Proposal:H.013734.6
Parish:Calcasieu
Routes:US 90
Description:US 90: LA 14 - LA 397
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,400,236.26
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $1,320,467.11 |
| 2 | 00183 | R. E. Heidt Construction Co., LLC | $1,390,269.96 |
| 3 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $1,804,005.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - R. E. Heidt Construction Co., LLC | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06140 | Removal of Curbs (Concrete) | 242.4 | LNFT | 40.00 | 9,696.00 | 10.10 | 2,448.24 | 22.00 | 5,332.80 | | 0002 | 202-02-14500 | Removal of Guard Rail | 680.1 | LNFT | 11.00 | 7,481.10 | 13.05 | 8,875.31 | 13.00 | 8,841.30 | | 0003 | 203-01-00100 | General Excavation | 82 | CUYD | 181.00 | 14,842.00 | 151.50 | 12,423.00 | 70.00 | 5,740.00 | | 0004 | 203-03-00100 | Embankment | 10 | CUYD | 500.00 | 5,000.00 | 404.00 | 4,040.00 | 70.00 | 700.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 91 | CUYD | 76.00 | 6,916.00 | 60.60 | 5,514.60 | 40.00 | 3,640.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 150.00 | 900.00 | 75.00 | 450.00 | 150.00 | 900.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 2,752 | LNFT | 1.50 | 4,128.00 | 2.02 | 5,559.04 | 1.50 | 4,128.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 10 | CUYD | 400.00 | 4,000.00 | 400.00 | 4,000.00 | 100.00 | 1,000.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 8,687 | TON | 80.50 | 699,303.50 | 97.00 | 842,639.00 | 110.00 | 955,570.00 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 711.7 | TON | 50.00 | 35,585.00 | 95.00 | 67,611.50 | 110.00 | 78,287.00 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 28,572 | SQYD | 1.85 | 52,858.20 | 1.62 | 46,286.64 | 4.00 | 114,288.00 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,121 | CUYD | 0.01 | -11.21 | 0.01 | -11.21 | 1.00 | -1,121.00 | | 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,221 | SQYD | 117.00 | 142,857.00 | 105.00 | 128,205.00 | 120.00 | 146,520.00 | | 0014 | 510-02-00100 | Pavement Widening 12" Minimum Thickness | 37.3 | SQYD | 120.00 | 4,476.00 | 179.00 | 6,676.70 | 185.00 | 6,900.50 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 143.8 | LNFT | 21.00 | 3,019.80 | 26.26 | 3,776.19 | 27.00 | 3,882.60 | | 0016 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 75 | LNFT | 32.00 | 2,400.00 | 55.55 | 4,166.25 | 60.00 | 4,500.00 | | 0017 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 91.00 | 9,100.00 | 101.00 | 10,100.00 | 105.00 | 10,500.00 | | 0018 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 2,400.00 | 9,600.00 | 2,828.00 | 11,312.00 | 3,000.00 | 12,000.00 | | 0019 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 46.1 | SQYD | 250.00 | 11,525.00 | 74.74 | 3,445.51 | 110.00 | 5,071.00 | | 0020 | 707-01-00100 | Concrete Curb Double Faced Lane Divider | 88 | LNFT | 300.00 | 26,400.00 | 48.48 | 4,266.24 | 100.00 | 8,800.00 | | 0021 | 707-01-00100 | Concrete Curb Modified Mountable | 61 | LNFT | 190.00 | 11,590.00 | 35.35 | 2,156.35 | 100.00 | 6,100.00 | | 0022 | 707-04-00100 | Asphalt Curb | 54 | LNFT | 100.00 | 5,400.00 | 48.00 | 2,592.00 | 85.00 | 4,590.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 17,000.00 | 17,000.00 | 9,602.07 | 9,602.07 | 84,000.00 | 84,000.00 | | 0024 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,754 | LNFT | 0.01 | 27.54 | 0.50 | 1,377.00 | 0.55 | 1,514.70 | | 0025 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 3,155 | LNFT | 0.01 | 31.55 | 0.75 | 2,366.25 | 0.80 | 2,524.00 | | 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.464 | MILE | 550.00 | 3,005.20 | 600.00 | 3,278.40 | 250.00 | 1,366.00 | | 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.02 | MILE | 650.00 | 1,313.00 | 631.25 | 1,275.13 | 700.00 | 1,414.00 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 13.86 | MILE | 950.00 | 13,167.00 | 959.50 | 13,298.67 | 1,000.00 | 13,860.00 | | 0029 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 51 | EACH | 0.01 | 0.51 | 25.25 | 1,287.75 | 30.00 | 1,530.00 | | 0030 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 0.01 | 0.02 | 101.00 | 202.00 | 105.00 | 210.00 | | 0031 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 4.6 | MILE | 1,300.00 | 5,980.00 | 262.60 | 1,207.96 | 2,000.00 | 9,200.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 119,000.00 | 119,000.00 | 87,000.00 | 87,000.00 | 175,000.00 | 175,000.00 | | 0033 | 729-16-00200 | Object Marker Assembly (Type 2) | 10 | EACH | 100.00 | 1,000.00 | 90.90 | 909.00 | 100.00 | 1,000.00 | | 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 95.00 | 380.00 | 101.00 | 404.00 | 80.00 | 320.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,792 | EACH | 6.10 | 10,931.20 | 6.06 | 10,859.52 | 7.00 | 12,544.00 | | 0036 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,123 | LNFT | 3.00 | 3,369.00 | 2.96 | 3,324.08 | 3.00 | 3,369.00 | | 0037 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,492 | LNFT | 13.00 | 19,396.00 | 13.01 | 19,410.92 | 14.00 | 20,888.00 | | 0038 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 72 | LNFT | 15.00 | 1,080.00 | 14.02 | 1,009.44 | 15.00 | 1,080.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.86 | MILE | 3,600.00 | 35,496.00 | 3,570.00 | 35,200.20 | 4,000.00 | 39,440.00 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.9 | MILE | 1,500.00 | 2,850.00 | 1,469.55 | 2,792.15 | 1,600.00 | 3,040.00 | | 0041 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.677 | MILE | 3,100.00 | 2,098.70 | 3,030.00 | 2,051.31 | 3,200.00 | 2,166.40 | | 0042 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.078 | MILE | 13,000.00 | 1,014.00 | 12,625.00 | 984.75 | 12,000.00 | 936.00 | | 0043 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 3 | EACH | 325.00 | 975.00 | 303.00 | 909.00 | 325.00 | 975.00 | | 0044 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 13 | EACH | 300.00 | 3,900.00 | 303.00 | 3,939.00 | 325.00 | 4,225.00 | | 0045 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 325.00 | 1,625.00 | 303.00 | 1,515.00 | 325.00 | 1,625.00 | | 0046 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 1,250.00 | 2,500.00 | 1,212.00 | 2,424.00 | 1,300.00 | 2,600.00 | | 0047 | 732-05-00100 | Removal of Existing Markings | 0.038 | MILE | 12,000.00 | 456.00 | 15,000.00 | 570.00 | 50,000.00 | 1,900.00 | | 0048 | 735-01-00100 | Mailboxes | 23 | EACH | 5.00 | 115.00 | 15.15 | 348.45 | 16.00 | 368.00 | | 0049 | 735-02-00100 | Mailbox Supports (Single) | 21 | EACH | 160.00 | 3,360.00 | 126.25 | 2,651.25 | 130.00 | 2,730.00 | | 0050 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 300.00 | 300.00 | 227.25 | 227.25 | 250.00 | 250.00 | | 0051 | 739-01-00100 | Hydro-Seeding | 0.23 | ACRE | 11,000.00 | 2,530.00 | 3,535.00 | 813.05 | 12,000.00 | 2,760.00 | | 0052 | 740-01-00100 | Construction Layout | 1 | LUMP | 500.00 | 500.00 | 2,500.00 | 2,500.00 | 25,000.00 | 25,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,320,467.11 | | 1,390,269.96 | | 1,804,005.30 |
|