Proposal:H.014210.6
Parish:Webster
Routes:US 80
Description:US 80: ROADWAY LOWERING AT I-20
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, IN-PLACE CEMENT TREATED SUBGRADE, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, CONCRETE CAST-IN-PLACE REVETMENT, CONCRETE ROADWAY BARRIER, AND RELATED WORK.
Estimated Construction Cost:$2,944,128.09
| Rank | License | Bidder | Construction Bid |
| 1 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $2,482,110.55 |
| 2 | 17464 | Benton & Brown, LLC. | $2,945,189.33 |
| 3 | 36374 | Best-Yet Builders, Llc | $3,836,369.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SPECIALTY TRACKHOE & DOZER SERV.INC | - 2 - Benton & Brown, LLC. | - 3 - Best-Yet Builders, Llc | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 6 | LUMP | 19,500.00 | 19,500.00 | 16,500.00 | 16,500.00 | 14,000.00 | 14,000.00 | | 0002 | 202-02-00010 | Removal of Gate | 1 | EACH | 200.00 | 200.00 | 110.00 | 110.00 | 140.00 | 140.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 122 | SQYD | 12.00 | 1,464.00 | 6.60 | 805.20 | 14.00 | 1,708.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 16,171.4 | SQYD | 4.25 | 68,728.45 | 5.75 | 92,985.55 | 4.90 | 79,239.86 | | 0005 | 202-02-06020 | Removal of Concrete Box Culverts 1 - 4' x 2' (208') | 1 | EACH | 4,800.00 | 4,800.00 | 3,850.00 | 3,850.00 | 7,000.00 | 7,000.00 | | 0006 | 202-02-06040 | Removal of Concrete Box Headwall STA. 37+98.43, 142' RT. | 1 | EACH | 1,000.00 | 1,000.00 | 550.00 | 550.00 | 4,900.00 | 4,900.00 | | 0007 | 202-02-06090 | Removal of Concrete Revetment | 1 | LUMP | 8,000.00 | 8,000.00 | 22,000.00 | 22,000.00 | 14,000.00 | 14,000.00 | | 0008 | 202-02-12000 | Removal of Fence | 1,515 | LNFT | 3.90 | 5,908.50 | 2.20 | 3,333.00 | 7.00 | 10,605.00 | | 0009 | 202-02-14500 | Removal of Guard Rail | 1,003.1 | LNFT | 6.50 | 6,520.15 | 5.50 | 5,517.05 | 7.00 | 7,021.70 | | 0010 | 202-02-26000 | Removal of Manholes | 1 | EACH | 600.00 | 600.00 | 275.00 | 275.00 | 700.00 | 700.00 | | 0011 | 202-02-32120 | Removal of Pipe (Side Drain) 2 - 18" (156'), 2 - 24" (52'), 1 - 30" (32'), 2 - 36" (168) | 408 | LNFT | 12.00 | 4,896.00 | 16.50 | 6,732.00 | 28.00 | 11,424.00 | | 0012 | 202-02-32140 | Removal of Pipe (Storm Drain) 1 - 36" (16') | 16 | LNFT | 18.00 | 288.00 | 55.00 | 880.00 | 35.00 | 560.00 | | 0013 | 202-02-32180 | Removal of Pipe Headwalls | 3 | EACH | 500.00 | 1,500.00 | 550.00 | 1,650.00 | 700.00 | 2,100.00 | | 0014 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 16,171.4 | SQYD | 6.00 | 97,028.40 | 11.00 | 177,885.40 | 14.00 | 226,399.60 | | 0015 | 202-02-38200 | Removal of Signs | 8 | EACH | 50.00 | 400.00 | 110.00 | 880.00 | 210.00 | 1,680.00 | | 0016 | 203-01-00100 | General Excavation | 30,852 | CUYD | 8.20 | 252,986.40 | 10.70 | 330,116.40 | 16.80 | 518,313.60 | | 0017 | 203-03-00100 | Embankment | 659 | CUYD | 12.25 | 8,072.75 | 25.25 | 16,639.75 | 14.00 | 9,226.00 | | 0018 | 204-02-00100 | Temporary Hay Bales | 68 | EACH | 12.00 | 816.00 | 13.20 | 897.60 | 14.00 | 952.00 | | 0019 | 204-06-00100 | Temporary Silt Fencing | 10,133 | LNFT | 2.10 | 21,279.30 | 2.30 | 23,305.90 | 2.80 | 28,372.40 | | 0020 | 302-02-08010 | Class II Base Course (8" Thick) (Soil Cement) | 17,086.2 | SQYD | 10.25 | 175,133.55 | 16.70 | 285,339.54 | 17.50 | 299,008.50 | | 0021 | 304-01-00100 | Lime | 242.18 | TON | 200.00 | 48,436.00 | 220.00 | 53,279.60 | 280.00 | 67,810.40 | | 0022 | 304-05-00100 | Lime Treatment (Type E) | 17,088 | SQYD | 2.00 | 34,176.00 | 1.00 | 17,088.00 | 4.20 | 71,769.60 | | 0023 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 17,088 | SQYD | 6.50 | 111,072.00 | 7.50 | 128,160.00 | 11.20 | 191,385.60 | | 0024 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 83 | CUYD | 120.00 | 9,960.00 | 56.00 | 4,648.00 | 140.00 | 11,620.00 | | 0025 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 673.6 | CUYD | 55.00 | 37,048.00 | 33.00 | 22,228.80 | 70.00 | 47,152.00 | | 0026 | 502-01-00100 | Asphalt Concrete | 5,970.3 | TON | 110.00 | 656,733.00 | 108.00 | 644,792.40 | 155.40 | 927,784.62 | | 0027 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 182.6 | TON | 90.00 | 16,434.00 | 200.00 | 36,520.00 | 168.00 | 30,676.80 | | 0028 | 509-01-00100 | Milling Asphalt Pavement | 3,023 | SQYD | 3.50 | 10,580.50 | 5.50 | 16,626.50 | 4.20 | 12,696.60 | | 0029 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -151 | CUYD | 0.10 | -15.10 | 0.01 | -1.51 | 0.14 | -21.14 | | 0030 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 3.25 | LNFT | 235.00 | 763.75 | 550.00 | 1,787.50 | 700.00 | 2,275.00 | | 0031 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 200 | LNFT | 80.00 | 16,000.00 | 66.00 | 13,200.00 | 157.00 | 31,400.00 | | 0032 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 232 | LNFT | 108.00 | 25,056.00 | 104.50 | 24,244.00 | 304.00 | 70,528.00 | | 0033 | 701-05-01046 | Side Drain Pipe (18" RCP/RPVCP) | 192 | LNFT | 56.00 | 10,752.00 | 55.00 | 10,560.00 | 124.00 | 23,808.00 | | 0034 | 702-02-00100 | Manholes (MH-06) | 2 | EACH | 6,150.00 | 12,300.00 | 4,400.00 | 8,800.00 | 5,600.00 | 11,200.00 | | 0035 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 4,400.00 | 4,400.00 | 4,400.00 | 4,400.00 | 4,900.00 | 4,900.00 | | 0036 | 702-07-00100 | Cross Drain Safety End (Type 1) | 1 | EACH | 1,500.00 | 1,500.00 | 2,750.00 | 2,750.00 | 7,000.00 | 7,000.00 | | 0037 | 702-08-00100 | Side Drain Safety End (Type 1) | 12 | EACH | 1,400.00 | 16,800.00 | 1,650.00 | 19,800.00 | 4,900.00 | 58,800.00 | | 0038 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 803 | LNFT | 25.00 | 20,075.00 | 31.00 | 24,893.00 | 39.20 | 31,477.60 | | 0039 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 19.8 | LNFT | 150.00 | 2,970.00 | 176.00 | 3,484.80 | 224.00 | 4,435.20 | | 0040 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 95.00 | 19,000.00 | 93.50 | 18,700.00 | 119.00 | 23,800.00 | | 0041 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 4,400.00 | 8,800.00 | 3,300.00 | 6,600.00 | 4,200.00 | 8,400.00 | | 0042 | 705-01-00100 | Barbed Wire Fence | 1,798 | LNFT | 4.50 | 8,091.00 | 5.00 | 8,990.00 | 11.20 | 20,137.60 | | 0043 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 1,000.00 | 1,000.00 | 550.00 | 550.00 | 1,400.00 | 1,400.00 | | 0044 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 441.8 | SQYD | 90.00 | 39,762.00 | 71.50 | 31,588.70 | 91.00 | 40,203.80 | | 0045 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 45.7 | SQYD | 105.00 | 4,798.50 | 93.50 | 4,272.95 | 140.00 | 6,398.00 | | 0046 | 707-04-00100 | Asphalt Curb | 108 | LNFT | 35.00 | 3,780.00 | 20.00 | 2,160.00 | 70.00 | 7,560.00 | | 0047 | 710-01-00120 | Flowable Fill (Non-Excavatable) | 167.55 | CUYD | 200.00 | 33,510.00 | 209.00 | 35,017.95 | 280.00 | 46,914.00 | | 0048 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 1,551 | SQYD | 90.00 | 139,590.00 | 77.00 | 119,427.00 | 70.00 | 108,570.00 | | 0049 | 712-01-00300 | Concrete Cast-in-Place Revetment (6" Thick) | 467 | SQYD | 85.00 | 39,695.00 | 88.00 | 41,096.00 | 84.00 | 39,228.00 | | 0050 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 150,000.00 | 150,000.00 | 60,000.00 | 60,000.00 | | 0051 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.942 | MILE | 1,000.00 | 942.00 | 350.00 | 329.70 | 700.00 | 659.40 | | 0052 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.942 | MILE | 1,000.00 | 942.00 | 1,100.00 | 1,036.20 | 700.00 | 659.40 | | 0053 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.769 | MILE | 2,000.00 | 7,538.00 | 2,200.00 | 8,291.80 | 1,400.00 | 5,276.60 | | 0054 | 716-01-00100 | Mulch (Vegetative) | 8.9 | TON | 650.00 | 5,785.00 | 715.00 | 6,363.50 | 1,190.00 | 10,591.00 | | 0055 | 717-01-00100 | Seeding | 268 | LB | 15.00 | 4,020.00 | 16.50 | 4,422.00 | 14.00 | 3,752.00 | | 0056 | 718-01-00100 | Fertilizer | 4,464 | LB | 0.75 | 3,348.00 | 0.85 | 3,794.40 | 0.70 | 3,124.80 | | 0057 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 3.769 | MILE | 1,600.00 | 6,030.40 | 1,750.00 | 6,595.75 | 2,240.00 | 8,442.56 | | 0058 | 726-01-00100 | Bedding Material | 99.5 | CUYD | 100.00 | 9,950.00 | 110.00 | 10,945.00 | 119.00 | 11,840.50 | | 0059 | 727-01-00100 | Mobilization | 1 | LUMP | 150,000.00 | 150,000.00 | 179,000.00 | 179,000.00 | 70,000.00 | 70,000.00 | | 0060 | 729-01-00103 | Sign (Type A)(Relocate) | 52 | SQFT | 25.00 | 1,300.00 | 80.00 | 4,160.00 | 140.00 | 7,280.00 | | 0061 | 729-16-00200 | Object Marker Assembly (Type 2) | 1 | EACH | 95.00 | 95.00 | 71.50 | 71.50 | 91.00 | 91.00 | | 0062 | 729-16-00300 | Object Marker Assembly (Type 3) | 10 | EACH | 105.00 | 1,050.00 | 110.00 | 1,100.00 | 140.00 | 1,400.00 | | 0063 | 731-02-00100 | Reflectorized Raised Pavement Markers | 125 | EACH | 10.00 | 1,250.00 | 11.00 | 1,375.00 | 14.00 | 1,750.00 | | 0064 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.885 | MILE | 5,000.00 | 9,425.00 | 5,500.00 | 10,367.50 | 7,000.00 | 13,195.00 | | 0065 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.942 | MILE | 2,000.00 | 1,884.00 | 2,200.00 | 2,072.40 | 2,800.00 | 2,637.60 | | 0066 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 | 40,000.00 | 40,000.00 | | 0067 | 741-10-00100 | Adjusting Water Service Lines | 840 | LNFT | 50.00 | 42,000.00 | 38.50 | 32,340.00 | 49.00 | 41,160.00 | | 0068 | 805-13-02700 | Reinforced Concrete Box Culverts (Cast-In-Place or Precast) RCB 4' x 2' | 95 | LNFT | 240.00 | 22,800.00 | 192.50 | 18,287.50 | 770.00 | 73,150.00 | | 0069 | 805-13-02700 | Reinforced Concrete Box Culverts (Cast-In-Place or Precast) RCB 5' x 2' | 139 | LNFT | 270.00 | 37,530.00 | 275.00 | 38,225.00 | 966.00 | 134,274.00 | | 0070 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Headwall for a 5' x 2' RCB at Sta. 37+00.00 | 1 | EACH | 9,000.00 | 9,000.00 | 8,800.00 | 8,800.00 | 25,000.00 | 25,000.00 | | 0071 | 810-05-00110 | Concrete Roadway Barrier (32 inch Height) | 492 | LNFT | 140.00 | 68,880.00 | 220.00 | 108,240.00 | 350.00 | 172,200.00 | | 0072 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 2,304 | INLF | 0.50 | 1,152.00 | 1.50 | 3,456.00 | 1.40 | 3,225.60 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,482,110.55 | | 2,945,189.33 | | 3,836,369.80 |
|