Proposal:H.013198.6
Parish:St. Landry
Routes:US 190
Description:US 190 EB & WB: WALLIOR ST - LA 742
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, SUBGRADE TREATMENT, CLASS II BASE COURSE, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT AND RELATED WORK.
Estimated Construction Cost:$11,777,974.04
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $9,810,340.16 |
| 2 | 06276 | Barriere Construction Co., LLC | $11,491,554.49 |
| 3 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $14,399,519.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Barriere Construction Co., LLC | - 3 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 5,000.00 | 5,000.00 | 30,000.00 | 30,000.00 | 10,000.00 | 10,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 35,000.00 | 35,000.00 | 20,000.00 | 20,000.00 | 60,000.00 | 60,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 6,437.5 | SQYD | 17.10 | 110,081.25 | 13.00 | 83,687.50 | 16.50 | 106,218.75 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 4,535.7 | SQYD | 13.10 | 59,417.67 | 11.00 | 49,892.70 | 30.50 | 138,338.85 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 54.2 | LNFT | 25.00 | 1,355.00 | 37.00 | 2,005.40 | 95.00 | 5,149.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 6,514.2 | LNFT | 11.10 | 72,307.62 | 8.00 | 52,113.60 | 8.00 | 52,113.60 | | 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 3,943 | SQYD | 15.00 | 59,145.00 | 10.90 | 42,978.70 | 8.00 | 31,544.00 | | 0008 | 202-02-38220 | Removal of Sign Supports | 2 | EACH | 180.00 | 360.00 | 105.00 | 210.00 | 105.00 | 210.00 | | 0009 | 202-02-38260 | Removal of Sign Support Footings | 1 | EACH | 810.00 | 810.00 | 405.00 | 405.00 | 425.00 | 425.00 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 120,000.00 | 120,000.00 | 155,000.00 | 155,000.00 | 150,000.00 | 150,000.00 | | 0011 | 203-07-00100 | Borrow (Vehicular Measurement) | 350 | CUYD | 25.00 | 8,750.00 | 120.00 | 42,000.00 | 55.00 | 19,250.00 | | 0012 | 204-02-00100 | Temporary Hay Bales | 217 | EACH | 22.00 | 4,774.00 | 1.00 | 217.00 | 22.00 | 4,774.00 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 66 | EACH | 127.50 | 8,415.00 | 1.00 | 66.00 | 130.00 | 8,580.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 6,315 | LNFT | 1.50 | 9,472.50 | 1.50 | 9,472.50 | 1.50 | 9,472.50 | | 0015 | 302-02-08020 | Class II Base Course (8" Thick) (Crushed Stone) | 1,289.4 | SQYD | 30.00 | 38,682.00 | 75.00 | 96,705.00 | 70.00 | 90,258.00 | | 0016 | 302-02-10010 | Class II Base Course (10" Thick) (Soil Cement) | 8,421.2 | SQYD | 10.50 | 88,422.60 | 31.00 | 261,057.20 | 35.00 | 294,742.00 | | 0017 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | 7,156 | SQYD | 11.00 | 78,716.00 | 16.00 | 114,496.00 | 31.00 | 221,836.00 | | 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 9 | CUYD | 250.00 | 2,250.00 | 177.10 | 1,593.90 | 300.00 | 2,700.00 | | 0019 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 800 | SQYD | 22.00 | 17,600.00 | 1.00 | 800.00 | 85.00 | 68,000.00 | | 0020 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 20.00 | 2,000.00 | 0.01 | 1.00 | 150.00 | 15,000.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 61,084.6 | TON | 75.00 | 4,581,345.00 | 85.00 | 5,192,191.00 | 95.00 | 5,803,037.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,292 | TON | 115.00 | 148,580.00 | 219.00 | 282,948.00 | 150.00 | 193,800.00 | | 0023 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 122,104 | GAL | 2.80 | 341,891.20 | 2.96 | 361,427.84 | 3.20 | 390,732.80 | | 0024 | 507-02-00200 | Aggregate (S2) | 179,560 | SQYD | 1.20 | 215,472.00 | 1.21 | 217,267.60 | 1.40 | 251,384.00 | | 0025 | 507-02-00300 | Aggregate (S3) | 179,560 | SQYD | 0.97 | 174,173.20 | 0.97 | 174,173.20 | 1.15 | 206,494.00 | | 0026 | 509-01-00100 | Milling Asphalt Pavement | 280,820 | SQYD | 2.00 | 561,640.00 | 1.25 | 351,025.00 | 2.50 | 702,050.00 | | 0027 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -19,566 | CUYD | 0.01 | -195.66 | 0.01 | -195.66 | 1.00 | -19,566.00 | | 0028 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 1,289 | SQYD | 120.00 | 154,680.00 | 131.00 | 168,859.00 | 155.00 | 199,795.00 | | 0029 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 2,593 | SQYD | 125.00 | 324,125.00 | 162.00 | 420,066.00 | 160.00 | 414,880.00 | | 0030 | 510-02-00100 | Pavement Widening 24" Minimum Thickness | 38.7 | SQYD | 186.00 | 7,198.20 | 325.00 | 12,577.50 | 400.00 | 15,480.00 | | 0031 | 601-01-01100 | Portland Cement Concrete Pavement (13" Thick) | 136.9 | SQYD | 250.00 | 34,225.00 | 168.00 | 22,999.20 | 170.00 | 23,273.00 | | 0032 | 601-01-01300 | Portland Cement Concrete Pavement (14" Thick) | 202.2 | SQYD | 255.00 | 51,561.00 | 150.00 | 30,330.00 | 180.00 | 36,396.00 | | 0033 | 701-01-01160 | Cross Drain Pipe (84" RCP) | 150 | LNFT | 730.00 | 109,500.00 | 950.00 | 142,500.00 | 1,600.00 | 240,000.00 | | 0034 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 1,326 | LNFT | 74.00 | 98,124.00 | 82.00 | 108,732.00 | 160.00 | 212,160.00 | | 0035 | 701-05-01046 | Side Drain Pipe (18" RCP/RPVCP) | 130 | LNFT | 90.00 | 11,700.00 | 72.00 | 9,360.00 | 110.00 | 14,300.00 | | 0036 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 72 | LNFT | 95.00 | 6,840.00 | 105.00 | 7,560.00 | 135.00 | 9,720.00 | | 0037 | 701-06-01080 | Side Drain Pipe Arch (36" Equiv. RCPA/CMPA) | 104 | LNFT | 100.00 | 10,400.00 | 113.00 | 11,752.00 | 165.00 | 17,160.00 | | 0038 | 701-15-00100 | Concrete Collar | 12 | EACH | 1,800.00 | 21,600.00 | 569.00 | 6,828.00 | 2,000.00 | 24,000.00 | | 0039 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 1,782 | LNFT | 16.00 | 28,512.00 | 0.01 | 17.82 | 11.00 | 19,602.00 | | 0040 | 702-03-00100 | Catch Basins (CB-01) | 18 | EACH | 4,500.00 | 81,000.00 | 2,500.00 | 45,000.00 | 4,000.00 | 72,000.00 | | 0041 | 702-03-00200 | Catch Basins (CB-02) | 11 | EACH | 5,500.00 | 60,500.00 | 4,250.00 | 46,750.00 | 8,100.00 | 89,100.00 | | 0042 | 702-03-00500 | Catch Basins (CB-06) | 2 | EACH | 7,750.00 | 15,500.00 | 4,800.00 | 9,600.00 | 5,500.00 | 11,000.00 | | 0043 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 3,750.00 | 3,750.00 | 1,275.00 | 1,275.00 | 2,000.00 | 2,000.00 | | 0044 | 702-08-00200 | Side Drain Safety End (Type 2) | 3 | EACH | 4,750.00 | 14,250.00 | 6,000.00 | 18,000.00 | 7,000.00 | 21,000.00 | | 0045 | 703-01-00100 | Shoulder Underdrain Systems | 1,528 | LNFT | 26.00 | 39,728.00 | 18.00 | 27,504.00 | 20.00 | 30,560.00 | | 0046 | 703-02-00100 | Shoulder Outlet Underdrains | 50 | EACH | 920.00 | 46,000.00 | 1,600.00 | 80,000.00 | 1,300.00 | 65,000.00 | | 0047 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 1,975 | LNFT | 35.25 | 69,618.75 | 37.00 | 73,075.00 | 40.00 | 79,000.00 | | 0048 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 3,857.5 | LNFT | 22.25 | 85,829.38 | 21.00 | 81,007.50 | 22.00 | 84,865.00 | | 0049 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 212.5 | LNFT | 97.00 | 20,612.50 | 95.00 | 20,187.50 | 135.00 | 28,687.50 | | 0050 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 102.50 | 20,500.00 | 132.00 | 26,400.00 | 100.00 | 20,000.00 | | 0051 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 8 | EACH | 2,850.00 | 22,800.00 | 3,000.00 | 24,000.00 | 3,000.00 | 24,000.00 | | 0052 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 13 | EACH | 2,650.00 | 34,450.00 | 2,600.00 | 33,800.00 | 2,700.00 | 35,100.00 | | 0053 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 4,500.3 | SQYD | 55.00 | 247,516.50 | 53.00 | 238,515.90 | 72.00 | 324,021.60 | | 0054 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 151 | SQYD | 180.00 | 27,180.00 | 70.00 | 10,570.00 | 125.00 | 18,875.00 | | 0055 | 711-04-00100 | Geotextile Fabric | 151 | SQYD | 17.50 | 2,642.50 | 2.25 | 339.75 | 2.60 | 392.60 | | 0056 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 400,000.00 | 400,000.00 | 225,000.00 | 225,000.00 | | 0057 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 474 | LNFT | 0.30 | 142.20 | 0.35 | 165.90 | 0.35 | 165.90 | | 0058 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 5,599 | LNFT | 0.50 | 2,799.50 | 0.01 | 55.99 | 0.50 | 2,799.50 | | 0059 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 750 | LNFT | 0.55 | 412.50 | 0.01 | 7.50 | 0.55 | 412.50 | | 0060 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 23.68 | MILE | 760.00 | 17,996.80 | 350.00 | 8,288.00 | 775.00 | 18,352.00 | | 0061 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 48.172 | MILE | 3,200.00 | 154,150.40 | 1,200.00 | 57,806.40 | 1,100.00 | 52,989.20 | | 0062 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 20 | EACH | 22.00 | 440.00 | 0.01 | 0.20 | 22.50 | 450.00 | | 0063 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 2 | EACH | 33.00 | 66.00 | 0.01 | 0.02 | 32.00 | 64.00 | | 0064 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 7 | EACH | 33.00 | 231.00 | 0.01 | 0.07 | 32.00 | 224.00 | | 0065 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 6,572 | EACH | 2.60 | 17,087.20 | 3.00 | 19,716.00 | 2.75 | 18,073.00 | | 0066 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 383 | EACH | 100.00 | 38,300.00 | 100.00 | 38,300.00 | 355.00 | 135,965.00 | | 0067 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 766 | EACH | 45.00 | 34,470.00 | 100.00 | 76,600.00 | 100.00 | 76,600.00 | | 0068 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 12,000.00 | 48,000.00 | 9,000.00 | 36,000.00 | 14,000.00 | 56,000.00 | | 0069 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 24,000.00 | 24,000.00 | | 0070 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 23.21 | MILE | 550.00 | 12,765.50 | 950.00 | 22,049.50 | 525.00 | 12,185.25 | | 0071 | 725-01-00100 | Temporary Detour Roads | 12,639.7 | SQYD | 56.00 | 707,823.20 | 55.00 | 695,183.50 | 82.00 | 1,036,455.40 | | 0072 | 726-01-00100 | Bedding Material | 218.8 | CUYD | 60.00 | 13,128.00 | 110.00 | 24,068.00 | 110.00 | 24,068.00 | | 0073 | 727-01-00100 | Mobilization | 1 | LUMP | 45,000.00 | 45,000.00 | 500,000.00 | 500,000.00 | 1,400,000.00 | 1,400,000.00 | | 0074 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 345 | SQFT | 24.25 | 8,366.25 | 13.00 | 4,485.00 | 13.00 | 4,485.00 | | 0075 | 729-01-00103 | Sign (Type A)(Relocate) | 4 | SQFT | 15.25 | 61.00 | 18.00 | 72.00 | 20.00 | 80.00 | | 0076 | 729-04-00103 | Sign (Type D)(Relocate) | 76 | SQFT | 15.25 | 1,159.00 | 16.00 | 1,216.00 | 16.00 | 1,216.00 | | 0077 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 2 | EACH | 2,125.00 | 4,250.00 | 1,800.00 | 3,600.00 | 1,800.00 | 3,600.00 | | 0078 | 729-16-00200 | Object Marker Assembly (Type 2) | 15 | EACH | 66.00 | 990.00 | 45.00 | 675.00 | 50.00 | 750.00 | | 0079 | 729-16-00300 | Object Marker Assembly (Type 3) | 48 | EACH | 100.00 | 4,800.00 | 75.00 | 3,600.00 | 80.00 | 3,840.00 | | 0080 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 22 | EACH | 97.00 | 2,134.00 | 102.00 | 2,244.00 | 110.00 | 2,420.00 | | 0081 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 160 | EACH | 11.25 | 1,800.00 | 2.50 | 400.00 | 12.00 | 1,920.00 | | 0082 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,329 | EACH | 6.25 | 20,806.25 | 7.50 | 24,967.50 | 6.50 | 21,638.50 | | 0083 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,632 | LNFT | 3.15 | 8,290.80 | 2.15 | 5,658.80 | 3.25 | 8,554.00 | | 0084 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 375 | LNFT | 13.25 | 4,968.75 | 9.00 | 3,375.00 | 14.00 | 5,250.00 | | 0085 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 474 | LNFT | 1.25 | 592.50 | 1.02 | 483.48 | 1.10 | 521.40 | | 0086 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 2,333 | LNFT | 2.60 | 6,065.80 | 1.50 | 3,499.50 | 2.75 | 6,415.75 | | 0087 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 25.192 | MILE | 3,400.00 | 85,652.80 | 3,600.00 | 90,691.20 | 3,500.00 | 88,172.00 | | 0088 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 12.9 | MILE | 1,425.00 | 18,382.50 | 1,500.00 | 19,350.00 | 1,450.00 | 18,705.00 | | 0089 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 525.00 | 1,050.00 | 450.00 | 900.00 | 525.00 | 1,050.00 | | 0090 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 12 | EACH | 325.00 | 3,900.00 | 300.00 | 3,600.00 | 325.00 | 3,900.00 | | 0091 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 325.00 | 1,300.00 | 325.00 | 1,300.00 | 325.00 | 1,300.00 | | 0092 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 1 | EACH | 425.00 | 425.00 | 900.00 | 900.00 | 425.00 | 425.00 | | 0093 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 4 | EACH | 625.00 | 2,500.00 | 350.00 | 1,400.00 | 625.00 | 2,500.00 | | 0094 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 7 | EACH | 425.00 | 2,975.00 | 350.00 | 2,450.00 | 425.00 | 2,975.00 | | 0095 | 732-05-00100 | Removal of Existing Markings | 0.2 | MILE | 8,000.00 | 1,600.00 | 21,000.15 | 4,200.03 | 8,000.00 | 1,600.00 | | 0096 | 735-01-00100 | Mailboxes | 48 | EACH | 6.25 | 300.00 | 30.00 | 1,440.00 | 16.00 | 768.00 | | 0097 | 735-02-00100 | Mailbox Supports (Single) | 48 | EACH | 130.00 | 6,240.00 | 150.00 | 7,200.00 | 130.00 | 6,240.00 | | 0098 | 739-01-00100 | Hydro-Seeding | 4.62 | ACRE | 1,500.00 | 6,930.00 | 1,750.00 | 8,085.00 | 1,500.00 | 6,930.00 | | 0099 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 95,000.00 | 95,000.00 | 80,000.00 | 80,000.00 | | 0100 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 62,481 | INLF | 1.00 | 62,481.00 | 1.25 | 78,101.25 | 1.40 | 87,473.40 | | 0101 | NS-702-00001 | Cleaning Existing Catch Basin | 2 | EACH | 1,600.00 | 3,200.00 | 6,500.00 | 13,000.00 | 900.00 | 1,800.00 | | 0102 | NS-729-00031 | Breakaway Square Tubing Sign Support (Surface Mount) | 7 | EACH | 1,500.00 | 10,500.00 | 325.00 | 2,275.00 | 325.00 | 2,275.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,810,340.16 | | 11,491,554.49 | | 14,399,519.00 |
|