Proposal:H.013330.6
Parish:East Baton Rouge
Routes:LA 42
Description:LA 42: LA 3246 - GARDERE LANE (RT II)
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,283,831.10
| Rank | License | Bidder | Construction Bid |
| 1 | 24901 | Hard Rock Construction LLC | $1,446,366.32 |
| 2 | 68237 | GULF STATES SERVICES, LLC | $1,708,448.25 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $1,785,657.45 |
| 4 | 57931 | KCR CONTRACTORS, LLC | $1,835,282.72 |
| 5 | 69570 | Bridging The Gap Solution LLC | $2,197,659.59 |
| 6 | 46547 | Interstate Improvement, Inc. | $2,602,329.05 |
| 7 | 39462 | JB JAMES CONSTRUCTION LLC | $3,654,996.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Hard Rock Construction LLC | - 2 - GULF STATES SERVICES, LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - KCR CONTRACTORS, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00020 | Removal of INCIDENTAL CONCRETE | 7.8 | SQYD | 41.00 | 319.80 | 25.00 | 195.00 | 90.00 | 702.00 | 11.72 | 91.42 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 333.4 | SQYD | 21.00 | 7,001.40 | 20.00 | 6,668.00 | 25.00 | 8,335.00 | 5.80 | 1,933.72 | | 0003 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 333.4 | SQYD | 10.00 | 3,334.00 | 20.00 | 6,668.00 | 25.00 | 8,335.00 | 9.13 | 3,043.94 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 24 | SQYD | 30.00 | 720.00 | 25.00 | 600.00 | 40.00 | 960.00 | 9.25 | 222.00 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 92 | LNFT | 15.00 | 1,380.00 | 25.00 | 2,300.00 | 20.00 | 1,840.00 | 3.13 | 287.96 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 41,000.00 | 41,000.00 | 7,500.00 | 7,500.00 | 25,000.00 | 25,000.00 | 28,750.00 | 28,750.00 | | 0007 | 203-08-00100 | Geotextile Fabric | 36 | SQYD | 2.00 | 72.00 | 3.50 | 126.00 | 3.50 | 126.00 | 2.24 | 80.64 | | 0008 | 203-10-00100 | Cleaning Existing Ditches | 5,000 | LNFT | 6.00 | 30,000.00 | 4.00 | 20,000.00 | 3.50 | 17,500.00 | 5.75 | 28,750.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 12 | EACH | 180.00 | 2,160.00 | 50.00 | 600.00 | 70.00 | 840.00 | 186.50 | 2,238.00 | | 0010 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 566.6 | SQYD | 45.00 | 25,497.00 | 45.00 | 25,497.00 | 38.00 | 21,530.80 | 45.95 | 26,035.27 | | 0011 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 515.8 | SQYD | 58.00 | 29,916.40 | 65.00 | 33,527.00 | 48.00 | 24,758.40 | 48.13 | 24,825.45 | | 0012 | 304-01-00100 | Lime | 14.87 | TON | 300.00 | 4,461.00 | 275.00 | 4,089.25 | 220.00 | 3,271.40 | 287.50 | 4,275.13 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 1,049 | SQYD | 15.00 | 15,735.00 | 21.00 | 22,029.00 | 6.00 | 6,294.00 | 37.59 | 39,431.91 | | 0014 | 502-01-00100 | Asphalt Concrete | 685.5 | TON | 158.00 | 108,309.00 | 155.00 | 106,252.50 | 135.00 | 92,542.50 | 164.45 | 112,730.48 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 45.3 | TON | 220.00 | 9,966.00 | 220.00 | 9,966.00 | 220.00 | 9,966.00 | 230.00 | 10,419.00 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 3,058 | SQYD | 5.50 | 16,819.00 | 10.00 | 30,580.00 | 5.00 | 15,290.00 | 5.75 | 17,583.50 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -171 | CUYD | 0.10 | -17.10 | 0.10 | -17.10 | 0.10 | -17.10 | 0.10 | -17.10 | | 0018 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 18,000 | LNFT | 2.00 | 36,000.00 | 2.25 | 40,500.00 | 1.75 | 31,500.00 | 2.80 | 50,400.00 | | 0019 | 602-03-00100 | Cleaning and Sealing Random cracks | 5,000 | LNFT | 3.50 | 17,500.00 | 2.25 | 11,250.00 | 1.75 | 8,750.00 | 3.19 | 15,950.00 | | 0020 | 602-05-01200 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10" Thick) | 278.4 | SQYD | 140.00 | 38,976.00 | 185.00 | 51,504.00 | 215.00 | 59,856.00 | 244.03 | 67,937.95 | | 0021 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 576 | SQYD | 140.00 | 80,640.00 | 185.00 | 106,560.00 | 185.00 | 106,560.00 | 240.35 | 138,441.60 | | 0022 | 602-05-03200 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (10" Thick) | 4,265.6 | SQYD | 140.00 | 597,184.00 | 185.00 | 789,136.00 | 180.00 | 767,808.00 | 228.76 | 975,798.66 | | 0023 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 7.8 | SQYD | 120.00 | 936.00 | 100.00 | 780.00 | 120.00 | 936.00 | 116.29 | 907.06 | | 0024 | 707-01-00100 | Concrete Curb | 177.2 | LNFT | 40.00 | 7,088.00 | 25.00 | 4,430.00 | 45.00 | 7,974.00 | 18.71 | 3,315.41 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 92,000.00 | 92,000.00 | 100,000.00 | 100,000.00 | 260,000.00 | 260,000.00 | 40,250.00 | 40,250.00 | | 0026 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 400 | LNFT | 1.50 | 600.00 | 0.15 | 60.00 | 0.15 | 60.00 | 0.17 | 68.00 | | 0027 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 110 | LNFT | 3.50 | 385.00 | 0.25 | 27.50 | 0.25 | 27.50 | 0.29 | 31.90 | | 0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.188 | MILE | 5,500.00 | 1,034.00 | 1,000.00 | 188.00 | 300.00 | 56.40 | 326.17 | 61.32 | | 0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.188 | MILE | 715.00 | 134.42 | 1,000.00 | 188.00 | 950.00 | 178.60 | 1,150.00 | 216.20 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.376 | MILE | 1,650.00 | 620.40 | 2,500.00 | 940.00 | 2,000.00 | 752.00 | 2,875.00 | 1,081.00 | | 0031 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 82.00 | 328.00 | 25.00 | 100.00 | 25.00 | 100.00 | 28.75 | 115.00 | | 0032 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 110.00 | 440.00 | 25.00 | 100.00 | 25.00 | 100.00 | 28.75 | 115.00 | | 0033 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 7,900.00 | 15,800.00 | 20,000.00 | 40,000.00 | 7,500.00 | 15,000.00 | 18,975.00 | 37,950.00 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | 135,000.00 | 135,000.00 | 23,000.00 | 23,000.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 730 | EACH | 8.00 | 5,840.00 | 6.00 | 4,380.00 | 6.00 | 4,380.00 | 6.90 | 5,037.00 | | 0036 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 3,100 | LNFT | 2.15 | 6,665.00 | 2.00 | 6,200.00 | 2.00 | 6,200.00 | 2.30 | 7,130.00 | | 0037 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 626 | LNFT | 11.00 | 6,886.00 | 12.00 | 7,512.00 | 12.00 | 7,512.00 | 13.80 | 8,638.80 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.244 | MILE | 4,000.00 | 44,976.00 | 3,600.00 | 40,478.40 | 3,650.00 | 41,040.60 | 4,140.00 | 46,550.16 | | 0039 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.811 | MILE | 2,500.00 | 7,027.50 | 850.00 | 2,389.35 | 850.00 | 2,389.35 | 977.50 | 2,747.75 | | 0040 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.424 | MILE | 5,000.00 | 2,120.00 | 2,500.00 | 1,060.00 | 3,500.00 | 1,484.00 | 4,063.33 | 1,722.85 | | 0041 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) | 2.811 | MILE | 5,000.00 | 14,055.00 | 850.00 | 2,389.35 | 2,500.00 | 7,027.50 | 2,876.02 | 8,084.49 | | 0042 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 440.00 | 880.00 | 500.00 | 1,000.00 | 500.00 | 1,000.00 | 575.00 | 1,150.00 | | 0043 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 39 | EACH | 305.00 | 11,895.00 | 375.00 | 14,625.00 | 375.00 | 14,625.00 | 431.25 | 16,818.75 | | 0044 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 7 | EACH | 305.00 | 2,135.00 | 375.00 | 2,625.00 | 375.00 | 2,625.00 | 431.25 | 3,018.75 | | 0045 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 36 | EACH | 400.00 | 14,400.00 | 475.00 | 17,100.00 | 475.00 | 17,100.00 | 546.25 | 19,665.00 | | 0046 | 732-05-00100 | Removal of Existing Markings | 2.811 | MILE | 18,000.00 | 50,598.00 | 12,000.00 | 33,732.00 | 12,500.00 | 35,137.50 | 13,804.91 | 38,805.60 | | 0047 | 739-01-00100 | Hydro-Seeding | 0.65 | ACRE | 4,900.00 | 3,185.00 | 2,500.00 | 1,625.00 | 2,500.00 | 1,625.00 | 4,643.03 | 3,017.97 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,850.00 | 3,850.00 | 25,000.00 | 25,000.00 | 5,000.00 | 5,000.00 | 7,500.00 | 7,500.00 | | 0049 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 1,750 | LNFT | 2.25 | 3,937.50 | 5.00 | 8,750.00 | 1.00 | 1,750.00 | 2.03 | 3,552.50 | | 0050 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 636 | LNFT | 2.25 | 1,431.00 | 5.00 | 3,180.00 | 1.00 | 636.00 | 2.67 | 1,698.12 | | 0051 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 2,386 | LNFT | 1.00 | 2,386.00 | 3.00 | 7,158.00 | 0.50 | 1,193.00 | 0.96 | 2,290.56 | | 0052 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,200 | INLF | 1.00 | 2,200.00 | 2.50 | 5,500.00 | 1.00 | 2,200.00 | 0.41 | 902.00 | | 0053 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 400 | INLF | 1.40 | 560.00 | 3.50 | 1,400.00 | 2.00 | 800.00 | 1.58 | 632.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,446,366.32 | | 1,708,448.25 | | 1,785,657.45 | | 1,835,282.72 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Bridging The Gap Solution LLC | - 6 - Interstate Improvement, Inc. | - 7 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00020 | Removal of INCIDENTAL CONCRETE | 7.8 | SQYD | 50.00 | 390.00 | 20.00 | 156.00 | 300.00 | 2,340.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 333.4 | SQYD | 10.00 | 3,334.00 | 15.80 | 5,267.72 | 40.00 | 13,336.00 | | 0003 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 333.4 | SQYD | 10.00 | 3,334.00 | 19.00 | 6,334.60 | 15.00 | 5,001.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 24 | SQYD | 40.00 | 960.00 | 20.00 | 480.00 | 100.00 | 2,400.00 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 92 | LNFT | 15.00 | 1,380.00 | 20.00 | 1,840.00 | 30.00 | 2,760.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 | 32,000.00 | 32,000.00 | 120,000.00 | 120,000.00 | | 0007 | 203-08-00100 | Geotextile Fabric | 36 | SQYD | 10.00 | 360.00 | 16.00 | 576.00 | 20.00 | 720.00 | | 0008 | 203-10-00100 | Cleaning Existing Ditches | 5,000 | LNFT | 11.26 | 56,300.00 | 22.00 | 110,000.00 | 11.00 | 55,000.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 12 | EACH | 125.00 | 1,500.00 | 215.00 | 2,580.00 | 150.00 | 1,800.00 | | 0010 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 566.6 | SQYD | 30.00 | 16,998.00 | 33.70 | 19,094.42 | 40.00 | 22,664.00 | | 0011 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 515.8 | SQYD | 60.00 | 30,948.00 | 52.65 | 27,156.87 | 42.00 | 21,663.60 | | 0012 | 304-01-00100 | Lime | 14.87 | TON | 300.00 | 4,461.00 | 290.00 | 4,312.30 | 200.00 | 2,974.00 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 1,049 | SQYD | 10.00 | 10,490.00 | 22.10 | 23,182.90 | 1.00 | 1,049.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 685.5 | TON | 140.00 | 95,970.00 | 173.60 | 119,002.80 | 120.00 | 82,260.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 45.3 | TON | 275.00 | 12,457.50 | 316.00 | 14,314.80 | 185.00 | 8,380.50 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 3,058 | SQYD | 10.00 | 30,580.00 | 10.60 | 32,414.80 | 17.00 | 51,986.00 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -171 | CUYD | 0.01 | -1.71 | 1.05 | -179.55 | 0.10 | -17.10 | | 0018 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 18,000 | LNFT | 3.00 | 54,000.00 | 2.50 | 45,000.00 | 3.50 | 63,000.00 | | 0019 | 602-03-00100 | Cleaning and Sealing Random cracks | 5,000 | LNFT | 5.00 | 25,000.00 | 2.25 | 11,250.00 | 4.00 | 20,000.00 | | 0020 | 602-05-01200 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10" Thick) | 278.4 | SQYD | 300.00 | 83,520.00 | 300.00 | 83,520.00 | 512.00 | 142,540.80 | | 0021 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 576 | SQYD | 300.00 | 172,800.00 | 250.00 | 144,000.00 | 445.00 | 256,320.00 | | 0022 | 602-05-03200 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (10" Thick) | 4,265.6 | SQYD | 300.00 | 1,279,680.00 | 240.00 | 1,023,744.00 | 418.00 | 1,783,020.80 | | 0023 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 7.8 | SQYD | 100.00 | 780.00 | 300.00 | 2,340.00 | 653.00 | 5,093.40 | | 0024 | 707-01-00100 | Concrete Curb | 177.2 | LNFT | 10.00 | 1,772.00 | 49.00 | 8,682.80 | 18.00 | 3,189.60 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 300,000.00 | 300,000.00 | 370,000.00 | 370,000.00 | | 0026 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 400 | LNFT | 6.00 | 2,400.00 | 0.17 | 68.00 | 0.15 | 60.00 | | 0027 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 110 | LNFT | 10.00 | 1,100.00 | 0.27 | 29.70 | 0.25 | 27.50 | | 0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.188 | MILE | 450.00 | 84.60 | 453.00 | 85.16 | 700.00 | 131.60 | | 0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.188 | MILE | 5,000.00 | 940.00 | 1,064.00 | 200.03 | 700.00 | 131.60 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.376 | MILE | 10,000.00 | 3,760.00 | 2,660.00 | 1,000.16 | 1,500.00 | 564.00 | | 0031 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 250.00 | 1,000.00 | 26.30 | 105.20 | 25.00 | 100.00 | | 0032 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 250.00 | 1,000.00 | 26.30 | 105.20 | 25.00 | 100.00 | | 0033 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 12,000.00 | 24,000.00 | 18,000.00 | 36,000.00 | 20,000.00 | 40,000.00 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 20,000.00 | 20,000.00 | 350,000.00 | 350,000.00 | 350,000.00 | 350,000.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 730 | EACH | 10.00 | 7,300.00 | 6.32 | 4,613.60 | 6.00 | 4,380.00 | | 0036 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 3,100 | LNFT | 8.00 | 24,800.00 | 2.10 | 6,510.00 | 2.00 | 6,200.00 | | 0037 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 626 | LNFT | 10.00 | 6,260.00 | 12.65 | 7,918.90 | 12.00 | 7,512.00 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.244 | MILE | 2,200.00 | 24,736.80 | 3,787.00 | 42,581.03 | 3,600.00 | 40,478.40 | | 0039 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.811 | MILE | 1,900.00 | 5,340.90 | 894.00 | 2,513.03 | 2,000.00 | 5,622.00 | | 0040 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.424 | MILE | 10,000.00 | 4,240.00 | 3,650.00 | 1,547.60 | 4,500.00 | 1,908.00 | | 0041 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) | 2.811 | MILE | 2,500.00 | 7,027.50 | 2,630.00 | 7,392.93 | 4,500.00 | 12,649.50 | | 0042 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 750.00 | 1,500.00 | 527.00 | 1,054.00 | 500.00 | 1,000.00 | | 0043 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 39 | EACH | 750.00 | 29,250.00 | 396.00 | 15,444.00 | 375.00 | 14,625.00 | | 0044 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 7 | EACH | 750.00 | 5,250.00 | 396.00 | 2,772.00 | 375.00 | 2,625.00 | | 0045 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 36 | EACH | 750.00 | 27,000.00 | 500.00 | 18,000.00 | 475.00 | 17,100.00 | | 0046 | 732-05-00100 | Removal of Existing Markings | 2.811 | MILE | 5,000.00 | 14,055.00 | 12,650.00 | 35,559.15 | 15,500.00 | 43,570.50 | | 0047 | 739-01-00100 | Hydro-Seeding | 0.65 | ACRE | 5,000.00 | 3,250.00 | 21,050.00 | 13,682.50 | 5,000.00 | 3,250.00 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 10,600.00 | 10,600.00 | 40,000.00 | 40,000.00 | | 0049 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 1,750 | LNFT | 3.00 | 5,250.00 | 3.70 | 6,475.00 | 5.00 | 8,750.00 | | 0050 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 636 | LNFT | 4.00 | 2,544.00 | 3.70 | 2,353.20 | 5.00 | 3,180.00 | | 0051 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 2,386 | LNFT | 3.00 | 7,158.00 | 3.70 | 8,828.20 | 5.00 | 11,930.00 | | 0052 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,200 | INLF | 2.00 | 4,400.00 | 3.70 | 8,140.00 | 0.60 | 1,320.00 | | 0053 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 400 | INLF | 5.00 | 2,000.00 | 4.20 | 1,680.00 | 0.75 | 300.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,197,659.59 | | 2,602,329.05 | | 3,654,996.70 |
|