Proposal:H.013250.6
Parish:Lafourche
Routes:US 90
Description:US 90: LA 308 - 2.5 MI E LA 182
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$7,602,648.77
| Rank | License | Bidder | Construction Bid |
| 1 | 62139 | HUEY P. STOCKSTILL, LLC | $4,920,702.17 |
| 2 | 06276 | Barriere Construction Co., LLC | $4,932,964.79 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $5,984,054.25 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $6,345,622.82 |
| 5 | 69570 | Bridging The Gap Solution LLC | $7,737,199.87 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - HUEY P. STOCKSTILL, LLC | - 2 - Barriere Construction Co., LLC | - 3 - Boh Bros. Construction Co., LLC. | - 4 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 144 | LNFT | 22.00 | 3,168.00 | 25.00 | 3,600.00 | 10.00 | 1,440.00 | 11.00 | 1,584.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 187 | SQYD | 22.00 | 4,114.00 | 18.00 | 3,366.00 | 25.00 | 4,675.00 | 16.00 | 2,992.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 688 | LNFT | 13.00 | 8,944.00 | 9.00 | 6,192.00 | 15.00 | 10,320.00 | 9.00 | 6,192.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 1,597 | LNFT | 8.00 | 12,776.00 | 10.00 | 15,970.00 | 10.00 | 15,970.00 | 10.00 | 15,970.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,069 | CUYD | 5.00 | 20,345.00 | 1.00 | 4,069.00 | 10.00 | 40,690.00 | 20.00 | 81,380.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 43,854.8 | TON | 79.00 | 3,464,529.20 | 79.00 | 3,464,529.20 | 90.00 | 3,946,932.00 | 94.00 | 4,122,351.20 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 924.3 | TON | 150.00 | 138,645.00 | 79.00 | 73,019.70 | 90.00 | 83,187.00 | 226.00 | 208,891.80 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 276,283 | SQYD | 0.50 | 138,141.50 | 1.25 | 345,353.75 | 2.00 | 552,566.00 | 1.75 | 483,495.25 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -13,946 | CUYD | 0.01 | -139.46 | 1.00 | -13,946.00 | 0.25 | -3,486.50 | 1.00 | -13,946.00 | | 0010 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 3,198 | SQYD | 82.00 | 262,236.00 | 90.00 | 287,820.00 | 125.00 | 399,750.00 | 120.00 | 383,760.00 | | 0011 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 583 | SQYD | 92.00 | 53,636.00 | 100.00 | 58,300.00 | 140.00 | 81,620.00 | 148.00 | 86,284.00 | | 0012 | 701-14-00100 | Cleaning Existing Pipes 24" DIAMETER AND BELOW | 1,120 | LNFT | 13.00 | 14,560.00 | 13.50 | 15,120.00 | 15.00 | 16,800.00 | 21.00 | 23,520.00 | | 0013 | 701-14-00100 | Cleaning Existing Pipes 36" DIAMETER | 1,815 | LNFT | 16.00 | 29,040.00 | 16.50 | 29,947.50 | 15.00 | 27,225.00 | 25.00 | 45,375.00 | | 0014 | 701-14-00100 | Cleaning Existing Pipes 60" DIAMETER | 156 | LNFT | 25.00 | 3,900.00 | 25.75 | 4,017.00 | 29.00 | 4,524.00 | 21.00 | 3,276.00 | | 0015 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 400 | LNFT | 58.00 | 23,200.00 | 28.75 | 11,500.00 | 40.00 | 16,000.00 | 40.00 | 16,000.00 | | 0016 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 806.3 | LNFT | 22.00 | 17,738.60 | 18.50 | 14,916.55 | 25.00 | 20,157.50 | 25.00 | 20,157.50 | | 0017 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 25 | LNFT | 76.00 | 1,900.00 | 30.00 | 750.00 | 55.00 | 1,375.00 | 52.00 | 1,300.00 | | 0018 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 150 | LNFT | 76.00 | 11,400.00 | 92.00 | 13,800.00 | 100.00 | 15,000.00 | 95.00 | 14,250.00 | | 0019 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 6 | EACH | 2,800.00 | 16,800.00 | 2,400.00 | 14,400.00 | 3,000.00 | 18,000.00 | 2,900.00 | 17,400.00 | | 0020 | 706-02-00200 | Concrete Drive (6" Thick) | 186.8 | SQYD | 88.00 | 16,438.40 | 77.00 | 14,383.60 | 100.00 | 18,680.00 | 82.00 | 15,317.60 | | 0021 | 707-01-00100 | Concrete Curb | 688 | LNFT | 20.00 | 13,760.00 | 14.00 | 9,632.00 | 15.00 | 10,320.00 | 22.00 | 15,136.00 | | 0022 | 707-03-00100 | Combination Concrete Curb and Gutter | 144 | LNFT | 56.00 | 8,064.00 | 33.00 | 4,752.00 | 50.00 | 7,200.00 | 47.00 | 6,768.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 80,000.00 | 80,000.00 | 135,000.00 | 135,000.00 | 128,000.00 | 128,000.00 | | 0024 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 9,555 | LNFT | 0.25 | 2,388.75 | 0.25 | 2,388.75 | 0.10 | 955.50 | 0.25 | 2,388.75 | | 0025 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 2,883 | LNFT | 0.25 | 720.75 | 0.25 | 720.75 | 0.10 | 288.30 | 0.25 | 720.75 | | 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 18.451 | MILE | 150.00 | 2,767.65 | 1.00 | 18.45 | 100.00 | 1,845.10 | 154.00 | 2,841.45 | | 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 18.451 | MILE | 725.00 | 13,376.98 | 1.00 | 18.45 | 100.00 | 1,845.10 | 735.00 | 13,561.49 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 36.903 | MILE | 1,100.00 | 40,593.30 | 1.00 | 36.90 | 1,000.00 | 36,903.00 | 1,150.00 | 42,438.45 | | 0029 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 10 | EACH | 50.00 | 500.00 | 1.00 | 10.00 | 50.00 | 500.00 | 52.00 | 520.00 | | 0030 | 717-01-00100 | Seeding | 403 | LB | 5.00 | 2,015.00 | 11.25 | 4,533.75 | 9.00 | 3,627.00 | 15.00 | 6,045.00 | | 0031 | 718-01-00100 | Fertilizer | 13,400 | LB | 0.25 | 3,350.00 | 0.50 | 6,700.00 | 0.40 | 5,360.00 | 0.55 | 7,370.00 | | 0032 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 18.452 | MILE | 500.00 | 9,226.00 | 270.00 | 4,982.04 | 750.00 | 13,839.00 | 575.00 | 10,609.90 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 352,000.00 | 352,000.00 | 260,000.00 | 260,000.00 | 300,000.00 | 300,000.00 | 343,500.00 | 343,500.00 | | 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 74 | EACH | 75.00 | 5,550.00 | 95.00 | 7,030.00 | 80.00 | 5,920.00 | 80.00 | 5,920.00 | | 0035 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 750.00 | 750.00 | 775.00 | 775.00 | 800.00 | 800.00 | 800.00 | 800.00 | | 0036 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,200 | EACH | 7.50 | 16,500.00 | 8.00 | 17,600.00 | 8.00 | 17,600.00 | 8.00 | 17,600.00 | | 0037 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,433 | LNFT | 4.00 | 9,732.00 | 2.50 | 6,082.50 | 5.00 | 12,165.00 | 4.00 | 9,732.00 | | 0038 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,722 | LNFT | 12.00 | 20,664.00 | 8.00 | 13,776.00 | 13.00 | 22,386.00 | 12.00 | 20,664.00 | | 0039 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 20 | LNFT | 15.00 | 300.00 | 20.00 | 400.00 | 16.00 | 320.00 | 16.00 | 320.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 23.599 | MILE | 4,000.00 | 94,396.00 | 4,000.00 | 94,396.00 | 4,000.00 | 94,396.00 | 4,255.00 | 100,413.75 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 11.799 | MILE | 1,500.00 | 17,698.50 | 2,200.00 | 25,957.80 | 1,750.00 | 20,648.25 | 1,650.00 | 19,468.35 | | 0042 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.103 | MILE | 5,000.00 | 515.00 | 5,200.00 | 535.60 | 10,000.00 | 1,030.00 | 4,975.00 | 512.43 | | 0043 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.65 | MILE | 5,000.00 | 3,250.00 | 5,600.00 | 3,640.00 | 6,000.00 | 3,900.00 | 5,500.00 | 3,575.00 | | 0044 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 3 | EACH | 300.00 | 900.00 | 325.00 | 975.00 | 350.00 | 1,050.00 | 325.00 | 975.00 | | 0045 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 300.00 | 600.00 | 325.00 | 650.00 | 350.00 | 700.00 | 325.00 | 650.00 | | 0046 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 5 | EACH | 300.00 | 1,500.00 | 375.00 | 1,875.00 | 350.00 | 1,750.00 | 325.00 | 1,625.00 | | 0047 | 735-01-00100 | Mailboxes | 7 | EACH | 75.00 | 525.00 | 16.00 | 112.00 | 100.00 | 700.00 | 25.00 | 175.00 | | 0048 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 75.00 | 525.00 | 200.00 | 1,400.00 | 150.00 | 1,050.00 | 155.00 | 1,085.00 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,100.00 | 6,100.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 45,250.00 | 45,250.00 | | 0050 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 531 | INLF | 2.00 | 1,062.00 | 3.50 | 1,858.50 | 1.00 | 531.00 | 2.65 | 1,407.15 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,920,702.17 | | 4,932,964.79 | | 5,984,054.25 | | 6,345,622.82 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Bridging The Gap Solution LLC | | Unit Price | Total Amount | | 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 144 | LNFT | 45.00 | 6,480.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 187 | SQYD | 25.00 | 4,675.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 688 | LNFT | 10.00 | 6,880.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 1,597 | LNFT | 15.00 | 23,955.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,069 | CUYD | 30.00 | 122,070.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 43,854.8 | TON | 110.00 | 4,824,028.00 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 924.3 | TON | 175.00 | 161,752.50 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 276,283 | SQYD | 2.75 | 759,778.25 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -13,946 | CUYD | 0.01 | -139.46 | | 0010 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 3,198 | SQYD | 125.00 | 399,750.00 | | 0011 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 583 | SQYD | 125.00 | 72,875.00 | | 0012 | 701-14-00100 | Cleaning Existing Pipes 24" DIAMETER AND BELOW | 1,120 | LNFT | 25.00 | 28,000.00 | | 0013 | 701-14-00100 | Cleaning Existing Pipes 36" DIAMETER | 1,815 | LNFT | 25.00 | 45,375.00 | | 0014 | 701-14-00100 | Cleaning Existing Pipes 60" DIAMETER | 156 | LNFT | 25.00 | 3,900.00 | | 0015 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 400 | LNFT | 41.00 | 16,400.00 | | 0016 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 806.3 | LNFT | 26.00 | 20,963.80 | | 0017 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 25 | LNFT | 55.00 | 1,375.00 | | 0018 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 150 | LNFT | 105.00 | 15,750.00 | | 0019 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 6 | EACH | 3,100.00 | 18,600.00 | | 0020 | 706-02-00200 | Concrete Drive (6" Thick) | 186.8 | SQYD | 65.00 | 12,142.00 | | 0021 | 707-01-00100 | Concrete Curb | 688 | LNFT | 10.00 | 6,880.00 | | 0022 | 707-03-00100 | Combination Concrete Curb and Gutter | 144 | LNFT | 75.00 | 10,800.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 250,000.00 | 250,000.00 | | 0024 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 9,555 | LNFT | 25.00 | 238,875.00 | | 0025 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 2,883 | LNFT | 0.25 | 720.75 | | 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 18.451 | MILE | 400.00 | 7,380.40 | | 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 18.451 | MILE | 725.00 | 13,376.98 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 36.903 | MILE | 1,100.00 | 40,593.30 | | 0029 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 10 | EACH | 50.00 | 500.00 | | 0030 | 717-01-00100 | Seeding | 403 | LB | 10.00 | 4,030.00 | | 0031 | 718-01-00100 | Fertilizer | 13,400 | LB | 2.00 | 26,800.00 | | 0032 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 18.452 | MILE | 800.00 | 14,761.60 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 325,000.00 | 325,000.00 | | 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 74 | EACH | 85.00 | 6,290.00 | | 0035 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 1,000.00 | 1,000.00 | | 0036 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,200 | EACH | 8.50 | 18,700.00 | | 0037 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,433 | LNFT | 4.50 | 10,948.50 | | 0038 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,722 | LNFT | 14.00 | 24,108.00 | | 0039 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 20 | LNFT | 17.00 | 340.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 23.599 | MILE | 4,500.00 | 106,195.50 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 11.799 | MILE | 1,750.00 | 20,648.25 | | 0042 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.103 | MILE | 5,500.00 | 566.50 | | 0043 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.65 | MILE | 5,500.00 | 3,575.00 | | 0044 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 3 | EACH | 400.00 | 1,200.00 | | 0045 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 400.00 | 800.00 | | 0046 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 5 | EACH | 400.00 | 2,000.00 | | 0047 | 735-01-00100 | Mailboxes | 7 | EACH | 15.00 | 105.00 | | 0048 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 155.00 | 1,085.00 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | | 0050 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 531 | INLF | 10.00 | 5,310.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,737,199.87 |
|