Proposal:H.013796.6
Parish:Ouachita
Description:TANGLEWOOD DRIVE (LA 15 - DELLWOOD DR.)
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, LIME TREATMENT, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$600,808.60
| Rank | License | Bidder | Construction Bid |
| 1 | 15099 | Amethyst Construction, Inc. | $485,502.00 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $648,686.74 |
| 3 | 05789 | D & J CONSTRUCTION CO., LLC | $658,311.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Amethyst Construction, Inc. | - 2 - Diamond B Construction Co., L.L.C. | - 3 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 7,500.00 | 7,500.00 | 6,000.00 | 6,000.00 | 3,500.00 | 3,500.00 | | 0002 | 202-02-00050 | Removal of (Brick Wall)(Sta. 10+45 Lt., 8" Length x 3' Height) | 1 | LUMP | 550.00 | 550.00 | 4,000.00 | 4,000.00 | 500.00 | 500.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 336 | SQYD | 15.00 | 5,040.00 | 40.00 | 13,440.00 | 15.00 | 5,040.00 | | 0004 | 203-01-00100 | General Excavation | 600 | CUYD | 26.00 | 15,600.00 | 30.00 | 18,000.00 | 15.00 | 9,000.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 45,000.00 | 45,000.00 | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 850 | CUYD | 16.65 | 14,152.50 | 33.00 | 28,050.00 | 30.00 | 25,500.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 100 | LNFT | 6.00 | 600.00 | 6.00 | 600.00 | 5.00 | 500.00 | | 0008 | 302-02-08560 | Class II Base Course (8-1/2" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 4,768 | SQYD | 24.00 | 114,432.00 | 40.00 | 190,720.00 | 30.00 | 143,040.00 | | 0009 | 304-01-00100 | Lime | 35 | TON | 250.00 | 8,750.00 | 250.00 | 8,750.00 | 285.00 | 9,975.00 | | 0010 | 304-05-00100 | Lime Treatment (Type E) | 2,384 | SQYD | 2.25 | 5,364.00 | 10.00 | 23,840.00 | 8.00 | 19,072.00 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 79 | CUYD | 62.00 | 4,898.00 | 80.00 | 6,320.00 | 75.00 | 5,925.00 | | 0012 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 20.00 | 2,000.00 | 50.00 | 5,000.00 | 100.00 | 10,000.00 | | 0013 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 60 | CUYD | 20.00 | 1,200.00 | 80.00 | 4,800.00 | 100.00 | 6,000.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 686.6 | TON | 120.00 | 82,392.00 | 130.00 | 89,258.00 | 148.00 | 101,616.80 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 319.3 | TON | 120.00 | 38,316.00 | 170.00 | 54,281.00 | 248.00 | 79,186.40 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 4,582 | SQYD | 6.00 | 27,492.00 | 3.50 | 16,037.00 | 5.00 | 22,910.00 | | 0017 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 54 | LNFT | 185.00 | 9,990.00 | 175.00 | 9,450.00 | 150.00 | 8,100.00 | | 0018 | 702-04-00100 | Adjusting Manholes | 4 | EACH | 2,500.00 | 10,000.00 | 1,700.00 | 6,800.00 | 2,000.00 | 8,000.00 | | 0019 | 706-02-00200 | Concrete Drive (6" Thick) | 33.3 | SQYD | 115.00 | 3,829.50 | 90.00 | 2,997.00 | 100.00 | 3,330.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,500.00 | 12,500.00 | 15,000.00 | 15,000.00 | 38,000.00 | 38,000.00 | | 0021 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 150 | LNFT | 0.75 | 112.50 | 0.30 | 45.00 | 0.25 | 37.50 | | 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 176 | LNFT | 1.75 | 308.00 | 0.85 | 149.60 | 0.75 | 132.00 | | 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.542 | MILE | 750.00 | 406.50 | 170.00 | 92.14 | 200.00 | 108.40 | | 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.17 | MILE | 1,500.00 | 3,255.00 | 1,000.00 | 2,170.00 | 950.00 | 2,061.50 | | 0025 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 1 | EACH | 60.00 | 60.00 | 60.00 | 60.00 | 55.00 | 55.00 | | 0026 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 1 | EACH | 115.00 | 115.00 | 60.00 | 60.00 | 55.00 | 55.00 | | 0027 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 1 | EACH | 115.00 | 115.00 | 60.00 | 60.00 | 55.00 | 55.00 | | 0028 | 716-01-00100 | Mulch (Vegetative) | 0.8 | TON | 2,000.00 | 1,600.00 | 5,000.00 | 4,000.00 | 2,200.00 | 1,760.00 | | 0029 | 717-01-00100 | Seeding | 12 | LB | 10.00 | 120.00 | 25.00 | 300.00 | 20.00 | 240.00 | | 0030 | 718-01-00100 | Fertilizer | 400 | LB | 1.00 | 400.00 | 5.00 | 2,000.00 | 1.00 | 400.00 | | 0031 | 726-01-00100 | Bedding Material | 12.5 | CUYD | 110.00 | 1,375.00 | 135.00 | 1,687.50 | 100.00 | 1,250.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 28,000.00 | 28,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 375.00 | 750.00 | 100.00 | 200.00 | 100.00 | 200.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 93 | EACH | 8.00 | 744.00 | 8.00 | 744.00 | 7.50 | 697.50 | | 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 75 | LNFT | 3.00 | 225.00 | 3.50 | 262.50 | 4.00 | 300.00 | | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 88 | LNFT | 15.00 | 1,320.00 | 15.00 | 1,320.00 | 15.00 | 1,320.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.085 | MILE | 4,000.00 | 4,340.00 | 5,000.00 | 5,425.00 | 6,000.00 | 6,510.00 | | 0038 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.014 | MILE | 15,000.00 | 210.00 | 8,000.00 | 112.00 | 10,000.00 | 140.00 | | 0039 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 350.00 | 350.00 | 500.00 | 500.00 | 500.00 | 500.00 | | 0040 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 250.00 | 250.00 | 500.00 | 500.00 | 500.00 | 500.00 | | 0041 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 350.00 | 350.00 | 500.00 | 500.00 | 500.00 | 500.00 | | 0042 | 735-01-00100 | Mailboxes | 26 | EACH | 25.00 | 650.00 | 35.00 | 910.00 | 15.00 | 390.00 | | 0043 | 735-02-00100 | Mailbox Supports (Single) | 26 | EACH | 200.00 | 5,200.00 | 225.00 | 5,850.00 | 200.00 | 5,200.00 | | 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | | 0045 | NS-300-00060 | Geogrid | 4,768 | SQYD | 2.00 | 9,536.00 | 3.00 | 14,304.00 | 4.00 | 19,072.00 | | 0046 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,012 | INLF | 2.00 | 4,024.00 | 1.00 | 2,012.00 | 1.00 | 2,012.00 | | 0047 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 3,540 | INLF | 2.00 | 7,080.00 | 2.00 | 7,080.00 | 3.00 | 10,620.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 485,502.00 | | 648,686.74 | | 658,311.10 |
|