Proposal:H.014134.6
Parish:Orleans
Routes:US 90-Z
Description:US 90B @ CLAIBORNE EXIT RAMP
Type Construction:GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, AND RELATED WORK.
Estimated Construction Cost:$409,978.40
| Rank | License | Bidder | Construction Bid |
| 1 | 48896 | Command Construction Industries LLC | $371,790.00 |
| 2 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $443,798.70 |
| 3 | 57931 | KCR CONTRACTORS, LLC | $475,793.79 |
| 4 | 61575 | La Pequena Construction LLC | $487,793.90 |
| 5 | 44187 | Palmisano Construction LLC | $494,607.52 |
| 6 | 36961 | Cycle Construction Co. L.L.C. | $520,577.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Command Construction Industries LLC | - 2 - KORT's CONSTRUCTION SERVICES, INC. | - 3 - KCR CONTRACTORS, LLC | - 4 - La Pequena Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06140 | Removal of Curbs (Concrete) | 41 | LNFT | 25.00 | 1,025.00 | 10.00 | 410.00 | 3.60 | 147.60 | 27.00 | 1,107.00 | | 0002 | 202-02-12020 | Removal of Fence (Chain Link) | 465 | LNFT | 10.00 | 4,650.00 | 3.00 | 1,395.00 | 5.75 | 2,673.75 | 7.00 | 3,255.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 3 | LNFT | 150.00 | 450.00 | 60.00 | 180.00 | 17.25 | 51.75 | 33.00 | 99.00 | | 0004 | 202-02-26000 | Removal of Manholes | 1 | EACH | 1.00 | 1.00 | 1,300.00 | 1,300.00 | 900.00 | 900.00 | 3,000.00 | 3,000.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,000.00 | 10,000.00 | 75,000.00 | 75,000.00 | 39,631.59 | 39,631.59 | 7,000.00 | 7,000.00 | | 0006 | 302-02-06000 | Class II Base Course (6" Thick) | 31 | SQYD | 50.00 | 1,550.00 | 60.00 | 1,860.00 | 155.31 | 4,814.61 | 53.00 | 1,643.00 | | 0007 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 6.5 | CUYD | 150.00 | 975.00 | 65.00 | 422.50 | 276.92 | 1,799.98 | 157.00 | 1,020.50 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 90.6 | TON | 150.00 | 13,590.00 | 180.00 | 16,308.00 | 195.50 | 17,712.30 | 97.00 | 8,788.20 | | 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 31 | SQYD | 100.00 | 3,100.00 | 160.00 | 4,960.00 | 252.00 | 7,812.00 | 109.00 | 3,379.00 | | 0010 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 29 | SQYD | 300.00 | 8,700.00 | 255.00 | 7,395.00 | 330.00 | 9,570.00 | 109.00 | 3,161.00 | | 0011 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 1,332 | LNFT | 100.00 | 133,200.00 | 103.00 | 137,196.00 | 142.31 | 189,556.92 | 157.00 | 209,124.00 | | 0012 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 852 | LNFT | 0.00 | 0.00 | 2.00 | 1,704.00 | 17.25 | 14,697.00 | 105.00 | 89,460.00 | | 0013 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 5,000.00 | 5,000.00 | 6,500.00 | 6,500.00 | 4,482.09 | 4,482.09 | 4,500.00 | 4,500.00 | | 0014 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 5,000.00 | 5,000.00 | 2,800.00 | 2,800.00 | 2,716.90 | 2,716.90 | 4,500.00 | 4,500.00 | | 0015 | 702-03-00200 | Catch Basins (CB-02) | 5 | EACH | 5,000.00 | 25,000.00 | 6,600.00 | 33,000.00 | 5,488.70 | 27,443.50 | 3,500.00 | 17,500.00 | | 0016 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 534 | LNFT | 20.00 | 10,680.00 | 24.00 | 12,816.00 | 23.54 | 12,570.36 | 23.00 | 12,282.00 | | 0017 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 9.92 | LNFT | 125.00 | 1,240.00 | 110.00 | 1,091.20 | 126.00 | 1,249.92 | 150.00 | 1,488.00 | | 0018 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 449 | LNFT | 34.00 | 15,266.00 | 36.00 | 16,164.00 | 37.40 | 16,792.60 | 23.00 | 10,327.00 | | 0019 | 705-08-03040 | 8-Foot Double Gates for Chain Link Fence (6-Foot Height) | 1 | DBGT | 1,000.00 | 1,000.00 | 1,200.00 | 1,200.00 | 1,100.00 | 1,100.00 | 3,000.00 | 3,000.00 | | 0020 | 707-01-00100 | Concrete Curb | 14 | LNFT | 10.00 | 140.00 | 24.00 | 336.00 | 19.50 | 273.00 | 77.00 | 1,078.00 | | 0021 | 712-01-00300 | Concrete Cast-in-Place Revetment (6" Thick) | 306.2 | SQYD | 75.00 | 22,965.00 | 105.00 | 32,151.00 | 132.46 | 40,559.25 | 76.00 | 23,271.20 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 5,865.00 | 5,865.00 | 7,000.00 | 7,000.00 | | 0023 | 717-01-00100 | Seeding | 20 | LB | 100.00 | 2,000.00 | 75.00 | 1,500.00 | 55.00 | 1,100.00 | 10.00 | 200.00 | | 0024 | 718-01-00100 | Fertilizer | 100 | LB | 5.00 | 500.00 | 3.00 | 300.00 | 2.20 | 220.00 | 5.00 | 500.00 | | 0025 | 726-01-00100 | Bedding Material | 423 | CUYD | 46.00 | 19,458.00 | 60.00 | 25,380.00 | 68.74 | 29,077.02 | 57.00 | 24,111.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 | 16,918.00 | 16,918.00 | 30,000.00 | 30,000.00 | | 0027 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 150.00 | 300.00 | 115.00 | 230.00 | 80.25 | 160.50 | 500.00 | 1,000.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 3,000.00 | 3,000.00 | 9,760.43 | 9,760.43 | 7,000.00 | 7,000.00 | | 0029 | NS-702-00100 | Paved Gutter Drain | 6 | EACH | 1,000.00 | 6,000.00 | 3,200.00 | 19,200.00 | 2,689.62 | 16,137.72 | 1,500.00 | 9,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 371,790.00 | | 443,798.70 | | 475,793.79 | | 487,793.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Palmisano Construction LLC | - 6 - Cycle Construction Co. L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06140 | Removal of Curbs (Concrete) | 41 | LNFT | 25.00 | 1,025.00 | 22.00 | 902.00 | | 0002 | 202-02-12020 | Removal of Fence (Chain Link) | 465 | LNFT | 7.00 | 3,255.00 | 6.00 | 2,790.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 3 | LNFT | 100.00 | 300.00 | 110.00 | 330.00 | | 0004 | 202-02-26000 | Removal of Manholes | 1 | EACH | 1,000.00 | 1,000.00 | 1,800.00 | 1,800.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 60,000.00 | 60,000.00 | 63,000.00 | 63,000.00 | | 0006 | 302-02-06000 | Class II Base Course (6" Thick) | 31 | SQYD | 125.00 | 3,875.00 | 50.00 | 1,550.00 | | 0007 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 6.5 | CUYD | 50.00 | 325.00 | 175.00 | 1,137.50 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 90.6 | TON | 215.00 | 19,479.00 | 185.00 | 16,761.00 | | 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 31 | SQYD | 325.00 | 10,075.00 | 250.00 | 7,750.00 | | 0010 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 29 | SQYD | 400.00 | 11,600.00 | 500.00 | 14,500.00 | | 0011 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 1,332 | LNFT | 105.00 | 139,860.00 | 112.00 | 149,184.00 | | 0012 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 852 | LNFT | 0.01 | 8.52 | 3.00 | 2,556.00 | | 0013 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 20,000.00 | 20,000.00 | 11,500.00 | 11,500.00 | | 0014 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 7,950.00 | 7,950.00 | 9,200.00 | 9,200.00 | | 0015 | 702-03-00200 | Catch Basins (CB-02) | 5 | EACH | 7,250.00 | 36,250.00 | 7,800.00 | 39,000.00 | | 0016 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 534 | LNFT | 18.00 | 9,612.00 | 22.00 | 11,748.00 | | 0017 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 9.92 | LNFT | 125.00 | 1,240.00 | 135.00 | 1,339.20 | | 0018 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 449 | LNFT | 35.00 | 15,715.00 | 37.00 | 16,613.00 | | 0019 | 705-08-03040 | 8-Foot Double Gates for Chain Link Fence (6-Foot Height) | 1 | DBGT | 1,250.00 | 1,250.00 | 1,100.00 | 1,100.00 | | 0020 | 707-01-00100 | Concrete Curb | 14 | LNFT | 200.00 | 2,800.00 | 60.00 | 840.00 | | 0021 | 712-01-00300 | Concrete Cast-in-Place Revetment (6" Thick) | 306.2 | SQYD | 60.00 | 18,372.00 | 124.00 | 37,968.80 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 17,000.00 | 17,000.00 | | 0023 | 717-01-00100 | Seeding | 20 | LB | 80.00 | 1,600.00 | 80.00 | 1,600.00 | | 0024 | 718-01-00100 | Fertilizer | 100 | LB | 25.00 | 2,500.00 | 3.50 | 350.00 | | 0025 | 726-01-00100 | Bedding Material | 423 | CUYD | 42.00 | 17,766.00 | 76.00 | 32,148.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 42,500.00 | 42,500.00 | 40,000.00 | 40,000.00 | | 0027 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 125.00 | 250.00 | 155.00 | 310.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 7,000.00 | 7,000.00 | | 0029 | NS-702-00100 | Paved Gutter Drain | 6 | EACH | 4,000.00 | 24,000.00 | 5,100.00 | 30,600.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 494,607.52 | | 520,577.50 |
|