Proposal:H.010285.6-R1
Parish:Desoto
Routes:LA 483, LA 512
Description:LA 512 & LA 483: US 171 TO LA 175
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, LIME TREATMENT, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$6,540,802.23
| Rank | License | Bidder | Construction Bid |
| 1 | 08584 | Madden Contracting Co., LLC | $5,616,967.42 |
| 2 | 36374 | Best-Yet Builders, Llc | $6,685,924.84 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Contracting Co., LLC | - 2 - Best-Yet Builders, Llc | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of Wingwalls | 6 | EACH | 800.00 | 4,800.00 | 500.00 | 3,000.00 | | 0002 | 202-02-06020 | Removal of Concrete Box Culverts 6'x6'x36' (2 openings) | 1 | EACH | 2,500.00 | 2,500.00 | 12,500.00 | 12,500.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 560 | LNFT | 14.00 | 7,840.00 | 5.00 | 2,800.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) Remove pipes at Sta 31+56, Sta 174+49, 193+54 and Sta 403+31 | 180 | LNFT | 8.00 | 1,440.00 | 15.00 | 2,700.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 5,000 | CUYD | 17.00 | 85,000.00 | 20.00 | 100,000.00 | | 0006 | 204-02-00100 | Temporary Hay Bales | 72 | EACH | 15.00 | 1,080.00 | 10.00 | 720.00 | | 0007 | 303-02-00100 | Removal of Existing Patches | 100 | SQYD | 12.00 | 1,200.00 | 150.00 | 15,000.00 | | 0008 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 115,185.8 | SQYD | 6.95 | 800,541.31 | 13.00 | 1,497,415.40 | | 0009 | 304-01-00100 | Lime (9% by Volume) | 544.6 | TON | 220.00 | 119,812.00 | 185.00 | 100,751.00 | | 0010 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 38,419.33 | SQYD | 3.50 | 134,467.66 | 3.00 | 115,257.99 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 44.9 | CUYD | 45.00 | 2,020.50 | 100.00 | 4,490.00 | | 0012 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 174.6 | SQYD | 41.10 | 7,176.06 | 65.00 | 11,349.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 24,072.4 | TON | 103.50 | 2,491,493.40 | 112.00 | 2,696,108.80 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,166.1 | TON | 186.00 | 216,894.60 | 118.00 | 137,599.80 | | 0015 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 78,326 | GAL | 2.52 | 197,381.52 | 2.55 | 199,731.30 | | 0016 | 507-02-00200 | Aggregate (S2) | 115,186 | SQYD | 1.64 | 188,905.04 | 1.70 | 195,816.20 | | 0017 | 507-02-00300 | Aggregate (S3) | 115,186 | SQYD | 1.35 | 155,501.10 | 1.40 | 161,260.40 | | 0018 | 509-01-00100 | Milling Asphalt Pavement | 108,251 | SQYD | 2.10 | 227,327.10 | 3.00 | 324,753.00 | | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,552 | CUYD | 0.10 | -455.20 | 0.10 | -455.20 | | 0020 | 701-01-01003 | Cross Drain Pipe (24" RCP/RPVCP/CPEPDW) Replace pipes at stations 31+56, 193+54, 403+31 | 158 | LNFT | 128.00 | 20,224.00 | 140.25 | 22,159.50 | | 0021 | 701-01-01023 | Cross Drain Pipe (30" RCP/RPVCP/CPEPDW) Replace pipes at stations 174+49 | 46 | LNFT | 136.00 | 6,256.00 | 275.00 | 12,650.00 | | 0022 | 701-08-00100 | Relaying Pipe 24", 30", 36" | 36 | LNFT | 101.00 | 3,636.00 | 500.00 | 18,000.00 | | 0023 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 16 | LNFT | 90.00 | 1,440.00 | 500.00 | 8,000.00 | | 0024 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 16 | LNFT | 130.00 | 2,080.00 | 500.00 | 8,000.00 | | 0025 | 701-15-00100 | Concrete Collar | 10 | EACH | 690.00 | 6,900.00 | 1,000.00 | 10,000.00 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 81 | LNFT | 2.00 | 162.00 | 100.00 | 8,100.00 | | 0027 | 702-07-00100 | Cross Drain Safety End (Type 1) | 8 | EACH | 2,100.00 | 16,800.00 | 4,000.00 | 32,000.00 | | 0028 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 575 | LNFT | 27.00 | 15,525.00 | 30.00 | 17,250.00 | | 0029 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 100 | LNFT | 60.00 | 6,000.00 | 65.00 | 6,500.00 | | 0030 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 95.00 | 19,000.00 | 85.00 | 17,000.00 | | 0031 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 8 | EACH | 3,600.00 | 28,800.00 | 3,000.00 | 24,000.00 | | 0032 | 710-01-00100 | Flowable Fill | 4 | CUYD | 150.00 | 600.00 | 250.00 | 1,000.00 | | 0033 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 73.3 | SQYD | 77.00 | 5,644.10 | 120.00 | 8,796.00 | | 0034 | 711-04-00100 | Geotextile Fabric | 73.3 | SQYD | 2.25 | 164.93 | 3.00 | 219.90 | | 0035 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 184,000.00 | 184,000.00 | 100,000.00 | 100,000.00 | | 0036 | 713-02-00500 | Temporary Pavement Markings (24" Width) Includes stop bars at US 171/La512, Railroad Crossing, La 512/La483, La 483/La175 | 219 | LNFT | 1.00 | 219.00 | 3.00 | 657.00 | | 0037 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 15.28 | MILE | 475.00 | 7,258.00 | 500.00 | 7,640.00 | | 0038 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.669 | MILE | 500.00 | 4,334.50 | 500.00 | 4,334.50 | | 0039 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 79.167 | MILE | 800.00 | 63,333.60 | 600.00 | 47,500.20 | | 0040 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 50.00 | 200.00 | 200.00 | 800.00 | | 0041 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 1,993 | EACH | 1.65 | 3,288.45 | 1.70 | 3,388.10 | | 0042 | 716-01-00100 | Mulch (Vegetative) | 37 | TON | 650.00 | 24,050.00 | 850.00 | 31,450.00 | | 0043 | 717-01-00100 | Seeding | 1,110 | LB | 15.00 | 16,650.00 | 12.00 | 13,320.00 | | 0044 | 718-01-00100 | Fertilizer | 18,500 | LB | 0.65 | 12,025.00 | 0.60 | 11,100.00 | | 0045 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 7,500.00 | 7,500.00 | 20,000.00 | 20,000.00 | | 0046 | 724-01-00100 | Rumble Strips (Centerline) | 7.56 | MILE | 1,500.00 | 11,340.00 | 1,500.00 | 11,340.00 | | 0047 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 15.119 | MILE | 1,500.00 | 22,678.50 | 1,500.00 | 22,678.50 | | 0048 | 726-01-00100 | Bedding Material | 82.4 | CUYD | 98.00 | 8,075.20 | 150.00 | 12,360.00 | | 0049 | 727-01-00100 | Mobilization | 1 | LUMP | 184,000.00 | 184,000.00 | 200,000.00 | 200,000.00 | | 0050 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 637.7 | SQFT | 23.50 | 14,985.95 | 23.50 | 14,985.95 | | 0051 | 729-16-00200 | Object Marker Assembly (Type 2) | 24 | EACH | 65.00 | 1,560.00 | 75.00 | 1,800.00 | | 0052 | 729-16-00300 | Object Marker Assembly (Type 3) Includes box culvert and guardrail on bridges | 11 | EACH | 100.00 | 1,100.00 | 100.00 | 1,100.00 | | 0053 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 100 | EACH | 122.00 | 12,200.00 | 122.00 | 12,200.00 | | 0054 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,636 | EACH | 5.00 | 8,180.00 | 6.00 | 9,816.00 | | 0055 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) Includes stop bars at US 171/La512, Railroad Crossing, La 512/La483, La 483/La175 | 73 | LNFT | 15.00 | 1,095.00 | 20.00 | 1,460.00 | | 0056 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 26.389 | MILE | 2,900.00 | 76,528.10 | 3,500.00 | 92,361.50 | | 0057 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.89 | MILE | 1,100.00 | 3,179.00 | 2,000.00 | 5,780.00 | | 0058 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 1,000.00 | 2,000.00 | 1,500.00 | 3,000.00 | | 0059 | 735-01-00100 | Mailboxes | 14 | EACH | 5.00 | 70.00 | 5.00 | 70.00 | | 0060 | 735-02-00100 | Mailbox Supports (Single) | 14 | EACH | 165.00 | 2,310.00 | 165.00 | 2,310.00 | | 0061 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 35,000.00 | 35,000.00 | | 0062 | 805-15-01200 | Reinforced Concrete Box Culverts (Precast) (6' x 6') | 80 | LNFT | 880.00 | 70,400.00 | 2,500.00 | 200,000.00 | | 0063 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (2) 6'x6' | 3 | EACH | 18,750.00 | 56,250.00 | 15,000.00 | 45,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,616,967.42 | | 6,685,924.84 |
|