Proposal:H.013744.6
Parish:Calcasieu
Routes:LA 385
Description:LA 385: LEFT TURN LANE @ COLLEGE ST
Type Construction:ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$84,150.68
| Rank | License | Bidder | Construction Bid |
| 1 | 36384 | JOHN BAILEY, INC. | $149,976.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - JOHN BAILEY, INC. | | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 68 | SQYD | 50.00 | 3,400.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 90 | LNFT | 35.00 | 3,150.00 | | 0003 | 202-02-26300 | Removal of Median / Island | 227 | SQYD | 40.00 | 9,080.00 | | 0004 | 202-02-38240 | Removal of Signs and Supports | 2 | EACH | 350.00 | 700.00 | | 0005 | 502-01-00100 | Asphalt Concrete | 56.2 | TON | 395.00 | 22,199.00 | | 0006 | 706-01-00300 | Concrete Walk (6" Thick) | 2.8 | SQYD | 500.00 | 1,400.00 | | 0007 | 706-04-00100 | Handicapped Curb Ramps | 4 | EACH | 4,000.00 | 16,000.00 | | 0008 | 707-01-00100 | Concrete Curb | 198 | LNFT | 45.00 | 8,910.00 | | 0009 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | | 0010 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 660 | LNFT | 0.60 | 396.00 | | 0011 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 48 | LNFT | 2.40 | 115.20 | | 0012 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.116 | MILE | 1,200.00 | 139.20 | | 0013 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.116 | MILE | 5,000.00 | 580.00 | | 0014 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.192 | MILE | 3,600.00 | 691.20 | | 0015 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 6 | EACH | 120.00 | 720.00 | | 0016 | 727-01-00100 | Mobilization | 1 | LUMP | 25,000.00 | 25,000.00 | | 0017 | 729-01-00100 | Sign (Type A) | 3.8 | SQFT | 100.00 | 380.00 | | 0018 | 729-02-00100 | Sign (Type B) | 8.2 | SQFT | 100.00 | 820.00 | | 0019 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 250.00 | 500.00 | | 0020 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 2 | EACH | 575.00 | 1,150.00 | | 0021 | 731-02-00100 | Reflectorized Raised Pavement Markers | 230 | EACH | 8.40 | 1,932.00 | | 0022 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 660 | LNFT | 2.40 | 1,584.00 | | 0023 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 12.00 | 576.00 | | 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.192 | MILE | 10,800.00 | 2,073.60 | | 0025 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.116 | MILE | 6,000.00 | 696.00 | | 0026 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.02 | MILE | 7,200.00 | 144.00 | | 0027 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.06 | MILE | 10,800.00 | 648.00 | | 0028 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 3 | EACH | 360.00 | 1,080.00 | | 0029 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 360.00 | 720.00 | | 0030 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 360.00 | 720.00 | | 0031 | 732-05-00100 | Removal of Existing Markings | 0.136 | MILE | 18,000.00 | 2,448.00 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | | 0033 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 693 | INLF | 3.00 | 2,079.00 | | 0034 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,089 | INLF | 5.00 | 5,445.00 | | 0035 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps | 3 | EACH | 4,000.00 | 12,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 149,976.20 |
|