Proposal:H.012965.6
Parish:Desoto
Routes:LA 175
Description:LA 175: SABINE PL TO LA 346
Type Construction:PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, AND RELATED WORK.
Estimated Construction Cost:$479,801.45
| Rank | License | Bidder | Construction Bid |
| 1 | 35378 | P.R. PARKER COMPANY INC | $724,128.54 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - P.R. PARKER COMPANY INC | | Unit Price | Total Amount | | 0001 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 36,268 | GAL | 2.76 | 100,099.68 | | 0002 | 507-02-00300 | Aggregate (S3) | 116,994 | SQYD | 1.49 | 174,321.06 | | 0003 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 1,169 | SQYD | 134.00 | 156,646.00 | | 0004 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 43,400.00 | 43,400.00 | | 0005 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.814 | MILE | 550.00 | 1,547.70 | | 0006 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 26.749 | MILE | 840.00 | 22,469.16 | | 0007 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 2,025 | EACH | 2.20 | 4,455.00 | | 0008 | 724-01-00100 | Rumble Strips (Centerline) | 7.67 | MILE | 1,470.00 | 11,274.90 | | 0009 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 15.34 | MILE | 1,470.00 | 22,549.80 | | 0010 | 727-01-00100 | Mobilization | 1 | LUMP | 72,400.00 | 72,400.00 | | 0011 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,653 | EACH | 7.20 | 11,901.60 | | 0012 | 737-01-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 53.498 | MILE | 1,720.00 | 92,016.56 | | 0013 | 737-02-00100 | Painted Traffic Striping (Broken Line) (4" Width) | 5.628 | MILE | 1,110.00 | 6,247.08 | | 0014 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,800.00 | 4,800.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 724,128.54 |
|