Proposal:H.010989.6
Parish:Lincoln, Ouachita
Routes:I-20
Description:I-20: LINCOLN/OUACHITA P. RAMP REHAB
Type Construction:PAVEMENT PATCHING, AND RELATED WORK.
Estimated Construction Cost:$5,049,677.76
| Rank | License | Bidder | Construction Bid |
| 1 | 30774 | Progressive Construction Co., LLC | $8,468,786.46 |
| 2 | C0001 | R. A. Knapp Construction, Inc. | $8,864,035.90 |
| 3 | 21982 | Forby Contracting, Inc. | $8,865,780.50 |
| 4 | 25609 | DIAMOND SURFACE, INC. | $9,486,520.17 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Progressive Construction Co., LLC | - 2 - R. A. Knapp Construction, Inc. | - 3 - Forby Contracting, Inc. | - 4 - DIAMOND SURFACE, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 3,632 | SQYD | 200.00 | 726,400.00 | 220.00 | 799,040.00 | 196.00 | 711,872.00 | 250.00 | 908,000.00 | | 0002 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 207,213 | LNFT | 1.70 | 352,262.10 | 1.90 | 393,704.70 | 3.00 | 621,639.00 | 2.12 | 439,291.56 | | 0003 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 129,698 | LNFT | 1.70 | 220,486.60 | 1.90 | 246,426.20 | 3.50 | 453,943.00 | 2.12 | 274,959.76 | | 0004 | 602-03-00100 | Cleaning and Sealing Random cracks | 12,520 | LNFT | 2.40 | 30,048.00 | 2.65 | 33,178.00 | 5.00 | 62,600.00 | 3.00 | 37,560.00 | | 0005 | 602-05-01320 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (13" Thick) | 636.9 | SQYD | 500.00 | 318,450.00 | 380.00 | 242,022.00 | 425.00 | 270,682.50 | 410.00 | 261,129.00 | | 0006 | 602-05-02320 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (13" Thick) | 2,732.4 | SQYD | 360.00 | 983,664.00 | 360.00 | 983,664.00 | 395.00 | 1,079,298.00 | 398.00 | 1,087,495.20 | | 0007 | 602-05-03320 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (13" Thick) | 11,529.1 | SQYD | 351.00 | 4,046,714.10 | 350.00 | 4,035,185.00 | 385.00 | 4,438,703.50 | 388.00 | 4,473,290.80 | | 0008 | 602-10-00100 | Longitudinal Shoulder Joints | 30,397 | LNFT | 1.78 | 54,106.66 | 1.90 | 57,754.30 | 2.50 | 75,992.50 | 2.22 | 67,481.34 | | 0009 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 250,000.00 | 250,000.00 | 134,000.00 | 134,000.00 | 550,000.00 | 550,000.00 | | 0010 | 713-11-00100 | Portable Changeable Message Signs | 6 | EACH | 13,750.00 | 82,500.00 | 17,500.00 | 105,000.00 | 20,000.00 | 120,000.00 | 2,500.00 | 15,000.00 | | 0011 | 727-01-00100 | Mobilization | 1 | LUMP | 721,000.00 | 721,000.00 | 1,000,000.00 | 1,000,000.00 | 251,000.00 | 251,000.00 | 595,000.00 | 595,000.00 | | 0012 | 731-02-00100 | Reflectorized Raised Pavement Markers | 20,157 | EACH | 4.40 | 88,690.80 | 4.40 | 88,690.80 | 4.00 | 80,628.00 | 5.00 | 100,785.00 | | 0013 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 13,759 | LNFT | 7.70 | 105,944.30 | 7.70 | 105,944.30 | 7.00 | 96,313.00 | 8.75 | 120,391.25 | | 0014 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,015 | LNFT | 9.90 | 10,048.50 | 9.90 | 10,048.50 | 9.00 | 9,135.00 | 11.25 | 11,418.75 | | 0015 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 58.695 | MILE | 4,180.00 | 245,345.10 | 4,180.00 | 245,345.10 | 3,800.00 | 223,041.00 | 4,750.00 | 278,801.25 | | 0016 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 12.045 | MILE | 14,300.00 | 172,243.50 | 14,294.00 | 172,171.23 | 13,000.00 | 156,585.00 | 16,250.00 | 195,731.25 | | 0017 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.752 | MILE | 1,650.00 | 1,240.80 | 1,650.00 | 1,240.80 | 1,500.00 | 1,128.00 | 1,875.00 | 1,410.00 | | 0018 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 2.103 | MILE | 7,150.00 | 15,036.45 | 7,140.00 | 15,015.42 | 6,500.00 | 13,669.50 | 8,125.00 | 17,086.88 | | 0019 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 63 | EACH | 275.00 | 17,325.00 | 275.00 | 17,325.00 | 250.00 | 15,750.00 | 312.50 | 19,687.50 | | 0020 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 12 | EACH | 302.50 | 3,630.00 | 302.50 | 3,630.00 | 275.00 | 3,300.00 | 343.75 | 4,125.00 | | 0021 | 732-04-01060 | Plastic Pavement Legends and Symbols (Arrow - Triple) | 1 | EACH | 440.00 | 440.00 | 440.00 | 440.00 | 400.00 | 400.00 | 500.00 | 500.00 | | 0022 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 9 | EACH | 275.00 | 2,475.00 | 275.00 | 2,475.00 | 250.00 | 2,250.00 | 312.50 | 2,812.50 | | 0023 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 12 | EACH | 275.00 | 3,300.00 | 275.00 | 3,300.00 | 250.00 | 3,000.00 | 312.50 | 3,750.00 | | 0024 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 8 | EACH | 495.00 | 3,960.00 | 495.00 | 3,960.00 | 450.00 | 3,600.00 | 562.50 | 4,500.00 | | 0025 | 732-05-00100 | Removal of Existing Markings | 24.501 | MILE | 550.00 | 13,475.55 | 550.00 | 13,475.55 | 500.00 | 12,250.50 | 625.00 | 15,313.13 | | 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 35,000.00 | 35,000.00 | 25,000.00 | 25,000.00 | 1,000.00 | 1,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,468,786.46 | | 8,864,035.90 | | 8,865,780.50 | | 9,486,520.17 |
|