Proposal:H.012558.6
Parish:St. Landry
Routes:LA 182
Description:LA 182: END ONE WAY COUPLET - US 167
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, CLASS II BASE COURSE, IN-PLACE CEMENT STABILIZED BASE COURSE, LIME TREATMENT, ASPHALT SURFACE TREATMENT, TRAFFIC SIGNALIZATION, ASPHALT CONCRETE OVERLAY, DRILLED SHAFT FOUNDATIONS, AND RELATED WORK.
Estimated Construction Cost:$3,793,199.20
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $3,456,161.85 |
| 2 | 51821 | Elliott Construction, LLC | $4,200,051.38 |
| 3 | 06276 | Barriere Construction Co., LLC | $4,261,024.03 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Elliott Construction, LLC | - 3 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 1,088.8 | SQYD | 11.25 | 12,249.00 | 10.00 | 10,888.00 | 7.50 | 8,166.00 | | 0002 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 1,088.8 | SQYD | 12.25 | 13,337.80 | 10.00 | 10,888.00 | 7.50 | 8,166.00 | | 0003 | 202-02-06040 | Removal of Concrete Box Headwall (2'x3') | 1 | EACH | 1,250.00 | 1,250.00 | 1,500.00 | 1,500.00 | 3,000.00 | 3,000.00 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 1,050.00 | 1,050.00 | 750.00 | 750.00 | 2,500.00 | 2,500.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,051 | SQYD | 15.50 | 31,790.50 | 12.00 | 24,612.00 | 20.00 | 41,020.00 | | 0006 | 202-02-06140 | Removal of Curbs (Concrete) | 1,174 | LNFT | 12.25 | 14,381.50 | 8.00 | 9,392.00 | 12.50 | 14,675.00 | | 0007 | 202-02-26000 | Removal of Manholes | 1 | EACH | 1,200.00 | 1,200.00 | 750.00 | 750.00 | 2,500.00 | 2,500.00 | | 0008 | 202-02-26300 | Removal of Median / Island | 408 | SQYD | 10.00 | 4,080.00 | 15.00 | 6,120.00 | 30.00 | 12,240.00 | | 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) (24" RCP) | 126 | LNFT | 23.00 | 2,898.00 | 20.00 | 2,520.00 | 25.00 | 3,150.00 | | 0010 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 3,850.00 | 3,850.00 | 4,200.00 | 4,200.00 | 10,000.00 | 10,000.00 | | 0011 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 41,500.00 | 41,500.00 | 25,000.00 | 25,000.00 | 145,000.00 | 145,000.00 | | 0012 | 203-07-00100 | Borrow (Vehicular Measurement) | 585 | CUYD | 26.00 | 15,210.00 | 17.00 | 9,945.00 | 25.00 | 14,625.00 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 40 | EACH | 125.00 | 5,000.00 | 130.00 | 5,200.00 | 130.00 | 5,200.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 398 | LNFT | 2.05 | 815.90 | 2.00 | 796.00 | 1.30 | 517.40 | | 0015 | 302-02-08510 | Class II Base Course (8-1/2" Thick) (Soil Cement) | 894.6 | SQYD | 12.00 | 10,735.20 | 25.00 | 22,365.00 | 35.00 | 31,311.00 | | 0016 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 21,690 | SQYD | 9.75 | 211,477.50 | 12.00 | 260,280.00 | 11.00 | 238,590.00 | | 0017 | 304-01-00100 | Lime | 83 | TON | 225.00 | 18,675.00 | 260.00 | 21,580.00 | 150.00 | 12,450.00 | | 0018 | 304-04-00300 | Lime Treatment (Type D) (10" Thick) | 10,540 | SQYD | 3.60 | 37,944.00 | 13.00 | 137,020.00 | 2.00 | 21,080.00 | | 0019 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 50 | SQYD | 95.00 | 4,750.00 | 90.00 | 4,500.00 | 92.00 | 4,600.00 | | 0020 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 40.00 | 8,000.00 | 35.00 | 7,000.00 | 60.00 | 12,000.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 14,196.4 | TON | 76.00 | 1,078,926.40 | 95.00 | 1,348,658.00 | 94.00 | 1,334,461.60 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,130.8 | TON | 140.00 | 298,312.00 | 130.00 | 277,004.00 | 1.00 | 2,130.80 | | 0023 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 32,341 | GAL | 2.85 | 92,171.85 | 3.00 | 97,023.00 | 3.00 | 97,023.00 | | 0024 | 507-02-00200 | Aggregate (S2) | 47,560 | SQYD | 1.50 | 71,340.00 | 1.60 | 76,096.00 | 1.50 | 71,340.00 | | 0025 | 507-02-00300 | Aggregate (S3) | 47,560 | SQYD | 1.25 | 59,450.00 | 1.50 | 71,340.00 | 1.35 | 64,206.00 | | 0026 | 509-01-00100 | Milling Asphalt Pavement | 50,247 | SQYD | 1.95 | 97,981.65 | 2.00 | 100,494.00 | 3.00 | 150,741.00 | | 0027 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,135 | CUYD | 0.01 | -31.35 | 0.01 | -31.35 | 18.00 | -56,430.00 | | 0028 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 4,580 | SQYD | 100.00 | 458,000.00 | 108.00 | 494,640.00 | 102.00 | 467,160.00 | | 0029 | 510-03-00100 | Pavement Joint Repair | 115 | TON | 45.00 | 5,175.00 | 375.00 | 43,125.00 | 350.00 | 40,250.00 | | 0030 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 13,379 | LNFT | 2.00 | 26,758.00 | 3.25 | 43,481.75 | 2.00 | 26,758.00 | | 0031 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 6,692 | LNFT | 2.20 | 14,722.40 | 3.25 | 21,749.00 | 2.25 | 15,057.00 | | 0032 | 602-03-00100 | Cleaning and Sealing Random cracks | 32 | LNFT | 7.25 | 232.00 | 2.25 | 72.00 | 8.00 | 256.00 | | 0033 | 602-05-01280 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (12" Thick) | 117.9 | SQYD | 220.00 | 25,938.00 | 300.00 | 35,370.00 | 225.00 | 26,527.50 | | 0034 | 602-05-02280 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (12" Thick) | 123.2 | SQYD | 200.00 | 24,640.00 | 250.00 | 30,800.00 | 205.00 | 25,256.00 | | 0035 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 108 | LNFT | 140.00 | 15,120.00 | 80.00 | 8,640.00 | 150.00 | 16,200.00 | | 0036 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 118 | LNFT | 10.00 | 1,180.00 | 15.00 | 1,770.00 | 8.00 | 944.00 | | 0037 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 6,250.00 | 6,250.00 | 6,600.00 | 6,600.00 | 6,500.00 | 6,500.00 | | 0038 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 4,750.00 | 4,750.00 | 5,060.00 | 5,060.00 | 5,000.00 | 5,000.00 | | 0039 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 4 | EACH | 800.00 | 3,200.00 | 300.00 | 1,200.00 | 200.00 | 800.00 | | 0040 | 706-01-00100 | Concrete Walk (4" Thick) | 20 | SQYD | 80.00 | 1,600.00 | 82.00 | 1,640.00 | 85.00 | 1,700.00 | | 0041 | 706-02-00200 | Concrete Drive (6" Thick) | 1,505.9 | SQYD | 76.00 | 114,448.40 | 82.00 | 123,483.80 | 85.00 | 128,001.50 | | 0042 | 706-04-00100 | Handicapped Curb Ramps | 5 | EACH | 1,950.00 | 9,750.00 | 2,100.00 | 10,500.00 | 3,000.00 | 15,000.00 | | 0043 | 707-01-00100 | Concrete Curb | 1,049 | LNFT | 25.00 | 26,225.00 | 25.00 | 26,225.00 | 25.00 | 26,225.00 | | 0044 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 75,000.00 | 75,000.00 | 300,000.00 | 300,000.00 | | 0045 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 4,070 | LNFT | 0.55 | 2,238.50 | 1.00 | 4,070.00 | 1.00 | 4,070.00 | | 0046 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 362 | LNFT | 0.80 | 289.60 | 2.75 | 995.50 | 2.00 | 724.00 | | 0047 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.375 | MILE | 2,500.00 | 13,437.50 | 725.00 | 3,896.88 | 175.00 | 940.63 | | 0048 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.08 | MILE | 625.00 | 1,300.00 | 660.00 | 1,372.80 | 950.00 | 1,976.00 | | 0049 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 19.443 | MILE | 3,000.00 | 58,329.00 | 1,210.00 | 23,526.03 | 1,500.00 | 29,164.50 | | 0050 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 20 | EACH | 125.00 | 2,500.00 | 55.00 | 1,100.00 | 100.00 | 2,000.00 | | 0051 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 3 | EACH | 175.00 | 525.00 | 88.00 | 264.00 | 100.00 | 300.00 | | 0052 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 8 | EACH | 75.00 | 600.00 | 110.00 | 880.00 | 50.00 | 400.00 | | 0053 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 2,001 | EACH | 2.55 | 5,102.55 | 2.75 | 5,502.75 | 2.75 | 5,502.75 | | 0054 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 17,500.00 | 17,500.00 | 8,000.00 | 8,000.00 | 25,000.00 | 25,000.00 | | 0055 | 726-01-00100 | Bedding Material | 14.3 | CUYD | 100.00 | 1,430.00 | 110.00 | 1,573.00 | 100.00 | 1,430.00 | | 0056 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 250,000.00 | 250,000.00 | 350,000.00 | 350,000.00 | | 0057 | 729-01-00100 | Sign (Type A) | 31.3 | SQFT | 55.00 | 1,721.50 | 72.00 | 2,253.60 | 60.00 | 1,878.00 | | 0058 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 60.00 | 240.00 | 82.00 | 328.00 | 80.00 | 320.00 | | 0059 | 729-16-00300 | Object Marker Assembly (Type 3) | 32 | EACH | 90.00 | 2,880.00 | 93.00 | 2,976.00 | 90.00 | 2,880.00 | | 0060 | 731-02-00100 | Reflectorized Raised Pavement Markers | 827 | EACH | 6.25 | 5,168.75 | 8.00 | 6,616.00 | 8.00 | 6,616.00 | | 0061 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 961 | LNFT | 3.25 | 3,123.25 | 2.25 | 2,162.25 | 4.25 | 4,084.25 | | 0062 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 640 | LNFT | 3.50 | 2,240.00 | 9.00 | 5,760.00 | 17.50 | 11,200.00 | | 0063 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 787 | LNFT | 3.25 | 2,557.75 | 1.50 | 1,180.50 | 5.50 | 4,328.50 | | 0064 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.016 | MILE | 3,650.00 | 40,208.40 | 4,015.00 | 44,229.24 | 5,500.00 | 60,588.00 | | 0065 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.144 | MILE | 1,250.00 | 3,930.00 | 1,650.00 | 5,187.60 | 1,800.00 | 5,659.20 | | 0066 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 325.00 | 650.00 | 330.00 | 660.00 | 600.00 | 1,200.00 | | 0067 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 3 | EACH | 575.00 | 1,725.00 | 495.00 | 1,485.00 | 700.00 | 2,100.00 | | 0068 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 19 | EACH | 325.00 | 6,175.00 | 330.00 | 6,270.00 | 450.00 | 8,550.00 | | 0069 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 325.00 | 325.00 | 330.00 | 330.00 | 450.00 | 450.00 | | 0070 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 8 | EACH | 375.00 | 3,000.00 | 385.00 | 3,080.00 | 600.00 | 4,800.00 | | 0071 | 732-05-00100 | Removal of Existing Markings | 0.606 | MILE | 9,000.00 | 5,454.00 | 16,500.00 | 9,999.00 | 15,000.00 | 9,090.00 | | 0072 | 735-01-00100 | Mailboxes | 186 | EACH | 10.00 | 1,860.00 | 16.00 | 2,976.00 | 15.00 | 2,790.00 | | 0073 | 735-02-00100 | Mailbox Supports (Single) | 122 | EACH | 135.00 | 16,470.00 | 126.00 | 15,372.00 | 150.00 | 18,300.00 | | 0074 | 735-03-00100 | Mailbox Supports (Double) | 36 | EACH | 155.00 | 5,580.00 | 240.00 | 8,640.00 | 225.00 | 8,100.00 | | 0075 | 736-01-00100 | Trenching and Backfilling | 105 | LNFT | 7.75 | 813.75 | 8.50 | 892.50 | 8.00 | 840.00 | | 0076 | 736-03-00100 | Jacking or Boring | 330 | LNFT | 11.50 | 3,795.00 | 12.50 | 4,125.00 | 12.00 | 3,960.00 | | 0077 | 736-04-10250 | Signal Pole (Single Mast Arm, 25ft) | 3 | EACH | 8,400.00 | 25,200.00 | 9,200.00 | 27,600.00 | 9,000.00 | 27,000.00 | | 0078 | 736-04-10300 | Signal Pole (Single Mast Arm, 30ft) | 2 | EACH | 9,000.00 | 18,000.00 | 9,850.00 | 19,700.00 | 9,500.00 | 19,000.00 | | 0079 | 736-04-23520 | Signal Pole (Dual Mast Arm, 35ft-Arm 1, 20ft-Arm 2) | 1 | EACH | 14,500.00 | 14,500.00 | 15,550.00 | 15,550.00 | 16,000.00 | 16,000.00 | | 0080 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 14 | EACH | 800.00 | 11,200.00 | 875.00 | 12,250.00 | 850.00 | 11,900.00 | | 0081 | 736-05-31200 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, FLT. Y) | 1 | EACH | 800.00 | 800.00 | 875.00 | 875.00 | 850.00 | 850.00 | | 0082 | 736-05-41200 | Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) | 1 | EACH | 950.00 | 950.00 | 1,025.00 | 1,025.00 | 1,000.00 | 1,000.00 | | 0083 | 736-06-00100 | Signal Service | 2 | EACH | 2,350.00 | 4,700.00 | 2,525.00 | 5,050.00 | 2,500.00 | 5,000.00 | | 0084 | 736-06-00500 | Signal Service Pedestal Disconnect | 2 | EACH | 1,450.00 | 2,900.00 | 1,550.00 | 3,100.00 | 1,500.00 | 3,000.00 | | 0085 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 2 | EACH | 6,250.00 | 12,500.00 | 6,750.00 | 13,500.00 | 6,500.00 | 13,000.00 | | 0086 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 575.00 | 575.00 | 625.00 | 625.00 | 600.00 | 600.00 | | 0087 | 736-10-00300 | Underground Junction Box (Type F) | 8 | EACH | 700.00 | 5,600.00 | 725.00 | 5,800.00 | 700.00 | 5,600.00 | | 0088 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 25 | LNFT | 4.75 | 118.75 | 5.00 | 125.00 | 4.75 | 118.75 | | 0089 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 460 | LNFT | 8.50 | 3,910.00 | 9.25 | 4,255.00 | 8.75 | 4,025.00 | | 0090 | 736-12-02014 | Conductor (2c, #14 awg) | 420 | LNFT | 0.70 | 294.00 | 1.00 | 420.00 | 0.75 | 315.00 | | 0091 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 125 | LNFT | 4.00 | 500.00 | 4.25 | 531.25 | 4.00 | 500.00 | | 0092 | 736-12-06014 | Conductor (6c, #14 awg) | 960 | LNFT | 1.75 | 1,680.00 | 2.00 | 1,920.00 | 1.75 | 1,680.00 | | 0093 | 736-12-10014 | Conductor (10c, #14 awg) | 840 | LNFT | 2.65 | 2,226.00 | 3.00 | 2,520.00 | 2.65 | 2,226.00 | | 0094 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 6 | EACH | 3,400.00 | 20,400.00 | 3,725.00 | 22,350.00 | 3,625.00 | 21,750.00 | | 0095 | 736-17-00000 | Video Detection Cabinet Components | 2 | EACH | 8,100.00 | 16,200.00 | 8,888.00 | 17,776.00 | 8,700.00 | 17,400.00 | | 0096 | 736-18-00000 | Video Detection Camera | 4 | EACH | 2,300.00 | 9,200.00 | 2,495.00 | 9,980.00 | 2,400.00 | 9,600.00 | | 0097 | 736-19-00000 | Video Camera Cable | 320 | LNFT | 1.50 | 480.00 | 2.00 | 640.00 | 1.50 | 480.00 | | 0098 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 4 | EACH | 950.00 | 3,800.00 | 1,000.00 | 4,000.00 | 975.00 | 3,900.00 | | 0099 | 736-22-00000 | Pedestrian Push Button | 4 | EACH | 300.00 | 1,200.00 | 305.00 | 1,220.00 | 300.00 | 1,200.00 | | 0100 | 739-01-00100 | Hydro-Seeding | 0.287 | ACRE | 7,500.00 | 2,152.50 | 7,825.00 | 2,245.78 | 7,500.00 | 2,152.50 | | 0101 | 740-01-00100 | Construction Layout | 1 | LUMP | 100.00 | 100.00 | 10,000.00 | 10,000.00 | 50,000.00 | 50,000.00 | | 0102 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) 2'x3' | 10 | LNFT | 1,550.00 | 15,500.00 | 1,650.00 | 16,500.00 | 1,800.00 | 18,000.00 | | 0103 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 5,374 | LNFT | 1.55 | 8,329.70 | 2.75 | 14,778.50 | 1.60 | 8,598.40 | | 0104 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 2,723 | LNFT | 1.70 | 4,629.10 | 3.00 | 8,169.00 | 1.75 | 4,765.25 | | 0105 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 16,194 | LNFT | 1.25 | 20,242.50 | 1.75 | 28,339.50 | 1.25 | 20,242.50 | | 0106 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 7,931 | INLF | 1.00 | 7,931.00 | 1.50 | 11,896.50 | 1.00 | 7,931.00 | | 0107 | NS-736-00001 | GPS | 2 | EACH | 120.00 | 240.00 | 125.00 | 250.00 | 125.00 | 250.00 | | 0108 | NS-736-00131 | TS-2 Traffic Signal Cabinet (Pole Mounted) | 2 | EACH | 15,750.00 | 31,500.00 | 17,105.00 | 34,210.00 | 18,000.00 | 36,000.00 | | 0109 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 4 | EACH | 900.00 | 3,600.00 | 975.00 | 3,900.00 | 950.00 | 3,800.00 | | 0110 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 2 | EACH | 3,750.00 | 7,500.00 | 4,000.00 | 8,000.00 | 4,000.00 | 8,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,456,161.85 | | 4,200,051.38 | | 4,261,024.03 |
|