Proposal:H.013331.6-R1
Parish:East Baton Rouge
Routes:LA 427
Description:LA 427: LA 3064 - ACADIAN THRUWAY (RT II)
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,142,033.71
| Rank | License | Bidder | Construction Bid |
| 1 | 24901 | Hard Rock Construction LLC | $3,783,975.18 |
| 2 | 48896 | Command Construction Industries LLC | $4,333,080.59 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $5,085,259.49 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Hard Rock Construction LLC | - 2 - Command Construction Industries LLC | - 3 - Barber Bros. Contracting Co., L.L.C | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 3,123 | SQYD | 25.00 | 78,075.00 | 50.00 | 156,150.00 | 25.00 | 78,075.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 1,658 | LNFT | 10.00 | 16,580.00 | 10.00 | 16,580.00 | 10.00 | 16,580.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 191 | LNFT | 10.00 | 1,910.00 | 25.00 | 4,775.00 | 8.00 | 1,528.00 | | 0004 | 202-02-26300 | Removal of Median / Island | 5 | SQYD | 100.00 | 500.00 | 50.00 | 250.00 | 175.00 | 875.00 | | 0005 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 100.00 | 5,000.00 | 25.00 | 1,250.00 | 50.00 | 2,500.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 2,617 | TON | 112.00 | 293,104.00 | 125.00 | 327,125.00 | 108.00 | 282,636.00 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 111.9 | TON | 225.00 | 25,177.50 | 250.00 | 27,975.00 | 175.00 | 19,582.50 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 23,791 | SQYD | 3.30 | 78,510.30 | 3.00 | 71,373.00 | 3.50 | 83,268.50 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -992 | CUYD | 1.00 | -992.00 | 50.00 | -49,600.00 | 0.00 | 0.00 | | 0010 | 510-04-00100 | Pavement Patching | 2,081 | TON | 175.00 | 364,175.00 | 50.00 | 104,050.00 | 165.00 | 343,365.00 | | 0011 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 99,792 | LNFT | 2.10 | 209,563.20 | 3.00 | 299,376.00 | 1.50 | 149,688.00 | | 0012 | 602-03-00100 | Cleaning and Sealing Random cracks | 2,597 | LNFT | 3.40 | 8,829.80 | 3.00 | 7,791.00 | 3.50 | 9,089.50 | | 0013 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 1,909.4 | SQYD | 160.00 | 305,504.00 | 215.00 | 410,521.00 | 300.00 | 572,820.00 | | 0014 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 1,701.7 | SQYD | 160.00 | 272,272.00 | 195.00 | 331,831.50 | 240.00 | 408,408.00 | | 0015 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 5,725.5 | SQYD | 160.00 | 916,080.00 | 175.00 | 1,001,962.50 | 200.00 | 1,145,100.00 | | 0016 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 6 | EACH | 4,500.00 | 27,000.00 | 1,000.00 | 6,000.00 | 2,500.00 | 15,000.00 | | 0017 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 81.3 | LNFT | 24.00 | 1,951.20 | 35.00 | 2,845.50 | 25.00 | 2,032.50 | | 0018 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 25 | LNFT | 60.00 | 1,500.00 | 150.00 | 3,750.00 | 65.00 | 1,625.00 | | 0019 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 92.00 | 4,600.00 | 150.00 | 7,500.00 | 95.00 | 4,750.00 | | 0020 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 3,400.00 | 6,800.00 | 5,000.00 | 10,000.00 | 3,500.00 | 7,000.00 | | 0021 | 706-01-00100 | Concrete Walk (4" Thick) | 3,009 | SQYD | 71.00 | 213,639.00 | 50.00 | 150,450.00 | 95.00 | 285,855.00 | | 0022 | 706-02-00200 | Concrete Drive (6" Thick) | 2,501.6 | SQYD | 75.00 | 187,620.00 | 60.00 | 150,096.00 | 100.00 | 250,160.00 | | 0023 | 706-04-00100 | Handicapped Curb Ramps | 44 | EACH | 1,600.00 | 70,400.00 | 1,250.00 | 55,000.00 | 2,800.00 | 123,200.00 | | 0024 | 707-01-00200 | Concrete Curb (Barrier) | 4,229 | LNFT | 15.00 | 63,435.00 | 20.00 | 84,580.00 | 20.00 | 84,580.00 | | 0025 | 707-01-00300 | Concrete Curb (Mountable) | 599 | LNFT | 16.00 | 9,584.00 | 20.00 | 11,980.00 | 20.00 | 11,980.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 114,000.00 | 114,000.00 | 250,000.00 | 250,000.00 | 275,000.00 | 275,000.00 | | 0027 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,782 | LNFT | 0.15 | 417.30 | 0.50 | 1,391.00 | 0.50 | 1,391.00 | | 0028 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,266 | LNFT | 0.25 | 316.50 | 1.00 | 1,266.00 | 1.00 | 1,266.00 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.501 | MILE | 525.00 | 4,988.03 | 300.00 | 2,850.30 | 440.00 | 4,180.44 | | 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 10.928 | MILE | 425.00 | 4,644.40 | 400.00 | 4,371.20 | 750.00 | 8,196.00 | | 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 12.668 | MILE | 700.00 | 8,867.60 | 500.00 | 6,334.00 | 750.00 | 9,501.00 | | 0032 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 106 | EACH | 20.00 | 2,120.00 | 50.00 | 5,300.00 | 50.00 | 5,300.00 | | 0033 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 24 | EACH | 26.00 | 624.00 | 50.00 | 1,200.00 | 50.00 | 1,200.00 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 130,000.00 | 130,000.00 | 430,000.00 | 430,000.00 | 450,000.00 | 450,000.00 | | 0035 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 85.00 | 170.00 | 100.00 | 200.00 | 175.00 | 350.00 | | 0036 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,622 | EACH | 4.75 | 12,454.50 | 7.00 | 18,354.00 | 7.00 | 18,354.00 | | 0037 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,782 | LNFT | 2.15 | 5,981.30 | 3.00 | 8,346.00 | 3.25 | 9,041.50 | | 0038 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,283 | LNFT | 2.15 | 2,758.45 | 3.00 | 3,849.00 | 3.25 | 4,169.75 | | 0039 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,266 | LNFT | 9.25 | 11,710.50 | 15.00 | 18,990.00 | 13.00 | 16,458.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.668 | MILE | 3,300.00 | 41,804.40 | 4,000.00 | 50,672.00 | 3,800.00 | 48,138.40 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 10.928 | MILE | 875.00 | 9,562.00 | 1,500.00 | 16,392.00 | 1,650.00 | 18,031.20 | | 0042 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.08 | MILE | 4,600.00 | 368.00 | 2,000.00 | 160.00 | 2,300.00 | 184.00 | | 0043 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.098 | MILE | 5,200.00 | 509.60 | 4,000.00 | 392.00 | 4,500.00 | 441.00 | | 0044 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 98 | EACH | 215.00 | 21,070.00 | 400.00 | 39,200.00 | 300.00 | 29,400.00 | | 0045 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 8 | EACH | 215.00 | 1,720.00 | 400.00 | 3,200.00 | 300.00 | 2,400.00 | | 0046 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 24 | EACH | 400.00 | 9,600.00 | 400.00 | 9,600.00 | 300.00 | 7,200.00 | | 0047 | 732-05-00100 | Removal of Existing Markings | 2.586 | MILE | 5,200.00 | 13,447.20 | 1.00 | 2.59 | 5,200.00 | 13,447.20 | | 0048 | 736-09-00100 | Loop Detector | 2,964 | LNFT | 20.00 | 59,280.00 | 25.00 | 74,100.00 | 20.00 | 59,280.00 | | 0049 | 736-11-00100 | Conduit (1" HDPE, Schedule 80) | 200 | LNFT | 2.75 | 550.00 | 5.00 | 1,000.00 | 2.75 | 550.00 | | 0050 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 200 | LNFT | 2.50 | 500.00 | 5.00 | 1,000.00 | 2.70 | 540.00 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 | | 0052 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 17,155 | LNFT | 2.10 | 36,025.50 | 2.00 | 34,310.00 | 2.00 | 34,310.00 | | 0053 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 8,359 | LNFT | 2.10 | 17,553.90 | 2.00 | 16,718.00 | 2.00 | 16,718.00 | | 0054 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 25,514 | LNFT | 1.00 | 25,514.00 | 1.50 | 38,271.00 | 1.00 | 25,514.00 | | 0055 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 2 | EACH | 7,800.00 | 15,600.00 | 10,000.00 | 20,000.00 | 7,500.00 | 15,000.00 | | 0056 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 8 | EACH | 7,000.00 | 56,000.00 | 4,000.00 | 32,000.00 | 10,000.00 | 80,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,783,975.18 | | 4,333,080.59 | | 5,085,259.49 |
|