Proposal:H.013225.6
Parish:Lafourche
Routes:LA 1
Description:LA 1: LA 1 BRIDGE - FALGOUT LN
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$5,362,344.10
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $3,857,777.00 |
| 2 | 62139 | HUEY P. STOCKSTILL, LLC | $4,108,558.73 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $5,255,452.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - HUEY P. STOCKSTILL, LLC | - 3 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 39.6 | SQYD | 30.00 | 1,188.00 | 12.00 | 475.20 | 50.00 | 1,980.00 | | 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 253.6 | LNFT | 15.00 | 3,804.00 | 12.00 | 3,043.20 | 15.00 | 3,804.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 265 | SQYD | 30.00 | 7,950.00 | 12.00 | 3,180.00 | 15.00 | 3,975.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 560 | LNFT | 10.00 | 5,600.00 | 10.00 | 5,600.00 | 15.00 | 8,400.00 | | 0005 | 202-03-38020 | Relocation of Sign Pole INCLUDING SIGNS | 1 | EACH | 25.00 | 25.00 | 500.00 | 500.00 | 1,000.00 | 1,000.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,459 | CUYD | 1.00 | 4,459.00 | 10.00 | 44,590.00 | 15.00 | 66,885.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 25,411.2 | TON | 86.00 | 2,185,363.20 | 88.00 | 2,236,185.60 | 100.00 | 2,541,120.00 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 440.5 | TON | 86.00 | 37,883.00 | 88.00 | 38,764.00 | 200.00 | 88,100.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 47,251 | SQYD | 1.50 | 70,876.50 | 2.00 | 94,502.00 | 2.50 | 118,127.50 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,911 | CUYD | 0.01 | -19.11 | 0.01 | -19.11 | 0.10 | -191.10 | | 0011 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 1,438 | SQYD | 95.00 | 136,610.00 | 127.00 | 182,626.00 | 130.00 | 186,940.00 | | 0012 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 2,656 | SQYD | 100.00 | 265,600.00 | 136.00 | 361,216.00 | 150.00 | 398,400.00 | | 0013 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 318 | LNFT | 200.00 | 63,600.00 | 165.00 | 52,470.00 | 175.00 | 55,650.00 | | 0014 | 701-14-00100 | Cleaning Existing Pipes 18" DIA. AND BELOW | 325 | LNFT | 8.00 | 2,600.00 | 28.00 | 9,100.00 | 30.00 | 9,750.00 | | 0015 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 9 | EACH | 1,500.00 | 13,500.00 | 1,700.00 | 15,300.00 | 2,000.00 | 18,000.00 | | 0016 | 702-03-00500 | Catch Basins (CB-06) | 4 | EACH | 3,850.00 | 15,400.00 | 5,300.00 | 21,200.00 | 5,500.00 | 22,000.00 | | 0017 | 702-03-00600 | Catch Basins (CB-07) | 1 | EACH | 4,400.00 | 4,400.00 | 5,800.00 | 5,800.00 | 6,000.00 | 6,000.00 | | 0018 | 702-04-00200 | Adjusting Catch Basins | 45 | EACH | 1,500.00 | 67,500.00 | 1,700.00 | 76,500.00 | 2,000.00 | 90,000.00 | | 0019 | 702-04-01000 | Capping Existing Catch Basin or Manhole | 2 | EACH | 1,500.00 | 3,000.00 | 4,350.00 | 8,700.00 | 5,000.00 | 10,000.00 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 450.1 | LNFT | 20.00 | 9,002.00 | 30.00 | 13,503.00 | 25.00 | 11,252.50 | | 0021 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 37.5 | LNFT | 40.00 | 1,500.00 | 100.00 | 3,750.00 | 40.00 | 1,500.00 | | 0022 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 112.5 | LNFT | 90.00 | 10,125.00 | 85.00 | 9,562.50 | 100.00 | 11,250.00 | | 0023 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 6 | EACH | 2,700.00 | 16,200.00 | 3,500.00 | 21,000.00 | 2,800.00 | 16,800.00 | | 0024 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 1 | EACH | 2,400.00 | 2,400.00 | 3,500.00 | 3,500.00 | 2,500.00 | 2,500.00 | | 0025 | 706-01-00100 | Concrete Walk (4" Thick) | 135 | SQYD | 95.00 | 12,825.00 | 65.00 | 8,775.00 | 70.00 | 9,450.00 | | 0026 | 706-01-00300 | Concrete Walk (6" Thick) | 202.6 | SQYD | 100.00 | 20,260.00 | 85.00 | 17,221.00 | 90.00 | 18,234.00 | | 0027 | 706-04-00100 | Handicapped Curb Ramps TYPE 3 | 2 | EACH | 2,100.00 | 4,200.00 | 1,800.00 | 3,600.00 | 1,900.00 | 3,800.00 | | 0028 | 706-04-00100 | Handicapped Curb Ramps TYPE 8 | 4 | EACH | 4,250.00 | 17,000.00 | 2,000.00 | 8,000.00 | 2,100.00 | 8,400.00 | | 0029 | 707-03-00100 | Combination Concrete Curb and Gutter | 256 | LNFT | 40.00 | 10,240.00 | 37.00 | 9,472.00 | 40.00 | 10,240.00 | | 0030 | 710-01-00100 | Flowable Fill | 3 | CUYD | 1,500.00 | 4,500.00 | 670.00 | 2,010.00 | 900.00 | 2,700.00 | | 0031 | 711-02-00400 | Riprap (55 lb) | 43 | CUYD | 300.00 | 12,900.00 | 275.00 | 11,825.00 | 200.00 | 8,600.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 25,000.00 | 25,000.00 | 445,000.00 | 445,000.00 | | 0033 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 975 | LNFT | 0.01 | 9.75 | 0.35 | 341.25 | 1.00 | 975.00 | | 0034 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 72 | LNFT | 0.01 | 0.72 | 0.50 | 36.00 | 1.50 | 108.00 | | 0035 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 824 | LNFT | 0.01 | 8.24 | 1.00 | 824.00 | 2.00 | 1,648.00 | | 0036 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 38.796 | MILE | 500.00 | 19,398.00 | 650.00 | 25,217.40 | 550.00 | 21,337.80 | | 0037 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 6 | EACH | 1.00 | 6.00 | 50.00 | 300.00 | 25.00 | 150.00 | | 0038 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 2 | EACH | 1.00 | 2.00 | 55.00 | 110.00 | 25.00 | 50.00 | | 0039 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 14 | EACH | 1.00 | 14.00 | 50.00 | 700.00 | 25.00 | 350.00 | | 0040 | 713-05-00500 | Temporary Pavement Legends & Symbols (SCHOOL CROSSING) | 1 | EACH | 1.00 | 1.00 | 100.00 | 100.00 | 25.00 | 25.00 | | 0041 | 717-01-00100 | Seeding | 210 | LB | 15.00 | 3,150.00 | 8.00 | 1,680.00 | 20.00 | 4,200.00 | | 0042 | 718-01-00100 | Fertilizer | 698 | LB | 1.00 | 698.00 | 2.00 | 1,396.00 | 1.00 | 698.00 | | 0043 | 724-01-00100 | Rumble Strips (Centerline) | 7.611 | MILE | 300.00 | 2,283.30 | 435.00 | 3,310.79 | 300.00 | 2,283.30 | | 0044 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 15.222 | MILE | 300.00 | 4,566.60 | 400.00 | 6,088.80 | 300.00 | 4,566.60 | | 0045 | 726-01-00100 | Bedding Material | 60.7 | CUYD | 90.00 | 5,463.00 | 100.00 | 6,070.00 | 100.00 | 6,070.00 | | 0046 | 727-01-00100 | Mobilization | 1 | LUMP | 237,778.70 | 237,778.70 | 249,000.00 | 249,000.00 | 500,000.00 | 500,000.00 | | 0047 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 100.00 | 1,600.00 | 150.00 | 2,400.00 | 100.00 | 1,600.00 | | 0048 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 650.00 | 650.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | | 0049 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,979 | EACH | 6.00 | 11,874.00 | 6.50 | 12,863.50 | 6.50 | 12,863.50 | | 0050 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 975 | LNFT | 1.10 | 1,072.50 | 2.00 | 1,950.00 | 2.00 | 1,950.00 | | 0051 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 788 | LNFT | 6.50 | 5,122.00 | 7.00 | 5,516.00 | 7.00 | 5,516.00 | | 0052 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 72 | LNFT | 4.00 | 288.00 | 4.00 | 288.00 | 5.00 | 360.00 | | 0053 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 36 | LNFT | 8.00 | 288.00 | 8.00 | 288.00 | 10.00 | 360.00 | | 0054 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 38.796 | MILE | 3,000.00 | 116,388.00 | 3,250.00 | 126,087.00 | 3,000.00 | 116,388.00 | | 0055 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.144 | MILE | 2,400.00 | 345.60 | 3,000.00 | 432.00 | 10,000.00 | 1,440.00 | | 0056 | 732-04-00001 | Plastic Pavement Legends and Symbols (Message) PAY | 5 | EACH | 200.00 | 1,000.00 | 350.00 | 1,750.00 | 250.00 | 1,250.00 | | 0057 | 732-04-00001 | Plastic Pavement Legends and Symbols (Message) STOP | 2 | EACH | 250.00 | 500.00 | 350.00 | 700.00 | 275.00 | 550.00 | | 0058 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 300.00 | 600.00 | 300.00 | 600.00 | 325.00 | 650.00 | | 0059 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 200.00 | 400.00 | 250.00 | 500.00 | 250.00 | 500.00 | | 0060 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 200.00 | 800.00 | 250.00 | 1,000.00 | 250.00 | 1,000.00 | | 0061 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 14 | EACH | 200.00 | 2,800.00 | 250.00 | 3,500.00 | 275.00 | 3,850.00 | | 0062 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | 1 | EACH | 200.00 | 200.00 | 500.00 | 500.00 | 400.00 | 400.00 | | 0063 | 732-04-19020 | Plastic Pavement Legends and Symbols (SCHOOL ZONE) | 2 | EACH | 500.00 | 1,000.00 | 500.00 | 1,000.00 | 750.00 | 1,500.00 | | 0064 | 732-04-19100 | Plastic Pavement Legends and Symbols (STOP AHEAD) | 1 | EACH | 500.00 | 500.00 | 500.00 | 500.00 | 650.00 | 650.00 | | 0065 | 732-04-20021 | Plastic Pavement Legends and Symbols (TAGS) | 6 | EACH | 200.00 | 1,200.00 | 500.00 | 3,000.00 | 250.00 | 1,500.00 | | 0066 | 735-01-00100 | Mailboxes | 132 | EACH | 10.00 | 1,320.00 | 20.00 | 2,640.00 | 15.00 | 1,980.00 | | 0067 | 735-02-00100 | Mailbox Supports (Single) | 114 | EACH | 150.00 | 17,100.00 | 120.00 | 13,680.00 | 150.00 | 17,100.00 | | 0068 | 735-03-00100 | Mailbox Supports (Double) | 9 | EACH | 180.00 | 1,620.00 | 175.00 | 1,575.00 | 200.00 | 1,800.00 | | 0069 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | | 0070 | 741-11-00200 | Adjusting Water Valve and Meter Box | 6 | EACH | 550.00 | 3,300.00 | 130.00 | 780.00 | 500.00 | 3,000.00 | | 0071 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 66,528 | LNFT | 1.50 | 99,792.00 | 1.25 | 83,160.00 | 1.00 | 66,528.00 | | 0072 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 67,252 | LNFT | 1.50 | 100,878.00 | 1.30 | 87,427.60 | 1.75 | 117,691.00 | | 0073 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 133,780 | LNFT | 0.65 | 86,957.00 | 1.00 | 133,780.00 | 1.00 | 133,780.00 | | 0074 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 6,164 | INLF | 0.75 | 4,623.00 | 2.00 | 12,328.00 | 0.75 | 4,623.00 | | 0075 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 94 | INLF | 2.00 | 188.00 | 2.00 | 188.00 | 1.00 | 94.00 | | 0076 | NS-702-00001 | Cleaning Existing Catch Basin | 7 | EACH | 500.00 | 3,500.00 | 1,000.00 | 7,000.00 | 1,200.00 | 8,400.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,857,777.00 | | 4,108,558.73 | | 5,255,452.10 |
|