Proposal:H.013235.6
Parish:Tensas
Routes:LA 608
Description:LA 608: LA 887 - N. JCT. LA 605
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, LIME TREATMENT, INPLACE CEMENT TREATED BASE COURSE, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK
Estimated Construction Cost:$2,441,242.03
| Rank | License | Bidder | Construction Bid |
| 1 | 05789 | D & J CONSTRUCTION CO., LLC | $2,771,394.65 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $2,982,682.59 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) APPROX. 5.304 ACRE | 5.304 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" CMP X 2 | 324 | LNFT | 10.00 | 3,240.00 | 35.00 | 11,340.00 | | 0003 | 203-01-00100 | General Excavation | 200 | CUYD | 10.00 | 2,000.00 | 37.50 | 7,500.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 314 | CUYD | 40.00 | 12,560.00 | 18.50 | 5,809.00 | | 0005 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 12,367 | SQYD | 14.00 | 173,138.00 | 12.85 | 158,915.95 | | 0006 | 304-01-00100 | Lime | 175.3 | TON | 250.00 | 43,825.00 | 240.00 | 42,072.00 | | 0007 | 304-05-00100 | Lime Treatment (Type E) | 12,367 | SQYD | 3.00 | 37,101.00 | 3.00 | 37,101.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,046 | CUYD | 75.00 | 153,450.00 | 110.00 | 225,060.00 | | 0009 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 50.00 | 5,000.00 | 100.00 | 10,000.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 11,517.5 | TON | 108.00 | 1,243,890.00 | 125.00 | 1,439,687.50 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 234.6 | TON | 160.00 | 37,536.00 | 225.00 | 52,785.00 | | 0012 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 41,405 | GAL | 3.00 | 124,215.00 | 2.90 | 120,074.50 | | 0013 | 507-02-00200 | Aggregate (S2) | 60,889 | SQYD | 1.15 | 70,022.35 | 1.15 | 70,022.35 | | 0014 | 507-02-00300 | Aggregate (S3) | 60,889 | SQYD | 1.10 | 66,977.90 | 1.10 | 66,977.90 | | 0015 | 509-01-00100 | Milling Asphalt Pavement | 62,084 | SQYD | 2.20 | 136,584.80 | 2.50 | 155,210.00 | | 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -706 | CUYD | 1.00 | -706.00 | 0.01 | -7.06 | | 0017 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 283 | SQYD | 100.00 | 28,300.00 | 130.00 | 36,790.00 | | 0018 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,050 | SQYD | 150.00 | 157,500.00 | 125.00 | 131,250.00 | | 0019 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 254 | LNFT | 135.00 | 34,290.00 | 170.00 | 43,180.00 | | 0020 | 701-08-00100 | Relaying Pipe | 4 | LNFT | 150.00 | 600.00 | 300.00 | 1,200.00 | | 0021 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 175.00 | 1,400.00 | 335.00 | 2,680.00 | | 0022 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 8 | LNFT | 200.00 | 1,600.00 | 350.00 | 2,800.00 | | 0023 | 701-15-00100 | Concrete Collar | 3 | EACH | 800.00 | 2,400.00 | 850.00 | 2,550.00 | | 0024 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 34 | SQYD | 100.00 | 3,400.00 | 80.00 | 2,720.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 34 | SQYD | 5.00 | 170.00 | 2.00 | 68.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | 30,000.00 | 30,000.00 | | 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14.03 | MILE | 200.00 | 2,806.00 | 150.00 | 2,104.50 | | 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 13.112 | MILE | 200.00 | 2,622.40 | 500.00 | 6,556.00 | | 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 41.241 | MILE | 200.00 | 8,248.20 | 750.00 | 30,930.75 | | 0030 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 2,073 | EACH | 2.00 | 4,146.00 | 2.00 | 4,146.00 | | 0031 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 10,000.00 | 10,000.00 | 4,000.00 | 4,000.00 | | 0032 | 726-01-00100 | Bedding Material | 83.2 | CUYD | 100.00 | 8,320.00 | 110.00 | 9,152.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 190,000.00 | 190,000.00 | 134,500.00 | 134,500.00 | | 0034 | 729-16-00200 | Object Marker Assembly (Type 2) | 64 | EACH | 100.00 | 6,400.00 | 75.00 | 4,800.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,261 | EACH | 6.00 | 7,566.00 | 6.00 | 7,566.00 | | 0036 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 269 | LNFT | 4.00 | 1,076.00 | 4.00 | 1,076.00 | | 0037 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 240 | LNFT | 15.00 | 3,600.00 | 14.00 | 3,360.00 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 20.62 | MILE | 4,000.00 | 82,480.00 | 3,500.00 | 72,170.00 | | 0039 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.556 | MILE | 1,000.00 | 6,556.00 | 1,200.00 | 7,867.20 | | 0040 | 735-01-00100 | Mailboxes | 13 | EACH | 10.00 | 130.00 | 11.00 | 143.00 | | 0041 | 735-02-00100 | Mailbox Supports (Single) | 13 | EACH | 150.00 | 1,950.00 | 175.00 | 2,275.00 | | 0042 | 739-01-00100 | Hydro-Seeding | 0.5 | ACRE | 6,000.00 | 3,000.00 | 7,500.00 | 3,750.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 14,000.00 | 14,000.00 | 12,500.00 | 12,500.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,771,394.65 | | 2,982,682.59 |
|