Proposal:H.012933.6
Parish:Vernon
Routes:LA 111
Description:LA 111: LA 8 TO JOHN KEEL LOOP - AST
Type Construction:MICRO-MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, AND RELATED WORK.
Estimated Construction Cost:$405,421.63
| Rank | License | Bidder | Construction Bid |
| 1 | 35378 | P.R. PARKER COMPANY INC | $543,857.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - P.R. PARKER COMPANY INC |
| Unit Price | Total Amount |
| 0001 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 37,231 | GAL | 2.77 | 103,129.87 |
| 0002 | 507-02-00200 | Aggregate (S2) | 54,750 | SQYD | 1.79 | 98,002.50 |
| 0003 | 507-02-00300 | Aggregate (S3) | 54,750 | SQYD | 1.51 | 82,672.50 |
| 0004 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -8 | CUYD | 0.01 | -0.08 |
| 0005 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 547 | SQYD | 165.00 | 90,255.00 |
| 0006 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 33,980.00 | 33,980.00 |
| 0007 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.344 | MILE | 740.00 | 2,474.56 |
| 0008 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 12.73 | MILE | 950.00 | 12,093.50 |
| 0009 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 2,288 | EACH | 2.00 | 4,576.00 |
| 0010 | 727-01-00100 | Mobilization | 1 | LUMP | 54,380.00 | 54,380.00 |
| 0011 | 731-02-00100 | Reflectorized Raised Pavement Markers | 702 | EACH | 6.50 | 4,563.00 |
| 0012 | 737-01-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 12.73 | MILE | 1,550.00 | 19,731.50 |
| 0013 | 737-02-00100 | Painted Traffic Striping (Broken Line) (4" Width) | 3.344 | MILE | 1,050.00 | 3,511.20 |
| 0014 | 737-03-00500 | Painted Traffic Striping (Solid Line) (24" Width) | 10 | LNFT | 15.00 | 150.00 |
| 0015 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,800.00 | 4,800.00 |
| 0016 | NS-509-00001 | Micro-Milling Asphaltic Pavement | 547 | SQYD | 54.00 | 29,538.00 |
| | | | | | | |
| | | CONTRACTOR TOTAL | | | | 543,857.55 |