Proposal:H.013640.6
Parish:Iberia
Routes:US 90
Description:US 90 W FR. DRAINAGE IMP. @ SEGURA CANAL
Type Construction:GRADING, DRAINAGE STRUCTURES, ASPHALT CONCRETE DRIVES, PORTLAND CEMENT CONCRETE DRIVES, AND RELATED WORK.
Estimated Construction Cost:$529,217.50
| Rank | License | Bidder | Construction Bid |
| 1 | 54206 | Southern Constructors, LLC | $589,531.20 |
| 2 | 34263 | La Contracting Enterprise LLC | $631,322.30 |
| 3 | 52306 | SIEMA CONSTRUCTION, LLC | $655,507.00 |
| 4 | 51821 | Elliott Construction, LLC | $680,117.60 |
| 5 | 33663 | Glenn Lege Construction LLC | $780,802.04 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Southern Constructors, LLC | - 2 - La Contracting Enterprise LLC | - 3 - SIEMA CONSTRUCTION, LLC | - 4 - Elliott Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,265.00 | 2,265.00 | 2,000.00 | 2,000.00 | 8,851.24 | 8,851.24 | 6,500.00 | 6,500.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 49 | SQYD | 24.00 | 1,176.00 | 31.00 | 1,519.00 | 7.50 | 367.50 | 30.00 | 1,470.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 436 | SQYD | 24.00 | 10,464.00 | 22.00 | 9,592.00 | 15.50 | 6,758.00 | 35.00 | 15,260.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) 18" - 24" | 980 | LNFT | 16.50 | 16,170.00 | 18.00 | 17,640.00 | 25.50 | 24,990.00 | 25.00 | 24,500.00 | | 0005 | 202-02-32160 | Removal of Pipe (Yard Drain) 4" PVC | 12 | LNFT | 14.00 | 168.00 | 10.00 | 120.00 | 4.25 | 51.00 | 20.00 | 240.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 31,750.00 | 31,750.00 | 41,000.00 | 41,000.00 | 65,000.00 | 65,000.00 | 48,000.00 | 48,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 185.00 | 370.00 | 300.00 | 600.00 | 83.00 | 166.00 | 25.00 | 50.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 380 | LNFT | 5.00 | 1,900.00 | 6.00 | 2,280.00 | 1.75 | 665.00 | 4.00 | 1,520.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 42.6 | CUYD | 100.00 | 4,260.00 | 147.00 | 6,262.20 | 98.50 | 4,196.10 | 90.00 | 3,834.00 | | 0010 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 100.00 | 5,000.00 | 160.00 | 8,000.00 | 97.00 | 4,850.00 | 90.00 | 4,500.00 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 190.5 | TON | 175.00 | 33,337.50 | 175.00 | 33,337.50 | 264.00 | 50,292.00 | 175.00 | 33,337.50 | | 0012 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 174 | LNFT | 56.00 | 9,744.00 | 53.00 | 9,222.00 | 59.00 | 10,266.00 | 75.00 | 13,050.00 | | 0013 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 248 | LNFT | 72.00 | 17,856.00 | 76.00 | 18,848.00 | 72.00 | 17,856.00 | 86.00 | 21,328.00 | | 0014 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 80 | LNFT | 169.00 | 13,520.00 | 195.00 | 15,600.00 | 156.00 | 12,480.00 | 175.00 | 14,000.00 | | 0015 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 32 | LNFT | 90.00 | 2,880.00 | 121.00 | 3,872.00 | 111.00 | 3,552.00 | 105.00 | 3,360.00 | | 0016 | 701-03-02122 | Storm Drain Pipe (Outfall) (48" RPVCP or 54" CMP) | 76 | LNFT | 163.00 | 12,388.00 | 167.00 | 12,692.00 | 176.00 | 13,376.00 | 175.00 | 13,300.00 | | 0017 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 100 | LNFT | 86.00 | 8,600.00 | 68.00 | 6,800.00 | 78.51 | 7,851.00 | 90.00 | 9,000.00 | | 0018 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 542 | LNFT | 122.00 | 66,124.00 | 131.00 | 71,002.00 | 120.00 | 65,040.00 | 140.00 | 75,880.00 | | 0019 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 336 | LNFT | 154.00 | 51,744.00 | 161.00 | 54,096.00 | 156.00 | 52,416.00 | 160.00 | 53,760.00 | | 0020 | 701-04-01120 | Storm Drain Pipe Arch (48" Equiv. RCPA) | 96 | LNFT | 188.00 | 18,048.00 | 200.00 | 19,200.00 | 174.00 | 16,704.00 | 215.00 | 20,640.00 | | 0021 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 336 | LNFT | 84.00 | 28,224.00 | 80.00 | 26,880.00 | 92.50 | 31,080.00 | 100.00 | 33,600.00 | | 0022 | 701-07-00300 | Yard Drain Pipe (8") | 16 | LNFT | 30.00 | 480.00 | 34.00 | 544.00 | 17.50 | 280.00 | 50.00 | 800.00 | | 0023 | 701-14-00100 | Cleaning Existing Pipes | 355 | LNFT | 4.00 | 1,420.00 | 40.00 | 14,200.00 | 78.00 | 27,690.00 | 25.00 | 8,875.00 | | 0024 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 2,020 | LNFT | 2.50 | 5,050.00 | 15.00 | 30,300.00 | 12.50 | 25,250.00 | 10.00 | 20,200.00 | | 0025 | 702-03-00100 | Catch Basins (CB-01) | 6 | EACH | 3,700.00 | 22,200.00 | 3,400.00 | 20,400.00 | 3,240.00 | 19,440.00 | 3,000.00 | 18,000.00 | | 0026 | 702-03-00200 | Catch Basins (CB-02) | 13 | EACH | 4,400.00 | 57,200.00 | 4,700.00 | 61,100.00 | 4,086.00 | 53,118.00 | 3,575.00 | 46,475.00 | | 0027 | 702-03-00300 | Catch Basins (CB-04) | 2 | EACH | 2,900.00 | 5,800.00 | 2,400.00 | 4,800.00 | 1,587.00 | 3,174.00 | 2,300.00 | 4,600.00 | | 0028 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 3,200.00 | 3,200.00 | 2,800.00 | 2,800.00 | 1,860.00 | 1,860.00 | 1,900.00 | 1,900.00 | | 0029 | 702-08-00200 | Side Drain Safety End (Type 2) | 5 | EACH | 6,000.00 | 30,000.00 | 3,300.00 | 16,500.00 | 2,310.00 | 11,550.00 | 2,325.00 | 11,625.00 | | 0030 | 706-02-00200 | Concrete Drive (6" Thick) | 570.7 | SQYD | 107.00 | 61,064.90 | 54.00 | 30,817.80 | 60.00 | 34,242.00 | 73.00 | 41,661.10 | | 0031 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 34 | SQYD | 204.00 | 6,936.00 | 144.00 | 4,896.00 | 105.00 | 3,570.00 | 130.00 | 4,420.00 | | 0032 | 711-04-00100 | Geotextile Fabric | 34 | SQYD | 8.00 | 272.00 | 5.00 | 170.00 | 2.00 | 68.00 | 10.00 | 340.00 | | 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 6,650.00 | 6,650.00 | 25,000.00 | 25,000.00 | 34,650.00 | 34,650.00 | 25,000.00 | 25,000.00 | | 0034 | 726-01-00100 | Bedding Material | 218.2 | CUYD | 119.00 | 25,965.80 | 129.00 | 28,147.80 | 107.00 | 23,347.40 | 100.00 | 21,820.00 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 12,750.00 | 12,750.00 | 65,000.00 | 65,000.00 | | 0036 | 735-01-00100 | Mailboxes | 8 | EACH | 76.00 | 608.00 | 12.00 | 96.00 | 1.50 | 12.00 | 30.00 | 240.00 | | 0037 | 735-02-00100 | Mailbox Supports (Single) | 8 | EACH | 285.00 | 2,280.00 | 275.00 | 2,200.00 | 266.00 | 2,128.00 | 150.00 | 1,200.00 | | 0038 | 739-01-00100 | Hydro-Seeding | 0.96 | ACRE | 2,100.00 | 2,016.00 | 2,800.00 | 2,688.00 | 2,156.00 | 2,069.76 | 2,950.00 | 2,832.00 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,400.00 | 2,400.00 | 6,100.00 | 6,100.00 | 3,500.00 | 3,500.00 | 8,000.00 | 8,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 589,531.20 | | 631,322.30 | | 655,507.00 | | 680,117.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Glenn Lege Construction LLC | | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,800.00 | 3,800.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 49 | SQYD | 40.00 | 1,960.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 436 | SQYD | 17.50 | 7,630.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) 18" - 24" | 980 | LNFT | 13.00 | 12,740.00 | | 0005 | 202-02-32160 | Removal of Pipe (Yard Drain) 4" PVC | 12 | LNFT | 20.00 | 240.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 43,515.00 | 43,515.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 582.00 | 1,164.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 380 | LNFT | 6.00 | 2,280.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 42.6 | CUYD | 91.00 | 3,876.60 | | 0010 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 90.00 | 4,500.00 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 190.5 | TON | 114.00 | 21,717.00 | | 0012 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 174 | LNFT | 104.00 | 18,096.00 | | 0013 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 248 | LNFT | 123.25 | 30,566.00 | | 0014 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 80 | LNFT | 272.50 | 21,800.00 | | 0015 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 32 | LNFT | 134.50 | 4,304.00 | | 0016 | 701-03-02122 | Storm Drain Pipe (Outfall) (48" RPVCP or 54" CMP) | 76 | LNFT | 301.25 | 22,895.00 | | 0017 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 100 | LNFT | 122.50 | 12,250.00 | | 0018 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 542 | LNFT | 188.50 | 102,167.00 | | 0019 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 336 | LNFT | 264.00 | 88,704.00 | | 0020 | 701-04-01120 | Storm Drain Pipe Arch (48" Equiv. RCPA) | 96 | LNFT | 309.00 | 29,664.00 | | 0021 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 336 | LNFT | 146.00 | 49,056.00 | | 0022 | 701-07-00300 | Yard Drain Pipe (8") | 16 | LNFT | 26.00 | 416.00 | | 0023 | 701-14-00100 | Cleaning Existing Pipes | 355 | LNFT | 107.00 | 37,985.00 | | 0024 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 2,020 | LNFT | 20.00 | 40,400.00 | | 0025 | 702-03-00100 | Catch Basins (CB-01) | 6 | EACH | 3,100.00 | 18,600.00 | | 0026 | 702-03-00200 | Catch Basins (CB-02) | 13 | EACH | 3,900.00 | 50,700.00 | | 0027 | 702-03-00300 | Catch Basins (CB-04) | 2 | EACH | 1,800.00 | 3,600.00 | | 0028 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 2,100.00 | 2,100.00 | | 0029 | 702-08-00200 | Side Drain Safety End (Type 2) | 5 | EACH | 2,800.00 | 14,000.00 | | 0030 | 706-02-00200 | Concrete Drive (6" Thick) | 570.7 | SQYD | 80.00 | 45,656.00 | | 0031 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 34 | SQYD | 95.00 | 3,230.00 | | 0032 | 711-04-00100 | Geotextile Fabric | 34 | SQYD | 15.00 | 510.00 | | 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,600.00 | 20,600.00 | | 0034 | 726-01-00100 | Bedding Material | 218.2 | CUYD | 86.00 | 18,765.20 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 13,250.00 | 13,250.00 | | 0036 | 735-01-00100 | Mailboxes | 8 | EACH | 58.50 | 468.00 | | 0037 | 735-02-00100 | Mailbox Supports (Single) | 8 | EACH | 292.00 | 2,336.00 | | 0038 | 739-01-00100 | Hydro-Seeding | 0.96 | ACRE | 5,819.00 | 5,586.24 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 19,675.00 | 19,675.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 780,802.04 |
|