Proposal:H.014078.6
Parish:St. Charles
Routes:US 61
Description:US 61 SB ACCEL LANE: LA 50 TO I-310
Type Construction:GRADING, MILLING ASPHALT PAVEMENT, PAVEMENT WIDENING, ASPHALT CONCRETE PAVEMENT, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$220,232.60
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $223,670.51 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $270,368.74 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $317,989.60 |
| 4 | 62139 | HUEY P. STOCKSTILL, LLC | $337,545.02 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - Boh Bros. Construction Co., LLC. | - 4 - HUEY P. STOCKSTILL, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 68 | SQYD | 1.75 | 119.00 | 45.00 | 3,060.00 | 40.00 | 2,720.00 | 15.00 | 1,020.00 | | 0002 | 202-02-38300 | Removal of Sign and U-Channel Post | 4 | EACH | 26.00 | 104.00 | 20.00 | 80.00 | 25.00 | 100.00 | 5.00 | 20.00 | | 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,600.00 | 10,600.00 | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | | 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 12.8 | CUYD | 25.00 | 320.00 | 120.00 | 1,536.00 | 200.00 | 2,560.00 | 125.00 | 1,600.00 | | 0005 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 40 | CUYD | 60.00 | 2,400.00 | 110.00 | 4,400.00 | 50.00 | 2,000.00 | 100.00 | 4,000.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 676.4 | TON | 105.00 | 71,022.00 | 140.00 | 94,696.00 | 175.00 | 118,370.00 | 155.00 | 104,842.00 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 131.5 | TON | 105.00 | 13,807.50 | 200.00 | 26,300.00 | 175.00 | 23,012.50 | 155.00 | 20,382.50 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 2,035 | SQYD | 5.00 | 10,175.00 | 4.85 | 9,869.75 | 9.00 | 18,315.00 | 6.00 | 12,210.00 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -158 | CUYD | 1.00 | -158.00 | 0.01 | -1.58 | 0.15 | -23.70 | 0.01 | -1.58 | | 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | | 0011 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 600 | LNFT | 0.50 | 300.00 | 0.45 | 270.00 | 0.40 | 240.00 | 0.35 | 210.00 | | 0012 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 1.25 | 30.00 | 1.30 | 31.20 | 5.00 | 120.00 | 1.00 | 24.00 | | 0013 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.658 | MILE | 750.00 | 493.50 | 1,119.00 | 736.30 | 750.00 | 493.50 | 150.00 | 98.70 | | 0014 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.658 | MILE | 1,075.00 | 707.35 | 1,119.00 | 736.30 | 850.00 | 559.30 | 850.00 | 559.30 | | 0015 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.433 | MILE | 2,600.00 | 1,125.80 | 2,600.00 | 1,125.80 | 2,000.00 | 866.00 | 2,000.00 | 866.00 | | 0016 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.117 | MILE | 16,000.00 | 1,872.00 | 16,850.00 | 1,971.45 | 12,000.00 | 1,404.00 | 12,500.00 | 1,462.50 | | 0017 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 65.00 | 260.00 | 50.00 | 200.00 | 50.00 | 200.00 | 50.00 | 200.00 | | 0018 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 65.00 | 260.00 | 50.00 | 200.00 | 50.00 | 200.00 | 50.00 | 200.00 | | 0019 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 60 | EACH | 8.25 | 495.00 | 6.50 | 390.00 | 9.00 | 540.00 | 6.50 | 390.00 | | 0020 | 717-01-00100 | Seeding | 25 | LB | 25.00 | 625.00 | 32.00 | 800.00 | 30.00 | 750.00 | 35.00 | 875.00 | | 0021 | 718-01-00100 | Fertilizer | 1,000 | LB | 1.00 | 1,000.00 | 1.40 | 1,400.00 | 1.50 | 1,500.00 | 1.50 | 1,500.00 | | 0022 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.212 | MILE | 630.00 | 133.56 | 660.00 | 139.92 | 2,500.00 | 530.00 | 4,000.00 | 848.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 42,000.00 | 42,000.00 | 26,500.00 | 26,500.00 | 30,000.00 | 30,000.00 | 34,000.00 | 34,000.00 | | 0024 | 729-01-00100 | Sign (Type A) | 32 | SQFT | 14.00 | 448.00 | 28.00 | 896.00 | 25.00 | 800.00 | 18.00 | 576.00 | | 0025 | 729-02-00100 | Sign (Type B) | 76 | SQFT | 22.00 | 1,672.00 | 29.00 | 2,204.00 | 25.00 | 1,900.00 | 18.00 | 1,368.00 | | 0026 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 9 | EACH | 115.00 | 1,035.00 | 245.00 | 2,205.00 | 90.00 | 810.00 | 75.00 | 675.00 | | 0027 | 731-02-00100 | Reflectorized Raised Pavement Markers | 371 | EACH | 10.00 | 3,710.00 | 10.00 | 3,710.00 | 9.00 | 3,339.00 | 8.00 | 2,968.00 | | 0028 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 400 | LNFT | 3.75 | 1,500.00 | 4.00 | 1,600.00 | 3.50 | 1,400.00 | 3.00 | 1,200.00 | | 0029 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 82 | LNFT | 15.00 | 1,230.00 | 16.00 | 1,312.00 | 13.00 | 1,066.00 | 12.00 | 984.00 | | 0030 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.363 | MILE | 9,600.00 | 3,484.80 | 9,800.00 | 3,557.40 | 8,000.00 | 2,904.00 | 7,500.00 | 2,722.50 | | 0031 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.6 | MILE | 1,900.00 | 1,140.00 | 1,980.00 | 1,188.00 | 1,750.00 | 1,050.00 | 1,500.00 | 900.00 | | 0032 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 375.00 | 750.00 | 395.00 | 790.00 | 350.00 | 700.00 | 300.00 | 600.00 | | 0033 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 375.00 | 1,500.00 | 395.00 | 1,580.00 | 350.00 | 1,400.00 | 300.00 | 1,200.00 | | 0034 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 375.00 | 750.00 | 395.00 | 790.00 | 350.00 | 700.00 | 300.00 | 600.00 | | 0035 | 732-05-00100 | Removal of Existing Markings | 0.376 | MILE | 26,000.00 | 9,776.00 | 27,000.00 | 10,152.00 | 20,000.00 | 7,520.00 | 20,000.00 | 7,520.00 | | 0036 | 736-01-00100 | Trenching and Backfilling | 445 | LNFT | 7.50 | 3,337.50 | 8.00 | 3,560.00 | 5.00 | 2,225.00 | 8.50 | 3,782.50 | | 0037 | 736-09-00100 | Loop Detector | 75 | LNFT | 32.00 | 2,400.00 | 32.00 | 2,400.00 | 40.00 | 3,000.00 | 22.00 | 1,650.00 | | 0038 | 736-10-00300 | Underground Junction Box (Type F) | 1 | EACH | 1,100.00 | 1,100.00 | 1,100.00 | 1,100.00 | 1,000.00 | 1,000.00 | 850.00 | 850.00 | | 0039 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 40 | LNFT | 3.25 | 130.00 | 3.50 | 140.00 | 8.00 | 320.00 | 3.25 | 130.00 | | 0040 | 736-11-00100 | Conduit (1" HDPE, Schedule 80) | 425 | LNFT | 4.50 | 1,912.50 | 5.00 | 2,125.00 | 5.00 | 2,125.00 | 3.75 | 1,593.75 | | 0041 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 445 | LNFT | 5.00 | 2,225.00 | 5.50 | 2,447.50 | 3.00 | 1,335.00 | 2.75 | 1,223.75 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,000.00 | 3,000.00 | 6,000.00 | 6,000.00 | 7,500.00 | 7,500.00 | 19,500.00 | 19,500.00 | | 0043 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 4,878 | INLF | 1.00 | 4,878.00 | 0.65 | 3,170.70 | 0.50 | 2,439.00 | 0.45 | 2,195.10 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 223,670.51 | | 270,368.74 | | 317,989.60 | | 337,545.02 |
|