | 391.00 | 3,128.00 | 480.00 | 3,840.00 | 400.00 | 3,200.00 | | 0036 | 701-05-01001 | Side Drain Pipe (12" RCP/RPVCP/CPEPDW/CMP) | 8 | LNFT | 165.00 | 1,320.00 | 128.70 | 1,029.60 | 160.00 | 1,280.00 | 130.00 | 1,040.00 | | 0037 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 1,518 | LNFT | 85.00 | 129,030.00 | 93.50 | 141,933.00 | 115.00 | 174,570.00 | 95.00 | 144,210.00 | | 0038 | 701-06-01000 | Side Drain Pipe Arch (15" Equiv. RCPA/CMPA) | 396 | LNFT | 85.00 | 33,660.00 | 95.00 | 37,620.00 | 95.00 | 37,620.00 | 80.00 | 31,680.00 | | 0039 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 818 | LNFT | 100.00 | 81,800.00 | 94.00 | 76,892.00 | 115.00 | 94,070.00 | 95.00 | 77,710.00 | | 0040 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 9,500.00 | 9,500.00 | 8,580.00 | 8,580.00 | 105.00 | 105.00 | 8,600.00 | 8,600.00 | | 0041 | 702-03-00100 | Catch Basins (CB-01) | 67 | EACH | 4,000.00 | 268,000.00 | 4,400.00 | 294,800.00 | 5,500.00 | 368,500.00 | 4,400.00 | 294,800.00 | | 0042 | 702-03-00200 | Catch Basins (CB-02) | 6 | EACH | 9,000.00 | 54,000.00 | 8,250.00 | 49,500.00 | 10,000.00 | 60,000.00 | 8,300.00 | 49,800.00 | | 0043 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 3,000.00 | 3,000.00 | 3,080.00 | 3,080.00 | 3,775.00 | 3,775.00 | 3,000.00 | 3,000.00 | | 0044 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 100 | LNFT | 24.00 | 2,400.00 | 24.00 | 2,400.00 | 40.00 | 4,000.00 | 26.00 | 2,600.00 | | 0045 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 98.00 | 9,800.00 | 98.00 | 9,800.00 | 130.00 | 13,000.00 | 110.00 | 11,000.00 | | 0046 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 2,600.00 | 10,400.00 | 2,600.00 | 10,400.00 | 3,400.00 | 13,600.00 | 3,000.00 | 12,000.00 | | 0047 | 705-01-00100 | Barbed Wire Fence | 200 | LNFT | 7.00 | 1,400.00 | 10.00 | 2,000.00 | 20.00 | 4,000.00 | 10.00 | 2,000.00 | | 0048 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 300 | LNFT | 12.00 | 3,600.00 | 25.00 | 7,500.00 | 50.00 | 15,000.00 | 25.00 | 7,500.00 | | 0049 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 750 | LNFT | 15.00 | 11,250.00 | 35.00 | 26,250.00 | 55.00 | 41,250.00 | 35.00 | 26,250.00 | | 0050 | 706-01-00100 | Concrete Walk (4" Thick) | 2.7 | SQYD | 120.00 | 324.00 | 127.60 | 344.52 | 80.00 | 216.00 | 1,000.00 | 2,700.00 | | 0051 | 706-02-00200 | Concrete Drive (6" Thick) | 368.7 | SQYD | 70.00 | 25,809.00 | 73.00 | 26,915.10 | 120.00 | 44,244.00 | 100.00 | 36,870.00 | | 0052 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 1,007.8 | SQYD | 65.00 | 65,507.00 | 68.20 | 68,731.96 | 110.00 | 110,858.00 | 90.00 | 90,702.00 | | 0053 | 707-01-00100 | Concrete Curb (Mountable) | 200 | LNFT | 39.00 | 7,800.00 | 72.00 | 14,400.00 | 50.00 | 10,000.00 | 30.00 | 6,000.00 | | 0054 | 708-01-00100 | Right-of-Way Monument | 25 | EACH | 265.00 | 6,625.00 | 325.00 | 8,125.00 | 800.00 | 20,000.00 | 250.00 | 6,250.00 | | 0055 | 708-02-00100 | Right-of-Way Monument Witness Post | 25 | EACH | 100.00 | 2,500.00 | 175.00 | 4,375.00 | 60.00 | 1,500.00 | 250.00 | 6,250.00 | | 0056 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 565 | SQYD | 80.00 | 45,200.00 | 160.00 | 90,400.00 | 200.00 | 113,000.00 | 125.00 | 70,625.00 | | 0057 | 711-04-00100 | Geotextile Fabric | 565 | SQYD | 10.00 | 5,650.00 | 10.00 | 5,650.00 | 1.50 | 847.50 | 11.00 | 6,215.00 | | 0058 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 82,000.00 | 82,000.00 | 275,000.00 | 275,000.00 | 240,000.00 | 240,000.00 | 400,000.00 | 400,000.00 | | 0059 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 25,000 | LNFT | 0.55 | 13,750.00 | 0.50 | 12,500.00 | 1.50 | 37,500.00 | 1.25 | 31,250.00 | | 0060 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 48,000.00 | 48,000.00 | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | | 0061 | 723-01-00100 | Granular Material (Net Section) | 5,317 | CUYD | 45.00 | 239,265.00 | 52.00 | 276,484.00 | 52.00 | 276,484.00 | 72.00 | 382,824.00 | | 0062 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.7 | MILE | 5,000.00 | 3,500.00 | 400.00 | 280.00 | 4,000.00 | 2,800.00 | 400.00 | 280.00 | | 0063 | 726-01-00100 | Bedding Material | 1,589.55 | CUYD | 125.00 | 198,693.75 | 125.40 | 199,329.57 | 150.00 | 238,432.50 | 125.00 | 198,693.75 | | 0064 | 727-01-00100 | Mobilization | 1 | LUMP | 2,491,000.00 | 2,491,000.00 | 3,710,000.00 | 3,710,000.00 | 1,565,000.00 | 1,565,000.00 | 4,250,000.00 | 4,250,000.00 | | 0065 | 729-01-00100 | Sign (Type A) | 240.9 | SQFT | 22.00 | 5,299.80 | 22.00 | 5,299.80 | 25.00 | 6,022.50 | 22.00 | 5,299.80 | | 0066 | 729-02-00100 | Sign (Type B) | 313.9 | SQFT | 22.00 | 6,905.80 | 22.00 | 6,905.80 | 25.00 | 7,847.50 | 22.00 | 6,905.80 | | 0067 | 729-04-00100 | Sign (Type D) | 76.6 | SQFT | 30.00 | 2,298.00 | 30.00 | 2,298.00 | 35.00 | 2,681.00 | 30.00 | 2,298.00 | | 0068 | 729-08-00200 | Mounting (3 1/2" Size Post) | 24 | EACH | 975.00 | 23,400.00 | 975.00 | 23,400.00 | 1,150.00 | 27,600.00 | 975.00 | 23,400.00 | | 0069 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 90.00 | 540.00 | 90.00 | 540.00 | 105.00 | 630.00 | 90.00 | 540.00 | | 0070 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 48 | EACH | 125.00 | 6,000.00 | 125.00 | 6,000.00 | 150.00 | 7,200.00 | 125.00 | 6,000.00 | | 0071 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,050 | EACH | 10.00 | 10,500.00 | 10.00 | 10,500.00 | 17.00 | 17,850.00 | 15.00 | 15,750.00 | | 0072 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,365 | LNFT | 10.00 | 13,650.00 | 10.00 | 13,650.00 | 24.00 | 32,760.00 | 20.00 | 27,300.00 | | 0073 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.57 | MILE | 7,100.00 | 32,447.00 | 6,000.00 | 27,420.00 | 7,600.00 | 34,732.00 | 6,500.00 | 29,705.00 | | 0074 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.333 | MILE | 12,000.00 | 3,996.00 | 11,892.00 | 3,960.04 | 23,000.00 | 7,659.00 | 20,000.00 | 6,660.00 | | 0075 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.08 | MILE | 3,000.00 | 240.00 | 3,000.00 | 240.00 | 11,750.00 | 940.00 | 10,000.00 | 800.00 | | 0076 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.33 | MILE | 7,000.00 | 2,310.00 | 7,000.00 | 2,310.00 | 5,800.00 | 1,914.00 | 5,000.00 | 1,650.00 | | 0077 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.22 | MILE | 7,500.00 | 1,650.00 | 7,500.00 | 1,650.00 | 7,000.00 | 1,540.00 | 6,000.00 | 1,320.00 | | 0078 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 7 | EACH | 600.00 | 4,200.00 | 600.00 | 4,200.00 | 600.00 | 4,200.00 | 500.00 | 3,500.00 | | 0079 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 10 | EACH | 400.00 | 4,000.00 | 400.00 | 4,000.00 | 470.00 | 4,700.00 | 400.00 | 4,000.00 | | 0080 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 7 | EACH | 400.00 | 2,800.00 | 400.00 | 2,800.00 | 470.00 | 3,290.00 | 400.00 | 2,800.00 | | 0081 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 3 | EACH | 100.00 | 300.00 | 100.00 | 300.00 | 530.00 | 1,590.00 | 450.00 | 1,350.00 | | 0082 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 5 | EACH | 500.00 | 2,500.00 | 500.00 | 2,500.00 | 470.00 | 2,350.00 | 400.00 | 2,000.00 | | 0083 | 732-05-00100 | Removal of Existing Markings | 0.216 | MILE | 28,000.00 | 6,048.00 | 25,500.00 | 5,508.00 | 11,400.00 | 2,462.40 | 10,000.00 | 2,160.00 | | 0084 | 735-01-00100 | Mailboxes | 21 | EACH | 2.00 | 42.00 | 3.00 | 63.00 | 3.50 | 73.50 | 3.00 | 63.00 | | 0085 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 140.00 | 2,660.00 | 140.00 | 2,660.00 | 165.00 | 3,135.00 | 140.00 | 2,660.00 | | 0086 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 275.00 | 275.00 | 275.00 | 275.00 | 320.00 | 320.00 | 275.00 | 275.00 | | 0087 | 736-01-00100 | Trenching and Backfilling | 224 | LNFT | 7.50 | 1,680.00 | 7.50 | 1,680.00 | 9.00 | 2,016.00 | 8.00 | 1,792.00 | | 0088 | 736-03-00100 | Jacking or Boring | 290 | LNFT | 12.00 | 3,480.00 | 12.00 | 3,480.00 | 38.00 | 11,020.00 | 12.00 | 3,480.00 | | 0089 | 736-04-10350 | Signal Pole (Single Mast Arm, 35ft) | 1 | EACH | 10,215.00 | 10,215.00 | 10,215.00 | 10,215.00 | 14,300.00 | 14,300.00 | 10,000.00 | 10,000.00 | | 0090 | 736-04-10500 | Signal Pole (Single Mast Arm, 50ft) | 3 | EACH | 13,574.00 | 40,722.00 | 13,574.00 | 40,722.00 | 19,000.00 | 57,000.00 | 14,000.00 | 42,000.00 | | 0091 | 736-05-10000 | Signal Heads (1 Section, 12 inch Led Lens, R) | 8 | EACH | 538.00 | 4,304.00 | 538.00 | 4,304.00 | 580.00 | 4,640.00 | 550.00 | 4,400.00 | | 0092 | 736-06-00200 | Signal Service (Existing Pole) | 1 | EACH | 1,775.00 | 1,775.00 | 1,774.00 | 1,774.00 | 3,600.00 | 3,600.00 | 1,800.00 | 1,800.00 | | 0093 | 736-06-00500 | Signal Service Pedestal Disconnect | 1 | EACH | 2,014.00 | 2,014.00 | 2,014.00 | 2,014.00 | 3,000.00 | 3,000.00 | 2,000.00 | 2,000.00 | | 0094 | 736-10-00300 | Underground Junction Box (Type F) | 3 | EACH | 765.00 | 2,295.00 | 765.00 | 2,295.00 | 1,025.00 | 3,075.00 | 800.00 | 2,400.00 | | 0095 | 736-10-00500 | Underground Junction Box (Type H) | 1 | EACH | 1,203.00 | 1,203.00 | 1,203.00 | 1,203.00 | 1,400.00 | 1,400.00 | 1,200.00 | 1,200.00 | | 0096 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 47 | LNFT | 6.00 | 282.00 | 6.00 | 282.00 | 5.50 | 258.50 | 6.00 | 282.00 | | 0097 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 644 | LNFT | 12.00 | 7,728.00 | 11.25 | 7,245.00 | 7.50 | 4,830.00 | 11.00 | 7,084.00 | | 0098 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 57 | LNFT | 4.00 | 228.00 | 4.00 | 228.00 | 24.00 | 1,368.00 | 4.00 | 228.00 | | 0099 | 736-12-06014 | Conductor (6c, #14 awg) | 1,632 | LNFT | 2.00 | 3,264.00 | 2.00 | 3,264.00 | 2.00 | 3,264.00 | 2.00 | 3,264.00 | | 0100 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 4 | EACH | 3,600.00 | 14,400.00 | 3,545.00 | 14,180.00 | 6,350.00 | 25,400.00 | 3,600.00 | 14,400.00 | | 0101 | 736-24-00000 | Flashing Switch Assembly For Beacons | 1 | EACH | 1,600.00 | 1,600.00 | 1,585.00 | 1,585.00 | 5,650.00 | 5,650.00 | 1,600.00 | 1,600.00 | | 0102 | 739-01-00100 | Hydro-Seeding | 5.07 | ACRE | 2,000.00 | 10,140.00 | 2,250.00 | 11,407.50 | 2,350.00 | 11,914.50 | 2,250.00 | 11,407.50 | | 0103 | 740-01-00100 | Construction Layout | 1 | LUMP | 195,000.00 | 195,000.00 | 450,000.00 | 450,000.00 | 600,000.00 | 600,000.00 | 400,000.00 | 400,000.00 | | 0104 | 802-02-00100 | Permanent Sheeting (Steel) | 34,523 | SQFT | 68.00 | 2,347,564.00 | 63.00 | 2,174,949.00 | 50.00 | 1,726,150.00 | 64.00 | 2,209,472.00 | | 0105 | 804-01-00200 | Precast Concrete Piles (14") | 622.5 | LNFT | 155.00 | 96,487.50 | 121.00 | 75,322.50 | 89.00 | 55,402.50 | 140.00 | 87,150.00 | | 0106 | 804-01-00600 | Precast Concrete Piles (24") | 11,847 | LNFT | 185.00 | 2,191,695.00 | 169.00 | 2,002,143.00 | 178.00 | 2,108,766.00 | 180.00 | 2,132,460.00 | | 0107 | 804-02-00100 | Treated Timber Piles (Noncoastal Treatment) | 4,350 | LNFT | 9.00 | 39,150.00 | 16.50 | 71,775.00 | 20.00 | 87,000.00 | 45.00 | 195,750.00 | | 0108 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) | 6,420 | LNFT | 42.00 | 269,640.00 | 37.00 | 237,540.00 | 36.00 | 231,120.00 | 50.00 | 321,000.00 | | 0109 | 804-10-00600 | Precast Concrete Indicator Piles (24") | 3 | EACH | 104,000.00 | 312,000.00 | 45,000.00 | 135,000.00 | 34,200.00 | 102,600.00 | 120,000.00 | 360,000.00 | | 0110 | 804-14-00100 | Dynamic Monitoring Assistance | 25 | EACH | 2,500.00 | 62,500.00 | 2,500.00 | 62,500.00 | 3,300.00 | 82,500.00 | 2,000.00 | 50,000.00 | | 0111 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 15,000.00 | 15,000.00 | 52,000.00 | 52,000.00 | 20,000.00 | 20,000.00 | 75,000.00 | 75,000.00 | | 0112 | 804-18-00100 | Vibration Monitoring | 21 | DAY | 625.00 | 13,125.00 | 800.00 | 16,800.00 | 750.00 | 15,750.00 | 2,000.00 | 42,000.00 | | 0113 | 805-01-00100 | Class A1 Concrete (Slab Span) | 182.55 | CUYD | 1,400.00 | 255,570.00 | 1,900.00 | 346,845.00 | 1,900.00 | 346,845.00 | 1,300.00 | 237,315.00 | | 0114 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 73.97 | CUYD | 975.00 | 72,120.75 | 1,650.00 | 122,050.50 | 1,150.00 | 85,065.50 | 1,300.00 | 96,161.00 | | 0115 | 805-01-00500 | Class A1 Concrete (Footing) | 52.18 | CUYD | 1,000.00 | 52,180.00 | 1,900.00 | 99,142.00 | 3,500.00 | 182,630.00 | 1,500.00 | 78,270.00 | | 0116 | 805-01-00900 | Class A1 Concrete (Access Bridge) | 0.3 | CUYD | 68,000.00 | 20,400.00 | 70,000.00 | 21,000.00 | 5,000.00 | 1,500.00 | 20,000.00 | 6,000.00 | | 0117 | 805-01-00900 | Class A1 Concrete (Machinery Deck) | 236.82 | CUYD | 4,050.00 | 959,121.00 | 3,100.00 | 734,142.00 | 3,700.00 | 876,234.00 | 3,400.00 | 805,188.00 | | 0118 | 805-01-00900 | Class A1 Concrete (Noise Barrier) | 77 | CUYD | 650.00 | 50,050.00 | 850.00 | 65,450.00 | 800.00 | 61,600.00 | 1,000.00 | 77,000.00 | | 0119 | 805-01-00900 | Class A1 Concrete (Tower) | 574.41 | CUYD | 1,575.00 | 904,695.75 | 2,200.00 | 1,263,702.00 | 3,100.00 | 1,780,671.00 | 2,300.00 | 1,321,143.00 | | 0120 | 805-04-00300 | Class MASS(A1) Concrete (Footing) | 519.64 | CUYD | 890.00 | 462,479.60 | 950.00 | 493,658.00 | 865.00 | 449,488.60 | 700.00 | 363,748.00 | | 0121 | 805-04-00400 | Class MASS(A1) Concrete (Counterweight) | 105 | CUYD | 790.00 | 82,950.00 | 3,200.00 | 336,000.00 | 1,760.00 | 184,800.00 | 2,000.00 | 210,000.00 | | 0122 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,598 | SQFT | 3.00 | 4,794.00 | 2.00 | 3,196.00 | 2.75 | 4,394.50 | 1.00 | 1,598.00 | | 0123 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 21,960 | SQFT | 3.00 | 65,880.00 | 0.50 | 10,980.00 | 0.55 | 12,078.00 | 5.00 | 109,800.00 | | 0124 | 806-01-00100 | Deformed Reinforcing Steel | 510,437 | LB | 1.15 | 587,002.55 | 1.50 | 765,655.50 | 1.80 | 918,786.60 | 1.80 | 918,786.60 | | 0125 | 807-01-00100 | Structural Metalwork (Grade 36) | 140,841 | LUMP | 550,000.00 | 550,000.00 | 1,000,000.00 | 1,000,000.00 | 950,000.00 | 950,000.00 | 550,000.00 | 550,000.00 | | 0126 | 807-01-00200 | Structural Metalwork (Grade 50) | 371,125 | LUMP | 1,750,000.00 | 1,750,000.00 | 2,550,000.00 | 2,550,000.00 | 2,445,000.00 | 2,445,000.00 | 1,600,000.00 | 1,600,000.00 | | 0127 | 807-01-00300 | Structural Metalwork (Grade 50S) | 82,697 | LUMP | 415,000.00 | 415,000.00 | 650,000.00 | 650,000.00 | 650,000.00 | 650,000.00 | 280,000.00 | 280,000.00 | | 0128 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 2,344 | LUMP | 22,000.00 | 22,000.00 | 90,000.00 | 90,000.00 | 140,000.00 | 140,000.00 | 26,000.00 | 26,000.00 | | 0129 | 807-03-00100 | Structural Metalwork (Access System) | 3,704 | LUMP | 112,000.00 | 112,000.00 | 40,000.00 | 40,000.00 | 90,000.00 | 90,000.00 | 50,000.00 | 50,000.00 | | 0130 | 807-04-00100 | Structural Metalwork (1" Strike Plate) | 220 | LUMP | 1,500.00 | 1,500.00 | 3,000.00 | 3,000.00 | 3,000.00 | 3,000.00 | 4,000.00 | 4,000.00 | | 0131 | 808-01-00300 | Steel Grid Flooring (Regular, GF-01) | 4,657 | SQFT | 72.00 | 335,304.00 | 215.00 | 1,001,255.00 | 130.00 | 605,410.00 | 70.00 | 325,990.00 | | 0132 | 810-02-00100 | Metal Bridge Railing | 224 | LNFT | 205.00 | 45,920.00 | 200.00 | 44,800.00 | 300.00 | 67,200.00 | 900.00 | 201,600.00 | | 0133 | 810-03-00100 | Concrete and Metal Bridge Railing | 201.1 | LNFT | 165.00 | 33,181.50 | 550.00 | 110,605.00 | 550.00 | 110,605.00 | 400.00 | 80,440.00 | | 0134 | 810-04-00100 | Hand Railing (Galvanized) | 1,683.17 | LNFT | 100.00 | 168,317.00 | 85.00 | 143,069.45 | 145.00 | 244,059.65 | 100.00 | 168,317.00 | | 0135 | 811-03-00100 | Navigation Clearance Gauge (Painted) | 2 | EACH | 1,000.00 | 2,000.00 | 8,500.00 | 17,000.00 | 6,600.00 | 13,200.00 | 10,000.00 | 20,000.00 | | 0136 | 812-01-00200 | Treated Timber (Coastal Treatment) | 28.92 | MFBM | 11,000.00 | 318,120.00 | 12,000.00 | 347,040.00 | 14,000.00 | 404,880.00 | 16,000.00 | 462,720.00 | | 0137 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,597.95 | SQFT | 26.00 | 93,546.70 | 65.00 | 233,866.75 | 60.00 | 215,877.00 | 40.00 | 143,918.00 | | 0138 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 1.85 | SFIN | 2,000.00 | 3,700.00 | 140.00 | 259.00 | 950.00 | 1,757.50 | 1,000.00 | 1,850.00 | | 0139 | 815-01-00100 | Unsealed Expansion Joint (End Dams) | 84 | LNFT | 13.00 | 1,092.00 | 150.00 | 12,600.00 | 125.00 | 10,500.00 | 200.00 | 16,800.00 | | 0140 | 815-03-00400 | Joint Seal (Slab Span Joint) | 121 | LNFT | 14.00 | 1,694.00 | 30.00 | 3,630.00 | 225.00 | 27,225.00 | 30.00 | 3,630.00 | | 0141 | 817-03-00100 | Cofferdams | 1 | LUMP | 785,000.00 | 785,000.00 | 1,000,000.00 | 1,000,000.00 | 1,400,000.00 | 1,400,000.00 | 4,000,000.00 | 4,000,000.00 | | 0142 | 822-01-00100 | Trenching and Backfilling | 4,500 | LNFT | 6.00 | 27,000.00 | 5.71 | 25,695.00 | 7.50 | 33,750.00 | 6.00 | 27,000.00 | | 0143 | 822-02-00300 | Conduit w Conductors (PVC/HDPE) (1-1/4") (2#10, 1#10 Bare Solid Ground) | 80 | LNFT | 6.00 | 480.00 | 5.80 | 464.00 | 7.60 | 608.00 | 6.00 | 480.00 | | 0144 | 822-02-00300 | Conduit w Conductors (PVC/HDPE) (1-1/4") (2#6, 1#6 Bare Solid Ground) | 4,300 | LNFT | 8.00 | 34,400.00 | 7.80 | 33,540.00 | 10.00 | 43,000.00 | 8.00 | 34,400.00 | | 0145 | 822-02-01300 | Conduit w Conductors (Rigid Alum) (1-1/4") (2#6, 1#6 Bare Solid Ground) | 20 | LNFT | 9.00 | 180.00 | 8.65 | 173.00 | 50.00 | 1,000.00 | 9.00 | 180.00 | | 0146 | 822-04-00300 | Jacked or Bored Casing (8" Dia) (PVC/HDPE) | 300 | LNFT | 55.00 | 16,500.00 | 54.29 | 16,287.00 | 90.00 | 27,000.00 | 55.00 | 16,500.00 | | 0147 | 822-05-02100 | Light Pole (30') (Stainless Steel) (Davit Arm) | 21 | EACH | 3,500.00 | 73,500.00 | 3,432.00 | 72,072.00 | 5,000.00 | 105,000.00 | 3,500.00 | 73,500.00 | | 0148 | 822-07-02800 | Luminaire (150 Watt) (LED) | 2 | EACH | 1,000.00 | 2,000.00 | 926.00 | 1,852.00 | 950.00 | 1,900.00 | 900.00 | 1,800.00 | | 0149 | 822-07-02800 | Luminaire (247 Watt) (LED) | 16 | EACH | 1,000.00 | 16,000.00 | 1,035.00 | 16,560.00 | 1,050.00 | 16,800.00 | 1,000.00 | 16,000.00 | | 0150 | 822-07-02800 | Luminaire (390 Watt) (LED) | 3 | EACH | 1,150.00 | 3,450.00 | 1,140.00 | 3,420.00 | 1,175.00 | 3,525.00 | 1,150.00 | 3,450.00 | | 0151 | 822-08-00200 | Electrical Service Point (Structure) | 1 | EACH | 5,800.00 | 5,800.00 | 5,695.00 | 5,695.00 | 22,000.00 | 22,000.00 | 5,700.00 | 5,700.00 | | 0152 | 822-09-00100 | Electrical System (Bridge) | 1 | LUMP | 2,400,000.00 | 2,400,000.00 | 2,300,000.00 | 2,300,000.00 | 2,550,000.00 | 2,550,000.00 | 2,300,000.00 | 2,300,000.00 | | 0153 | 822-16-00100 | Underground Junction Box (12" x 12") | 21 | EACH | 550.00 | 11,550.00 | 533.00 | 11,193.00 | 650.00 | 13,650.00 | 540.00 | 11,340.00 | | 0154 | 822-16-00200 | Underground Junction Box (11" x 18") | 3 | EACH | 825.00 | 2,475.00 | 825.00 | 2,475.00 | 2,350.00 | 7,050.00 | 830.00 | 2,490.00 | | 0155 | 822-19-00100 | Modular Breakaway Cable System (Roadway) | 21 | EACH | 2,120.00 | 44,520.00 | 2,119.00 | 44,499.00 | 2,650.00 | 55,650.00 | 2,100.00 | 44,100.00 | | 0156 | 822-21-00100 | Duct Marker (Concrete) | 4 | EACH | 510.00 | 2,040.00 | 507.00 | 2,028.00 | 615.00 | 2,460.00 | 500.00 | 2,000.00 | | 0157 | 822-22-00300 | Underground Marker Tape (6")(Detectable) | 4,500 | LNFT | 0.40 | 1,800.00 | 0.38 | 1,710.00 | 0.75 | 3,375.00 | 0.40 | 1,800.00 | | 0158 | NS-300-00060 | Geogrid | 30,366 | SQYD | 1.50 | 45,549.00 | 1.45 | 44,030.70 | 1.50 | 45,549.00 | 4.00 | 121,464.00 | | 0159 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 3,650 | LNFT | 1.30 | 4,745.00 | 1.25 | 4,562.50 | 1.50 | 5,475.00 | 1.25 | 4,562.50 | | 0160 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 1,488 | LNFT | 4.00 | 5,952.00 | 4.00 | 5,952.00 | 4.50 | 6,696.00 | 4.00 | 5,952.00 | | 0161 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 26,660.2 | INLF | 0.65 | 17,329.13 | 0.60 | 15,996.12 | 0.75 | 19,995.15 | 0.60 | 15,996.12 | | 0162 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,244.8 | INLF | 0.80 | 995.84 | 0.75 | 933.60 | 0.90 | 1,120.32 | 0.75 | 933.60 | | 0163 | NS-822-00110 | Light Pole Foundation (8.5' Length) | 21 | EACH | 1,500.00 | 31,500.00 | 1,770.00 | 37,170.00 | 4,500.00 | 94,500.00 | 1,800.00 | 37,800.00 | | 0164 | NS-824-00580 | Sound Barrier Systems (Ground Mounted) | 7,108 | SQFT | 33.00 | 234,564.00 | 50.00 | 355,400.00 | 55.00 | 390,940.00 | 40.00 | 284,320.00 | | 0165 | TS-821-02100 | Vertical Lift Bridge Machinery | 1 | LUMP | 4,150,000.00 | 4,150,000.00 | 6,000,000.00 | 6,000,000.00 | 7,650,000.00 | 7,650,000.00 | 8,150,000.00 | 8,150,000.00 | | 0166 | TS-821-06010 | Movable Bridge Traffic Barrier | 1 | LUMP | 325,000.00 | 325,000.00 | 180,000.00 | 180,000.00 | 720,000.00 | 720,000.00 | 180,000.00 | 180,000.00 | | 0167 | TS-821-06100 | Coating of New Movable Bridge Machinery | 1 | LUMP | 130,000.00 | 130,000.00 | 220,000.00 | 220,000.00 | 535,000.00 | 535,000.00 | 200,000.00 | 200,000.00 | | 0168 | TS-823-01100 | Bridge Operator's House New Construction | 1 | LUMP | 720,000.00 | 720,000.00 | 850,000.00 | 850,000.00 | 865,000.00 | 865,000.00 | 650,000.00 | 650,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 30,956,316.07 | | 37,142,023.90 | | 40,579,285.66 | | 43,326,055.71 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Traylor Bros., Inc. | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 350,000.00 | 350,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 100,000.00 | 100,000.00 | | 0003 | 202-02-00010 | Removal of Overhead Crossing for Lighting | 2 | EACH | 2,000.00 | 4,000.00 | | 0004 | 202-02-02000 | Removal of Asphalt Drives | 417 | SQYD | 20.38 | 8,498.46 | | 0005 | 202-02-02020 | Removal of Asphalt Pavement | 5,815.6 | SQYD | 7.00 | 40,709.20 | | 0006 | 202-02-06060 | Removal of Concrete Catch Basin | 18 | EACH | 700.00 | 12,600.00 | | 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 493 | SQYD | 20.00 | 9,860.00 | | 0008 | 202-02-12000 | Removal of Fence | 200 | LNFT | 12.00 | 2,400.00 | | 0009 | 202-02-12020 | Removal of Fence (Chain Link) | 1,070 | LNFT | 8.00 | 8,560.00 | | 0010 | 202-02-14500 | Removal of Guard Rail | 17 | LNFT | 30.00 | 510.00 | | 0011 | 202-02-32100 | Removal of Pipe (Cross Drain) (See Summary of Drainage Structures for size and material of existing pipe to be removed) | 601 | LNFT | 30.00 | 18,030.00 | | 0012 | 202-02-32120 | Removal of Pipe (Side Drain) (See Summary of Drainage Structures for size and material of existing pipe to be removed) | 1,254 | LNFT | 20.00 | 25,080.00 | | 0013 | 202-02-38300 | Removal of Sign and U-Channel Post | 15 | EACH | 12.00 | 180.00 | | 0014 | 202-03-00010 | Relocation of Existing Electric Utility Pole | 1 | EACH | 3,000.00 | 3,000.00 | | 0015 | 203-01-00100 | General Excavation | 16,954.6 | CUYD | 15.00 | 254,319.00 | | 0016 | 203-02-00100 | Drainage Excavation (Bayou Lafourche) | 2,543 | CUYD | 150.00 | 381,450.00 | | 0017 | 203-03-00100 | Embankment | 5,437.7 | CUYD | 20.00 | 108,754.00 | | 0018 | 203-04-00300 | Nonplastic Embankment (Stone) (22" Thick) | 181.3 | CUYD | 130.00 | 23,569.00 | | 0019 | 203-10-00100 | Cleaning Existing Ditches | 280 | LNFT | 15.00 | 4,200.00 | | 0020 | 204-02-00100 | Temporary Hay Bales | 602 | EACH | 30.00 | 18,060.00 | | 0021 | 204-06-00100 | Temporary Silt Fencing | 9,235.2 | LNFT | 5.00 | 46,176.00 | | 0022 | 302-02-18000 | Class II Base Course (18" Thick) (Stone) | 20,880.1 | SQYD | 65.00 | 1,357,206.50 | | 0023 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 56.4 | CUYD | 55.00 | 3,102.00 | | 0024 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 87.1 | CUYD | 150.00 | 13,065.00 | | 0025 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 261.3 | SQYD | 101.00 | 26,391.30 | | 0026 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 110.9 | CUYD | 150.00 | 16,635.00 | | 0027 | 502-01-00100 | Asphalt Concrete | 15,696.2 | TON | 110.00 | 1,726,582.00 | | 0028 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 4,251 | TON | 150.00 | 637,650.00 | | 0029 | 509-01-00100 | Milling Asphalt Pavement | 8,561.9 | SQYD | 6.00 | 51,371.40 | | 0030 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -476 | CUYD | 1.00 | -476.00 | | 0031 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 261.3 | SQYD | 180.00 | 47,034.00 | | 0032 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 4 | LNFT | 350.00 | 1,400.00 | | 0033 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 328 | LNFT | 275.00 | 90,200.00 | | 0034 | 701-02-01080 | Cross Drain Pipe Arch (48" Equiv. RCPA) | 424 | LNFT | 375.00 | 159,000.00 | | 0035 | 701-02-01100 | Cross Drain Pipe Arch (54" Equiv. RCPA) | 8 | LNFT | 400.00 | 3,200.00 | | 0036 | 701-05-01001 | Side Drain Pipe (12" RCP/RPVCP/CPEPDW/CMP) | 8 | LNFT | 145.00 | 1,160.00 | | 0037 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 1,518 | LNFT | 100.00 | 151,800.00 | | 0038 | 701-06-01000 | Side Drain Pipe Arch (15" Equiv. RCPA/CMPA) | 396 | LNFT | 80.00 | 31,680.00 | | 0039 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 818 | LNFT | 90.00 | 73,620.00 | | 0040 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 8,500.00 | 8,500.00 | | 0041 | 702-03-00100 | Catch Basins (CB-01) | 67 | EACH | 3,500.00 | 234,500.00 | | 0042 | 702-03-00200 | Catch Basins (CB-02) | 6 | EACH | 8,200.00 | 49,200.00 | | 0043 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 3,500.00 | 3,500.00 | | 0044 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 100 | LNFT | 27.00 | 2,700.00 | | 0045 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 92.00 | 9,200.00 | | 0046 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,200.00 | 12,800.00 | | 0047 | 705-01-00100 | Barbed Wire Fence | 200 | LNFT | 6.00 | 1,200.00 | | 0048 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 300 | LNFT | 35.00 | 10,500.00 | | 0049 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 750 | LNFT | 45.00 | 33,750.00 | | 0050 | 706-01-00100 | Concrete Walk (4" Thick) | 2.7 | SQYD | 200.00 | 540.00 | | 0051 | 706-02-00200 | Concrete Drive (6" Thick) | 368.7 | SQYD | 100.00 | 36,870.00 | | 0052 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 1,007.8 | SQYD | 120.00 | 120,936.00 | | 0053 | 707-01-00100 | Concrete Curb (Mountable) | 200 | LNFT | 55.00 | 11,000.00 | | 0054 | 708-01-00100 | Right-of-Way Monument | 25 | EACH | 250.00 | 6,250.00 | | 0055 | 708-02-00100 | Right-of-Way Monument Witness Post | 25 | EACH | 250.00 | 6,250.00 | | 0056 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 565 | SQYD | 250.00 | 141,250.00 | | 0057 | 711-04-00100 | Geotextile Fabric | 565 | SQYD | 15.00 | 8,475.00 | | 0058 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | | 0059 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 25,000 | LNFT | 0.50 | 12,500.00 | | 0060 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,000.00 | 25,000.00 | | 0061 | 723-01-00100 | Granular Material (Net Section) | 5,317 | CUYD | 42.00 | 223,314.00 | | 0062 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.7 | MILE | 3,000.00 | 2,100.00 | | 0063 | 726-01-00100 | Bedding Material | 1,589.55 | CUYD | 100.00 | 158,955.00 | | 0064 | 727-01-00100 | Mobilization | 1 | LUMP | 4,900,000.00 | 4,900,000.00 | | 0065 | 729-01-00100 | Sign (Type A) | 240.9 | SQFT | 20.00 | 4,818.00 | | 0066 | 729-02-00100 | Sign (Type B) | 313.9 | SQFT | 27.00 | 8,475.30 | | 0067 | 729-04-00100 | Sign (Type D) | 76.6 | SQFT | 32.00 | 2,451.20 | | 0068 | 729-08-00200 | Mounting (3 1/2" Size Post) | 24 | EACH | 1,250.00 | 30,000.00 | | 0069 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 80.00 | 480.00 | | 0070 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 48 | EACH | 130.00 | 6,240.00 | | 0071 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,050 | EACH | 10.15 | 10,657.50 | | 0072 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,365 | LNFT | 10.15 | 13,854.75 | | 0073 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.57 | MILE | 6,091.37 | 27,837.56 | | 0074 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.333 | MILE | 12,000.00 | 3,996.00 | | 0075 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.08 | MILE | 3,045.63 | 243.65 | | 0076 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.33 | MILE | 7,106.61 | 2,345.18 | | 0077 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.22 | MILE | 7,614.23 | 1,675.13 | | 0078 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 7 | EACH | 609.14 | 4,263.98 | | 0079 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 10 | EACH | 406.09 | 4,060.90 | | 0080 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 7 | EACH | 406.09 | 2,842.63 | | 0081 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 3 | EACH | 101.52 | 304.56 | | 0082 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 5 | EACH | 304.57 | 1,522.85 | | 0083 | 732-05-00100 | Removal of Existing Markings | 0.216 | MILE | 25,000.00 | 5,400.00 | | 0084 | 735-01-00100 | Mailboxes | 21 | EACH | 20.00 | 420.00 | | 0085 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 125.00 | 2,375.00 | | 0086 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 225.00 | 225.00 | | 0087 | 736-01-00100 | Trenching and Backfilling | 224 | LNFT | 7.50 | 1,680.00 | | 0088 | 736-03-00100 | Jacking or Boring | 290 | LNFT | 15.00 | 4,350.00 | | 0089 | 736-04-10350 | Signal Pole (Single Mast Arm, 35ft) | 1 | EACH | 13,400.00 | 13,400.00 | | 0090 | 736-04-10500 | Signal Pole (Single Mast Arm, 50ft) | 3 | EACH | 17,000.00 | 51,000.00 | | 0091 | 736-05-10000 | Signal Heads (1 Section, 12 inch Led Lens, R) | 8 | EACH | 740.00 | 5,920.00 | | 0092 | 736-06-00200 | Signal Service (Existing Pole) | 1 | EACH | 5,000.00 | 5,000.00 | | 0093 | 736-06-00500 | Signal Service Pedestal Disconnect | 1 | EACH | 3,600.00 | 3,600.00 | | 0094 | 736-10-00300 | Underground Junction Box (Type F) | 3 | EACH | 760.00 | 2,280.00 | | 0095 | 736-10-00500 | Underground Junction Box (Type H) | 1 | EACH | 1,250.00 | 1,250.00 | | 0096 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 47 | LNFT | 15.00 | 705.00 | | 0097 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 644 | LNFT | 18.00 | 11,592.00 | | 0098 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 57 | LNFT | 4.00 | 228.00 | | 0099 | 736-12-06014 | Conductor (6c, #14 awg) | 1,632 | LNFT | 2.50 | 4,080.00 | | 0100 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 4 | EACH | 4,500.00 | 18,000.00 | | 0101 | 736-24-00000 | Flashing Switch Assembly For Beacons | 1 | EACH | 3,300.00 | 3,300.00 | | 0102 | 739-01-00100 | Hydro-Seeding | 5.07 | ACRE | 2,500.00 | 12,675.00 | | 0103 | 740-01-00100 | Construction Layout | 1 | LUMP | 200,000.00 | 200,000.00 | | 0104 | 802-02-00100 | Permanent Sheeting (Steel) | 34,523 | SQFT | 60.00 | 2,071,380.00 | | 0105 | 804-01-00200 | Precast Concrete Piles (14") | 622.5 | LNFT | 300.00 | 186,750.00 | | 0106 | 804-01-00600 | Precast Concrete Piles (24") | 11,847 | LNFT | 350.00 | 4,146,450.00 | | 0107 | 804-02-00100 | Treated Timber Piles (Noncoastal Treatment) | 4,350 | LNFT | 50.00 | 217,500.00 | | 0108 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) | 6,420 | LNFT | 50.00 | 321,000.00 | | 0109 | 804-10-00600 | Precast Concrete Indicator Piles (24") | 3 | EACH | 75,000.00 | 225,000.00 | | 0110 | 804-14-00100 | Dynamic Monitoring Assistance | 25 | EACH | 2,500.00 | 62,500.00 | | 0111 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 100,000.00 | 100,000.00 | | 0112 | 804-18-00100 | Vibration Monitoring | 21 | DAY | 2,000.00 | 42,000.00 | | 0113 | 805-01-00100 | Class A1 Concrete (Slab Span) | 182.55 | CUYD | 1,000.00 | 182,550.00 | | 0114 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 73.97 | CUYD | 2,500.00 | 184,925.00 | | 0115 | 805-01-00500 | Class A1 Concrete (Footing) | 52.18 | CUYD | 3,000.00 | 156,540.00 | | 0116 | 805-01-00900 | Class A1 Concrete (Access Bridge) | 0.3 | CUYD | 15,000.00 | 4,500.00 | | 0117 | 805-01-00900 | Class A1 Concrete (Machinery Deck) | 236.82 | CUYD | 4,200.00 | 994,644.00 | | 0118 | 805-01-00900 | Class A1 Concrete (Noise Barrier) | 77 | CUYD | 3,000.00 | 231,000.00 | | 0119 | 805-01-00900 | Class A1 Concrete (Tower) | 574.41 | CUYD | 3,000.00 | 1,723,230.00 | | 0120 | 805-04-00300 | Class MASS(A1) Concrete (Footing) | 519.64 | CUYD | 1,500.00 | 779,460.00 | | 0121 | 805-04-00400 | Class MASS(A1) Concrete (Counterweight) | 105 | CUYD | 4,000.00 | 420,000.00 | | 0122 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,598 | SQFT | 10.00 | 15,980.00 | | 0123 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 21,960 | SQFT | 15.00 | 329,400.00 | | 0124 | 806-01-00100 | Deformed Reinforcing Steel | 510,437 | LB | 1.75 | 893,264.75 | | 0125 | 807-01-00100 | Structural Metalwork (Grade 36) | 140,841 | LUMP | 800,000.00 | 800,000.00 | | 0126 | 807-01-00200 | Structural Metalwork (Grade 50) | 371,125 | LUMP | 2,000,000.00 | 2,000,000.00 | | 0127 | 807-01-00300 | Structural Metalwork (Grade 50S) | 82,697 | LUMP | 500,000.00 | 500,000.00 | | 0128 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 2,344 | LUMP | 200,000.00 | 200,000.00 | | 0129 | 807-03-00100 | Structural Metalwork (Access System) | 3,704 | LUMP | 150,000.00 | 150,000.00 | | 0130 | 807-04-00100 | Structural Metalwork (1" Strike Plate) | 220 | LUMP | 20,000.00 | 20,000.00 | | 0131 | 808-01-00300 | Steel Grid Flooring (Regular, GF-01) | 4,657 | SQFT | 250.00 | 1,164,250.00 | | 0132 | 810-02-00100 | Metal Bridge Railing | 224 | LNFT | 250.00 | 56,000.00 | | 0133 | 810-03-00100 | Concrete and Metal Bridge Railing | 201.1 | LNFT | 300.00 | 60,330.00 | | 0134 | 810-04-00100 | Hand Railing (Galvanized) | 1,683.17 | LNFT | 150.00 | 252,475.50 | | 0135 | 811-03-00100 | Navigation Clearance Gauge (Painted) | 2 | EACH | 1,500.00 | 3,000.00 | | 0136 | 812-01-00200 | Treated Timber (Coastal Treatment) | 28.92 | MFBM | 5,500.00 | 159,060.00 | | 0137 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,597.95 | SQFT | 30.00 | 107,938.50 | | 0138 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 1.85 | SFIN | 5,500.00 | 10,175.00 | | 0139 | 815-01-00100 | Unsealed Expansion Joint (End Dams) | 84 | LNFT | 200.00 | 16,800.00 | | 0140 | 815-03-00400 | Joint Seal (Slab Span Joint) | 121 | LNFT | 35.00 | 4,235.00 | | 0141 | 817-03-00100 | Cofferdams | 1 | LUMP | 3,350,000.00 | 3,350,000.00 | | 0142 | 822-01-00100 | Trenching and Backfilling | 4,500 | LNFT | 5.00 | 22,500.00 | | 0143 | 822-02-00300 | Conduit w Conductors (PVC/HDPE) (1-1/4") (2#10, 1#10 Bare Solid Ground) | 80 | LNFT | 7.00 | 560.00 | | 0144 | 822-02-00300 | Conduit w Conductors (PVC/HDPE) (1-1/4") (2#6, 1#6 Bare Solid Ground) | 4,300 | LNFT | 7.00 | 30,100.00 | | 0145 | 822-02-01300 | Conduit w Conductors (Rigid Alum) (1-1/4") (2#6, 1#6 Bare Solid Ground) | 20 | LNFT | 20.00 | 400.00 | | 0146 | 822-04-00300 | Jacked or Bored Casing (8" Dia) (PVC/HDPE) | 300 | LNFT | 60.00 | 18,000.00 | | 0147 | 822-05-02100 | Light Pole (30') (Stainless Steel) (Davit Arm) | 21 | EACH | 10,000.00 | 210,000.00 | | 0148 | 822-07-02800 | Luminaire (150 Watt) (LED) | 2 | EACH | 2,600.00 | 5,200.00 | | 0149 | 822-07-02800 | Luminaire (247 Watt) (LED) | 16 | EACH | 2,600.00 | 41,600.00 | | 0150 | 822-07-02800 | Luminaire (390 Watt) (LED) | 3 | EACH | 2,600.00 | 7,800.00 | | 0151 | 822-08-00200 | Electrical Service Point (Structure) | 1 | EACH | 28,000.00 | 28,000.00 | | 0152 | 822-09-00100 | Electrical System (Bridge) | 1 | LUMP | 3,000,000.00 | 3,000,000.00 | | 0153 | 822-16-00100 | Underground Junction Box (12" x 12") | 21 | EACH | 550.00 | 11,550.00 | | 0154 | 822-16-00200 | Underground Junction Box (11" x 18") | 3 | EACH | 500.00 | 1,500.00 | | 0155 | 822-19-00100 | Modular Breakaway Cable System (Roadway) | 21 | EACH | 2,500.00 | 52,500.00 | | 0156 | 822-21-00100 | Duct Marker (Concrete) | 4 | EACH | 500.00 | 2,000.00 | | 0157 | 822-22-00300 | Underground Marker Tape (6")(Detectable) | 4,500 | LNFT | 0.50 | 2,250.00 | | 0158 | NS-300-00060 | Geogrid | 30,366 | SQYD | 8.00 | 242,928.00 | | 0159 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 3,650 | LNFT | 2.00 | 7,300.00 | | 0160 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 1,488 | LNFT | 2.00 | 2,976.00 | | 0161 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 26,660.2 | INLF | 1.00 | 26,660.20 | | 0162 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,244.8 | INLF | 3.00 | 3,734.40 | | 0163 | NS-822-00110 | Light Pole Foundation (8.5' Length) | 21 | EACH | 1,500.00 | 31,500.00 | | 0164 | NS-824-00580 | Sound Barrier Systems (Ground Mounted) | 7,108 | SQFT | 40.00 | 284,320.00 | | 0165 | TS-821-02100 | Vertical Lift Bridge Machinery | 1 | LUMP | 9,650,000.00 | 9,650,000.00 | | 0166 | TS-821-06010 | Movable Bridge Traffic Barrier | 1 | LUMP | 600,000.00 | 600,000.00 | | 0167 | TS-821-06100 | Coating of New Movable Bridge Machinery | 1 | LUMP | 100,000.00 | 100,000.00 | | 0168 | TS-823-01100 | Bridge Operator's House New Construction | 1 | LUMP | 900,000.00 | 900,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 49,804,132.40 |
|