Proposal:H.011856.6
Parish:Tangipahoa
Routes:LA 22
Description:LA 22: FIFTH ST - WAYNE STREET, SW
Type Construction:DRAINAGE STRUCTURES, CONCRETE SIDEWALKS, AND RELATED WORK.
Estimated Construction Cost:$294,636.00
| Rank | License | Bidder | Construction Bid |
| 1 | 48896 | Command Construction Industries LLC | $260,333.00 |
| 2 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $274,925.70 |
| 3 | 14807 | Richard Price Contracting Co, Llc | $292,384.45 |
| 4 | 68237 | GULF STATES SERVICES, LLC | $311,922.70 |
| 5 | 64262 | FMF GROUP LLC | $316,188.70 |
| 6 | 05693 | Industrial Enterprises, Inc. | $349,357.64 |
| 7 | C0002 | Dragon Limited, Inc. | $357,614.50 |
| 8 | 63313 | BRIGGS BROTHERS ENTERPRISES CORPORATION | $378,957.80 |
| 9 | 12198 | Byron E. Talbot Contractor, Inc. | $387,216.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Command Construction Industries LLC | - 2 - KORT's CONSTRUCTION SERVICES, INC. | - 3 - Richard Price Contracting Co, Llc | - 4 - GULF STATES SERVICES, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 9,500.00 | 9,500.00 | 9,000.00 | 9,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 5 | SQYD | 1.00 | 5.00 | 8.00 | 40.00 | 15.50 | 77.50 | 30.00 | 150.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 401.8 | SQYD | 1.00 | 401.80 | 11.00 | 4,419.80 | 15.00 | 6,027.00 | 30.00 | 12,054.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 600 | SQYD | 30.00 | 18,000.00 | 10.00 | 6,000.00 | 15.00 | 9,000.00 | 30.00 | 18,000.00 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 88 | LNFT | 1.00 | 88.00 | 8.00 | 704.00 | 15.00 | 1,320.00 | 50.00 | 4,400.00 | | 0006 | 203-01-00100 | General Excavation | 8 | CUYD | 30.00 | 240.00 | 8.00 | 64.00 | 60.00 | 480.00 | 75.00 | 600.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 108 | EACH | 0.01 | 1.08 | 15.00 | 1,620.00 | 37.00 | 3,996.00 | 5.00 | 540.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 3,246 | LNFT | 0.01 | 32.46 | 2.00 | 6,492.00 | 4.00 | 12,984.00 | 0.25 | 811.50 | | 0009 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 0.01 | 1.00 | 80.00 | 8,000.00 | 140.00 | 14,000.00 | 55.00 | 5,500.00 | | 0010 | 701-05-01001 | Side Drain Pipe (12" RCP/RPVCP/CPEPDW/CMP) | 32 | LNFT | 30.00 | 960.00 | 60.00 | 1,920.00 | 84.00 | 2,688.00 | 115.00 | 3,680.00 | | 0011 | 701-05-01021 | Side Drain Pipe (15" RCP/RPVCP/CPEPDW/CMP) | 8 | LNFT | 180.00 | 1,440.00 | 65.00 | 520.00 | 91.50 | 732.00 | 220.00 | 1,760.00 | | 0012 | 701-06-01000 | Side Drain Pipe Arch (15" Equiv. RCPA/CMPA) | 16 | LNFT | 180.00 | 2,880.00 | 68.00 | 1,088.00 | 100.25 | 1,604.00 | 220.00 | 3,520.00 | | 0013 | 701-07-00300 | Yard Drain Pipe (8") | 48 | LNFT | 30.00 | 1,440.00 | 40.00 | 1,920.00 | 25.50 | 1,224.00 | 90.00 | 4,320.00 | | 0014 | 702-03-00400 | Catch Basins (CB-05) | 3 | EACH | 1,000.00 | 3,000.00 | 1,500.00 | 4,500.00 | 870.50 | 2,611.50 | 2,000.00 | 6,000.00 | | 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 5.3 | SQYD | 75.00 | 397.50 | 74.00 | 392.20 | 400.00 | 2,120.00 | 125.00 | 662.50 | | 0016 | 706-01-00300 | Concrete Walk (6" Thick) | 1,756.1 | SQYD | 75.00 | 131,707.50 | 64.00 | 112,390.40 | 60.50 | 106,244.05 | 78.00 | 136,975.80 | | 0017 | 706-02-00200 | Concrete Drive (6" Thick) | 163.3 | SQYD | 75.00 | 12,247.50 | 84.00 | 13,717.20 | 63.00 | 10,287.90 | 78.00 | 12,737.40 | | 0018 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 14.5 | SQYD | 75.00 | 1,087.50 | 66.00 | 957.00 | 125.00 | 1,812.50 | 125.00 | 1,812.50 | | 0019 | 706-04-00100 | Handicapped Curb Ramps (Type 7) | 9 | EACH | 300.00 | 2,700.00 | 1,500.00 | 13,500.00 | 900.00 | 8,100.00 | 1,300.00 | 11,700.00 | | 0020 | 707-01-00200 | Concrete Curb (Barrier) | 235 | LNFT | 30.00 | 7,050.00 | 11.00 | 2,585.00 | 20.00 | 4,700.00 | 30.00 | 7,050.00 | | 0021 | 707-01-00300 | Concrete Curb (Mountable) | 319 | LNFT | 30.00 | 9,570.00 | 11.00 | 3,509.00 | 20.00 | 6,380.00 | 30.00 | 9,570.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 3,000.00 | 3,000.00 | 21,000.00 | 21,000.00 | 12,000.00 | 12,000.00 | 20,000.00 | 20,000.00 | | 0023 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 206 | SQYD | 10.00 | 2,060.00 | 8.00 | 1,648.00 | 14.50 | 2,987.00 | 6.00 | 1,236.00 | | 0024 | 715-01-00100 | Topsoil | 35 | CUYD | 10.00 | 350.00 | 50.00 | 1,750.00 | 50.00 | 1,750.00 | 50.00 | 1,750.00 | | 0025 | 726-01-00100 | Bedding Material | 6.9 | CUYD | 30.00 | 207.00 | 75.00 | 517.50 | 150.00 | 1,035.00 | 75.00 | 517.50 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 29,118.96 | 29,118.96 | 25,000.00 | 25,000.00 | 18,000.00 | 18,000.00 | 12,500.00 | 12,500.00 | | 0027 | 729-01-00103 | Sign (Type A)(Relocate) | 10.3 | SQFT | 60.00 | 618.00 | 27.00 | 278.10 | 1,500.00 | 15,450.00 | 25.00 | 257.50 | | 0028 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 169 | LNFT | 10.00 | 1,690.00 | 17.00 | 2,873.00 | 18.00 | 3,042.00 | 12.00 | 2,028.00 | | 0029 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,000.00 | 3,000.00 | 12,000.00 | 12,000.00 | 12,000.00 | 12,000.00 | 5,000.00 | 5,000.00 | | 0030 | 810-04-00100 | Hand Railing (Between Stations 8+99 and 9+52) | 39 | LNFT | 300.00 | 11,700.00 | 265.00 | 10,335.00 | 300.00 | 11,700.00 | 175.00 | 6,825.00 | | 0031 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,770 | INLF | 3.00 | 5,310.00 | 1.00 | 1,770.00 | 1.80 | 3,186.00 | 2.00 | 3,540.00 | | 0032 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 1,188 | INLF | 0.01 | 11.88 | 1.00 | 1,188.00 | 1.80 | 2,138.40 | 2.50 | 2,970.00 | | 0033 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,782 | INLF | 0.01 | 17.82 | 1.25 | 2,227.50 | 1.80 | 3,207.60 | 2.50 | 4,455.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 260,333.00 | | 274,925.70 | | 292,384.45 | | 311,922.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - FMF GROUP LLC | - 6 - Industrial Enterprises, Inc. | - 7 - Dragon Limited, Inc. | - 8 - BRIGGS BROTHERS ENTERPRISES CORPORATION | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | 10,302.50 | 10,302.50 | 1,500.00 | 1,500.00 | 15,000.00 | 15,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 5 | SQYD | 25.00 | 125.00 | 23.00 | 115.00 | 30.00 | 150.00 | 37.50 | 187.50 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 401.8 | SQYD | 25.00 | 10,045.00 | 12.56 | 5,046.61 | 30.00 | 12,054.00 | 6.50 | 2,611.70 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 600 | SQYD | 20.00 | 12,000.00 | 34.50 | 20,700.00 | 25.00 | 15,000.00 | 30.00 | 18,000.00 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 88 | LNFT | 15.00 | 1,320.00 | 23.00 | 2,024.00 | 1.00 | 88.00 | 12.00 | 1,056.00 | | 0006 | 203-01-00100 | General Excavation | 8 | CUYD | 40.00 | 320.00 | 115.00 | 920.00 | 50.00 | 400.00 | 200.00 | 1,600.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 108 | EACH | 23.75 | 2,565.00 | 17.25 | 1,863.00 | 30.00 | 3,240.00 | 40.00 | 4,320.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 3,246 | LNFT | 4.85 | 15,743.10 | 1.73 | 5,615.58 | 8.00 | 25,968.00 | 4.00 | 12,984.00 | | 0009 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 50.00 | 5,000.00 | 60.00 | 6,000.00 | 80.00 | 8,000.00 | 130.00 | 13,000.00 | | 0010 | 701-05-01001 | Side Drain Pipe (12" RCP/RPVCP/CPEPDW/CMP) | 32 | LNFT | 85.00 | 2,720.00 | 44.16 | 1,413.12 | 100.00 | 3,200.00 | 100.00 | 3,200.00 | | 0011 | 701-05-01021 | Side Drain Pipe (15" RCP/RPVCP/CPEPDW/CMP) | 8 | LNFT | 85.00 | 680.00 | 40.62 | 324.96 | 100.00 | 800.00 | 142.00 | 1,136.00 | | 0012 | 701-06-01000 | Side Drain Pipe Arch (15" Equiv. RCPA/CMPA) | 16 | LNFT | 85.00 | 1,360.00 | 55.90 | 894.40 | 100.00 | 1,600.00 | 120.00 | 1,920.00 | | 0013 | 701-07-00300 | Yard Drain Pipe (8") | 48 | LNFT | 80.00 | 3,840.00 | 25.40 | 1,219.20 | 100.00 | 4,800.00 | 110.50 | 5,304.00 | | 0014 | 702-03-00400 | Catch Basins (CB-05) | 3 | EACH | 2,500.00 | 7,500.00 | 591.35 | 1,774.05 | 5,000.00 | 15,000.00 | 2,700.00 | 8,100.00 | | 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 5.3 | SQYD | 80.00 | 424.00 | 139.77 | 740.78 | 80.00 | 424.00 | 200.00 | 1,060.00 | | 0016 | 706-01-00300 | Concrete Walk (6" Thick) | 1,756.1 | SQYD | 81.00 | 142,244.10 | 91.83 | 161,262.66 | 90.00 | 158,049.00 | 80.00 | 140,488.00 | | 0017 | 706-02-00200 | Concrete Drive (6" Thick) | 163.3 | SQYD | 90.00 | 14,697.00 | 125.06 | 20,422.30 | 90.00 | 14,697.00 | 90.00 | 14,697.00 | | 0018 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 14.5 | SQYD | 84.00 | 1,218.00 | 143.75 | 2,084.38 | 90.00 | 1,305.00 | 200.00 | 2,900.00 | | 0019 | 706-04-00100 | Handicapped Curb Ramps (Type 7) | 9 | EACH | 1,800.00 | 16,200.00 | 1,150.00 | 10,350.00 | 2,100.00 | 18,900.00 | 2,400.00 | 21,600.00 | | 0020 | 707-01-00200 | Concrete Curb (Barrier) | 235 | LNFT | 20.00 | 4,700.00 | 40.25 | 9,458.75 | 15.00 | 3,525.00 | 24.00 | 5,640.00 | | 0021 | 707-01-00300 | Concrete Curb (Mountable) | 319 | LNFT | 30.00 | 9,570.00 | 40.25 | 12,839.75 | 15.00 | 4,785.00 | 12.00 | 3,828.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 9,500.00 | 9,500.00 | 11,500.00 | 11,500.00 | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 | | 0023 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 206 | SQYD | 30.00 | 6,180.00 | 16.24 | 3,345.44 | 40.00 | 8,240.00 | 13.00 | 2,678.00 | | 0024 | 715-01-00100 | Topsoil | 35 | CUYD | 28.00 | 980.00 | 28.75 | 1,006.25 | 40.00 | 1,400.00 | 35.00 | 1,225.00 | | 0025 | 726-01-00100 | Bedding Material | 6.9 | CUYD | 65.00 | 448.50 | 69.00 | 476.10 | 80.00 | 552.00 | 110.00 | 759.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 27,850.00 | 27,850.00 | 22,595.00 | 22,595.00 | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | | 0027 | 729-01-00103 | Sign (Type A)(Relocate) | 10.3 | SQFT | 150.00 | 1,545.00 | 172.50 | 1,776.75 | 75.00 | 772.50 | 32.00 | 329.60 | | 0028 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 169 | LNFT | 12.50 | 2,112.50 | 11.50 | 1,943.50 | 25.00 | 4,225.00 | 11.00 | 1,859.00 | | 0029 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 11,500.00 | 11,500.00 | 7,500.00 | 7,500.00 | 12,500.00 | 12,500.00 | | 0030 | 810-04-00100 | Hand Railing (Between Stations 8+99 and 9+52) | 39 | LNFT | 75.00 | 2,925.00 | 369.04 | 14,392.56 | 300.00 | 11,700.00 | 250.00 | 9,750.00 | | 0031 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,770 | INLF | 0.75 | 1,327.50 | 1.15 | 2,035.50 | 1.00 | 1,770.00 | 1.00 | 1,770.00 | | 0032 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 1,188 | INLF | 1.25 | 1,485.00 | 1.15 | 1,366.20 | 1.00 | 1,188.00 | 1.50 | 1,782.00 | | 0033 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,782 | INLF | 2.00 | 3,564.00 | 1.15 | 2,049.30 | 1.00 | 1,782.00 | 1.50 | 2,673.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 316,188.70 | | 349,357.64 | | 357,614.50 | | 378,957.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Byron E. Talbot Contractor, Inc. | | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 8,500.00 | 8,500.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 5 | SQYD | 15.00 | 75.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 401.8 | SQYD | 15.00 | 6,027.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 600 | SQYD | 15.00 | 9,000.00 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 88 | LNFT | 3.25 | 286.00 | | 0006 | 203-01-00100 | General Excavation | 8 | CUYD | 25.00 | 200.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 108 | EACH | 26.00 | 2,808.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 3,246 | LNFT | 3.50 | 11,361.00 | | 0009 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 82.00 | 8,200.00 | | 0010 | 701-05-01001 | Side Drain Pipe (12" RCP/RPVCP/CPEPDW/CMP) | 32 | LNFT | 60.00 | 1,920.00 | | 0011 | 701-05-01021 | Side Drain Pipe (15" RCP/RPVCP/CPEPDW/CMP) | 8 | LNFT | 72.00 | 576.00 | | 0012 | 701-06-01000 | Side Drain Pipe Arch (15" Equiv. RCPA/CMPA) | 16 | LNFT | 75.00 | 1,200.00 | | 0013 | 701-07-00300 | Yard Drain Pipe (8") | 48 | LNFT | 32.00 | 1,536.00 | | 0014 | 702-03-00400 | Catch Basins (CB-05) | 3 | EACH | 1,250.00 | 3,750.00 | | 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 5.3 | SQYD | 106.00 | 561.80 | | 0016 | 706-01-00300 | Concrete Walk (6" Thick) | 1,756.1 | SQYD | 100.00 | 175,610.00 | | 0017 | 706-02-00200 | Concrete Drive (6" Thick) | 163.3 | SQYD | 84.00 | 13,717.20 | | 0018 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 14.5 | SQYD | 91.00 | 1,319.50 | | 0019 | 706-04-00100 | Handicapped Curb Ramps (Type 7) | 9 | EACH | 2,500.00 | 22,500.00 | | 0020 | 707-01-00200 | Concrete Curb (Barrier) | 235 | LNFT | 30.00 | 7,050.00 | | 0021 | 707-01-00300 | Concrete Curb (Mountable) | 319 | LNFT | 12.00 | 3,828.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 22,000.00 | 22,000.00 | | 0023 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 206 | SQYD | 11.00 | 2,266.00 | | 0024 | 715-01-00100 | Topsoil | 35 | CUYD | 25.00 | 875.00 | | 0025 | 726-01-00100 | Bedding Material | 6.9 | CUYD | 108.00 | 745.20 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 32,700.00 | 32,700.00 | | 0027 | 729-01-00103 | Sign (Type A)(Relocate) | 10.3 | SQFT | 212.00 | 2,183.60 | | 0028 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 169 | LNFT | 35.00 | 5,915.00 | | 0029 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | | 0030 | 810-04-00100 | Hand Railing (Between Stations 8+99 and 9+52) | 39 | LNFT | 465.00 | 18,135.00 | | 0031 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,770 | INLF | 2.00 | 3,540.00 | | 0032 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 1,188 | INLF | 2.00 | 2,376.00 | | 0033 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,782 | INLF | 2.50 | 4,455.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 387,216.30 |
|