Search


Bid Tabulations for the Letting of 9/23/2020 LA DOTD Headquarters

Proposal:H.013761.6
Parish:Lafourche, Terrebonne
Routes:LA 20, LA 24, LA 3087, LA 315
Description:DISTRICT 02 APPR SLAB LEVELING PHASE 2
Type Construction:MILLING ASPHALT CONCRETE, ASPHALT CONCRETE OVERLAY, ADDITIVE ALTERNATE 1 (C.S. 829-28): (LA 3087 APPROACH SLAB LEVELING) MILLING ASPHALT CONCRETE, MILLING PROTLAND CEMENT CONCRETE, ASPHALT CONCRETE OVERLAY; ADDITIVE ALTERNATE 2 (C.S. 065-01): (LA 24 APPROACH SLAB LEVELING) MILLING ASPHALT CONCRETE, MILLING PORTLAND CEMENT CONCRETE, ASPHALT CONCRETE OVERLAY, BRIDGE REPAIRS: ADDITIVE ALTERNATE 3 (C.S. 245-90): (LA 315 APPROACH SLAB LEVELING) MILLING PORTLAND CEMENT CONCRETE, ASPHALT CONCRETE OVERLAY; AND RELATED WORK.
Estimated Construction Cost:$1,574,441.61
Rank License BidderConstruction Bid
162139HUEY P. STOCKSTILL, LLC$1,135,310.65
206276Barriere Construction Co., LLC$1,398,039.38


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
HUEY P. STOCKSTILL, LLC
- 2 -
Barriere Construction Co., LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-14500Removal of Guard Rail 728     LNFT2.501,820.0015.0010,920.00
0002203-07-00100Borrow (Vehicular Measurement) 42     CUYD85.003,570.0023.00966.00
0003502-01-00100Asphalt Concrete 746.2   TON130.0097,006.00160.00119,392.00
0004502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 99     TON130.0012,870.00250.0024,750.00
0005509-01-00100Milling Asphalt Pavement 3,495     SQYD3.5012,232.5010.5036,697.50
0006509-02-00100Contractor Retained Reclaimed Asphalt Pavement -100.5   CUYD0.01-1.0110.00-1,005.00
0007602-08-00100Diamond Grinding Concrete Pavement 64.7   SQYD20.001,294.0050.003,235.00
0008704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 550     LNFT22.5012,375.0025.0013,750.00
0009704-06-00200Guard Rail Bridge Attachments (Single Thrie Beam) 100     LNFT55.505,550.0035.003,500.00
0010704-07-00200Guard Rail Transitions (Double Thrie Beam) 200     LNFT75.5015,100.00112.0022,400.00
0011704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 8     EACH3,600.0028,800.003,000.0024,000.00
0012713-01-00100Temporary Signs and Barricades C.S. 244-011     LUMP26,600.0026,600.0028,000.0028,000.00
0013713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 0.633 MILE150.0094.95179.00113.31
0014713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 0.633 MILE700.00443.10932.00589.96
0015713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 1.899 MILE1,300.002,468.701,500.002,848.50
0016717-01-00100Seeding 5     LB11.0055.00165.00825.00
0017718-01-00100Fertilizer 16     LB6.0096.008.00128.00
0018724-02-00100Rumble Strips (Shoulder/Edge) 0.325 MILE1,500.00487.50622.00202.15
0019727-01-00100Mobilization C.S. 244-011     LUMP26,600.0026,600.0031,000.0031,000.00
0020729-16-00300Object Marker Assembly (Type 3) 8     EACH75.50604.00106.00848.00
0021731-02-00100Reflectorized Raised Pavement Markers 38     EACH6.00228.0015.00570.00
0022732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.633 MILE6,000.003,798.007,000.004,431.00
0023732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.211 MILE3,000.00633.002,500.00527.50
0024732-04-02000Plastic Pavement Legends and Symbols (Bicycle) 8     EACH550.004,400.00500.004,000.00
0025732-05-00100Removal of Existing Markings 0.048 MILE8,500.00408.0020,000.00960.00
0026740-01-00100Construction Layout C.S. 244-011     LUMP10,000.0010,000.0010,000.0010,000.00
0027NS-500-00340Saw Cutting Asphalt Concrete Pavement 656     INLF1.00656.001.00656.00
  SUBTOTAL GENERAL   268,189 344,305
         
 Additive Section 1ADDITIVE ALTERNATE 1 (C.S. 829-28)      
         
0028202-02-14500Removal of Guard Rail 1,477.5   LNFT2.503,693.7513.5019,946.25
0029203-07-00100Borrow (Vehicular Measurement) 51     CUYD85.004,335.0022.501,147.50
0030502-01-00100Asphalt Concrete 864.1   TON130.00112,333.00148.00127,886.80
0031502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 200     TON130.0026,000.00247.0049,400.00
0032509-01-00100Milling Asphalt Pavement 2,557     SQYD4.0010,228.0017.0043,469.00
0033509-02-00100Contractor Retained Reclaimed Asphalt Pavement -37.2   CUYD0.01-0.3710.50-390.60
0034602-14-00100Holes 9     EACH400.003,600.00700.006,300.00
0035704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 1,237.5   LNFT22.5027,843.7521.5026,606.25
0036704-07-00200Guard Rail Transitions (Double Thrie Beam) 125     LNFT75.509,437.50106.0013,250.00
0037704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 5     EACH3,600.0018,000.002,750.0013,750.00
0038707-04-00100Asphalt Curb 67.5   LNFT100.006,750.00110.007,425.00
0039710-01-00100Flowable Fill 42     CUYD225.009,450.00400.0016,800.00
0040712-02-00100Sacked Concrete Revetment 18     SQYD400.007,200.00371.006,678.00
0041713-01-00100Temporary Signs and Barricades C.S. 829-281     LUMP28,000.0028,000.0038,500.0038,500.00
0042713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 1.518 MILE150.00227.70180.00273.24
0043713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 1.518 MILE700.001,062.60800.001,214.40
0044713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 3.003 MILE1,300.003,903.901,900.005,705.70
0045717-01-00100Seeding 5     LB11.0055.00165.00825.00
0046718-01-00100Fertilizer 16     LB6.0096.007.00112.00
0047724-02-00100Rumble Strips (Shoulder/Edge) 0.678 MILE1,000.00678.00615.00416.97
0048727-01-00100Mobilization C.S. 829-281     LUMP33,000.0033,000.0039,500.0039,500.00
0049729-16-00300Object Marker Assembly (Type 3) 6     EACH75.50453.00105.00630.00
0050731-02-00100Reflectorized Raised Pavement Markers 45     EACH7.00315.0018.00810.00
0051732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 1.011 MILE6,000.006,066.007,000.007,077.00
0052732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.506 MILE1,500.00759.003,200.001,619.20
0053732-05-00100Removal of Existing Markings 0.083 MILE10,000.00830.0019,000.001,577.00
0054740-01-00100Construction Layout C.S. 829-281     LUMP6,500.006,500.007,500.007,500.00
0055815-03-00300Joint Seal (Poured) 42     LNFT50.002,100.0018.00756.00
0056NS-500-00340Saw Cutting Asphalt Concrete Pavement 1,216     INLF1.001,216.001.001,216.00
0057NS-602-00001Milling Concrete Pavement 164.8   SQYD40.006,592.0041.006,756.80
  SUBTOTAL ADDITIVE SECTION 1   330,725 446,758
         
 Additive Section 2ADDITIVE ALTERNATE 2 (C.S. 065-01)      
         
0058202-02-14500Removal of Guard Rail 762     LNFT2.501,905.0018.0013,716.00
0059203-07-00100Borrow (Vehicular Measurement) 36     CUYD80.002,880.0022.00792.00
0060502-01-00100Asphalt Concrete 618.3   TON141.0087,180.30145.0089,653.50
0061502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 446     TON141.0062,886.00163.0072,698.00
0062509-01-00100Milling Asphalt Pavement 2,008     SQYD5.0010,040.0010.0020,080.00
0063509-02-00100Contractor Retained Reclaimed Asphalt Pavement -47.6   CUYD0.01-0.4810.00-476.00
0064704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 50     LNFT67.503,375.0049.502,475.00
0065704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 425.2   LNFT22.509,567.0027.5011,693.00
0066704-06-00200Guard Rail Bridge Attachments (Single Thrie Beam) 50     LNFT55.502,775.0044.002,200.00
0067704-07-00200Guard Rail Transitions (Double Thrie Beam) 200     LNFT75.5015,100.00118.0023,600.00
0068704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 8     EACH4,000.0032,000.002,800.0022,400.00
0069713-01-00100Temporary Signs and Barricades C.S. 065-011     LUMP31,000.0031,000.0024,500.0024,500.00
0070713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 1.464 MILE1,300.001,903.20900.001,317.60
0071717-01-00100Seeding 4     LB12.0048.00200.00800.00
0072718-01-00100Fertilizer 14     LB6.0084.009.00126.00
0073724-01-00100Rumble Strips (Centerline) 0.149 MILE3,000.00447.00650.0096.85
0074724-02-00100Rumble Strips (Shoulder/Edge) 0.298 MILE2,000.00596.00650.00193.70
0075727-01-00100Mobilization C.S. 065-011     LUMP33,000.0033,000.0035,000.0035,000.00
0076729-16-00300Object Marker Assembly (Type 3) 8     EACH75.50604.0085.00680.00
0077729-19-00300Dead End Road Installations (Type C) 1     EACH600.00600.00750.00750.00
0078731-02-00100Reflectorized Raised Pavement Markers 38     EACH7.00266.0015.00570.00
0079732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.862 MILE6,000.005,172.005,500.004,741.00
0080732-05-00100Removal of Existing Markings 0.066 MILE10,000.00660.0018,000.001,188.00
0081740-01-00100Construction Layout C.S. 065-011     LUMP2,900.002,900.009,000.009,000.00
0082NS-500-00340Saw Cutting Asphalt Concrete Pavement 656     INLF1.00656.001.00656.00
0083NS-602-00001Milling Concrete Pavement 249.1   SQYD35.008,718.5012.503,113.75
0084NS-830-00100Concrete Bridge Railing Repair and Rehabilitation DAMAGED BRIDGE RAILING REPAIR2.5   LNFT2,500.006,250.006,000.0015,000.00
  SUBTOTAL ADDITIVE SECTION 2   320,613 356,564
         
 Additive Section 3ADDITIVE ALTERNATE 3 (C.S. 245-90)      
         
0085202-02-14500Removal of Guard Rail 206     LNFT2.50515.0019.504,017.00
0086203-07-00100Borrow (Vehicular Measurement) 45     CUYD80.003,600.0022.00990.00
0087502-01-00100Asphalt Concrete 598.4   TON131.0078,390.40147.0087,964.80
0088502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 25.8   TON131.003,379.80432.0011,145.60
0089702-04-00200Adjusting Catch Basins 2     EACH8,000.0016,000.003,100.006,200.00
0090704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 137.5   LNFT22.503,093.7525.003,437.50
0091704-06-00200Guard Rail Bridge Attachments (Single Thrie Beam) 25     LNFT55.501,387.5043.001,075.00
0092704-07-00200Guard Rail Transitions (Double Thrie Beam) 50     LNFT75.503,775.00118.005,900.00
0093704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 2     EACH5,000.0010,000.003,600.007,200.00
0094707-01-00100Concrete Curb 592     LNFT20.0011,840.0034.0020,128.00
0095713-01-00100Temporary Signs and Barricades C.S. 245-901     LUMP21,000.0021,000.0028,000.0028,000.00
0096713-02-00300Temporary Pavement Markings (8" Width) 135     LNFT0.5067.501.25168.75
0097713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 0.939 MILE1,300.001,220.701,900.001,784.10
0098717-01-00100Seeding 2     LB12.0024.00400.00800.00
0099718-01-00100Fertilizer 8     LB6.0048.0017.00136.00
0100727-01-00100Mobilization C.S. 245-901     LUMP21,000.0021,000.0024,500.0024,500.00
0101729-16-00300Object Marker Assembly (Type 3) 2     EACH75.50151.00118.00236.00
0102731-02-00100Reflectorized Raised Pavement Markers 138     EACH7.00966.0019.002,622.00
0103732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.313 MILE6,000.001,878.006,200.001,940.60
0104732-03-02030Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) 0.026 MILE12,000.00312.006,200.00161.20
0105740-01-00100Construction Layout C.S. 245-901     LUMP5,000.005,000.009,000.009,000.00
0106NS-500-00220Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay 3,492     LNFT2.508,730.002.508,730.00
0107NS-500-00240Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay 2,406     LNFT2.506,015.002.506,015.00
0108NS-500-00260Sawcuts in Asphalt Concrete Lifts 5,898     LNFT1.005,898.001.005,898.00
0109NS-602-00001Milling Concrete Pavement 638.2   SQYD15.009,573.0015.009,573.00
0110509-01-00100Milling Asphalt Pavement 320     SQYD6.001,920.009.002,880.00
0111509-02-00100Contractor Retained Reclaimed Asphalt Pavement -9     CUYD0.01-0.0910.00-90.00
  SUBTOTAL ADDITIVE SECTION 3   215,784.56 250,412.55
         
  CONTRACTOR TOTAL   1,135,310.65 1,398,039.38