Proposal:H.011495.6
Parish:Iberia
Routes:LA 88, US 90
Description:US 90: RAMPS @ LA 88 ROUNDABOUTS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, SUBGRADE LAYER (TREATED), LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$6,403,212.45
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $6,986,179.52 |
| 2 | 54206 | Southern Constructors, LLC | $7,612,439.70 |
| 3 | 55505 | MERRICK, LLC | $7,871,148.07 |
| 4 | 52306 | SIEMA CONSTRUCTION, LLC | $8,496,338.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - Southern Constructors, LLC | - 3 - MERRICK, LLC | - 4 - SIEMA CONSTRUCTION, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 4,721.75 | 4,721.75 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 80,900.00 | 80,900.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 85,439.69 | 85,439.69 | 29,000.00 | 29,000.00 | 90,000.00 | 90,000.00 | 85,249.09 | 85,249.09 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 3,052.5 | SQYD | 8.44 | 25,763.10 | 9.00 | 27,472.50 | 3.00 | 9,157.50 | 10.00 | 30,525.00 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 2,572.7 | SQYD | 11.46 | 29,483.14 | 9.00 | 23,154.30 | 5.00 | 12,863.50 | 8.92 | 22,948.48 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,728.4 | SQYD | 5.89 | 10,180.28 | 10.00 | 17,284.00 | 6.50 | 11,234.60 | 11.10 | 19,185.24 | | 0006 | 202-02-06140 | Removal of Curbs (Concrete) | 4,125 | LNFT | 2.47 | 10,188.75 | 6.00 | 24,750.00 | 1.00 | 4,125.00 | 3.50 | 14,437.50 | | 0007 | 202-02-14500 | Removal of Guard Rail | 365 | LNFT | 13.26 | 4,839.90 | 16.50 | 6,022.50 | 10.00 | 3,650.00 | 1.03 | 375.95 | | 0008 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 15,985.1 | SQYD | 6.04 | 96,550.00 | 13.50 | 215,798.85 | 5.00 | 79,925.50 | 16.65 | 266,151.92 | | 0009 | 203-01-00100 | General Excavation | 19,683 | CUYD | 10.00 | 196,830.00 | 8.00 | 157,464.00 | 7.50 | 147,622.50 | 16.30 | 320,832.90 | | 0010 | 203-02-00100 | Drainage Excavation | 65 | CUYD | 31.11 | 2,022.15 | 20.00 | 1,300.00 | 35.00 | 2,275.00 | 27.00 | 1,755.00 | | 0011 | 203-03-00100 | Embankment | 4,058 | CUYD | 21.15 | 85,826.70 | 24.00 | 97,392.00 | 20.00 | 81,160.00 | 28.10 | 114,029.80 | | 0012 | 203-10-00100 | Cleaning Existing Ditches | 2,432 | LNFT | 6.34 | 15,418.88 | 9.00 | 21,888.00 | 5.50 | 13,376.00 | 8.28 | 20,136.96 | | 0013 | 204-02-00100 | Temporary Hay Bales | 119 | EACH | 27.78 | 3,305.82 | 65.00 | 7,735.00 | 15.00 | 1,785.00 | 22.00 | 2,618.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 29 | EACH | 138.88 | 4,027.52 | 290.00 | 8,410.00 | 112.00 | 3,248.00 | 108.75 | 3,153.75 | | 0015 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 12 | EACH | 435.45 | 5,225.40 | 400.00 | 4,800.00 | 900.00 | 10,800.00 | 183.00 | 2,196.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 10,531 | LNFT | 2.06 | 21,693.86 | 2.00 | 21,062.00 | 2.00 | 21,062.00 | 2.00 | 21,062.00 | | 0017 | 302-02-08010 | Class II Base Course (8" Thick) (Soil Cement) | 2,515 | SQYD | 16.15 | 40,617.25 | 20.00 | 50,300.00 | 20.00 | 50,300.00 | 76.41 | 192,171.15 | | 0018 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 18,169 | SQYD | 20.00 | 363,380.00 | 25.75 | 467,851.75 | 25.00 | 454,225.00 | 25.85 | 469,668.65 | | 0019 | 304-01-00100 | Lime | 5.4 | TON | 410.41 | 2,216.21 | 500.00 | 2,700.00 | 260.00 | 1,404.00 | 256.50 | 1,385.10 | | 0020 | 304-05-00100 | Lime Treatment (Type E) | 343 | SQYD | 17.82 | 6,112.26 | 20.00 | 6,860.00 | 10.00 | 3,430.00 | 20.00 | 6,860.00 | | 0021 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | 19,631.3 | SQYD | 12.00 | 235,575.60 | 22.00 | 431,888.60 | 17.00 | 333,732.10 | 18.00 | 353,363.40 | | 0022 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 712 | SQYD | 53.13 | 37,828.56 | 35.00 | 24,920.00 | 40.00 | 28,480.00 | 26.68 | 18,996.16 | | 0023 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 331.8 | CUYD | 86.80 | 28,800.24 | 110.00 | 36,498.00 | 90.00 | 29,862.00 | 116.68 | 38,714.42 | | 0024 | 502-01-00100 | Asphalt Concrete | 2,792 | TON | 95.48 | 266,580.16 | 150.00 | 418,800.00 | 125.00 | 349,000.00 | 105.50 | 294,556.00 | | 0025 | 502-03-00200 | Asphalt Concrete (4" Thick) | 250.6 | SQYD | 27.66 | 6,931.60 | 86.00 | 21,551.60 | 100.00 | 25,060.00 | 28.73 | 7,199.74 | | 0026 | 509-01-00100 | Milling Asphalt Pavement | 14,414.7 | SQYD | 1.46 | 21,045.46 | 5.00 | 72,073.50 | 3.75 | 54,055.13 | 1.80 | 25,946.46 | | 0027 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -801 | CUYD | 0.10 | -80.10 | 1.00 | -801.00 | 16.00 | -12,816.00 | 0.01 | -8.01 | | 0028 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 359.1 | SQYD | 80.05 | 28,745.96 | 87.00 | 31,241.70 | 82.00 | 29,446.20 | 114.35 | 41,063.09 | | 0029 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 240 | SQYD | 95.84 | 23,001.60 | 112.00 | 26,880.00 | 82.00 | 19,680.00 | 139.96 | 33,590.40 | | 0030 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 9,399.1 | SQYD | 80.79 | 759,353.29 | 91.00 | 855,318.10 | 95.00 | 892,914.50 | 88.00 | 827,120.80 | | 0031 | 601-01-00700 | Portland Cement Concrete Pavement (11" Thick) | 3,030.7 | SQYD | 101.79 | 308,494.95 | 108.00 | 327,315.60 | 105.00 | 318,223.50 | 103.00 | 312,162.10 | | 0032 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) 11" Thick | 1,052.8 | SQYD | 124.12 | 130,673.54 | 112.00 | 117,913.60 | 125.00 | 131,600.00 | 190.00 | 200,032.00 | | 0033 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) 12 " Thick | 264.5 | SQYD | 138.92 | 36,744.34 | 135.00 | 35,707.50 | 135.00 | 35,707.50 | 203.00 | 53,693.50 | | 0034 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) 14" Thick | 107.2 | SQYD | 166.37 | 17,834.86 | 162.00 | 17,366.40 | 155.00 | 16,616.00 | 210.00 | 22,512.00 | | 0035 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 8 | EACH | 315.63 | 2,525.04 | 1,500.00 | 12,000.00 | 200.00 | 1,600.00 | 80.00 | 640.00 | | 0036 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 3,216 | LNFT | 7.00 | 22,512.00 | 5.00 | 16,080.00 | 3.00 | 9,648.00 | 3.50 | 11,256.00 | | 0037 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 825 | LNFT | 85.55 | 70,578.75 | 100.00 | 82,500.00 | 125.00 | 103,125.00 | 112.00 | 92,400.00 | | 0038 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 184 | LNFT | 112.21 | 20,646.64 | 131.30 | 24,159.20 | 135.00 | 24,840.00 | 128.00 | 23,552.00 | | 0039 | 701-02-01100 | Cross Drain Pipe Arch (54" Equiv. RCPA) | 720 | LNFT | 195.54 | 140,788.80 | 229.00 | 164,880.00 | 215.00 | 154,800.00 | 227.00 | 163,440.00 | | 0040 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 136 | LNFT | 251.09 | 34,148.24 | 294.00 | 39,984.00 | 265.00 | 36,040.00 | 294.00 | 39,984.00 | | 0041 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 251 | LNFT | 97.77 | 24,540.27 | 114.50 | 28,739.50 | 90.00 | 22,590.00 | 76.00 | 19,076.00 | | 0042 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 1,382 | LNFT | 62.22 | 85,988.04 | 73.00 | 100,886.00 | 95.00 | 131,290.00 | 69.22 | 95,662.04 | | 0043 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 195 | LNFT | 93.32 | 18,197.40 | 109.00 | 21,255.00 | 105.00 | 20,475.00 | 84.00 | 16,380.00 | | 0044 | 701-03-02022 | Storm Drain Pipe (Outfall) (18" RPVCP or 24" CMP) | 100 | LNFT | 66.66 | 6,666.00 | 78.00 | 7,800.00 | 95.00 | 9,500.00 | 70.00 | 7,000.00 | | 0045 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 102 | LNFT | 78.88 | 8,045.76 | 92.30 | 9,414.60 | 110.00 | 11,220.00 | 86.00 | 8,772.00 | | 0046 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 522 | LNFT | 127.21 | 66,403.62 | 149.00 | 77,778.00 | 145.00 | 75,690.00 | 139.00 | 72,558.00 | | 0047 | 701-04-02080 | Storm Drain Pipe Arch (Outfall) (36" Equiv. CMPA) | 66 | LNFT | 131.10 | 8,652.60 | 153.40 | 10,124.40 | 165.00 | 10,890.00 | 111.00 | 7,326.00 | | 0048 | 701-06-01080 | Side Drain Pipe Arch (36" Equiv. RCPA/CMPA) | 60 | LNFT | 141.10 | 8,466.00 | 165.00 | 9,900.00 | 150.00 | 9,000.00 | 143.00 | 8,580.00 | | 0049 | 701-06-01100 | Side Drain Pipe Arch (42" Equiv. RCPA/CMPA) | 294 | LNFT | 152.21 | 44,749.74 | 178.00 | 52,332.00 | 155.00 | 45,570.00 | 172.00 | 50,568.00 | | 0050 | 701-06-01160 | Side Drain Pipe Arch (60" Equiv. RCPA/CMPA) | 192 | LNFT | 237.75 | 45,648.00 | 278.00 | 53,376.00 | 255.00 | 48,960.00 | 282.00 | 54,144.00 | | 0051 | 701-06-02040 | Side Drain Pipe Arch (Erosion) (24" CMPA) | 24 | LNFT | 97.77 | 2,346.48 | 114.50 | 2,748.00 | 145.00 | 3,480.00 | 102.00 | 2,448.00 | | 0052 | 701-06-02080 | Side Drain Pipe Arch (Erosion) (36" CMPA) | 80 | LNFT | 136.65 | 10,932.00 | 160.00 | 12,800.00 | 150.00 | 12,000.00 | 143.00 | 11,440.00 | | 0053 | 701-06-02160 | Side Drain Pipe Arch (Erosion) (60" CMPA) | 222 | LNFT | 288.86 | 64,126.92 | 338.00 | 75,036.00 | 300.00 | 66,600.00 | 268.00 | 59,496.00 | | 0054 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 849 | LNFT | 3.33 | 2,827.17 | 5.00 | 4,245.00 | 10.00 | 8,490.00 | 9.15 | 7,768.35 | | 0055 | 702-03-00010 | Catch Basins (CB-SD02) | 5 | EACH | 5,555.00 | 27,775.00 | 6,500.00 | 32,500.00 | 4,000.00 | 20,000.00 | 5,454.00 | 27,270.00 | | 0056 | 702-03-00100 | Catch Basins (CB-01) | 13 | EACH | 3,416.33 | 44,412.29 | 4,000.00 | 52,000.00 | 3,100.00 | 40,300.00 | 3,614.00 | 46,982.00 | | 0057 | 702-03-00500 | Catch Basins (CB-06) | 3 | EACH | 5,555.00 | 16,665.00 | 6,500.00 | 19,500.00 | 4,500.00 | 13,500.00 | 5,832.00 | 17,496.00 | | 0058 | 702-03-00600 | Catch Basins (CB-07) | 4 | EACH | 5,110.60 | 20,442.40 | 6,000.00 | 24,000.00 | 5,200.00 | 20,800.00 | 5,723.00 | 22,892.00 | | 0059 | 702-03-00800 | Catch Basins (CB-09) | 3 | EACH | 5,443.90 | 16,331.70 | 6,400.00 | 19,200.00 | 5,000.00 | 15,000.00 | 5,988.00 | 17,964.00 | | 0060 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 1,694.28 | 1,694.28 | 2,000.00 | 2,000.00 | 3,200.00 | 3,200.00 | 3,590.00 | 3,590.00 | | 0061 | 703-01-00100 | Shoulder Underdrain Systems | 4,714 | LNFT | 10.95 | 51,618.30 | 9.50 | 44,783.00 | 15.00 | 70,710.00 | 19.50 | 91,923.00 | | 0062 | 703-02-00100 | Shoulder Outlet Underdrains | 16 | EACH | 984.38 | 15,750.08 | 1,200.00 | 19,200.00 | 750.00 | 12,000.00 | 675.00 | 10,800.00 | | 0063 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 25 | LNFT | 24.44 | 611.00 | 29.00 | 725.00 | 24.00 | 600.00 | 76.25 | 1,906.25 | | 0064 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 113.32 | 5,666.00 | 135.00 | 6,750.00 | 110.00 | 5,500.00 | 83.00 | 4,150.00 | | 0065 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 2 | EACH | 2,666.40 | 5,332.80 | 3,200.00 | 6,400.00 | 2,800.00 | 5,600.00 | 2,565.00 | 5,130.00 | | 0066 | 706-02-00200 | Concrete Drive (6" Thick) | 1,990.6 | SQYD | 83.33 | 165,876.70 | 75.00 | 149,295.00 | 80.00 | 159,248.00 | 166.00 | 330,439.60 | | 0067 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 7.5 | SQYD | 83.33 | 624.98 | 685.00 | 5,137.50 | 195.00 | 1,462.50 | 119.45 | 895.88 | | 0068 | 706-03-00800 | Incidental Concrete Paving (12" Thick) | 605.3 | SQYD | 138.88 | 84,064.06 | 96.00 | 58,108.80 | 145.00 | 87,768.50 | 135.00 | 81,715.50 | | 0069 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) 11" Thick | 3,025 | SQYD | 144.43 | 436,900.75 | 115.00 | 347,875.00 | 148.00 | 447,700.00 | 140.00 | 423,500.00 | | 0070 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) 12" Thick | 1,244.6 | SQYD | 144.43 | 179,757.58 | 128.00 | 159,308.80 | 165.00 | 205,359.00 | 140.00 | 174,244.00 | | 0071 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) 15" Thick | 71.2 | SQYD | 166.65 | 11,865.48 | 234.50 | 16,696.40 | 235.00 | 16,732.00 | 160.00 | 11,392.00 | | 0072 | 706-04-00100 | Handicapped Curb Ramps | 6 | EACH | 2,222.00 | 13,332.00 | 2,250.00 | 13,500.00 | 850.00 | 5,100.00 | 2,290.00 | 13,740.00 | | 0073 | 707-01-00200 | Concrete Curb (Barrier) | 492 | LNFT | 17.78 | 8,747.76 | 24.00 | 11,808.00 | 14.00 | 6,888.00 | 22.00 | 10,824.00 | | 0074 | 707-01-00300 | Concrete Curb (Mountable) | 682 | LNFT | 17.78 | 12,125.96 | 22.00 | 15,004.00 | 14.00 | 9,548.00 | 16.87 | 11,505.34 | | 0075 | 707-03-00100 | Combination Concrete Curb and Gutter | 3,892.7 | LNFT | 38.69 | 150,608.56 | 34.50 | 134,298.15 | 25.00 | 97,317.50 | 26.00 | 101,210.20 | | 0076 | 710-01-00100 | Flowable Fill | 637 | CUYD | 139.39 | 88,791.43 | 165.00 | 105,105.00 | 135.00 | 85,995.00 | 135.00 | 85,995.00 | | 0077 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,037.6 | SQYD | 66.00 | 134,481.60 | 75.00 | 152,820.00 | 70.00 | 142,632.00 | 86.00 | 175,233.60 | | 0078 | 711-04-00100 | Geotextile Fabric | 1,982 | SQYD | 3.89 | 7,709.98 | 3.00 | 5,946.00 | 2.00 | 3,964.00 | 1.90 | 3,765.80 | | 0079 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 115,500.00 | 115,500.00 | 104,000.00 | 104,000.00 | 400,000.00 | 400,000.00 | 222,000.00 | 222,000.00 | | 0080 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 496 | LNFT | 3.33 | 1,651.68 | 2.00 | 992.00 | 3.50 | 1,736.00 | 3.50 | 1,736.00 | | 0081 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.522 | MILE | 666.60 | 347.97 | 860.00 | 448.92 | 720.00 | 375.84 | 688.00 | 359.14 | | 0082 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 0.235 | MILE | 14,998.50 | 3,524.65 | 11,410.00 | 2,681.35 | 15,000.00 | 3,525.00 | 15,500.00 | 3,642.50 | | 0083 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.965 | MILE | 1,055.45 | 9,462.11 | 1,460.00 | 13,088.90 | 1,100.00 | 9,861.50 | 1,090.00 | 9,771.85 | | 0084 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 40 | EACH | 55.55 | 2,222.00 | 66.30 | 2,652.00 | 60.00 | 2,400.00 | 51.30 | 2,052.00 | | 0085 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 282 | EACH | 6.67 | 1,880.94 | 10.50 | 2,961.00 | 7.25 | 2,044.50 | 6.16 | 1,737.12 | | 0086 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 18,937.50 | 37,875.00 | 18,000.00 | 36,000.00 | 15,000.00 | 30,000.00 | 17,503.00 | 35,006.00 | | 0087 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 22,093.00 | 22,093.00 | 12,500.00 | 12,500.00 | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | | 0088 | 725-01-00100 | Temporary Detour Roads | 5,389.1 | SQYD | 68.08 | 366,889.93 | 81.00 | 436,517.10 | 80.00 | 431,128.00 | 87.42 | 471,115.12 | | 0089 | 726-01-00100 | Bedding Material | 729.68 | CUYD | 112.21 | 81,877.39 | 132.00 | 96,317.76 | 115.00 | 83,913.20 | 105.00 | 76,616.40 | | 0090 | 727-01-00100 | Mobilization | 1 | LUMP | 546,031.25 | 546,031.25 | 424,500.00 | 424,500.00 | 780,000.00 | 780,000.00 | 750,000.00 | 750,000.00 | | 0091 | 729-01-00100 | Sign (Type A) | 731.4 | SQFT | 24.44 | 17,875.42 | 46.00 | 33,644.40 | 25.00 | 18,285.00 | 10.50 | 7,679.70 | | 0092 | 729-02-00100 | Sign (Type B) | 72 | SQFT | 26.66 | 1,919.52 | 50.00 | 3,600.00 | 28.00 | 2,016.00 | 10.50 | 756.00 | | 0093 | 729-08-00200 | Mounting (3 1/2" Size Post) | 8 | EACH | 944.35 | 7,554.80 | 2,050.00 | 16,400.00 | 1,000.00 | 8,000.00 | 2,052.00 | 16,416.00 | | 0094 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 105.55 | 422.20 | 140.00 | 560.00 | 115.00 | 460.00 | 102.60 | 410.40 | | 0095 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 29 | EACH | 105.55 | 3,060.95 | 133.00 | 3,857.00 | 115.00 | 3,335.00 | 128.25 | 3,719.25 | | 0096 | 731-02-00100 | Reflectorized Raised Pavement Markers | 294 | EACH | 7.78 | 2,287.32 | 9.00 | 2,646.00 | 8.00 | 2,352.00 | 7.20 | 2,116.80 | | 0097 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 787 | LNFT | 7.78 | 6,122.86 | 16.00 | 12,592.00 | 8.00 | 6,296.00 | 7.20 | 5,666.40 | | 0098 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.67 | MILE | 3,777.40 | 13,863.06 | 5,550.00 | 20,368.50 | 4,000.00 | 14,680.00 | 3,489.00 | 12,804.63 | | 0099 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.661 | MILE | 7,777.00 | 5,140.60 | 20,500.00 | 13,550.50 | 8,000.00 | 5,288.00 | 7,182.00 | 4,747.30 | | 0100 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.438 | MILE | 1,610.95 | 705.60 | 2,660.00 | 1,165.08 | 1,500.00 | 657.00 | 1,488.00 | 651.74 | | 0101 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.099 | MILE | 1,666.50 | 164.98 | 2,800.00 | 277.20 | 1,600.00 | 158.40 | 1,539.00 | 152.36 | | 0102 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.393 | MILE | 4,444.00 | 1,746.49 | 985.00 | 387.11 | 4,700.00 | 1,847.10 | 4,104.00 | 1,612.87 | | 0103 | 732-03-02060 | Plastic Pavement Striping (Dotted Line)(24" W)(2' L)(Thermo 90 mil) | 0.083 | MILE | 27,775.00 | 2,305.33 | 40,850.00 | 3,390.55 | 28,000.00 | 2,324.00 | 25,650.00 | 2,128.95 | | 0104 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 9 | EACH | 333.30 | 2,999.70 | 400.00 | 3,600.00 | 350.00 | 3,150.00 | 308.00 | 2,772.00 | | 0105 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 16 | EACH | 333.30 | 5,332.80 | 400.00 | 6,400.00 | 350.00 | 5,600.00 | 308.00 | 4,928.00 | | 0106 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 4 | EACH | 555.50 | 2,222.00 | 464.00 | 1,856.00 | 550.00 | 2,200.00 | 313.00 | 1,252.00 | | 0107 | 732-04-01131 | PlstcPvmtLgnds&Sym(DirArrRndbt-Fshk)(Type LTC) | 6 | EACH | 1,111.00 | 6,666.00 | 927.50 | 5,565.00 | 1,100.00 | 6,600.00 | 1,026.00 | 6,156.00 | | 0108 | 732-04-01133 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type LC) | 3 | EACH | 1,222.10 | 3,666.30 | 927.50 | 2,782.50 | 1,200.00 | 3,600.00 | 1,129.00 | 3,387.00 | | 0109 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 16 | EACH | 361.08 | 5,777.28 | 464.00 | 7,424.00 | 400.00 | 6,400.00 | 334.00 | 5,344.00 | | 0110 | 732-05-00100 | Removal of Existing Markings | 3.525 | MILE | 8,888.00 | 31,330.20 | 9,525.00 | 33,575.63 | 9,000.00 | 31,725.00 | 8,208.00 | 28,933.20 | | 0111 | 735-01-00100 | Mailboxes | 15 | EACH | 11.11 | 166.65 | 110.00 | 1,650.00 | 12.00 | 180.00 | 40.50 | 607.50 | | 0112 | 735-02-00100 | Mailbox Supports (Single) | 15 | EACH | 166.65 | 2,499.75 | 300.00 | 4,500.00 | 180.00 | 2,700.00 | 129.00 | 1,935.00 | | 0113 | 736-11-00400 | Conduit (4" HDPE, Schedule 80) | 380 | LNFT | 12.30 | 4,674.00 | 18.00 | 6,840.00 | 12.00 | 4,560.00 | 10.00 | 3,800.00 | | 0114 | 739-01-00100 | Hydro-Seeding | 6.69 | ACRE | 2,055.35 | 13,750.29 | 4,000.00 | 26,760.00 | 1,600.00 | 10,704.00 | 2,300.00 | 15,387.00 | | 0115 | 740-01-00100 | Construction Layout | 1 | LUMP | 167,596.88 | 167,596.88 | 74,000.00 | 74,000.00 | 50,000.00 | 50,000.00 | 57,000.00 | 57,000.00 | | 0116 | 805-01-00900 | Class A1 Concrete Class A-1 Concrete | 36.52 | CUYD | 1,178.28 | 43,030.79 | 1,025.00 | 37,433.00 | 2,100.00 | 76,692.00 | 1,900.00 | 69,388.00 | | 0117 | 806-01-00100 | Deformed Reinforcing Steel | 1,832 | LB | 1.29 | 2,363.28 | 2.65 | 4,854.80 | 2.00 | 3,664.00 | 0.78 | 1,428.96 | | 0118 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 41,999 | INLF | 1.58 | 66,358.42 | 2.25 | 94,497.75 | 0.90 | 37,799.10 | 1.00 | 41,999.00 | | 0119 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 13,912 | INLF | 1.90 | 26,432.80 | 2.65 | 36,866.80 | 1.20 | 16,694.40 | 1.00 | 13,912.00 | | 0120 | NS-702-00100 | Paved Gutter Drain (PG-DRAIN01) | 12 | EACH | 6,110.50 | 73,326.00 | 5,300.00 | 63,600.00 | 6,200.00 | 74,400.00 | 6,300.00 | 75,600.00 | | 0121 | NS-702-00100 | Paved Gutter Drain (PG-DRAIN02) | 22 | EACH | 6,110.50 | 134,431.00 | 4,500.00 | 99,000.00 | 6,200.00 | 136,400.00 | 6,300.00 | 138,600.00 | | 0122 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad | 19 | EACH | 694.38 | 13,193.22 | 1,125.00 | 21,375.00 | 750.00 | 14,250.00 | 745.00 | 14,155.00 | | 0123 | NS-729-00030 | Breakaway Square Tubing Sign Support (Wet Concrete) | 33 | EACH | 216.65 | 7,149.45 | 260.00 | 8,580.00 | 235.00 | 7,755.00 | 250.00 | 8,250.00 | | 0124 | NS-744-00101 | Flexible Post Traffic Delineators | 81 | EACH | 189.38 | 15,339.78 | 65.00 | 5,265.00 | 55.00 | 4,455.00 | 86.00 | 6,966.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,986,179.52 | | 7,612,439.70 | | 7,871,148.07 | | 8,496,338.30 |
|