Proposal:H.013727.6
Parish:Iberville
Routes:LA 30
Description:LA 30: LA 74 - ASCENSION P/L
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,977,818.46
| Rank | License | Bidder | Construction Bid |
| 1 | 12031 | R.J. Daigle & Sons Contractors, Inc | $1,668,011.37 |
| 2 | 06276 | Barriere Construction Co., LLC | $1,849,000.00 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $1,890,270.80 |
| 4 | 44013 | M. Trak, LLC | $2,690,350.45 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R.J. Daigle & Sons Contractors, Inc | - 2 - Barriere Construction Co., LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - M. Trak, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 615 | LNFT | 6.95 | 4,274.25 | 7.00 | 4,305.00 | 6.50 | 3,997.50 | 30.00 | 18,450.00 | | 0002 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 2,804.30 | 5,608.60 | 2,000.00 | 4,000.00 | 2,000.00 | 4,000.00 | 2,500.00 | 5,000.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 290 | CUYD | 37.93 | 10,999.70 | 55.00 | 15,950.00 | 35.00 | 10,150.00 | 35.00 | 10,150.00 | | 0004 | 203-10-00100 | Cleaning Existing Ditches | 700 | LNFT | 3.80 | 2,660.00 | 7.00 | 4,900.00 | 6.50 | 4,550.00 | 12.00 | 8,400.00 | | 0005 | 204-02-00100 | Temporary Hay Bales | 10 | EACH | 220.00 | 2,200.00 | 25.00 | 250.00 | 50.00 | 500.00 | 15.00 | 150.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 100 | LNFT | 11.00 | 1,100.00 | 15.00 | 1,500.00 | 2.00 | 200.00 | 3.00 | 300.00 | | 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 60 | CUYD | 31.24 | 1,874.40 | 150.00 | 9,000.00 | 50.00 | 3,000.00 | 25.00 | 1,500.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 14,504.7 | TON | 70.16 | 1,017,649.75 | 85.00 | 1,232,899.50 | 85.00 | 1,232,899.50 | 110.00 | 1,595,517.00 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 426.9 | TON | 117.40 | 50,118.06 | 160.00 | 68,304.00 | 125.00 | 53,362.50 | 165.00 | 70,438.50 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 74,792 | SQYD | 1.77 | 132,381.84 | 1.00 | 74,792.00 | 2.00 | 149,584.00 | 3.50 | 261,772.00 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,625 | CUYD | 0.00 | 0.00 | 1.00 | -3,625.00 | 0.00 | 0.00 | 0.01 | -36.25 | | 0012 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 1,486 | SQYD | 85.07 | 126,414.02 | 85.00 | 126,310.00 | 80.00 | 118,880.00 | 150.00 | 222,900.00 | | 0013 | 701-10-01140 | Reinforced Concrete Pipe (Extension) (48") | 32 | LNFT | 258.76 | 8,280.32 | 175.00 | 5,600.00 | 450.00 | 14,400.00 | 135.00 | 4,320.00 | | 0014 | 701-14-00100 | Cleaning Existing Pipes | 192 | LNFT | 18.98 | 3,644.16 | 25.00 | 4,800.00 | 12.00 | 2,304.00 | 12.00 | 2,304.00 | | 0015 | 701-15-00100 | Concrete Collar | 4 | EACH | 632.50 | 2,530.00 | 2,000.00 | 8,000.00 | 1,600.00 | 6,400.00 | 1,500.00 | 6,000.00 | | 0016 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 200 | LNFT | 36.00 | 7,200.00 | 35.00 | 7,000.00 | 35.50 | 7,100.00 | 40.00 | 8,000.00 | | 0017 | 704-03-00100 | Blocked Out Guard rail | 31.3 | LNFT | 25.00 | 782.50 | 25.00 | 782.50 | 22.70 | 710.51 | 25.00 | 782.50 | | 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 256.4 | LNFT | 25.00 | 6,410.00 | 25.00 | 6,410.00 | 22.70 | 5,820.28 | 25.00 | 6,410.00 | | 0019 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 122.00 | 768.60 | 115.00 | 724.50 | 117.00 | 737.10 | 125.00 | 787.50 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 96.00 | 9,600.00 | 95.00 | 9,500.00 | 87.00 | 8,700.00 | 90.00 | 9,000.00 | | 0021 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 3,540.00 | 10,620.00 | 3,300.00 | 9,900.00 | 3,300.00 | 9,900.00 | 3,500.00 | 10,500.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 47,138.39 | 47,138.39 | 31,028.82 | 31,028.82 | 76,000.00 | 76,000.00 | 120,000.00 | 120,000.00 | | 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.924 | MILE | 360.00 | 3,572.64 | 10.00 | 99.24 | 200.00 | 1,984.80 | 500.00 | 4,962.00 | | 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.592 | MILE | 540.00 | 4,639.68 | 10.00 | 85.92 | 200.00 | 1,718.40 | 500.00 | 4,296.00 | | 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 23.412 | MILE | 790.00 | 18,495.48 | 10.00 | 234.12 | 200.00 | 4,682.40 | 250.00 | 5,853.00 | | 0026 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 6.578 | MILE | 308.09 | 2,026.62 | 800.00 | 5,262.40 | 300.00 | 1,973.40 | 650.00 | 4,275.70 | | 0027 | 726-01-00100 | Bedding Material | 22 | CUYD | 94.88 | 2,087.36 | 105.00 | 2,310.00 | 65.00 | 1,430.00 | 150.00 | 3,300.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 77,292.50 | 77,292.50 | 130,000.00 | 130,000.00 | 75,000.00 | 75,000.00 | 225,000.00 | 225,000.00 | | 0029 | 729-16-00200 | Object Marker Assembly (Type 2) | 38 | EACH | 80.00 | 3,040.00 | 80.00 | 3,040.00 | 72.00 | 2,736.00 | 80.00 | 3,040.00 | | 0030 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 80.00 | 320.00 | 80.00 | 320.00 | 82.00 | 328.00 | 90.00 | 360.00 | | 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 483 | EACH | 7.00 | 3,381.00 | 7.00 | 3,381.00 | 6.60 | 3,187.80 | 7.00 | 3,381.00 | | 0032 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 528 | LNFT | 1.90 | 1,003.20 | 2.00 | 1,056.00 | 1.75 | 924.00 | 2.00 | 1,056.00 | | 0033 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 413 | LNFT | 6.70 | 2,767.10 | 7.00 | 2,891.00 | 6.10 | 2,519.30 | 6.50 | 2,684.50 | | 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 92 | LNFT | 7.45 | 685.40 | 8.00 | 736.00 | 7.15 | 657.80 | 8.00 | 736.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.156 | MILE | 3,250.00 | 26,507.00 | 3,100.00 | 25,283.60 | 3,060.00 | 24,957.36 | 3,500.00 | 28,546.00 | | 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.864 | MILE | 1,100.00 | 3,150.40 | 1,000.00 | 2,864.00 | 968.00 | 2,772.35 | 1,000.00 | 2,864.00 | | 0037 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.042 | MILE | 4,200.00 | 176.40 | 4,200.00 | 176.40 | 3,900.00 | 163.80 | 4,500.00 | 189.00 | | 0038 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 320.00 | 640.00 | 300.00 | 600.00 | 310.00 | 620.00 | 300.00 | 600.00 | | 0039 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 280.00 | 560.00 | 250.00 | 500.00 | 250.00 | 500.00 | 250.00 | 500.00 | | 0040 | 732-05-00100 | Removal of Existing Markings | 0.284 | MILE | 5,600.00 | 1,590.40 | 6,000.00 | 1,704.00 | 5,000.00 | 1,420.00 | 5,500.00 | 1,562.00 | | 0041 | 739-01-00100 | Hydro-Seeding | 0.05 | ACRE | 22,000.00 | 1,100.00 | 2,500.00 | 125.00 | 10,000.00 | 500.00 | 10,000.00 | 500.00 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,565.00 | 3,565.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 18,000.00 | 18,000.00 | | 0043 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Concrete: 15.07 Cubic Yards. Steel: 904 Lbs. | 2 | EACH | 29,578.30 | 59,156.60 | 18,000.00 | 36,000.00 | 17,000.00 | 34,000.00 | 8,000.00 | 16,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,668,011.37 | | 1,849,000.00 | | 1,890,270.80 | | 2,690,350.45 |
|