Search


Bid Tabulations for the Letting of 1/8/2020 LA DOTD Headquarters

Proposal:H.011856.6
Parish:Tangipahoa
Routes:LA 22
Description:LA 22: FIFTH ST - WAYNE STREET, SW
Type Construction:DRAINAGE STRUCTURES, CONCRETE SIDEWALKS, AND RELATED WORK.
Estimated Construction Cost:$294,636.00
Rank License BidderConstruction Bid
148896Command Construction Industries LLC$260,333.00
249356KORT's CONSTRUCTION SERVICES, INC.$274,925.70
314807Richard Price Contracting Co, Llc$292,384.45
468237GULF STATES SERVICES, LLC$311,922.70
564262FMF GROUP LLC$316,188.70
605693Industrial Enterprises, Inc.$349,357.64
7C0002Dragon Limited, Inc.$357,614.50
863313BRIGGS BROTHERS ENTERPRISES CORPORATION$378,957.80
912198Byron E. Talbot Contractor, Inc.$387,216.30


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Command Construction Industries LLC
- 2 -
KORT's CONSTRUCTION SERVICES, INC.
- 3 -
Richard Price Contracting Co, Llc
- 4 -
GULF STATES SERVICES, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-01-00100Removal of Structures and Obstructions 1     LUMP10,000.0010,000.0010,000.0010,000.009,500.009,500.009,000.009,000.00
0002202-02-02000Removal of Asphalt Drives 5     SQYD1.005.008.0040.0015.5077.5030.00150.00
0003202-02-02020Removal of Asphalt Pavement 401.8   SQYD1.00401.8011.004,419.8015.006,027.0030.0012,054.00
0004202-02-06100Removal of Concrete Walks and Drives 600     SQYD30.0018,000.0010.006,000.0015.009,000.0030.0018,000.00
0005202-02-06140Removal of Curbs (Concrete) 88     LNFT1.0088.008.00704.0015.001,320.0050.004,400.00
0006203-01-00100General Excavation 8     CUYD30.00240.008.0064.0060.00480.0075.00600.00
0007204-02-00100Temporary Hay Bales 108     EACH0.011.0815.001,620.0037.003,996.005.00540.00
0008204-06-00100Temporary Silt Fencing 3,246     LNFT0.0132.462.006,492.004.0012,984.000.25811.50
0009402-01-00100Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 100     CUYD0.011.0080.008,000.00140.0014,000.0055.005,500.00
0010701-05-01001Side Drain Pipe (12" RCP/RPVCP/CPEPDW/CMP) 32     LNFT30.00960.0060.001,920.0084.002,688.00115.003,680.00
0011701-05-01021Side Drain Pipe (15" RCP/RPVCP/CPEPDW/CMP) 8     LNFT180.001,440.0065.00520.0091.50732.00220.001,760.00
0012701-06-01000Side Drain Pipe Arch (15" Equiv. RCPA/CMPA) 16     LNFT180.002,880.0068.001,088.00100.251,604.00220.003,520.00
0013701-07-00300Yard Drain Pipe (8") 48     LNFT30.001,440.0040.001,920.0025.501,224.0090.004,320.00
0014702-03-00400Catch Basins (CB-05) 3     EACH1,000.003,000.001,500.004,500.00870.502,611.502,000.006,000.00
0015706-01-00100Concrete Walk (4" Thick) 5.3   SQYD75.00397.5074.00392.20400.002,120.00125.00662.50
0016706-01-00300Concrete Walk (6" Thick) 1,756.1   SQYD75.00131,707.5064.00112,390.4060.50106,244.0578.00136,975.80
0017706-02-00200Concrete Drive (6" Thick) 163.3   SQYD75.0012,247.5084.0013,717.2063.0010,287.9078.0012,737.40
0018706-03-00300Incidental Concrete Paving (6" Thick) 14.5   SQYD75.001,087.5066.00957.00125.001,812.50125.001,812.50
0019706-04-00100Handicapped Curb Ramps (Type 7)9     EACH300.002,700.001,500.0013,500.00900.008,100.001,300.0011,700.00
0020707-01-00200Concrete Curb (Barrier) 235     LNFT30.007,050.0011.002,585.0020.004,700.0030.007,050.00
0021707-01-00300Concrete Curb (Mountable) 319     LNFT30.009,570.0011.003,509.0020.006,380.0030.009,570.00
0022713-01-00100Temporary Signs and Barricades 1     LUMP3,000.003,000.0021,000.0021,000.0012,000.0012,000.0020,000.0020,000.00
0023714-01-00100Slab Sodding (Bermuda Grass) 206     SQYD10.002,060.008.001,648.0014.502,987.006.001,236.00
0024715-01-00100Topsoil 35     CUYD10.00350.0050.001,750.0050.001,750.0050.001,750.00
0025726-01-00100Bedding Material 6.9   CUYD30.00207.0075.00517.50150.001,035.0075.00517.50
0026727-01-00100Mobilization 1     LUMP29,118.9629,118.9625,000.0025,000.0018,000.0018,000.0012,500.0012,500.00
0027729-01-00103Sign (Type A)(Relocate) 10.3   SQFT60.00618.0027.00278.101,500.0015,450.0025.00257.50
0028732-01-01000Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) 169     LNFT10.001,690.0017.002,873.0018.003,042.0012.002,028.00
0029740-01-00100Construction Layout 1     LUMP3,000.003,000.0012,000.0012,000.0012,000.0012,000.005,000.005,000.00
0030810-04-00100Hand Railing (Between Stations 8+99 and 9+52)39     LNFT300.0011,700.00265.0010,335.00300.0011,700.00175.006,825.00
0031NS-500-00340Saw Cutting Asphalt Concrete Pavement 1,770     INLF3.005,310.001.001,770.001.803,186.002.003,540.00
0032NS-500-00360Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement 1,188     INLF0.0111.881.001,188.001.802,138.402.502,970.00
0033NS-600-00220Saw Cutting Portland Cement Concrete Pavement 1,782     INLF0.0117.821.252,227.501.803,207.602.504,455.00
             
  CONTRACTOR TOTAL   260,333.00 274,925.70 292,384.45 311,922.70



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
FMF GROUP LLC
- 6 -
Industrial Enterprises, Inc.
- 7 -
Dragon Limited, Inc.
- 8 -
BRIGGS BROTHERS ENTERPRISES CORPORATION
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-01-00100Removal of Structures and Obstructions 1     LUMP1,000.001,000.0010,302.5010,302.501,500.001,500.0015,000.0015,000.00
0002202-02-02000Removal of Asphalt Drives 5     SQYD25.00125.0023.00115.0030.00150.0037.50187.50
0003202-02-02020Removal of Asphalt Pavement 401.8   SQYD25.0010,045.0012.565,046.6130.0012,054.006.502,611.70
0004202-02-06100Removal of Concrete Walks and Drives 600     SQYD20.0012,000.0034.5020,700.0025.0015,000.0030.0018,000.00
0005202-02-06140Removal of Curbs (Concrete) 88     LNFT15.001,320.0023.002,024.001.0088.0012.001,056.00
0006203-01-00100General Excavation 8     CUYD40.00320.00115.00920.0050.00400.00200.001,600.00
0007204-02-00100Temporary Hay Bales 108     EACH23.752,565.0017.251,863.0030.003,240.0040.004,320.00
0008204-06-00100Temporary Silt Fencing 3,246     LNFT4.8515,743.101.735,615.588.0025,968.004.0012,984.00
0009402-01-00100Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 100     CUYD50.005,000.0060.006,000.0080.008,000.00130.0013,000.00
0010701-05-01001Side Drain Pipe (12" RCP/RPVCP/CPEPDW/CMP) 32     LNFT85.002,720.0044.161,413.12100.003,200.00100.003,200.00
0011701-05-01021Side Drain Pipe (15" RCP/RPVCP/CPEPDW/CMP) 8     LNFT85.00680.0040.62324.96100.00800.00142.001,136.00
0012701-06-01000Side Drain Pipe Arch (15" Equiv. RCPA/CMPA) 16     LNFT85.001,360.0055.90894.40100.001,600.00120.001,920.00
0013701-07-00300Yard Drain Pipe (8") 48     LNFT80.003,840.0025.401,219.20100.004,800.00110.505,304.00
0014702-03-00400Catch Basins (CB-05) 3     EACH2,500.007,500.00591.351,774.055,000.0015,000.002,700.008,100.00
0015706-01-00100Concrete Walk (4" Thick) 5.3   SQYD80.00424.00139.77740.7880.00424.00200.001,060.00
0016706-01-00300Concrete Walk (6" Thick) 1,756.1   SQYD81.00142,244.1091.83161,262.6690.00158,049.0080.00140,488.00
0017706-02-00200Concrete Drive (6" Thick) 163.3   SQYD90.0014,697.00125.0620,422.3090.0014,697.0090.0014,697.00
0018706-03-00300Incidental Concrete Paving (6" Thick) 14.5   SQYD84.001,218.00143.752,084.3890.001,305.00200.002,900.00
0019706-04-00100Handicapped Curb Ramps (Type 7)9     EACH1,800.0016,200.001,150.0010,350.002,100.0018,900.002,400.0021,600.00
0020707-01-00200Concrete Curb (Barrier) 235     LNFT20.004,700.0040.259,458.7515.003,525.0024.005,640.00
0021707-01-00300Concrete Curb (Mountable) 319     LNFT30.009,570.0040.2512,839.7515.004,785.0012.003,828.00
0022713-01-00100Temporary Signs and Barricades 1     LUMP9,500.009,500.0011,500.0011,500.0010,000.0010,000.0035,000.0035,000.00
0023714-01-00100Slab Sodding (Bermuda Grass) 206     SQYD30.006,180.0016.243,345.4440.008,240.0013.002,678.00
0024715-01-00100Topsoil 35     CUYD28.00980.0028.751,006.2540.001,400.0035.001,225.00
0025726-01-00100Bedding Material 6.9   CUYD65.00448.5069.00476.1080.00552.00110.00759.00
0026727-01-00100Mobilization 1     LUMP27,850.0027,850.0022,595.0022,595.0015,000.0015,000.0030,000.0030,000.00
0027729-01-00103Sign (Type A)(Relocate) 10.3   SQFT150.001,545.00172.501,776.7575.00772.5032.00329.60
0028732-01-01000Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) 169     LNFT12.502,112.5011.501,943.5025.004,225.0011.001,859.00
0029740-01-00100Construction Layout 1     LUMP5,000.005,000.0011,500.0011,500.007,500.007,500.0012,500.0012,500.00
0030810-04-00100Hand Railing (Between Stations 8+99 and 9+52)39     LNFT75.002,925.00369.0414,392.56300.0011,700.00250.009,750.00
0031NS-500-00340Saw Cutting Asphalt Concrete Pavement 1,770     INLF0.751,327.501.152,035.501.001,770.001.001,770.00
0032NS-500-00360Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement 1,188     INLF1.251,485.001.151,366.201.001,188.001.501,782.00
0033NS-600-00220Saw Cutting Portland Cement Concrete Pavement 1,782     INLF2.003,564.001.152,049.301.001,782.001.502,673.00
             
  CONTRACTOR TOTAL   316,188.70 349,357.64 357,614.50 378,957.80



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 9 -
Byron E. Talbot Contractor, Inc.
Unit PriceTotal
Amount
0001202-01-00100Removal of Structures and Obstructions 1     LUMP8,500.008,500.00
0002202-02-02000Removal of Asphalt Drives 5     SQYD15.0075.00
0003202-02-02020Removal of Asphalt Pavement 401.8   SQYD15.006,027.00
0004202-02-06100Removal of Concrete Walks and Drives 600     SQYD15.009,000.00
0005202-02-06140Removal of Curbs (Concrete) 88     LNFT3.25286.00
0006203-01-00100General Excavation 8     CUYD25.00200.00
0007204-02-00100Temporary Hay Bales 108     EACH26.002,808.00
0008204-06-00100Temporary Silt Fencing 3,246     LNFT3.5011,361.00
0009402-01-00100Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 100     CUYD82.008,200.00
0010701-05-01001Side Drain Pipe (12" RCP/RPVCP/CPEPDW/CMP) 32     LNFT60.001,920.00
0011701-05-01021Side Drain Pipe (15" RCP/RPVCP/CPEPDW/CMP) 8     LNFT72.00576.00
0012701-06-01000Side Drain Pipe Arch (15" Equiv. RCPA/CMPA) 16     LNFT75.001,200.00
0013701-07-00300Yard Drain Pipe (8") 48     LNFT32.001,536.00
0014702-03-00400Catch Basins (CB-05) 3     EACH1,250.003,750.00
0015706-01-00100Concrete Walk (4" Thick) 5.3   SQYD106.00561.80
0016706-01-00300Concrete Walk (6" Thick) 1,756.1   SQYD100.00175,610.00
0017706-02-00200Concrete Drive (6" Thick) 163.3   SQYD84.0013,717.20
0018706-03-00300Incidental Concrete Paving (6" Thick) 14.5   SQYD91.001,319.50
0019706-04-00100Handicapped Curb Ramps (Type 7)9     EACH2,500.0022,500.00
0020707-01-00200Concrete Curb (Barrier) 235     LNFT30.007,050.00
0021707-01-00300Concrete Curb (Mountable) 319     LNFT12.003,828.00
0022713-01-00100Temporary Signs and Barricades 1     LUMP22,000.0022,000.00
0023714-01-00100Slab Sodding (Bermuda Grass) 206     SQYD11.002,266.00
0024715-01-00100Topsoil 35     CUYD25.00875.00
0025726-01-00100Bedding Material 6.9   CUYD108.00745.20
0026727-01-00100Mobilization 1     LUMP32,700.0032,700.00
0027729-01-00103Sign (Type A)(Relocate) 10.3   SQFT212.002,183.60
0028732-01-01000Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) 169     LNFT35.005,915.00
0029740-01-00100Construction Layout 1     LUMP12,000.0012,000.00
0030810-04-00100Hand Railing (Between Stations 8+99 and 9+52)39     LNFT465.0018,135.00
0031NS-500-00340Saw Cutting Asphalt Concrete Pavement 1,770     INLF2.003,540.00
0032NS-500-00360Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement 1,188     INLF2.002,376.00
0033NS-600-00220Saw Cutting Portland Cement Concrete Pavement 1,782     INLF2.504,455.00
       
  CONTRACTOR TOTAL   387,216.30