Proposal:H.013674.6
Parish:Livingston
Description:BENTON LANE IMPROVEMENTS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$728,452.95
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $631,913.18 |
| 2 | 57931 | KCR CONTRACTORS, LLC | $642,647.73 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $679,675.40 |
| 4 | 44013 | M. Trak, LLC | $704,675.22 |
| 5 | 14807 | Richard Price Contracting Co, Llc | $758,680.70 |
| 6 | 55950 | Brown Industrial Construction, LLC | $762,580.45 |
| 7 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $777,339.85 |
| 8 | 61167 | HENDRICK CONSTRUCTION, INC. | $1,109,671.85 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - KCR CONTRACTORS, LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - M. Trak, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.81 | LUMP | 18,000.00 | 18,000.00 | 33,511.42 | 33,511.42 | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,800.00 | 1,800.00 | 4,025.00 | 4,025.00 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 359 | SQYD | 12.00 | 4,308.00 | 10.22 | 3,668.98 | 25.00 | 8,975.00 | 25.00 | 8,975.00 | | 0004 | 202-02-38300 | Removal of Sign and U-Channel Post | 13 | EACH | 25.00 | 325.00 | 28.75 | 373.75 | 25.00 | 325.00 | 100.00 | 1,300.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 15,000.00 | 15,000.00 | 8,625.00 | 8,625.00 | 15,000.00 | 15,000.00 | 6,500.00 | 6,500.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 1,303 | LNFT | 6.00 | 7,818.00 | 4.72 | 6,150.16 | 5.50 | 7,166.50 | 8.00 | 10,424.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 217 | EACH | 19.00 | 4,123.00 | 21.77 | 4,724.09 | 15.00 | 3,255.00 | 20.00 | 4,340.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 4,934 | LNFT | 1.50 | 7,401.00 | 1.69 | 8,338.46 | 1.50 | 7,401.00 | 2.60 | 12,828.40 | | 0009 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 5,303 | SQYD | 10.25 | 54,355.75 | 12.30 | 65,226.90 | 11.00 | 58,333.00 | 11.00 | 58,333.00 | | 0010 | 304-01-00100 | Lime | 18.78 | TON | 1.00 | 18.78 | 219.43 | 4,120.90 | 220.00 | 4,131.60 | 225.00 | 4,225.50 | | 0011 | 304-05-00100 | Lime Treatment (Type E) (12" Thick) | 1,325 | SQYD | 1.00 | 1,325.00 | 3.62 | 4,796.50 | 3.00 | 3,975.00 | 4.50 | 5,962.50 | | 0012 | 401-01-00100 | Aggregate Surface Course (Net Section) | 4.2 | CUYD | 10.00 | 42.00 | 136.90 | 574.98 | 225.00 | 945.00 | 80.00 | 336.00 | | 0013 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 16 | CUYD | 40.00 | 640.00 | 180.00 | 2,880.00 | 125.00 | 2,000.00 | 75.00 | 1,200.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 991.8 | TON | 110.00 | 109,098.00 | 100.82 | 99,993.28 | 92.00 | 91,245.60 | 96.00 | 95,212.80 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 153 | TON | 110.00 | 16,830.00 | 140.28 | 21,462.84 | 180.00 | 27,540.00 | 125.00 | 19,125.00 | | 0016 | 509-01-00100 | Milling Asphalt Pavement (2.0" Avg. Depth) | 4,423 | SQYD | 2.00 | 8,846.00 | 2.55 | 11,278.65 | 3.00 | 13,269.00 | 4.00 | 17,692.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement (2.75" Avg. Depth) | 441 | SQYD | 2.00 | 882.00 | 2.81 | 1,239.21 | 4.00 | 1,764.00 | 10.00 | 4,410.00 | | 0018 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 48 | SQYD | 100.00 | 4,800.00 | 43.75 | 2,100.00 | 75.00 | 3,600.00 | 100.00 | 4,800.00 | | 0019 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 706 | LNFT | 50.00 | 35,300.00 | 49.59 | 35,010.54 | 60.00 | 42,360.00 | 40.00 | 28,240.00 | | 0020 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 777 | LNFT | 67.00 | 52,059.00 | 65.11 | 50,590.47 | 70.00 | 54,390.00 | 68.00 | 52,836.00 | | 0021 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 27 | LNFT | 90.00 | 2,430.00 | 70.26 | 1,897.02 | 100.00 | 2,700.00 | 156.00 | 4,212.00 | | 0022 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 289 | LNFT | 86.00 | 24,854.00 | 84.95 | 24,550.55 | 94.00 | 27,166.00 | 100.00 | 28,900.00 | | 0023 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 88 | LNFT | 64.00 | 5,632.00 | 46.44 | 4,086.72 | 72.00 | 6,336.00 | 90.00 | 7,920.00 | | 0024 | 702-03-00100 | Catch Basins (CB-01) | 29 | EACH | 2,500.00 | 72,500.00 | 2,513.27 | 72,884.83 | 2,600.00 | 75,400.00 | 3,500.00 | 101,500.00 | | 0025 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 4,000.00 | 8,000.00 | 4,153.80 | 8,307.60 | 3,800.00 | 7,600.00 | 5,500.00 | 11,000.00 | | 0026 | 702-04-00100 | Adjusting Manholes | 8 | EACH | 200.00 | 1,600.00 | 1,466.25 | 11,730.00 | 800.00 | 6,400.00 | 50.00 | 400.00 | | 0027 | 706-02-00200 | Concrete Drive (6" Thick) | 436.5 | SQYD | 78.00 | 34,047.00 | 67.88 | 29,629.62 | 88.00 | 38,412.00 | 80.00 | 34,920.00 | | 0028 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 16 | SQYD | 250.00 | 4,000.00 | 63.25 | 1,012.00 | 150.00 | 2,400.00 | 125.00 | 2,000.00 | | 0029 | 711-04-00100 | Geotextile Fabric | 16 | SQYD | 1.00 | 16.00 | 2.30 | 36.80 | 3.00 | 48.00 | 10.00 | 160.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 45,000.00 | 45,000.00 | 10,972.73 | 10,972.73 | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | | 0031 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 2,459 | LNFT | 0.50 | 1,229.50 | 0.40 | 983.60 | 0.60 | 1,475.40 | 0.25 | 614.75 | | 0032 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 35 | LNFT | 3.25 | 113.75 | 4.60 | 161.00 | 1.00 | 35.00 | 1.00 | 35.00 | | 0033 | 726-01-00100 | Bedding Material | 197.4 | CUYD | 90.00 | 17,766.00 | 65.07 | 12,844.82 | 80.00 | 15,792.00 | 90.00 | 17,766.00 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 40,000.00 | 40,000.00 | 57,309.22 | 57,309.22 | 45,000.00 | 45,000.00 | 65,000.00 | 65,000.00 | | 0035 | 729-01-00100 | Sign (Type A) | 58.4 | SQFT | 25.00 | 1,460.00 | 25.88 | 1,511.39 | 23.00 | 1,343.20 | 25.00 | 1,460.00 | | 0036 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 13 | EACH | 95.00 | 1,235.00 | 103.50 | 1,345.50 | 92.00 | 1,196.00 | 25.00 | 325.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 124 | EACH | 6.00 | 744.00 | 8.63 | 1,070.12 | 7.75 | 961.00 | 8.00 | 992.00 | | 0038 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 35 | LNFT | 18.00 | 630.00 | 23.00 | 805.00 | 15.50 | 542.50 | 108.00 | 3,780.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.864 | MILE | 5,100.00 | 9,506.40 | 4,830.00 | 9,003.12 | 6,150.00 | 11,463.60 | 6,000.00 | 11,184.00 | | 0040 | 735-01-00100 | Mailboxes | 3 | EACH | 15.00 | 45.00 | 132.25 | 396.75 | 15.00 | 45.00 | 15.00 | 45.00 | | 0041 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 150.00 | 450.00 | 17.25 | 51.75 | 120.00 | 360.00 | 120.00 | 360.00 | | 0042 | 739-01-00100 | Hydro-Seeding | 2.09 | ACRE | 2,500.00 | 5,225.00 | 2,226.63 | 4,653.66 | 2,000.00 | 4,180.00 | 2,500.00 | 5,225.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,500.00 | 10,500.00 | 15,525.00 | 15,525.00 | 10,000.00 | 10,000.00 | 8,498.27 | 8,498.27 | | 0044 | 741-11-00100 | Adjusting Water Valve | 4 | EACH | 200.00 | 800.00 | 575.00 | 2,300.00 | 400.00 | 1,600.00 | 120.00 | 480.00 | | 0045 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 772 | INLF | 1.50 | 1,158.00 | 1.15 | 887.80 | 2.00 | 1,544.00 | 1.50 | 1,158.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 631,913.18 | | 642,647.73 | | 679,675.40 | | 704,675.22 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Richard Price Contracting Co, Llc | - 6 - Brown Industrial Construction, LLC | - 7 - KORT's CONSTRUCTION SERVICES, INC. | - 8 - HENDRICK CONSTRUCTION, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.81 | LUMP | 32,000.00 | 32,000.00 | 80,000.00 | 80,000.00 | 20,000.00 | 20,000.00 | 124,758.00 | 124,758.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 24,000.00 | 24,000.00 | 15,000.00 | 15,000.00 | 87,114.00 | 87,114.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 359 | SQYD | 9.00 | 3,231.00 | 12.00 | 4,308.00 | 10.00 | 3,590.00 | 31.98 | 11,480.82 | | 0004 | 202-02-38300 | Removal of Sign and U-Channel Post | 13 | EACH | 75.00 | 975.00 | 10.00 | 130.00 | 15.00 | 195.00 | 215.38 | 2,799.94 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 39,000.00 | 39,000.00 | 38,000.00 | 38,000.00 | 31,000.00 | 31,000.00 | 89,540.00 | 89,540.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 1,303 | LNFT | 15.00 | 19,545.00 | 8.00 | 10,424.00 | 8.00 | 10,424.00 | 5.37 | 6,997.11 | | 0007 | 204-02-00100 | Temporary Hay Bales | 217 | EACH | 20.00 | 4,340.00 | 20.00 | 4,340.00 | 20.00 | 4,340.00 | 31.23 | 6,776.91 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 4,934 | LNFT | 2.75 | 13,568.50 | 2.00 | 9,868.00 | 2.00 | 9,868.00 | 3.19 | 15,739.46 | | 0009 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 5,303 | SQYD | 11.50 | 60,984.50 | 11.00 | 58,333.00 | 13.00 | 68,939.00 | 13.05 | 69,204.15 | | 0010 | 304-01-00100 | Lime | 18.78 | TON | 250.00 | 4,695.00 | 230.00 | 4,319.40 | 150.00 | 2,817.00 | 296.70 | 5,572.03 | | 0011 | 304-05-00100 | Lime Treatment (Type E) (12" Thick) | 1,325 | SQYD | 3.25 | 4,306.25 | 4.00 | 5,300.00 | 2.00 | 2,650.00 | 6.15 | 8,148.75 | | 0012 | 401-01-00100 | Aggregate Surface Course (Net Section) | 4.2 | CUYD | 475.00 | 1,995.00 | 180.00 | 756.00 | 250.00 | 1,050.00 | 47.60 | 199.92 | | 0013 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 16 | CUYD | 225.00 | 3,600.00 | 100.00 | 1,600.00 | 110.00 | 1,760.00 | 135.10 | 2,161.60 | | 0014 | 502-01-00100 | Asphalt Concrete | 991.8 | TON | 129.00 | 127,942.20 | 92.00 | 91,245.60 | 100.00 | 99,180.00 | 105.40 | 104,535.72 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 153 | TON | 129.00 | 19,737.00 | 130.00 | 19,890.00 | 135.00 | 20,655.00 | 146.66 | 22,438.98 | | 0016 | 509-01-00100 | Milling Asphalt Pavement (2.0" Avg. Depth) | 4,423 | SQYD | 2.35 | 10,394.05 | 2.40 | 10,615.20 | 2.50 | 11,057.50 | 2.67 | 11,809.41 | | 0017 | 509-01-00100 | Milling Asphalt Pavement (2.75" Avg. Depth) | 441 | SQYD | 2.35 | 1,036.35 | 2.60 | 1,146.60 | 2.75 | 1,212.75 | 2.93 | 1,292.13 | | 0018 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 48 | SQYD | 117.00 | 5,616.00 | 230.00 | 11,040.00 | 280.00 | 13,440.00 | 263.55 | 12,650.40 | | 0019 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 706 | LNFT | 54.00 | 38,124.00 | 60.00 | 42,360.00 | 70.00 | 49,420.00 | 100.71 | 71,101.26 | | 0020 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 777 | LNFT | 59.00 | 45,843.00 | 72.00 | 55,944.00 | 76.00 | 59,052.00 | 114.40 | 88,888.80 | | 0021 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 27 | LNFT | 72.00 | 1,944.00 | 92.00 | 2,484.00 | 130.00 | 3,510.00 | 115.27 | 3,112.29 | | 0022 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 289 | LNFT | 84.00 | 24,276.00 | 96.00 | 27,744.00 | 105.00 | 30,345.00 | 135.56 | 39,176.84 | | 0023 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 88 | LNFT | 64.00 | 5,632.00 | 66.00 | 5,808.00 | 75.00 | 6,600.00 | 96.28 | 8,472.64 | | 0024 | 702-03-00100 | Catch Basins (CB-01) | 29 | EACH | 3,400.00 | 98,600.00 | 2,500.00 | 72,500.00 | 3,700.00 | 107,300.00 | 4,441.99 | 128,817.71 | | 0025 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 4,100.00 | 8,200.00 | 3,200.00 | 6,400.00 | 4,500.00 | 9,000.00 | 5,508.00 | 11,016.00 | | 0026 | 702-04-00100 | Adjusting Manholes | 8 | EACH | 245.00 | 1,960.00 | 800.00 | 6,400.00 | 1,100.00 | 8,800.00 | 280.00 | 2,240.00 | | 0027 | 706-02-00200 | Concrete Drive (6" Thick) | 436.5 | SQYD | 65.00 | 28,372.50 | 60.00 | 26,190.00 | 73.00 | 31,864.50 | 125.00 | 54,562.50 | | 0028 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 16 | SQYD | 120.00 | 1,920.00 | 110.00 | 1,760.00 | 200.00 | 3,200.00 | 236.69 | 3,787.04 | | 0029 | 711-04-00100 | Geotextile Fabric | 16 | SQYD | 39.00 | 624.00 | 4.50 | 72.00 | 2.00 | 32.00 | 91.18 | 1,458.88 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 19,000.00 | 19,000.00 | 20,000.00 | 20,000.00 | 40,000.00 | 40,000.00 | 8,452.55 | 8,452.55 | | 0031 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 2,459 | LNFT | 0.41 | 1,008.19 | 0.35 | 860.65 | 0.25 | 614.75 | 0.40 | 983.60 | | 0032 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 35 | LNFT | 4.70 | 164.50 | 4.00 | 140.00 | 1.25 | 43.75 | 4.60 | 161.00 | | 0033 | 726-01-00100 | Bedding Material | 197.4 | CUYD | 33.90 | 6,691.86 | 80.00 | 15,792.00 | 90.00 | 17,766.00 | 32.20 | 6,356.28 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 55,000.00 | 55,000.00 | 76,000.00 | 76,000.00 | 50,000.00 | 50,000.00 | 46,000.00 | 46,000.00 | | 0035 | 729-01-00100 | Sign (Type A) | 58.4 | SQFT | 26.50 | 1,547.60 | 18.00 | 1,051.20 | 19.00 | 1,109.60 | 25.88 | 1,511.39 | | 0036 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 13 | EACH | 105.50 | 1,371.50 | 110.00 | 1,430.00 | 295.00 | 3,835.00 | 103.50 | 1,345.50 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 124 | EACH | 8.80 | 1,091.20 | 7.50 | 930.00 | 8.00 | 992.00 | 8.63 | 1,070.12 | | 0038 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 35 | LNFT | 23.50 | 822.50 | 20.00 | 700.00 | 16.00 | 560.00 | 23.00 | 805.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.864 | MILE | 4,925.00 | 9,180.20 | 4,200.00 | 7,828.80 | 6,250.00 | 11,650.00 | 4,830.00 | 9,003.12 | | 0040 | 735-01-00100 | Mailboxes | 3 | EACH | 18.00 | 54.00 | 6.00 | 18.00 | 22.00 | 66.00 | 17.25 | 51.75 | | 0041 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 135.00 | 405.00 | 130.00 | 390.00 | 200.00 | 600.00 | 132.25 | 396.75 | | 0042 | 739-01-00100 | Hydro-Seeding | 2.09 | ACRE | 3,200.00 | 6,688.00 | 1,000.00 | 2,090.00 | 2,700.00 | 5,643.00 | 2,226.63 | 4,653.66 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 26,000.00 | 26,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 27,500.00 | 27,500.00 | | 0044 | 741-11-00100 | Adjusting Water Valve | 4 | EACH | 125.00 | 500.00 | 400.00 | 1,600.00 | 500.00 | 2,000.00 | 1,050.00 | 4,200.00 | | 0045 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 772 | INLF | 0.90 | 694.80 | 1.00 | 772.00 | 1.50 | 1,158.00 | 1.72 | 1,327.84 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 758,680.70 | | 762,580.45 | | 777,339.85 | | 1,109,671.85 |
|