Proposal:H.013553.6
Parish:Livingston
Description:PENDARVIS LANE IMPROVEMENTS PHASE 1
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,119,725.00
| Rank | License | Bidder | Construction Bid |
| 1 | 57931 | KCR CONTRACTORS, LLC | $952,632.23 |
| 2 | 12031 | R.J. Daigle & Sons Contractors, Inc | $981,367.71 |
| 3 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $1,184,970.75 |
| 4 | 24901 | Hard Rock Construction LLC | $1,312,539.60 |
| 5 | 55950 | Brown Industrial Construction, LLC | $1,321,346.39 |
| 6 | 06276 | Barriere Construction Co., LLC | $1,376,307.00 |
| 7 | 61167 | HENDRICK CONSTRUCTION, INC. | $1,396,233.19 |
| 8 | 44013 | M. Trak, LLC | $1,430,522.75 |
| 9 | 69570 | Bridging The Gap Solution LLC | $1,455,305.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - KCR CONTRACTORS, LLC | - 2 - R.J. Daigle & Sons Contractors, Inc | - 3 - KORT's CONSTRUCTION SERVICES, INC. | - 4 - Hard Rock Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2.37 | LUMP | 55,068.65 | 55,068.65 | 77,000.00 | 77,000.00 | 90,000.00 | 90,000.00 | 17,000.00 | 17,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,480.29 | 5,480.29 | 6,466.74 | 6,466.74 | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 277 | SQYD | 12.51 | 3,465.27 | 12.10 | 3,351.70 | 10.00 | 2,770.00 | 23.00 | 6,371.00 | | 0004 | 202-02-38240 | Removal of Signs and Supports | 30 | EACH | 26.25 | 787.50 | 29.50 | 885.00 | 1.25 | 37.50 | 16.00 | 480.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,722.42 | 25,722.42 | 30,881.54 | 30,881.54 | 35,000.00 | 35,000.00 | 15,000.00 | 15,000.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 3,233 | LNFT | 3.94 | 12,738.02 | 6.17 | 19,947.61 | 8.00 | 25,864.00 | 6.00 | 19,398.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 133 | EACH | 26.87 | 3,573.71 | 30.25 | 4,023.25 | 18.00 | 2,394.00 | 28.00 | 3,724.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 8,257 | LNFT | 1.52 | 12,550.64 | 2.20 | 18,165.40 | 1.50 | 12,385.50 | 1.00 | 8,257.00 | | 0009 | 401-01-00100 | Aggregate Surface Course (Net Section) | 5.1 | CUYD | 125.00 | 637.50 | 100.43 | 512.19 | 90.00 | 459.00 | 600.00 | 3,060.00 | | 0010 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 258.3 | CUYD | 101.35 | 26,178.71 | 23.38 | 6,039.05 | 100.00 | 25,830.00 | 140.00 | 36,162.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 1,078 | TON | 91.29 | 98,410.62 | 82.07 | 88,471.46 | 90.00 | 97,020.00 | 97.00 | 104,566.00 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 129.6 | TON | 139.55 | 18,085.68 | 125.46 | 16,259.62 | 140.00 | 18,144.00 | 148.00 | 19,180.80 | | 0013 | 509-01-00100 | Milling Asphalt Pavement (2" Depth) | 9,494 | SQYD | 2.49 | 23,640.06 | 2.24 | 21,266.56 | 2.50 | 23,735.00 | 2.65 | 25,159.10 | | 0014 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 266 | SQYD | 81.81 | 21,761.46 | 80.89 | 21,516.74 | 80.00 | 21,280.00 | 90.00 | 23,940.00 | | 0015 | 510-02-00100 | Pavement Widening (12" Minimum Thickness) | 396.7 | SQYD | 116.70 | 46,294.89 | 95.85 | 38,023.70 | 120.00 | 47,604.00 | 195.00 | 77,356.50 | | 0016 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 68 | LNFT | 146.99 | 9,995.32 | 188.89 | 12,844.52 | 220.00 | 14,960.00 | 232.00 | 15,776.00 | | 0017 | 701-02-02080 | Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) | 38 | LNFT | 183.76 | 6,982.88 | 218.66 | 8,309.08 | 250.00 | 9,500.00 | 245.00 | 9,310.00 | | 0018 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 26 | LNFT | 68.94 | 1,792.44 | 60.90 | 1,583.40 | 90.00 | 2,340.00 | 203.00 | 5,278.00 | | 0019 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 368 | LNFT | 75.12 | 27,644.16 | 66.09 | 24,321.12 | 94.00 | 34,592.00 | 92.00 | 33,856.00 | | 0020 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 192 | LNFT | 90.82 | 17,437.44 | 83.70 | 16,070.40 | 105.00 | 20,160.00 | 120.00 | 23,040.00 | | 0021 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 438 | LNFT | 124.28 | 54,434.64 | 98.62 | 43,195.56 | 120.00 | 52,560.00 | 103.00 | 45,114.00 | | 0022 | 701-03-02062 | Storm Drain Pipe (Outfall) (30" RPVCP or 36" CMP) | 101 | LNFT | 81.24 | 8,205.24 | 102.86 | 10,388.86 | 175.00 | 17,675.00 | 405.00 | 40,905.00 | | 0023 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 528 | LNFT | 126.20 | 66,633.60 | 105.32 | 55,608.96 | 110.00 | 58,080.00 | 127.00 | 67,056.00 | | 0024 | 701-05-01022 | Side Drain Pipe (15" RCP/RPVCP/CMP) | 58 | LNFT | 48.88 | 2,835.04 | 63.36 | 3,674.88 | 90.00 | 5,220.00 | 98.00 | 5,684.00 | | 0025 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 224 | LNFT | 74.34 | 16,652.16 | 111.76 | 25,034.24 | 110.00 | 24,640.00 | 130.00 | 29,120.00 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 470 | LNFT | 11.48 | 5,395.60 | 2.76 | 1,297.20 | 1.00 | 470.00 | 11.00 | 5,170.00 | | 0027 | 702-03-00100 | Catch Basins (CB-01) | 15 | EACH | 2,885.57 | 43,283.55 | 2,948.49 | 44,227.35 | 3,200.00 | 48,000.00 | 3,500.00 | 52,500.00 | | 0028 | 702-03-00200 | Catch Basins (CB-02) | 3 | EACH | 2,376.67 | 7,130.01 | 2,896.25 | 8,688.75 | 3,700.00 | 11,100.00 | 4,200.00 | 12,600.00 | | 0029 | 702-03-00500 | Catch Basins (CB-06) | 2 | EACH | 3,996.25 | 7,992.50 | 4,496.95 | 8,993.90 | 6,200.00 | 12,400.00 | 6,700.00 | 13,400.00 | | 0030 | 706-02-00200 | Concrete Drive (6" Thick) | 370 | SQYD | 58.11 | 21,500.70 | 84.05 | 31,098.50 | 72.00 | 26,640.00 | 100.00 | 37,000.00 | | 0031 | 707-03-00100 | Combination Concrete Curb and Gutter (barrier) | 139.5 | LNFT | 40.25 | 5,614.88 | 45.85 | 6,396.08 | 43.00 | 5,998.50 | 65.00 | 9,067.50 | | 0032 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 171 | SQYD | 88.38 | 15,112.98 | 57.90 | 9,900.90 | 120.00 | 20,520.00 | 70.00 | 11,970.00 | | 0033 | 711-04-00100 | Geotextile Fabric | 171 | SQYD | 1.43 | 244.53 | 2.47 | 422.37 | 1.00 | 171.00 | 2.00 | 342.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,657.50 | 10,657.50 | 20,500.00 | 20,500.00 | 50,000.00 | 50,000.00 | 78,000.00 | 78,000.00 | | 0035 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 4,129 | LNFT | 0.53 | 2,188.37 | 0.09 | 371.61 | 0.75 | 3,096.75 | 0.50 | 2,064.50 | | 0036 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 8 | LNFT | 1.05 | 8.40 | 1.10 | 8.80 | 1.25 | 10.00 | 3.50 | 28.00 | | 0037 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 154 | SQYD | 4.79 | 737.66 | 5.50 | 847.00 | 5.00 | 770.00 | 5.00 | 770.00 | | 0038 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 43 | SQYD | 8.33 | 358.19 | 11.00 | 473.00 | 8.50 | 365.50 | 8.00 | 344.00 | | 0039 | 726-01-00100 | Bedding Material | 281.5 | CUYD | 92.99 | 26,176.69 | 27.73 | 7,806.00 | 110.00 | 30,965.00 | 46.00 | 12,949.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 23,231.25 | 23,231.25 | 45,000.00 | 45,000.00 | 90,000.00 | 90,000.00 | 82,000.00 | 82,000.00 | | 0041 | 729-01-00100 | Sign (Type A) | 92 | SQFT | 23.10 | 2,125.20 | 24.20 | 2,226.40 | 21.00 | 1,932.00 | 22.00 | 2,024.00 | | 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 89.25 | 357.00 | 93.50 | 374.00 | 275.00 | 1,100.00 | 94.00 | 376.00 | | 0043 | 729-19-00300 | Dead End Road Installations (Type C) | 2 | EACH | 787.50 | 1,575.00 | 825.00 | 1,650.00 | 275.00 | 550.00 | 834.00 | 1,668.00 | | 0044 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 19 | EACH | 157.50 | 2,992.50 | 165.00 | 3,135.00 | 275.00 | 5,225.00 | 100.00 | 1,900.00 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 207 | EACH | 10.50 | 2,173.50 | 11.00 | 2,277.00 | 11.00 | 2,277.00 | 13.00 | 2,691.00 | | 0046 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 46 | LNFT | 5.25 | 241.50 | 5.50 | 253.00 | 6.00 | 276.00 | 3.50 | 161.00 | | 0047 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 25 | LNFT | 21.00 | 525.00 | 22.00 | 550.00 | 22.00 | 550.00 | 22.00 | 550.00 | | 0048 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.128 | MILE | 5,250.00 | 16,422.00 | 5,503.52 | 17,215.01 | 5,500.00 | 17,204.00 | 4,400.00 | 13,763.20 | | 0049 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 525.00 | 525.00 | 550.00 | 550.00 | 550.00 | 550.00 | 389.00 | 389.00 | | 0050 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 525.00 | 525.00 | 550.00 | 550.00 | 550.00 | 550.00 | 379.00 | 379.00 | | 0051 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 525.00 | 525.00 | 550.00 | 550.00 | 550.00 | 550.00 | 392.00 | 392.00 | | 0052 | 735-01-00100 | Mailboxes | 28 | EACH | 15.75 | 441.00 | 16.50 | 462.00 | 45.00 | 1,260.00 | 12.00 | 336.00 | | 0053 | 735-02-00100 | Mailbox Supports (Single) | 28 | EACH | 120.75 | 3,381.00 | 126.50 | 3,542.00 | 85.00 | 2,380.00 | 170.00 | 4,760.00 | | 0054 | 739-01-00100 | Hydro-Seeding | 2.19 | ACRE | 2,045.36 | 4,479.34 | 2,750.00 | 6,022.50 | 2,500.00 | 5,475.00 | 2,100.00 | 4,599.00 | | 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,750.00 | 15,750.00 | 22,000.00 | 22,000.00 | 10,000.00 | 10,000.00 | 16,000.00 | 16,000.00 | | 0056 | 805-15-01900 | Reinforced Concrete Box Culverts (Precast) (9' x 7') | 68 | LNFT | 1,353.19 | 92,016.92 | 1,488.51 | 101,218.68 | 1,300.00 | 88,400.00 | 2,400.00 | 163,200.00 | | 0057 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (9' x 7') | 2 | EACH | 28,690.86 | 57,381.72 | 31,559.95 | 63,119.90 | 35,000.00 | 70,000.00 | 47,000.00 | 94,000.00 | | 0058 | 810-04-00100 | Hand Railing Galvanized Steel Pipe | 105 | LNFT | 126.96 | 13,330.80 | 139.66 | 14,664.30 | 120.00 | 12,600.00 | 145.00 | 15,225.00 | | 0059 | NS-300-00060 | Geogrid | 261 | SQYD | 2.30 | 600.30 | 2.50 | 652.50 | 2.00 | 522.00 | 4.00 | 1,044.00 | | 0060 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 542 | INLF | 1.15 | 623.30 | 0.89 | 482.38 | 1.50 | 813.00 | 2.00 | 1,084.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 952,632.23 | | 981,367.71 | | 1,184,970.75 | | 1,312,539.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Brown Industrial Construction, LLC | - 6 - Barriere Construction Co., LLC | - 7 - HENDRICK CONSTRUCTION, INC. | - 8 - M. Trak, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2.37 | LUMP | 105,000.00 | 105,000.00 | 6,000.00 | 6,000.00 | 62,000.00 | 62,000.00 | 80,000.00 | 80,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 40,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | 48,020.00 | 48,020.00 | 35,000.00 | 35,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 277 | SQYD | 29.00 | 8,033.00 | 30.00 | 8,310.00 | 86.83 | 24,051.91 | 30.00 | 8,310.00 | | 0004 | 202-02-38240 | Removal of Signs and Supports | 30 | EACH | 1.00 | 30.00 | 1.00 | 30.00 | 128.33 | 3,849.90 | 25.00 | 750.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 45,000.00 | 45,000.00 | 100,000.00 | 100,000.00 | 75,000.00 | 75,000.00 | 25,000.00 | 25,000.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 3,233 | LNFT | 11.00 | 35,563.00 | 5.00 | 16,165.00 | 32.01 | 103,488.33 | 8.00 | 25,864.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 133 | EACH | 25.60 | 3,404.80 | 12.00 | 1,596.00 | 43.80 | 5,825.40 | 25.00 | 3,325.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 8,257 | LNFT | 1.75 | 14,449.75 | 1.00 | 8,257.00 | 1.24 | 10,238.68 | 1.65 | 13,624.05 | | 0009 | 401-01-00100 | Aggregate Surface Course (Net Section) | 5.1 | CUYD | 160.00 | 816.00 | 250.00 | 1,275.00 | 353.98 | 1,805.30 | 50.00 | 255.00 | | 0010 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 258.3 | CUYD | 108.00 | 27,896.40 | 10.00 | 2,583.00 | 101.11 | 26,116.71 | 25.00 | 6,457.50 | | 0011 | 502-01-00100 | Asphalt Concrete | 1,078 | TON | 87.00 | 93,786.00 | 108.00 | 116,424.00 | 124.20 | 133,887.60 | 100.00 | 107,800.00 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 129.6 | TON | 133.00 | 17,236.80 | 200.00 | 25,920.00 | 230.00 | 29,808.00 | 200.00 | 25,920.00 | | 0013 | 509-01-00100 | Milling Asphalt Pavement (2" Depth) | 9,494 | SQYD | 2.40 | 22,785.60 | 2.65 | 25,159.10 | 3.05 | 28,956.70 | 3.00 | 28,482.00 | | 0014 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 266 | SQYD | 78.00 | 20,748.00 | 118.00 | 31,388.00 | 135.70 | 36,096.20 | 120.00 | 31,920.00 | | 0015 | 510-02-00100 | Pavement Widening (12" Minimum Thickness) | 396.7 | SQYD | 112.00 | 44,430.40 | 118.00 | 46,810.60 | 135.70 | 53,832.19 | 85.00 | 33,719.50 | | 0016 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 68 | LNFT | 160.00 | 10,880.00 | 200.00 | 13,600.00 | 139.87 | 9,511.16 | 175.00 | 11,900.00 | | 0017 | 701-02-02080 | Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) | 38 | LNFT | 190.00 | 7,220.00 | 300.00 | 11,400.00 | 197.36 | 7,499.68 | 250.00 | 9,500.00 | | 0018 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 26 | LNFT | 106.00 | 2,756.00 | 90.00 | 2,340.00 | 99.03 | 2,574.78 | 115.00 | 2,990.00 | | 0019 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 368 | LNFT | 90.00 | 33,120.00 | 100.00 | 36,800.00 | 105.90 | 38,971.20 | 85.00 | 31,280.00 | | 0020 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 192 | LNFT | 95.00 | 18,240.00 | 120.00 | 23,040.00 | 125.84 | 24,161.28 | 135.00 | 25,920.00 | | 0021 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 438 | LNFT | 139.00 | 60,882.00 | 140.00 | 61,320.00 | 140.74 | 61,644.12 | 120.00 | 52,560.00 | | 0022 | 701-03-02062 | Storm Drain Pipe (Outfall) (30" RPVCP or 36" CMP) | 101 | LNFT | 129.00 | 13,029.00 | 140.00 | 14,140.00 | 140.74 | 14,214.74 | 135.00 | 13,635.00 | | 0023 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 528 | LNFT | 105.00 | 55,440.00 | 120.00 | 63,360.00 | 139.87 | 73,851.36 | 115.00 | 60,720.00 | | 0024 | 701-05-01022 | Side Drain Pipe (15" RCP/RPVCP/CMP) | 58 | LNFT | 105.00 | 6,090.00 | 90.00 | 5,220.00 | 99.03 | 5,743.74 | 150.00 | 8,700.00 | | 0025 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 224 | LNFT | 107.00 | 23,968.00 | 120.00 | 26,880.00 | 139.87 | 31,330.88 | 120.00 | 26,880.00 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 470 | LNFT | 1.00 | 470.00 | 0.10 | 47.00 | 110.00 | 51,700.00 | 60.00 | 28,200.00 | | 0027 | 702-03-00100 | Catch Basins (CB-01) | 15 | EACH | 2,800.00 | 42,000.00 | 3,900.00 | 58,500.00 | 4,641.44 | 69,621.60 | 3,500.00 | 52,500.00 | | 0028 | 702-03-00200 | Catch Basins (CB-02) | 3 | EACH | 3,000.00 | 9,000.00 | 5,000.00 | 15,000.00 | 4,602.76 | 13,808.28 | 4,500.00 | 13,500.00 | | 0029 | 702-03-00500 | Catch Basins (CB-06) | 2 | EACH | 4,000.00 | 8,000.00 | 8,000.00 | 16,000.00 | 4,899.44 | 9,798.88 | 6,500.00 | 13,000.00 | | 0030 | 706-02-00200 | Concrete Drive (6" Thick) | 370 | SQYD | 79.00 | 29,230.00 | 85.00 | 31,450.00 | 86.25 | 31,912.50 | 90.00 | 33,300.00 | | 0031 | 707-03-00100 | Combination Concrete Curb and Gutter (barrier) | 139.5 | LNFT | 55.00 | 7,672.50 | 45.00 | 6,277.50 | 40.25 | 5,614.88 | 35.00 | 4,882.50 | | 0032 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 171 | SQYD | 80.00 | 13,680.00 | 100.00 | 17,100.00 | 88.55 | 15,142.05 | 100.00 | 17,100.00 | | 0033 | 711-04-00100 | Geotextile Fabric | 171 | SQYD | 4.00 | 684.00 | 10.00 | 1,710.00 | 1.02 | 174.42 | 5.00 | 855.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 68,000.00 | 68,000.00 | 90,000.00 | 90,000.00 | 8,218.76 | 8,218.76 | 70,000.00 | 70,000.00 | | 0035 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 4,129 | LNFT | 0.45 | 1,858.05 | 0.20 | 825.80 | 0.46 | 1,899.34 | 0.50 | 2,064.50 | | 0036 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 8 | LNFT | 3.00 | 24.00 | 1.50 | 12.00 | 3.45 | 27.60 | 1.00 | 8.00 | | 0037 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 154 | SQYD | 4.60 | 708.40 | 6.00 | 924.00 | 24.57 | 3,783.78 | 5.00 | 770.00 | | 0038 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 43 | SQYD | 7.95 | 341.85 | 12.00 | 516.00 | 43.67 | 1,877.81 | 8.00 | 344.00 | | 0039 | 726-01-00100 | Bedding Material | 281.5 | CUYD | 83.80 | 23,589.70 | 100.00 | 28,150.00 | 52.09 | 14,663.34 | 100.00 | 28,150.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 130,000.00 | 130,000.00 | 100,000.00 | 100,000.00 | 57,568.00 | 57,568.00 | 140,000.00 | 140,000.00 | | 0041 | 729-01-00100 | Sign (Type A) | 92 | SQFT | 20.50 | 1,886.00 | 23.00 | 2,116.00 | 25.30 | 2,327.60 | 25.00 | 2,300.00 | | 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 250.00 | 1,000.00 | 300.00 | 1,200.00 | 97.75 | 391.00 | 85.00 | 340.00 | | 0043 | 729-19-00300 | Dead End Road Installations (Type C) | 2 | EACH | 250.00 | 500.00 | 300.00 | 600.00 | 862.50 | 1,725.00 | 750.00 | 1,500.00 | | 0044 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 19 | EACH | 250.00 | 4,750.00 | 300.00 | 5,700.00 | 172.50 | 3,277.50 | 150.00 | 2,850.00 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 207 | EACH | 12.00 | 2,484.00 | 11.00 | 2,277.00 | 13.80 | 2,856.60 | 10.00 | 2,070.00 | | 0046 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 46 | LNFT | 3.00 | 138.00 | 6.00 | 276.00 | 3.45 | 158.70 | 5.00 | 230.00 | | 0047 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 25 | LNFT | 20.00 | 500.00 | 22.00 | 550.00 | 23.00 | 575.00 | 25.00 | 625.00 | | 0048 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.128 | MILE | 4,005.00 | 12,527.64 | 5,000.00 | 15,640.00 | 4,600.00 | 14,388.80 | 9,500.00 | 29,716.00 | | 0049 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 350.00 | 350.00 | 500.00 | 500.00 | 402.50 | 402.50 | 550.00 | 550.00 | | 0050 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 350.00 | 350.00 | 500.00 | 500.00 | 402.50 | 402.50 | 550.20 | 550.20 | | 0051 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 350.00 | 350.00 | 500.00 | 500.00 | 402.50 | 402.50 | 547.00 | 547.00 | | 0052 | 735-01-00100 | Mailboxes | 28 | EACH | 40.00 | 1,120.00 | 10.00 | 280.00 | 17.25 | 483.00 | 15.00 | 420.00 | | 0053 | 735-02-00100 | Mailbox Supports (Single) | 28 | EACH | 80.00 | 2,240.00 | 120.00 | 3,360.00 | 132.25 | 3,703.00 | 120.00 | 3,360.00 | | 0054 | 739-01-00100 | Hydro-Seeding | 2.19 | ACRE | 1,950.00 | 4,270.50 | 2,500.00 | 5,475.00 | 2,239.05 | 4,903.52 | 2,150.00 | 4,708.50 | | 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 22,500.00 | 22,500.00 | 25,000.00 | 25,000.00 | 43,000.00 | 43,000.00 | 24,000.00 | 24,000.00 | | 0056 | 805-15-01900 | Reinforced Concrete Box Culverts (Precast) (9' x 7') | 68 | LNFT | 1,700.00 | 115,600.00 | 2,000.00 | 136,000.00 | 1,097.01 | 74,596.68 | 2,500.00 | 170,000.00 | | 0057 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (9' x 7') | 2 | EACH | 44,267.40 | 88,534.80 | 50,000.00 | 100,000.00 | 10,470.75 | 20,941.50 | 40,000.00 | 80,000.00 | | 0058 | 810-04-00100 | Hand Railing Galvanized Steel Pipe | 105 | LNFT | 141.00 | 14,805.00 | 200.00 | 21,000.00 | 113.36 | 11,902.80 | 250.00 | 26,250.00 | | 0059 | NS-300-00060 | Geogrid | 261 | SQYD | 3.20 | 835.20 | 1.00 | 261.00 | 1.09 | 284.49 | 10.00 | 2,610.00 | | 0060 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 542 | INLF | 1.00 | 542.00 | 1.00 | 542.00 | 20.70 | 11,219.40 | 5.00 | 2,710.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,321,346.39 | | 1,376,307.00 | | 1,396,233.19 | | 1,430,522.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Bridging The Gap Solution LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2.37 | LUMP | 25,000.00 | 25,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 277 | SQYD | 20.00 | 5,540.00 | | 0004 | 202-02-38240 | Removal of Signs and Supports | 30 | EACH | 50.00 | 1,500.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 3,233 | LNFT | 10.00 | 32,330.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 133 | EACH | 10.00 | 1,330.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 8,257 | LNFT | 0.25 | 2,064.25 | | 0009 | 401-01-00100 | Aggregate Surface Course (Net Section) | 5.1 | CUYD | 50.00 | 255.00 | | 0010 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 258.3 | CUYD | 25.00 | 6,457.50 | | 0011 | 502-01-00100 | Asphalt Concrete | 1,078 | TON | 115.00 | 123,970.00 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 129.6 | TON | 185.00 | 23,976.00 | | 0013 | 509-01-00100 | Milling Asphalt Pavement (2" Depth) | 9,494 | SQYD | 3.00 | 28,482.00 | | 0014 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 266 | SQYD | 69.00 | 18,354.00 | | 0015 | 510-02-00100 | Pavement Widening (12" Minimum Thickness) | 396.7 | SQYD | 100.00 | 39,670.00 | | 0016 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 68 | LNFT | 250.00 | 17,000.00 | | 0017 | 701-02-02080 | Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) | 38 | LNFT | 320.00 | 12,160.00 | | 0018 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 26 | LNFT | 125.00 | 3,250.00 | | 0019 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 368 | LNFT | 145.00 | 53,360.00 | | 0020 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 192 | LNFT | 150.00 | 28,800.00 | | 0021 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 438 | LNFT | 175.00 | 76,650.00 | | 0022 | 701-03-02062 | Storm Drain Pipe (Outfall) (30" RPVCP or 36" CMP) | 101 | LNFT | 175.00 | 17,675.00 | | 0023 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 528 | LNFT | 150.00 | 79,200.00 | | 0024 | 701-05-01022 | Side Drain Pipe (15" RCP/RPVCP/CMP) | 58 | LNFT | 125.00 | 7,250.00 | | 0025 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 224 | LNFT | 150.00 | 33,600.00 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 470 | LNFT | 30.00 | 14,100.00 | | 0027 | 702-03-00100 | Catch Basins (CB-01) | 15 | EACH | 6,500.00 | 97,500.00 | | 0028 | 702-03-00200 | Catch Basins (CB-02) | 3 | EACH | 7,000.00 | 21,000.00 | | 0029 | 702-03-00500 | Catch Basins (CB-06) | 2 | EACH | 8,000.00 | 16,000.00 | | 0030 | 706-02-00200 | Concrete Drive (6" Thick) | 370 | SQYD | 80.00 | 29,600.00 | | 0031 | 707-03-00100 | Combination Concrete Curb and Gutter (barrier) | 139.5 | LNFT | 30.00 | 4,185.00 | | 0032 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 171 | SQYD | 100.00 | 17,100.00 | | 0033 | 711-04-00100 | Geotextile Fabric | 171 | SQYD | 20.00 | 3,420.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | | 0035 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 4,129 | LNFT | 2.00 | 8,258.00 | | 0036 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 8 | LNFT | 10.00 | 80.00 | | 0037 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 154 | SQYD | 30.00 | 4,620.00 | | 0038 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 43 | SQYD | 100.00 | 4,300.00 | | 0039 | 726-01-00100 | Bedding Material | 281.5 | CUYD | 100.00 | 28,150.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | | 0041 | 729-01-00100 | Sign (Type A) | 92 | SQFT | 30.00 | 2,760.00 | | 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | | 0043 | 729-19-00300 | Dead End Road Installations (Type C) | 2 | EACH | 800.00 | 1,600.00 | | 0044 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 19 | EACH | 200.00 | 3,800.00 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 207 | EACH | 10.00 | 2,070.00 | | 0046 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 46 | LNFT | 25.00 | 1,150.00 | | 0047 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 25 | LNFT | 25.00 | 625.00 | | 0048 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.128 | MILE | 2,000.00 | 6,256.00 | | 0049 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 750.00 | 750.00 | | 0050 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 750.00 | 750.00 | | 0051 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 750.00 | 750.00 | | 0052 | 735-01-00100 | Mailboxes | 28 | EACH | 10.00 | 280.00 | | 0053 | 735-02-00100 | Mailbox Supports (Single) | 28 | EACH | 200.00 | 5,600.00 | | 0054 | 739-01-00100 | Hydro-Seeding | 2.19 | ACRE | 2,500.00 | 5,475.00 | | 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | | 0056 | 805-15-01900 | Reinforced Concrete Box Culverts (Precast) (9' x 7') | 68 | LNFT | 4,500.00 | 306,000.00 | | 0057 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (9' x 7') | 2 | EACH | 16,500.00 | 33,000.00 | | 0058 | 810-04-00100 | Hand Railing Galvanized Steel Pipe | 105 | LNFT | 125.00 | 13,125.00 | | 0059 | NS-300-00060 | Geogrid | 261 | SQYD | 15.00 | 3,915.00 | | 0060 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 542 | INLF | 1.50 | 813.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,455,305.75 |
|