Proposal:H.010339.6
Parish:Vernon
Routes:LA 10
Description:LA 10: LOOK OUT RD - 850' E BAILEY RD
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$3,191,288.53
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $2,932,801.28 |
| 2 | 34356 | Prairie Contractors LLC | $3,010,207.07 |
| 3 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $3,769,780.42 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Prairie Contractors LLC | - 3 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" CMPA | 79 | LNFT | 13.00 | 1,027.00 | 5.00 | 395.00 | 2.00 | 158.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" CMP | 49 | LNFT | 21.00 | 1,029.00 | 5.00 | 245.00 | 2.00 | 98.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" CMPA | 168 | LNFT | 6.00 | 1,008.00 | 5.00 | 840.00 | 2.00 | 336.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" CMP | 81 | LNFT | 13.00 | 1,053.00 | 5.00 | 405.00 | 2.00 | 162.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" CMPA | 40 | LNFT | 26.00 | 1,040.00 | 5.00 | 200.00 | 2.00 | 80.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 355 | CUYD | 34.00 | 12,070.00 | 25.00 | 8,875.00 | 40.00 | 14,200.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 71 | EACH | 155.00 | 11,005.00 | 125.00 | 8,875.00 | 150.00 | 10,650.00 | | 0008 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 84,647.1 | SQYD | 9.75 | 825,309.23 | 9.75 | 825,309.23 | 12.00 | 1,015,765.20 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,535 | CUYD | 41.00 | 62,935.00 | 42.00 | 64,470.00 | 70.00 | 107,450.00 | | 0010 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 41.1 | CUYD | 80.00 | 3,288.00 | 100.00 | 4,110.00 | 100.00 | 4,110.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 18,235 | TON | 75.00 | 1,367,625.00 | 76.00 | 1,385,860.00 | 95.00 | 1,732,325.00 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 311.1 | TON | 160.00 | 49,776.00 | 55.00 | 17,110.50 | 95.00 | 29,554.50 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 75,324 | SQYD | 2.00 | 150,648.00 | 2.80 | 210,907.20 | 2.00 | 150,648.00 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -6,264 | CUYD | 1.00 | -6,264.00 | 0.01 | -62.64 | 1.00 | -6,264.00 | | 0015 | 701-01-02002 | Cross Drain Pipe (24" RCP/RPVCP/CPEPDW or 30" CMP) | 56 | LNFT | 340.00 | 19,040.00 | 250.00 | 14,000.00 | 250.00 | 14,000.00 | | 0016 | 701-01-02081 | Cross Drain Pipe (36" RCP/RPVCP/CPEPDW or 42" CMP) | 80 | LNFT | 318.00 | 25,440.00 | 230.00 | 18,400.00 | 255.00 | 20,400.00 | | 0017 | 701-02-02000 | Cross Drain Pipe Arch (24" Equiv. RCPA or 30" Equiv. CMPA) | 256 | LNFT | 275.00 | 70,400.00 | 205.00 | 52,480.00 | 250.00 | 64,000.00 | | 0018 | 701-02-02080 | Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) | 40 | LNFT | 330.00 | 13,200.00 | 315.00 | 12,600.00 | 325.00 | 13,000.00 | | 0019 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 417 | LNFT | 19.50 | 8,131.50 | 2.00 | 834.00 | 2.00 | 834.00 | | 0020 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 35 | SQYD | 165.00 | 5,775.00 | 125.00 | 4,375.00 | 130.00 | 4,550.00 | | 0021 | 711-04-00100 | Geotextile Fabric | 35 | SQYD | 1.00 | 35.00 | 6.25 | 218.75 | 10.00 | 350.00 | | 0022 | 712-02-00100 | Sacked Concrete Revetment | 12 | SQYD | 450.00 | 5,400.00 | 265.00 | 3,180.00 | 500.00 | 6,000.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 23,500.00 | 23,500.00 | 25,000.00 | 25,000.00 | 60,000.00 | 60,000.00 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 17.168 | MILE | 154.00 | 2,643.87 | 500.00 | 8,584.00 | 200.00 | 3,433.60 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 13.276 | MILE | 700.00 | 9,293.20 | 1.00 | 13.28 | 750.00 | 9,957.00 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 50.54 | MILE | 955.00 | 48,265.70 | 1,200.00 | 60,648.00 | 1,000.00 | 50,540.00 | | 0027 | 716-01-00100 | Mulch (Vegetative) | 16.6 | TON | 600.00 | 9,960.00 | 750.00 | 12,450.00 | 465.70 | 7,730.62 | | 0028 | 717-01-00100 | Seeding | 249 | LB | 13.00 | 3,237.00 | 15.00 | 3,735.00 | 20.00 | 4,980.00 | | 0029 | 718-01-00100 | Fertilizer | 8,300 | LB | 0.75 | 6,225.00 | 0.50 | 4,150.00 | 1.00 | 8,300.00 | | 0030 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 3,500.00 | 3,500.00 | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 | | 0031 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 11.445 | MILE | 525.00 | 6,008.63 | 1,300.00 | 14,878.50 | 1,000.00 | 11,445.00 | | 0032 | 726-01-00100 | Bedding Material | 101.8 | CUYD | 100.00 | 10,180.00 | 110.00 | 11,198.00 | 110.00 | 11,198.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 95,000.00 | 95,000.00 | 155,000.00 | 155,000.00 | 300,000.00 | 300,000.00 | | 0034 | 729-16-00200 | Object Marker Assembly (Type 2) | 18 | EACH | 95.00 | 1,710.00 | 100.00 | 1,800.00 | 80.00 | 1,440.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 930 | EACH | 6.00 | 5,580.00 | 8.00 | 7,440.00 | 7.00 | 6,510.00 | | 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.847 | MILE | 3,450.00 | 58,122.15 | 3,500.00 | 58,964.50 | 3,500.00 | 58,964.50 | | 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.425 | MILE | 1,600.00 | 7,080.00 | 1,750.00 | 7,743.75 | 1,600.00 | 7,080.00 | | 0038 | 735-01-00100 | Mailboxes | 5 | EACH | 1.00 | 5.00 | 15.00 | 75.00 | 25.00 | 125.00 | | 0039 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 380.00 | 1,140.00 | 200.00 | 600.00 | 140.00 | 420.00 | | 0040 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 380.00 | 380.00 | 300.00 | 300.00 | 250.00 | 250.00 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 1,000.00 | 1,000.00 | 40,000.00 | 40,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,932,801.28 | | 3,010,207.07 | | 3,769,780.42 |
|