Proposal:H.013101.6
Parish:Ouachita
Description:CONSTITUTION DR SIGNING & STRIPING
Type Construction:SIGNS, REFLECTORIZED RAISED PAVEMENT MARKERS, PLASTIC PAVEMENT STRIPING AND RELATED WORK.
Estimated Construction Cost:$117,132.47
| Rank | License | Bidder | Construction Bid |
| 1 | 24518 | HIGHWAY GRAPHICS LLC | $164,662.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - HIGHWAY GRAPHICS LLC | | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 25.6 | SQYD | 10.00 | 256.00 | | 0003 | 202-02-38240 | Removal of Signs and Supports | 30 | EACH | 45.00 | 1,350.00 | | 0004 | 202-03-38000 | Relocation of Sign (Street Sign) | 2 | EACH | 45.00 | 90.00 | | 0005 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 1.2 | SQYD | 325.00 | 390.00 | | 0006 | 706-03-00700 | Incidental Concrete Paving (10" Thick) | 17.7 | SQYD | 325.00 | 5,752.50 | | 0007 | 707-01-00100 | Concrete Curb | 58.6 | LNFT | 50.00 | 2,930.00 | | 0008 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 16,500.00 | 16,500.00 | | 0009 | 727-01-00100 | Mobilization | 1 | LUMP | 16,500.00 | 16,500.00 | | 0010 | 729-01-00100 | Sign (Type A) | 228.7 | SQFT | 25.00 | 5,717.50 | | 0011 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 250.00 | 1,000.00 | | 0012 | 729-19-00300 | Dead End Road Installations (Type C) | 2 | EACH | 3,000.00 | 6,000.00 | | 0013 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 36 | EACH | 125.00 | 4,500.00 | | 0014 | 731-02-00100 | Reflectorized Raised Pavement Markers | 869 | EACH | 8.00 | 6,952.00 | | 0015 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 1,745 | LNFT | 2.00 | 3,490.00 | | 0016 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 480 | LNFT | 6.00 | 2,880.00 | | 0017 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,284 | LNFT | 14.00 | 17,976.00 | | 0018 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 204 | LNFT | 16.00 | 3,264.00 | | 0019 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 187 | LNFT | 4.00 | 748.00 | | 0020 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.711 | MILE | 8,500.00 | 31,543.50 | | 0021 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.061 | MILE | 25,000.00 | 1,525.00 | | 0022 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.035 | MILE | 35,000.00 | 1,225.00 | | 0023 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.016 | MILE | 55,000.00 | 880.00 | | 0024 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 650.00 | 650.00 | | 0025 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 750.00 | 1,500.00 | | 0026 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 650.00 | 2,600.00 | | 0027 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 650.00 | 650.00 | | 0028 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 6 | EACH | 1,200.00 | 7,200.00 | | 0029 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 2 | EACH | 1,500.00 | 3,000.00 | | 0030 | 732-05-00100 | Removal of Existing Markings | 1.049 | MILE | 500.00 | 524.50 | | 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | | 0032 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 534 | INLF | 2.00 | 1,068.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 164,662.00 |
|