Proposal:H.002381.6
Parish:Livingston
Routes:LA 43
Description:LA 43 CREEK BRIDGE NEAR ALBANY
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, SUBGRADE LAYER (TREATED), ASPHALT CONCRETE PAVEMENT, REINFORCED CONCRETE BOX CULVERTS (PRECAST), AND RELATED WORK.
Estimated Construction Cost:$1,308,285.54
| Rank | License | Bidder | Construction Bid |
| 1 | 57931 | KCR CONTRACTORS, LLC | $944,951.33 |
| 2 | 14807 | Richard Price Contracting Co, Llc | $1,029,392.76 |
| 3 | 06276 | Barriere Construction Co., LLC | $1,067,067.30 |
| 4 | 54896 | Magee Excavation & Development LLC | $1,148,259.69 |
| 5 | 24901 | Hard Rock Construction LLC | $1,183,286.28 |
| 6 | 63897 | TL Hawk, LLC | $1,202,929.48 |
| 7 | 12198 | Byron E. Talbot Contractor, Inc. | $1,233,174.17 |
| 8 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $1,274,638.94 |
| 9 | 55950 | Brown Industrial Construction, LLC | $1,297,948.25 |
| 10 | 55505 | MERRICK, LLC | $1,300,402.58 |
| 11 | 05693 | Industrial Enterprises, Inc. | $1,300,751.50 |
| 12 | 12487 | Diamond B Construction Co., L.L.C. | $1,319,546.86 |
| 13 | 39462 | JB JAMES CONSTRUCTION LLC | $1,401,852.40 |
| 14 | 39613 | BAKER PILE DRIVING AND SITE WORK LLC | $1,443,422.40 |
| 15 | 00044 | GUINN CONSTRUCTION, LLC | $1,454,212.06 |
| 16 | 61167 | HENDRICK CONSTRUCTION, INC. | $2,479,228.92 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - KCR CONTRACTORS, LLC | - 2 - Richard Price Contracting Co, Llc | - 3 - Barriere Construction Co., LLC | - 4 - Magee Excavation & Development LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2.376 | LUMP | 35,536.15 | 35,536.15 | 5,000.00 | 5,000.00 | 30,000.00 | 30,000.00 | 16,000.00 | 16,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 216 | SQYD | 8.04 | 1,736.64 | 10.28 | 2,220.48 | 5.00 | 1,080.00 | 2.00 | 432.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 2,784 | SQYD | 1.96 | 5,456.64 | 10.28 | 28,619.52 | 5.00 | 13,920.00 | 4.00 | 11,136.00 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 2,784 | SQYD | 1.96 | 5,456.64 | 10.28 | 28,619.52 | 3.00 | 8,352.00 | 5.00 | 13,920.00 | | 0005 | 202-02-04501 | Removal of Bridge 28' x 40' Treated Timber Trestles Bridge | 1 | LUMP | 23,788.11 | 23,788.11 | 9,000.00 | 9,000.00 | 30,000.00 | 30,000.00 | 46,000.00 | 46,000.00 | | 0006 | 202-02-12000 | Removal of Fence | 532 | LNFT | 4.04 | 2,149.28 | 12.00 | 6,384.00 | 5.00 | 2,660.00 | 1.00 | 532.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 477.84 | LNFT | 9.97 | 4,764.06 | 8.50 | 4,061.64 | 5.00 | 2,389.20 | 1.00 | 477.84 | | 0008 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" X 35" CDPA) | 50 | LNFT | 10.00 | 500.00 | 12.00 | 600.00 | 20.00 | 1,000.00 | 10.00 | 500.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) (18" to 24" SD, 14" X 22" SDA) | 66 | LNFT | 7.94 | 524.04 | 10.00 | 660.00 | 20.00 | 1,320.00 | 10.00 | 660.00 | | 0010 | 202-02-38240 | Removal of Signs and Supports | 12 | EACH | 22.00 | 264.00 | 24.00 | 288.00 | 20.00 | 240.00 | 22.00 | 264.00 | | 0011 | 203-01-00100 | General Excavation | 1,665 | CUYD | 5.82 | 9,690.30 | 12.00 | 19,980.00 | 10.00 | 16,650.00 | 20.00 | 33,300.00 | | 0012 | 203-02-00100 | Drainage Excavation | 60 | CUYD | 22.00 | 1,320.00 | 24.00 | 1,440.00 | 80.00 | 4,800.00 | 20.00 | 1,200.00 | | 0013 | 203-03-00100 | Embankment | 2,083 | CUYD | 26.51 | 55,220.33 | 26.00 | 54,158.00 | 35.00 | 72,905.00 | 25.00 | 52,075.00 | | 0014 | 203-04-00300 | Nonplastic Embankment (Stone) | 14 | CUYD | 118.70 | 1,661.80 | 135.00 | 1,890.00 | 400.00 | 5,600.00 | 100.00 | 1,400.00 | | 0015 | 203-08-00100 | Geotextile Fabric | 74 | SQYD | 2.01 | 148.74 | 15.00 | 1,110.00 | 5.00 | 370.00 | 6.00 | 444.00 | | 0016 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 18 | EACH | 27.50 | 495.00 | 65.00 | 1,170.00 | 34.00 | 612.00 | 50.00 | 900.00 | | 0017 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 4 | EACH | 345.00 | 1,380.00 | 400.00 | 1,600.00 | 300.00 | 1,200.00 | 450.00 | 1,800.00 | | 0018 | 204-06-00100 | Temporary Silt Fencing | 2,402 | LNFT | 2.20 | 5,284.40 | 4.00 | 9,608.00 | 2.00 | 4,804.00 | 1.75 | 4,203.50 | | 0019 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 3,850.6 | SQYD | 29.91 | 115,171.45 | 25.50 | 98,190.30 | 26.00 | 100,115.60 | 20.00 | 77,012.00 | | 0020 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 3,965 | SQYD | 14.06 | 55,747.90 | 15.50 | 61,457.50 | 14.00 | 55,510.00 | 22.50 | 89,212.50 | | 0021 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 32 | CUYD | 105.00 | 3,360.00 | 100.00 | 3,200.00 | 100.00 | 3,200.00 | 78.00 | 2,496.00 | | 0022 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 57 | CUYD | 87.50 | 4,987.50 | 80.00 | 4,560.00 | 1.00 | 57.00 | 90.00 | 5,130.00 | | 0023 | 502-01-00100 | Asphalt Concrete | 1,033.8 | TON | 115.50 | 119,403.90 | 137.25 | 141,889.05 | 109.00 | 112,684.20 | 130.00 | 134,394.00 | | 0024 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 71.8 | TON | 189.00 | 13,570.20 | 300.00 | 21,540.00 | 250.00 | 17,950.00 | 190.00 | 13,642.00 | | 0025 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 71 | SQYD | 136.50 | 9,691.50 | 220.00 | 15,620.00 | 100.00 | 7,100.00 | 200.00 | 14,200.00 | | 0026 | 701-02-02040 | Cross Drain Pipe Arch (30" Equiv. RCPA or 36" Equiv. CMPA) | 74 | LNFT | 162.01 | 11,988.74 | 119.00 | 8,806.00 | 110.00 | 8,140.00 | 160.00 | 11,840.00 | | 0027 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 60 | LNFT | 100.34 | 6,020.40 | 78.00 | 4,680.00 | 89.00 | 5,340.00 | 165.00 | 9,900.00 | | 0028 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 36 | LNFT | 51.75 | 1,863.00 | 78.00 | 2,808.00 | 89.00 | 3,204.00 | 150.00 | 5,400.00 | | 0029 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 200 | LNFT | 6.84 | 1,368.00 | 8.50 | 1,700.00 | 0.01 | 2.00 | 8.00 | 1,600.00 | | 0030 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 2,472.50 | 2,472.50 | 3,025.00 | 3,025.00 | 3,000.00 | 3,000.00 | 3,700.00 | 3,700.00 | | 0031 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 2,242.50 | 2,242.50 | 2,050.00 | 2,050.00 | 2,500.00 | 2,500.00 | 3,450.00 | 3,450.00 | | 0032 | 705-01-00100 | Barbed Wire Fence | 235 | LNFT | 11.00 | 2,585.00 | 16.25 | 3,818.75 | 15.00 | 3,525.00 | 14.00 | 3,290.00 | | 0033 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 262.83 | 2,628.30 | 150.00 | 1,500.00 | 300.00 | 3,000.00 | 200.00 | 2,000.00 | | 0034 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 233.21 | 2,332.10 | 125.00 | 1,250.00 | 300.00 | 3,000.00 | 200.00 | 2,000.00 | | 0035 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 379 | SQYD | 72.33 | 27,413.07 | 75.00 | 28,425.00 | 150.00 | 56,850.00 | 130.00 | 49,270.00 | | 0036 | 711-04-00100 | Geotextile Fabric | 379 | SQYD | 2.88 | 1,091.52 | 1.75 | 663.25 | 5.00 | 1,895.00 | 4.00 | 1,516.00 | | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,110.00 | 10,110.00 | 56,000.00 | 56,000.00 | 10,000.00 | 10,000.00 | 17,000.00 | 17,000.00 | | 0038 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.582 | MILE | 715.00 | 1,131.13 | 250.00 | 395.50 | 1,300.00 | 2,056.60 | 225.00 | 355.95 | | 0039 | 713-11-00100 | Portable Changeable Message Signs | 7 | EACH | 1,230.50 | 8,613.50 | 4,150.00 | 29,050.00 | 4,000.00 | 28,000.00 | 3,300.00 | 23,100.00 | | 0040 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 3,141 | SQYD | 2.20 | 6,910.20 | 1.75 | 5,496.75 | 2.50 | 7,852.50 | 1.50 | 4,711.50 | | 0041 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 488 | SQYD | 5.50 | 2,684.00 | 2.00 | 976.00 | 6.00 | 2,928.00 | 1.75 | 854.00 | | 0042 | 724-01-00100 | Rumble Strips (Centerline) | 0.198 | MILE | 440.00 | 87.12 | 1,000.00 | 198.00 | 1,800.00 | 356.40 | 450.00 | 89.10 | | 0043 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.396 | MILE | 1,273.33 | 504.24 | 1,000.00 | 396.00 | 800.00 | 316.80 | 450.00 | 178.20 | | 0044 | 726-01-00100 | Bedding Material | 246.5 | CUYD | 44.93 | 11,075.25 | 45.00 | 11,092.50 | 90.00 | 22,185.00 | 115.00 | 28,347.50 | | 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 36,235.00 | 36,235.00 | 55,000.00 | 55,000.00 | 95,000.00 | 95,000.00 | 30,000.00 | 30,000.00 | | 0046 | 729-01-00100 | Sign (Type A) | 24 | SQFT | 16.50 | 396.00 | 18.00 | 432.00 | 18.00 | 432.00 | 17.00 | 408.00 | | 0047 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 82.50 | 165.00 | 90.00 | 180.00 | 90.00 | 180.00 | 60.00 | 120.00 | | 0048 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 93.50 | 374.00 | 102.00 | 408.00 | 100.00 | 400.00 | 90.00 | 360.00 | | 0049 | 729-21-00100 | U-Channel Post | 3 | EACH | 82.50 | 247.50 | 90.00 | 270.00 | 90.00 | 270.00 | 100.00 | 300.00 | | 0050 | 731-02-00100 | Reflectorized Raised Pavement Markers | 53 | EACH | 11.00 | 583.00 | 12.00 | 636.00 | 7.00 | 371.00 | 11.00 | 583.00 | | 0051 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.791 | MILE | 4,400.00 | 3,480.40 | 5,000.00 | 3,955.00 | 4,000.00 | 3,164.00 | 4,600.00 | 3,638.60 | | 0052 | 735-01-00100 | Mailboxes | 2 | EACH | 16.50 | 33.00 | 25.00 | 50.00 | 20.00 | 40.00 | 11.00 | 22.00 | | 0053 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 126.50 | 253.00 | 150.00 | 300.00 | 120.00 | 240.00 | 150.00 | 300.00 | | 0054 | 739-01-00100 | Hydro-Seeding | 2.35 | ACRE | 2,200.00 | 5,170.00 | 2,000.00 | 4,700.00 | 2,000.00 | 4,700.00 | 1,900.00 | 4,465.00 | | 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | | 0056 | 805-15-00900 | Reinforced Concrete Box Culverts (Precast) (8' x 5') | 364 | LNFT | 656.90 | 239,111.60 | 590.00 | 214,760.00 | 740.00 | 269,360.00 | 920.00 | 334,880.00 | | 0057 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (4 - 8' X 5' RCB) | 2 | EACH | 34,550.59 | 69,101.18 | 22,000.00 | 44,000.00 | 10,000.00 | 20,000.00 | 30,000.00 | 60,000.00 | | 0058 | NS-705-00001 | Wire Mesh Fence Wire Mesh Fence (4-Foot Height) | 265 | LNFT | 16.50 | 4,372.50 | 17.00 | 4,505.00 | 16.00 | 4,240.00 | 50.00 | 13,250.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 944,951.33 | | 1,029,392.76 | | 1,067,067.30 | | 1,148,259.69 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Hard Rock Construction LLC | - 6 - TL Hawk, LLC | - 7 - Byron E. Talbot Contractor, Inc. | - 8 - KORT's CONSTRUCTION SERVICES, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2.376 | LUMP | 20,000.00 | 20,000.00 | 55,000.00 | 55,000.00 | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 216 | SQYD | 10.00 | 2,160.00 | 11.00 | 2,376.00 | 12.50 | 2,700.00 | 10.00 | 2,160.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 2,784 | SQYD | 8.00 | 22,272.00 | 10.00 | 27,840.00 | 9.00 | 25,056.00 | 7.00 | 19,488.00 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 2,784 | SQYD | 6.00 | 16,704.00 | 7.00 | 19,488.00 | 9.00 | 25,056.00 | 10.00 | 27,840.00 | | 0005 | 202-02-04501 | Removal of Bridge 28' x 40' Treated Timber Trestles Bridge | 1 | LUMP | 33,000.00 | 33,000.00 | 70,000.00 | 70,000.00 | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | | 0006 | 202-02-12000 | Removal of Fence | 532 | LNFT | 4.00 | 2,128.00 | 5.00 | 2,660.00 | 5.00 | 2,660.00 | 3.00 | 1,596.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 477.84 | LNFT | 4.50 | 2,150.28 | 7.00 | 3,344.88 | 4.50 | 2,150.28 | 11.00 | 5,256.24 | | 0008 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" X 35" CDPA) | 50 | LNFT | 4.50 | 225.00 | 30.00 | 1,500.00 | 15.00 | 750.00 | 15.00 | 750.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) (18" to 24" SD, 14" X 22" SDA) | 66 | LNFT | 6.25 | 412.50 | 35.00 | 2,310.00 | 12.00 | 792.00 | 15.00 | 990.00 | | 0010 | 202-02-38240 | Removal of Signs and Supports | 12 | EACH | 21.00 | 252.00 | 20.00 | 240.00 | 300.00 | 3,600.00 | 1.00 | 12.00 | | 0011 | 203-01-00100 | General Excavation | 1,665 | CUYD | 21.00 | 34,965.00 | 18.00 | 29,970.00 | 9.00 | 14,985.00 | 13.00 | 21,645.00 | | 0012 | 203-02-00100 | Drainage Excavation | 60 | CUYD | 47.00 | 2,820.00 | 40.00 | 2,400.00 | 7.00 | 420.00 | 25.00 | 1,500.00 | | 0013 | 203-03-00100 | Embankment | 2,083 | CUYD | 30.00 | 62,490.00 | 25.00 | 52,075.00 | 31.00 | 64,573.00 | 26.00 | 54,158.00 | | 0014 | 203-04-00300 | Nonplastic Embankment (Stone) | 14 | CUYD | 148.00 | 2,072.00 | 100.00 | 1,400.00 | 135.00 | 1,890.00 | 100.00 | 1,400.00 | | 0015 | 203-08-00100 | Geotextile Fabric | 74 | SQYD | 1.35 | 99.90 | 5.00 | 370.00 | 3.00 | 222.00 | 1.00 | 74.00 | | 0016 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 18 | EACH | 135.00 | 2,430.00 | 160.00 | 2,880.00 | 46.00 | 828.00 | 150.00 | 2,700.00 | | 0017 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 4 | EACH | 500.00 | 2,000.00 | 340.00 | 1,360.00 | 750.00 | 3,000.00 | 300.00 | 1,200.00 | | 0018 | 204-06-00100 | Temporary Silt Fencing | 2,402 | LNFT | 1.50 | 3,603.00 | 2.50 | 6,005.00 | 2.75 | 6,605.50 | 1.75 | 4,203.50 | | 0019 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 3,850.6 | SQYD | 24.00 | 92,414.40 | 24.00 | 92,414.40 | 23.00 | 88,563.80 | 26.00 | 100,115.60 | | 0020 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 3,965 | SQYD | 8.00 | 31,720.00 | 21.00 | 83,265.00 | 22.50 | 89,212.50 | 22.00 | 87,230.00 | | 0021 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 32 | CUYD | 150.00 | 4,800.00 | 120.00 | 3,840.00 | 110.00 | 3,520.00 | 100.00 | 3,200.00 | | 0022 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 57 | CUYD | 80.00 | 4,560.00 | 70.00 | 3,990.00 | 100.00 | 5,700.00 | 100.00 | 5,700.00 | | 0023 | 502-01-00100 | Asphalt Concrete | 1,033.8 | TON | 115.00 | 118,887.00 | 113.60 | 117,439.68 | 125.00 | 129,225.00 | 120.00 | 124,056.00 | | 0024 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 71.8 | TON | 185.00 | 13,283.00 | 179.05 | 12,855.79 | 200.00 | 14,360.00 | 200.00 | 14,360.00 | | 0025 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 71 | SQYD | 145.00 | 10,295.00 | 182.26 | 12,940.46 | 220.00 | 15,620.00 | 185.00 | 13,135.00 | | 0026 | 701-02-02040 | Cross Drain Pipe Arch (30" Equiv. RCPA or 36" Equiv. CMPA) | 74 | LNFT | 145.00 | 10,730.00 | 199.00 | 14,726.00 | 100.00 | 7,400.00 | 185.00 | 13,690.00 | | 0027 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 60 | LNFT | 130.00 | 7,800.00 | 112.00 | 6,720.00 | 75.00 | 4,500.00 | 95.00 | 5,700.00 | | 0028 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 36 | LNFT | 122.00 | 4,392.00 | 90.00 | 3,240.00 | 75.00 | 2,700.00 | 90.00 | 3,240.00 | | 0029 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 200 | LNFT | 10.00 | 2,000.00 | 1.00 | 200.00 | 25.00 | 5,000.00 | 5.00 | 1,000.00 | | 0030 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 4,000.00 | 4,000.00 | 3,550.00 | 3,550.00 | 3,000.00 | 3,000.00 | 2,900.00 | 2,900.00 | | 0031 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 3,700.00 | 3,700.00 | 2,450.00 | 2,450.00 | 3,000.00 | 3,000.00 | 2,250.00 | 2,250.00 | | 0032 | 705-01-00100 | Barbed Wire Fence | 235 | LNFT | 13.75 | 3,231.25 | 13.58 | 3,191.30 | 15.00 | 3,525.00 | 10.00 | 2,350.00 | | 0033 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 75.00 | 750.00 | 300.00 | 3,000.00 | 110.00 | 1,100.00 | 750.00 | 7,500.00 | | 0034 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 75.00 | 750.00 | 100.00 | 1,000.00 | 135.00 | 1,350.00 | 50.00 | 500.00 | | 0035 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 379 | SQYD | 130.00 | 49,270.00 | 110.00 | 41,690.00 | 110.00 | 41,690.00 | 140.00 | 53,060.00 | | 0036 | 711-04-00100 | Geotextile Fabric | 379 | SQYD | 2.00 | 758.00 | 5.00 | 1,895.00 | 2.80 | 1,061.20 | 1.00 | 379.00 | | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | | 0038 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.582 | MILE | 150.00 | 237.30 | 199.75 | 316.00 | 1,320.00 | 2,088.24 | 1,200.00 | 1,898.40 | | 0039 | 713-11-00100 | Portable Changeable Message Signs | 7 | EACH | 3,200.00 | 22,400.00 | 3,000.00 | 21,000.00 | 4,700.00 | 32,900.00 | 4,000.00 | 28,000.00 | | 0040 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 3,141 | SQYD | 1.50 | 4,711.50 | 1.41 | 4,428.81 | 2.75 | 8,637.75 | 1.50 | 4,711.50 | | 0041 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 488 | SQYD | 1.70 | 829.60 | 1.57 | 766.16 | 3.50 | 1,708.00 | 1.75 | 854.00 | | 0042 | 724-01-00100 | Rumble Strips (Centerline) | 0.198 | MILE | 438.00 | 86.72 | 404.04 | 80.00 | 500.00 | 99.00 | 550.00 | 108.90 | | 0043 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.396 | MILE | 442.00 | 175.03 | 393.94 | 156.00 | 500.00 | 198.00 | 550.00 | 217.80 | | 0044 | 726-01-00100 | Bedding Material | 246.5 | CUYD | 68.00 | 16,762.00 | 75.00 | 18,487.50 | 105.00 | 25,882.50 | 110.00 | 27,115.00 | | 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 93,000.00 | 93,000.00 | 118,418.00 | 118,418.00 | 60,000.00 | 60,000.00 | 60,000.00 | 60,000.00 | | 0046 | 729-01-00100 | Sign (Type A) | 24 | SQFT | 17.00 | 408.00 | 16.00 | 384.00 | 60.00 | 1,440.00 | 14.00 | 336.00 | | 0047 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 60.00 | 120.00 | 55.00 | 110.00 | 80.00 | 160.00 | 130.00 | 260.00 | | 0048 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 93.00 | 372.00 | 85.00 | 340.00 | 110.00 | 440.00 | 120.00 | 480.00 | | 0049 | 729-21-00100 | U-Channel Post | 3 | EACH | 104.00 | 312.00 | 95.00 | 285.00 | 100.00 | 300.00 | 130.00 | 390.00 | | 0050 | 731-02-00100 | Reflectorized Raised Pavement Markers | 53 | EACH | 10.50 | 556.50 | 10.00 | 530.00 | 7.50 | 397.50 | 7.00 | 371.00 | | 0051 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.791 | MILE | 4,300.00 | 3,401.30 | 4,195.00 | 3,318.25 | 4,400.00 | 3,480.40 | 4,000.00 | 3,164.00 | | 0052 | 735-01-00100 | Mailboxes | 2 | EACH | 10.00 | 20.00 | 10.00 | 20.00 | 20.00 | 40.00 | 100.00 | 200.00 | | 0053 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 200.00 | 400.00 | 140.00 | 280.00 | 140.00 | 280.00 | 175.00 | 350.00 | | 0054 | 739-01-00100 | Hydro-Seeding | 2.35 | ACRE | 2,500.00 | 5,875.00 | 1,713.00 | 4,025.55 | 2,000.00 | 4,700.00 | 1,800.00 | 4,230.00 | | 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | 7,500.00 | 7,500.00 | | 0056 | 805-15-00900 | Reinforced Concrete Box Culverts (Precast) (8' x 5') | 364 | LNFT | 930.00 | 338,520.00 | 650.00 | 236,600.00 | 875.00 | 318,500.00 | 1,026.00 | 373,464.00 | | 0057 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (4 - 8' X 5' RCB) | 2 | EACH | 40,000.00 | 80,000.00 | 35,000.00 | 70,000.00 | 56,000.00 | 112,000.00 | 26,500.00 | 53,000.00 | | 0058 | NS-705-00001 | Wire Mesh Fence Wire Mesh Fence (4-Foot Height) | 265 | LNFT | 15.00 | 3,975.00 | 14.18 | 3,757.70 | 15.50 | 4,107.50 | 10.00 | 2,650.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,183,286.28 | | 1,202,929.48 | | 1,233,174.17 | | 1,274,638.94 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Brown Industrial Construction, LLC | - 10 - MERRICK, LLC | - 11 - Industrial Enterprises, Inc. | - 12 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2.376 | LUMP | 150,000.00 | 150,000.00 | 38,000.00 | 38,000.00 | 50,400.00 | 50,400.00 | 25,000.00 | 25,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 216 | SQYD | 9.25 | 1,998.00 | 7.00 | 1,512.00 | 11.50 | 2,484.00 | 22.00 | 4,752.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 2,784 | SQYD | 4.50 | 12,528.00 | 8.00 | 22,272.00 | 12.60 | 35,078.40 | 6.50 | 18,096.00 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 2,784 | SQYD | 6.00 | 16,704.00 | 5.00 | 13,920.00 | 4.03 | 11,219.52 | 11.00 | 30,624.00 | | 0005 | 202-02-04501 | Removal of Bridge 28' x 40' Treated Timber Trestles Bridge | 1 | LUMP | 50,000.00 | 50,000.00 | 65,000.00 | 65,000.00 | 42,000.00 | 42,000.00 | 20,000.00 | 20,000.00 | | 0006 | 202-02-12000 | Removal of Fence | 532 | LNFT | 2.00 | 1,064.00 | 2.00 | 1,064.00 | 2.40 | 1,276.80 | 6.00 | 3,192.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 477.84 | LNFT | 10.75 | 5,136.78 | 9.50 | 4,539.48 | 6.00 | 2,867.04 | 14.00 | 6,689.76 | | 0008 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" X 35" CDPA) | 50 | LNFT | 26.85 | 1,342.50 | 20.00 | 1,000.00 | 12.00 | 600.00 | 90.00 | 4,500.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) (18" to 24" SD, 14" X 22" SDA) | 66 | LNFT | 13.50 | 891.00 | 20.00 | 1,320.00 | 12.00 | 792.00 | 55.00 | 3,630.00 | | 0010 | 202-02-38240 | Removal of Signs and Supports | 12 | EACH | 1.00 | 12.00 | 40.00 | 480.00 | 115.00 | 1,380.00 | 30.00 | 360.00 | | 0011 | 203-01-00100 | General Excavation | 1,665 | CUYD | 9.50 | 15,817.50 | 6.50 | 10,822.50 | 21.60 | 35,964.00 | 20.00 | 33,300.00 | | 0012 | 203-02-00100 | Drainage Excavation | 60 | CUYD | 17.60 | 1,056.00 | 20.00 | 1,200.00 | 18.00 | 1,080.00 | 88.00 | 5,280.00 | | 0013 | 203-03-00100 | Embankment | 2,083 | CUYD | 37.80 | 78,737.40 | 25.00 | 52,075.00 | 28.20 | 58,740.60 | 22.00 | 45,826.00 | | 0014 | 203-04-00300 | Nonplastic Embankment (Stone) | 14 | CUYD | 140.00 | 1,960.00 | 185.00 | 2,590.00 | 103.50 | 1,449.00 | 150.00 | 2,100.00 | | 0015 | 203-08-00100 | Geotextile Fabric | 74 | SQYD | 4.15 | 307.10 | 2.00 | 148.00 | 3.00 | 222.00 | 4.00 | 296.00 | | 0016 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 18 | EACH | 131.00 | 2,358.00 | 135.00 | 2,430.00 | 157.24 | 2,830.32 | 150.00 | 2,700.00 | | 0017 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 4 | EACH | 550.00 | 2,200.00 | 700.00 | 2,800.00 | 180.00 | 720.00 | 1,000.00 | 4,000.00 | | 0018 | 204-06-00100 | Temporary Silt Fencing | 2,402 | LNFT | 1.80 | 4,323.60 | 2.00 | 4,804.00 | 1.78 | 4,275.56 | 3.00 | 7,206.00 | | 0019 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 3,850.6 | SQYD | 21.54 | 82,941.92 | 28.00 | 107,816.80 | 29.21 | 112,476.03 | 30.00 | 115,518.00 | | 0020 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 3,965 | SQYD | 13.90 | 55,113.50 | 12.00 | 47,580.00 | 13.64 | 54,082.60 | 10.00 | 39,650.00 | | 0021 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 32 | CUYD | 110.00 | 3,520.00 | 110.00 | 3,520.00 | 92.00 | 2,944.00 | 200.00 | 6,400.00 | | 0022 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 57 | CUYD | 87.00 | 4,959.00 | 90.00 | 5,130.00 | 63.25 | 3,605.25 | 50.00 | 2,850.00 | | 0023 | 502-01-00100 | Asphalt Concrete | 1,033.8 | TON | 114.00 | 117,853.20 | 145.00 | 149,901.00 | 131.76 | 136,213.49 | 122.00 | 126,123.60 | | 0024 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 71.8 | TON | 180.00 | 12,924.00 | 240.00 | 17,232.00 | 216.00 | 15,508.80 | 200.00 | 14,360.00 | | 0025 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 71 | SQYD | 182.00 | 12,922.00 | 265.00 | 18,815.00 | 237.60 | 16,869.60 | 220.00 | 15,620.00 | | 0026 | 701-02-02040 | Cross Drain Pipe Arch (30" Equiv. RCPA or 36" Equiv. CMPA) | 74 | LNFT | 157.00 | 11,618.00 | 140.00 | 10,360.00 | 126.97 | 9,395.78 | 225.00 | 16,650.00 | | 0027 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 60 | LNFT | 90.00 | 5,400.00 | 96.00 | 5,760.00 | 84.94 | 5,096.40 | 135.00 | 8,100.00 | | 0028 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 36 | LNFT | 97.00 | 3,492.00 | 96.00 | 3,456.00 | 84.94 | 3,057.84 | 125.00 | 4,500.00 | | 0029 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 200 | LNFT | 5.15 | 1,030.00 | 6.00 | 1,200.00 | 11.50 | 2,300.00 | 1.00 | 200.00 | | 0030 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 2,500.00 | 2,500.00 | 5,000.00 | 5,000.00 | 3,049.20 | 3,049.20 | 4,500.00 | 4,500.00 | | 0031 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 1,500.00 | 1,500.00 | 3,800.00 | 3,800.00 | 2,508.00 | 2,508.00 | 7,000.00 | 7,000.00 | | 0032 | 705-01-00100 | Barbed Wire Fence | 235 | LNFT | 15.00 | 3,525.00 | 18.00 | 4,230.00 | 5.75 | 1,351.25 | 15.00 | 3,525.00 | | 0033 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 690.00 | 6,900.00 | 160.00 | 1,600.00 | 402.50 | 4,025.00 | 1,000.00 | 10,000.00 | | 0034 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 230.00 | 2,300.00 | 160.00 | 1,600.00 | 92.00 | 920.00 | 175.00 | 1,750.00 | | 0035 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 379 | SQYD | 88.00 | 33,352.00 | 100.00 | 37,900.00 | 121.33 | 45,984.07 | 100.00 | 37,900.00 | | 0036 | 711-04-00100 | Geotextile Fabric | 379 | SQYD | 1.85 | 701.15 | 1.50 | 568.50 | 2.88 | 1,091.52 | 5.00 | 1,895.00 | | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 24,000.00 | 24,000.00 | 35,000.00 | 35,000.00 | | 0038 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.582 | MILE | 200.00 | 316.40 | 750.00 | 1,186.50 | 230.00 | 363.86 | 2,000.00 | 3,164.00 | | 0039 | 713-11-00100 | Portable Changeable Message Signs | 7 | EACH | 1,000.00 | 7,000.00 | 4,400.00 | 30,800.00 | 2,760.00 | 19,320.00 | 2,800.00 | 19,600.00 | | 0040 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 3,141 | SQYD | 1.45 | 4,554.45 | 1.80 | 5,653.80 | 1.62 | 5,088.42 | 3.50 | 10,993.50 | | 0041 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 488 | SQYD | 1.60 | 780.80 | 1.90 | 927.20 | 1.81 | 883.28 | 3.50 | 1,708.00 | | 0042 | 724-01-00100 | Rumble Strips (Centerline) | 0.198 | MILE | 2,500.00 | 495.00 | 2,000.00 | 396.00 | 460.00 | 91.08 | 500.00 | 99.00 | | 0043 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.396 | MILE | 2,500.00 | 990.00 | 2,000.00 | 792.00 | 460.00 | 182.16 | 500.00 | 198.00 | | 0044 | 726-01-00100 | Bedding Material | 246.5 | CUYD | 75.00 | 18,487.50 | 100.00 | 24,650.00 | 74.75 | 18,425.88 | 100.00 | 24,650.00 | | 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 110,000.00 | 110,000.00 | 120,000.00 | 120,000.00 | 61,440.00 | 61,440.00 | 130,000.00 | 130,000.00 | | 0046 | 729-01-00100 | Sign (Type A) | 24 | SQFT | 13.50 | 324.00 | 20.00 | 480.00 | 17.25 | 414.00 | 35.00 | 840.00 | | 0047 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 125.00 | 250.00 | 65.00 | 130.00 | 86.25 | 172.50 | 90.00 | 180.00 | | 0048 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 115.00 | 460.00 | 100.00 | 400.00 | 97.75 | 391.00 | 95.00 | 380.00 | | 0049 | 729-21-00100 | U-Channel Post | 3 | EACH | 125.00 | 375.00 | 115.00 | 345.00 | 86.25 | 258.75 | 175.00 | 525.00 | | 0050 | 731-02-00100 | Reflectorized Raised Pavement Markers | 53 | EACH | 10.00 | 530.00 | 13.00 | 689.00 | 11.50 | 609.50 | 7.50 | 397.50 | | 0051 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.791 | MILE | 4,200.00 | 3,322.20 | 4,800.00 | 3,796.80 | 4,830.00 | 3,820.53 | 4,500.00 | 3,559.50 | | 0052 | 735-01-00100 | Mailboxes | 2 | EACH | 75.00 | 150.00 | 25.00 | 50.00 | 17.25 | 34.50 | 12.00 | 24.00 | | 0053 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 150.00 | 300.00 | 165.00 | 330.00 | 132.25 | 264.50 | 175.00 | 350.00 | | 0054 | 739-01-00100 | Hydro-Seeding | 2.35 | ACRE | 1,715.00 | 4,030.25 | 2,200.00 | 5,170.00 | 1,969.80 | 4,629.03 | 2,500.00 | 5,875.00 | | 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,200.00 | 11,200.00 | 25,000.00 | 25,000.00 | 36,000.00 | 36,000.00 | 23,000.00 | 23,000.00 | | 0056 | 805-15-00900 | Reinforced Concrete Box Culverts (Precast) (8' x 5') | 364 | LNFT | 905.00 | 329,420.00 | 790.00 | 287,560.00 | 1,061.91 | 386,535.24 | 885.00 | 322,140.00 | | 0057 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (4 - 8' X 5' RCB) | 2 | EACH | 31,000.00 | 62,000.00 | 40,000.00 | 80,000.00 | 30,765.60 | 61,531.20 | 49,000.00 | 98,000.00 | | 0058 | NS-705-00001 | Wire Mesh Fence Wire Mesh Fence (4-Foot Height) | 265 | LNFT | 15.00 | 3,975.00 | 40.00 | 10,600.00 | 9.20 | 2,438.00 | 18.00 | 4,770.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,297,948.25 | | 1,300,402.58 | | 1,300,751.50 | | 1,319,546.86 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 13 - JB JAMES CONSTRUCTION LLC | - 14 - BAKER PILE DRIVING AND SITE WORK LLC | - 15 - GUINN CONSTRUCTION, LLC | - 16 - HENDRICK CONSTRUCTION, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2.376 | LUMP | 100,000.00 | 100,000.00 | 24,038.62 | 24,038.62 | 30,000.00 | 30,000.00 | 75,000.00 | 75,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 216 | SQYD | 5.00 | 1,080.00 | 24.04 | 5,192.64 | 10.00 | 2,160.00 | 21.70 | 4,687.20 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 2,784 | SQYD | 5.00 | 13,920.00 | 24.04 | 66,927.36 | 6.00 | 16,704.00 | 35.00 | 97,440.00 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 2,784 | SQYD | 5.00 | 13,920.00 | 15.02 | 41,815.68 | 6.00 | 16,704.00 | 25.00 | 69,600.00 | | 0005 | 202-02-04501 | Removal of Bridge 28' x 40' Treated Timber Trestles Bridge | 1 | LUMP | 60,000.00 | 60,000.00 | 42,067.58 | 42,067.58 | 50,000.00 | 50,000.00 | 80,000.00 | 80,000.00 | | 0006 | 202-02-12000 | Removal of Fence | 532 | LNFT | 4.00 | 2,128.00 | 12.02 | 6,394.64 | 4.00 | 2,128.00 | 10.78 | 5,734.96 | | 0007 | 202-02-14500 | Removal of Guard Rail | 477.84 | LNFT | 5.00 | 2,389.20 | 14.42 | 6,890.45 | 4.00 | 1,911.36 | 15.69 | 7,497.31 | | 0008 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" X 35" CDPA) | 50 | LNFT | 40.00 | 2,000.00 | 78.13 | 3,906.50 | 50.00 | 2,500.00 | 60.00 | 3,000.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) (18" to 24" SD, 14" X 22" SDA) | 66 | LNFT | 30.00 | 1,980.00 | 78.13 | 5,156.58 | 40.00 | 2,640.00 | 60.00 | 3,960.00 | | 0010 | 202-02-38240 | Removal of Signs and Supports | 12 | EACH | 25.00 | 300.00 | 120.19 | 1,442.28 | 100.00 | 1,200.00 | 500.00 | 6,000.00 | | 0011 | 203-01-00100 | General Excavation | 1,665 | CUYD | 15.00 | 24,975.00 | 34.00 | 56,610.00 | 20.00 | 33,300.00 | 45.00 | 74,925.00 | | 0012 | 203-02-00100 | Drainage Excavation | 60 | CUYD | 50.00 | 3,000.00 | 34.00 | 2,040.00 | 30.00 | 1,800.00 | 90.00 | 5,400.00 | | 0013 | 203-03-00100 | Embankment | 2,083 | CUYD | 30.00 | 62,490.00 | 34.00 | 70,822.00 | 38.00 | 79,154.00 | 40.00 | 83,320.00 | | 0014 | 203-04-00300 | Nonplastic Embankment (Stone) | 14 | CUYD | 150.00 | 2,100.00 | 240.39 | 3,365.46 | 200.00 | 2,800.00 | 150.00 | 2,100.00 | | 0015 | 203-08-00100 | Geotextile Fabric | 74 | SQYD | 5.00 | 370.00 | 6.01 | 444.74 | 5.00 | 370.00 | 1.75 | 129.50 | | 0016 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 18 | EACH | 25.00 | 450.00 | 102.16 | 1,838.88 | 250.00 | 4,500.00 | 150.00 | 2,700.00 | | 0017 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 4 | EACH | 1,350.00 | 5,400.00 | 360.58 | 1,442.32 | 1,000.00 | 4,000.00 | 200.00 | 800.00 | | 0018 | 204-06-00100 | Temporary Silt Fencing | 2,402 | LNFT | 3.00 | 7,206.00 | 2.50 | 6,005.00 | 4.00 | 9,608.00 | 1.75 | 4,203.50 | | 0019 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 3,850.6 | SQYD | 27.00 | 103,966.20 | 28.85 | 111,089.81 | 35.00 | 134,771.00 | 25.74 | 99,114.44 | | 0020 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 3,965 | SQYD | 9.00 | 35,685.00 | 18.03 | 71,488.95 | 22.00 | 87,230.00 | 25.00 | 99,125.00 | | 0021 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 32 | CUYD | 150.00 | 4,800.00 | 90.14 | 2,884.48 | 150.00 | 4,800.00 | 150.00 | 4,800.00 | | 0022 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 57 | CUYD | 125.00 | 7,125.00 | 90.14 | 5,137.98 | 100.00 | 5,700.00 | 150.00 | 8,550.00 | | 0023 | 502-01-00100 | Asphalt Concrete | 1,033.8 | TON | 120.00 | 124,056.00 | 162.26 | 167,744.39 | 165.00 | 170,577.00 | 148.97 | 154,005.19 | | 0024 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 71.8 | TON | 180.00 | 12,924.00 | 366.59 | 26,321.16 | 200.00 | 14,360.00 | 205.89 | 14,782.90 | | 0025 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 71 | SQYD | 185.00 | 13,135.00 | 270.43 | 19,200.53 | 130.00 | 9,230.00 | 209.59 | 14,880.89 | | 0026 | 701-02-02040 | Cross Drain Pipe Arch (30" Equiv. RCPA or 36" Equiv. CMPA) | 74 | LNFT | 145.00 | 10,730.00 | 72.12 | 5,336.88 | 145.00 | 10,730.00 | 121.75 | 9,009.50 | | 0027 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 60 | LNFT | 120.00 | 7,200.00 | 75.11 | 4,506.60 | 95.00 | 5,700.00 | 97.18 | 5,830.80 | | 0028 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 36 | LNFT | 115.00 | 4,140.00 | 80.10 | 2,883.60 | 95.00 | 3,420.00 | 97.18 | 3,498.48 | | 0029 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 200 | LNFT | 4.00 | 800.00 | 540.87 | 108,174.00 | 10.00 | 2,000.00 | 60.00 | 12,000.00 | | 0030 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 5,000.00 | 5,000.00 | 1,802.90 | 1,802.90 | 4,500.00 | 4,500.00 | 10,000.00 | 10,000.00 | | 0031 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 3,000.00 | 3,000.00 | 1,802.90 | 1,802.90 | 2,500.00 | 2,500.00 | 10,000.00 | 10,000.00 | | 0032 | 705-01-00100 | Barbed Wire Fence | 235 | LNFT | 10.00 | 2,350.00 | 18.03 | 4,237.05 | 12.00 | 2,820.00 | 20.00 | 4,700.00 | | 0033 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 250.00 | 2,500.00 | 450.00 | 4,500.00 | 500.00 | 5,000.00 | 500.00 | 5,000.00 | | 0034 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 250.00 | 2,500.00 | 450.00 | 4,500.00 | 500.00 | 5,000.00 | 100.00 | 1,000.00 | | 0035 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 379 | SQYD | 120.00 | 45,480.00 | 102.16 | 38,718.64 | 95.00 | 36,005.00 | 85.00 | 32,215.00 | | 0036 | 711-04-00100 | Geotextile Fabric | 379 | SQYD | 3.50 | 1,326.50 | 1.80 | 682.20 | 5.00 | 1,895.00 | 2.00 | 758.00 | | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 90,000.00 | 90,000.00 | 21,033.79 | 21,033.79 | 100,000.00 | 100,000.00 | 70,000.00 | 70,000.00 | | 0038 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.582 | MILE | 1,200.00 | 1,898.40 | 1,201.93 | 1,901.45 | 1,000.00 | 1,582.00 | 7,500.00 | 11,865.00 | | 0039 | 713-11-00100 | Portable Changeable Message Signs | 7 | EACH | 8,280.00 | 57,960.00 | 3,004.83 | 21,033.81 | 4,000.00 | 28,000.00 | 5,000.00 | 35,000.00 | | 0040 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 3,141 | SQYD | 2.00 | 6,282.00 | 2.10 | 6,596.10 | 2.00 | 6,282.00 | 2.00 | 6,282.00 | | 0041 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 488 | SQYD | 5.00 | 2,440.00 | 9.01 | 4,396.88 | 5.00 | 2,440.00 | 2.00 | 976.00 | | 0042 | 724-01-00100 | Rumble Strips (Centerline) | 0.198 | MILE | 400.00 | 79.20 | 9,615.45 | 1,903.86 | 800.00 | 158.40 | 40,000.00 | 7,920.00 | | 0043 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.396 | MILE | 400.00 | 158.40 | 9,615.45 | 3,807.72 | 800.00 | 316.80 | 40,000.00 | 15,840.00 | | 0044 | 726-01-00100 | Bedding Material | 246.5 | CUYD | 110.00 | 27,115.00 | 78.13 | 19,259.05 | 125.00 | 30,812.50 | 50.00 | 12,325.00 | | 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 125,000.00 | 125,000.00 | 132,212.39 | 132,212.39 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | | 0046 | 729-01-00100 | Sign (Type A) | 24 | SQFT | 15.00 | 360.00 | 18.03 | 432.72 | 25.00 | 600.00 | 750.00 | 18,000.00 | | 0047 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 75.00 | 150.00 | 180.29 | 360.58 | 200.00 | 400.00 | 750.00 | 1,500.00 | | 0048 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 | 120.19 | 480.76 | 200.00 | 800.00 | 750.00 | 3,000.00 | | 0049 | 729-21-00100 | U-Channel Post | 3 | EACH | 75.00 | 225.00 | 96.15 | 288.45 | 200.00 | 600.00 | 500.00 | 1,500.00 | | 0050 | 731-02-00100 | Reflectorized Raised Pavement Markers | 53 | EACH | 6.50 | 344.50 | 30.05 | 1,592.65 | 25.00 | 1,325.00 | 20.00 | 1,060.00 | | 0051 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.791 | MILE | 4,000.00 | 3,164.00 | 9,014.48 | 7,130.45 | 8,000.00 | 6,328.00 | 5,750.00 | 4,548.25 | | 0052 | 735-01-00100 | Mailboxes | 2 | EACH | 20.00 | 40.00 | 120.19 | 240.38 | 250.00 | 500.00 | 500.00 | 1,000.00 | | 0053 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 100.00 | 200.00 | 180.29 | 360.58 | 500.00 | 1,000.00 | 500.00 | 1,000.00 | | 0054 | 739-01-00100 | Hydro-Seeding | 2.35 | ACRE | 2,000.00 | 4,700.00 | 12,019.31 | 28,245.38 | 2,500.00 | 5,875.00 | 2,200.00 | 5,170.00 | | 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 15,527.31 | 15,527.31 | 12,500.00 | 12,500.00 | 50,000.00 | 50,000.00 | | 0056 | 805-15-00900 | Reinforced Concrete Box Culverts (Precast) (8' x 5') | 364 | LNFT | 800.00 | 291,200.00 | 600.97 | 218,753.08 | 750.00 | 273,000.00 | 2,300.00 | 837,200.00 | | 0057 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (4 - 8' X 5' RCB) | 2 | EACH | 40,000.00 | 80,000.00 | 12,519.13 | 25,038.26 | 30,000.00 | 60,000.00 | 110,000.00 | 220,000.00 | | 0058 | NS-705-00001 | Wire Mesh Fence Wire Mesh Fence (4-Foot Height) | 265 | LNFT | 18.00 | 4,770.00 | 20.43 | 5,413.95 | 15.00 | 3,975.00 | 35.00 | 9,275.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,401,852.40 | | 1,443,422.40 | | 1,454,212.06 | | 2,479,228.92 |
|