Proposal:H.013079.6
Parish:Union
Routes:CHURCH STREET, W. FRANKLIN STREET
Description:TOWN OF FARMERVILLE SIDEWALKS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, CONCRETE SIDEWALKS, AND RELATED WORK
Estimated Construction Cost:$690,605.29
| Rank | License | Bidder | Construction Bid |
| 1 | 32563 | The Mabry Company Llc | $718,535.10 |
| 2 | 18546 | C W & W Contractors, Inc. | $738,535.58 |
| 3 | 49864 | Terral Construction L.L.C. | $769,253.10 |
| 4 | 15099 | Amethyst Construction, Inc. | $860,682.90 |
| 5 | 39001 | JD's Rebar & Construction Inc. | $1,008,769.89 |
| 6 | 63313 | BRIGGS BROTHERS ENTERPRISES CORPORATION | $1,072,550.43 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - The Mabry Company Llc | - 2 - C W & W Contractors, Inc. | - 3 - Terral Construction L.L.C. | - 4 - Amethyst Construction, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 10,000.00 | 10,000.00 | 11,900.00 | 11,900.00 | 40,000.00 | 40,000.00 | 14,000.00 | 14,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 8,000.00 | 8,000.00 | 14,800.00 | 14,800.00 | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 | | 0003 | 202-02-00020 | Removal of Concrete Bricks | 10 | SQYD | 50.00 | 500.00 | 50.00 | 500.00 | 200.00 | 2,000.00 | 20.00 | 200.00 | | 0004 | 202-02-00050 | Removal of Concrete Block Wall | 1 | LUMP | 1,200.00 | 1,200.00 | 500.00 | 500.00 | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | | 0005 | 202-02-02000 | Removal of Asphalt Drives | 269.4 | SQYD | 20.00 | 5,388.00 | 15.00 | 4,041.00 | 18.00 | 4,849.20 | 9.00 | 2,424.60 | | 0006 | 202-02-02020 | Removal of Asphalt Pavement | 51.5 | SQYD | 20.00 | 1,030.00 | 15.00 | 772.50 | 30.00 | 1,545.00 | 12.00 | 618.00 | | 0007 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 51.5 | SQYD | 10.00 | 515.00 | 20.00 | 1,030.00 | 30.00 | 1,545.00 | 12.00 | 618.00 | | 0008 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 75.3 | LNFT | 25.00 | 1,882.50 | 10.00 | 753.00 | 40.00 | 3,012.00 | 15.00 | 1,129.50 | | 0009 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,588 | SQYD | 20.00 | 31,760.00 | 15.00 | 23,820.00 | 18.00 | 28,584.00 | 15.00 | 23,820.00 | | 0010 | 202-02-06140 | Removal of Curbs (Concrete) | 85.2 | LNFT | 25.00 | 2,130.00 | 10.00 | 852.00 | 24.00 | 2,044.80 | 1.50 | 127.80 | | 0011 | 202-02-38300 | Removal of Sign and U-Channel Post | 20 | EACH | 150.00 | 3,000.00 | 29.00 | 580.00 | 30.00 | 600.00 | 70.00 | 1,400.00 | | 0012 | 202-03-38000 | Relocation of Sign (Street Signs, Parking Signs, Children Playing Sign) | 10 | EACH | 150.00 | 1,500.00 | 98.00 | 980.00 | 100.00 | 1,000.00 | 20.00 | 200.00 | | 0013 | 202-03-38020 | Relocation of Sign Pole (2" Galvanized) | 7 | EACH | 200.00 | 1,400.00 | 98.00 | 686.00 | 100.00 | 700.00 | 400.00 | 2,800.00 | | 0014 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 22,000.00 | 22,000.00 | 16,750.00 | 16,750.00 | 24,000.00 | 24,000.00 | 70,000.00 | 70,000.00 | | 0015 | 203-10-00100 | Cleaning Existing Ditches | 40 | LNFT | 25.00 | 1,000.00 | 45.00 | 1,800.00 | 20.00 | 800.00 | 30.00 | 1,200.00 | | 0016 | 204-02-00100 | Temporary Hay Bales | 112 | EACH | 20.00 | 2,240.00 | 12.50 | 1,400.00 | 25.00 | 2,800.00 | 16.00 | 1,792.00 | | 0017 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 250.00 | 1,250.00 | 230.00 | 1,150.00 | 100.00 | 500.00 | 210.00 | 1,050.00 | | 0018 | 204-06-00100 | Temporary Silt Fencing | 2,172 | LNFT | 3.25 | 7,059.00 | 4.60 | 9,991.20 | 3.00 | 6,516.00 | 3.50 | 7,602.00 | | 0019 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 12.6 | CUYD | 100.00 | 1,260.00 | 100.00 | 1,260.00 | 200.00 | 2,520.00 | 140.00 | 1,764.00 | | 0020 | 502-01-00100 | Asphalt Concrete | 112.3 | TON | 200.00 | 22,460.00 | 212.75 | 23,891.83 | 300.00 | 33,690.00 | 180.00 | 20,214.00 | | 0021 | 509-01-00100 | Milling Asphalt Pavement | 434 | SQYD | 10.00 | 4,340.00 | 24.75 | 10,741.50 | 20.00 | 8,680.00 | 20.00 | 8,680.00 | | 0022 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 28.1 | SQYD | 100.00 | 2,810.00 | 402.50 | 11,310.25 | 132.00 | 3,709.20 | 200.00 | 5,620.00 | | 0023 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 486 | LNFT | 80.00 | 38,880.00 | 75.00 | 36,450.00 | 55.00 | 26,730.00 | 60.00 | 29,160.00 | | 0024 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 348 | LNFT | 130.00 | 45,240.00 | 130.00 | 45,240.00 | 60.00 | 20,880.00 | 70.00 | 24,360.00 | | 0025 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 24 | LNFT | 90.00 | 2,160.00 | 250.00 | 6,000.00 | 125.00 | 3,000.00 | 60.00 | 1,440.00 | | 0026 | 701-15-00100 | Concrete Collar | 3 | EACH | 1,000.00 | 3,000.00 | 1,500.00 | 4,500.00 | 200.00 | 600.00 | 1,400.00 | 4,200.00 | | 0027 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 150 | LNFT | 2.00 | 300.00 | 17.00 | 2,550.00 | 1.00 | 150.00 | 1.00 | 150.00 | | 0028 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 3,800.00 | 3,800.00 | 4,500.00 | 4,500.00 | 6,000.00 | 6,000.00 | 6,000.00 | 6,000.00 | | 0029 | 702-03-00100 | Catch Basins (CB-01) | 12 | EACH | 3,600.00 | 43,200.00 | 3,500.00 | 42,000.00 | 4,000.00 | 48,000.00 | 5,500.00 | 66,000.00 | | 0030 | 702-03-00800 | Catch Basins (CB-09) | 1 | EACH | 5,000.00 | 5,000.00 | 6,500.00 | 6,500.00 | 5,000.00 | 5,000.00 | 6,500.00 | 6,500.00 | | 0031 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 3,500.00 | 3,500.00 | 3,000.00 | 3,000.00 | 3,000.00 | 3,000.00 | 3,000.00 | 3,000.00 | | 0032 | 706-01-00100 | Concrete Walk (4" Thick) | 2,484.7 | SQYD | 53.00 | 131,689.10 | 57.00 | 141,627.90 | 60.00 | 149,082.00 | 74.00 | 183,867.80 | | 0033 | 706-02-00200 | Concrete Drive (6" Thick) | 975.8 | SQYD | 65.00 | 63,427.00 | 65.00 | 63,427.00 | 80.00 | 78,064.00 | 94.00 | 91,725.20 | | 0034 | 706-02-00400 | Concrete Drive (10" Thick) | 558.4 | SQYD | 80.00 | 44,672.00 | 91.00 | 50,814.40 | 105.00 | 58,632.00 | 100.00 | 55,840.00 | | 0035 | 706-04-00100 | Handicapped Curb Ramps | 16 | EACH | 1,200.00 | 19,200.00 | 1,250.00 | 20,000.00 | 4,000.00 | 64,000.00 | 1,500.00 | 24,000.00 | | 0036 | 707-01-00200 | Concrete Curb (Barrier) | 355.1 | LNFT | 65.00 | 23,081.50 | 15.00 | 5,326.50 | 34.00 | 12,073.40 | 30.00 | 10,653.00 | | 0037 | 707-01-00300 | Concrete Curb (Mountable) | 17 | LNFT | 60.00 | 1,020.00 | 15.00 | 255.00 | 118.00 | 2,006.00 | 30.00 | 510.00 | | 0038 | 707-03-00100 | Combination Concrete Curb and Gutter | 193.5 | LNFT | 80.00 | 15,480.00 | 31.00 | 5,998.50 | 25.00 | 4,837.50 | 70.00 | 13,545.00 | | 0039 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 12,500.00 | 12,500.00 | 8,000.00 | 8,000.00 | 30,000.00 | 30,000.00 | | 0040 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 1,850 | SQYD | 6.50 | 12,025.00 | 8.50 | 15,725.00 | 5.50 | 10,175.00 | 8.00 | 14,800.00 | | 0041 | 726-01-00100 | Bedding Material | 183.6 | CUYD | 100.00 | 18,360.00 | 100.00 | 18,360.00 | 130.00 | 23,868.00 | 100.00 | 18,360.00 | | 0042 | 727-01-00100 | Mobilization | 1 | LUMP | 53,000.00 | 53,000.00 | 46,500.00 | 46,500.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | | 0043 | 729-01-00100 | Sign (Type A) | 117 | SQFT | 30.00 | 3,510.00 | 35.00 | 4,095.00 | 30.00 | 3,510.00 | 40.00 | 4,680.00 | | 0044 | 729-21-00100 | U-Channel Post | 21 | EACH | 175.00 | 3,675.00 | 96.00 | 2,016.00 | 90.00 | 1,890.00 | 80.00 | 1,680.00 | | 0045 | 735-01-00100 | Mailboxes | 4 | EACH | 10.00 | 40.00 | 5.00 | 20.00 | 100.00 | 400.00 | 30.00 | 120.00 | | 0046 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 150.00 | 600.00 | 225.00 | 900.00 | 130.00 | 520.00 | 300.00 | 1,200.00 | | 0047 | 739-01-00100 | Hydro-Seeding | 0.85 | ACRE | 5,500.00 | 4,675.00 | 3,500.00 | 2,975.00 | 3,000.00 | 2,550.00 | 5,000.00 | 4,250.00 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 | 19,000.00 | 19,000.00 | 12,000.00 | 12,000.00 | 30,000.00 | 30,000.00 | | 0049 | 741-11-00100 | Adjusting Water Valve | 4 | EACH | 1,000.00 | 4,000.00 | 500.00 | 2,000.00 | 500.00 | 2,000.00 | 400.00 | 1,600.00 | | 0050 | 741-11-00200 | Adjusting Water Valve and Meter Box | 4 | EACH | 1,000.00 | 4,000.00 | 750.00 | 3,000.00 | 500.00 | 2,000.00 | 800.00 | 3,200.00 | | 0051 | 805-01-00900 | Class A1 Concrete Pipe Headwall | 4.96 | CUYD | 2,000.00 | 9,920.00 | 2,200.00 | 10,912.00 | 1,500.00 | 7,440.00 | 2,500.00 | 12,400.00 | | 0052 | 806-01-00100 | Deformed Reinforcing Steel | 292 | LB | 5.00 | 1,460.00 | 1.50 | 438.00 | 2.00 | 584.00 | 5.00 | 1,460.00 | | 0053 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 2 | EACH | 1,000.00 | 2,000.00 | 4,500.00 | 9,000.00 | 3,000.00 | 6,000.00 | 4,000.00 | 8,000.00 | | 0054 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,178 | INLF | 2.00 | 2,356.00 | 2.00 | 2,356.00 | 2.00 | 2,356.00 | 1.50 | 1,767.00 | | 0055 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 770 | INLF | 2.00 | 1,540.00 | 2.00 | 1,540.00 | 3.00 | 2,310.00 | 1.50 | 1,155.00 | | 0056 | NS-700-00100 | Trench Drains | 1 | EACH | 1,500.00 | 1,500.00 | 3,500.00 | 3,500.00 | 1,500.00 | 1,500.00 | 1,800.00 | 1,800.00 | | 0057 | NS-719-00002 | Tree Trimming | 1 | LUMP | 3,500.00 | 3,500.00 | 2,500.00 | 2,500.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | | 0058 | NS-MSC-00120 | Drainage Structure Convert C.B. to M.H. | 1 | EACH | 2,000.00 | 2,000.00 | 3,500.00 | 3,500.00 | 4,000.00 | 4,000.00 | 3,000.00 | 3,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 718,535.10 | | 738,535.58 | | 769,253.10 | | 860,682.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - JD's Rebar & Construction Inc. | - 6 - BRIGGS BROTHERS ENTERPRISES CORPORATION | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 11,500.00 | 11,500.00 | 117,500.00 | 117,500.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 12,000.00 | 12,000.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-00020 | Removal of Concrete Bricks | 10 | SQYD | 2,228.98 | 22,289.80 | 10.00 | 100.00 | | 0004 | 202-02-00050 | Removal of Concrete Block Wall | 1 | LUMP | 13,347.12 | 13,347.12 | 22.00 | 22.00 | | 0005 | 202-02-02000 | Removal of Asphalt Drives | 269.4 | SQYD | 28.00 | 7,543.20 | 37.50 | 10,102.50 | | 0006 | 202-02-02020 | Removal of Asphalt Pavement | 51.5 | SQYD | 43.28 | 2,228.92 | 6.50 | 334.75 | | 0007 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 51.5 | SQYD | 34.62 | 1,782.93 | 8.25 | 424.88 | | 0008 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 75.3 | LNFT | 47.36 | 3,566.21 | 22.00 | 1,656.60 | | 0009 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,588 | SQYD | 22.00 | 34,936.00 | 17.00 | 26,996.00 | | 0010 | 202-02-06140 | Removal of Curbs (Concrete) | 85.2 | LNFT | 13.08 | 1,114.42 | 12.00 | 1,022.40 | | 0011 | 202-02-38300 | Removal of Sign and U-Channel Post | 20 | EACH | 55.72 | 1,114.40 | 49.25 | 985.00 | | 0012 | 202-03-38000 | Relocation of Sign (Street Signs, Parking Signs, Children Playing Sign) | 10 | EACH | 445.79 | 4,457.90 | 215.00 | 2,150.00 | | 0013 | 202-03-38020 | Relocation of Sign Pole (2" Galvanized) | 7 | EACH | 222.90 | 1,560.30 | 71.65 | 501.55 | | 0014 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 24,000.00 | 24,000.00 | 59,000.00 | 59,000.00 | | 0015 | 203-10-00100 | Cleaning Existing Ditches | 40 | LNFT | 55.27 | 2,210.80 | 9.50 | 380.00 | | 0016 | 204-02-00100 | Temporary Hay Bales | 112 | EACH | 20.74 | 2,322.88 | 43.50 | 4,872.00 | | 0017 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 345.59 | 1,727.95 | 150.00 | 750.00 | | 0018 | 204-06-00100 | Temporary Silt Fencing | 2,172 | LNFT | 4.84 | 10,512.48 | 5.50 | 11,946.00 | | 0019 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 12.6 | CUYD | 303.52 | 3,824.35 | 95.00 | 1,197.00 | | 0020 | 502-01-00100 | Asphalt Concrete | 112.3 | TON | 309.36 | 34,741.13 | 89.00 | 9,994.70 | | 0021 | 509-01-00100 | Milling Asphalt Pavement | 434 | SQYD | 49.03 | 21,279.02 | 2.25 | 976.50 | | 0022 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 28.1 | SQYD | 184.32 | 5,179.39 | 97.00 | 2,725.70 | | 0023 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 486 | LNFT | 89.47 | 43,482.42 | 142.00 | 69,012.00 | | 0024 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 348 | LNFT | 185.00 | 64,380.00 | 185.00 | 64,380.00 | | 0025 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 24 | LNFT | 263.26 | 6,318.24 | 86.00 | 2,064.00 | | 0026 | 701-15-00100 | Concrete Collar | 3 | EACH | 1,267.18 | 3,801.54 | 2,500.00 | 7,500.00 | | 0027 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 150 | LNFT | 10.66 | 1,599.00 | 25.00 | 3,750.00 | | 0028 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 10,373.48 | 10,373.48 | 5,300.00 | 5,300.00 | | 0029 | 702-03-00100 | Catch Basins (CB-01) | 12 | EACH | 3,597.39 | 43,168.68 | 4,500.00 | 54,000.00 | | 0030 | 702-03-00800 | Catch Basins (CB-09) | 1 | EACH | 10,603.88 | 10,603.88 | 5,850.00 | 5,850.00 | | 0031 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 2,879.96 | 2,879.96 | 1,900.00 | 1,900.00 | | 0032 | 706-01-00100 | Concrete Walk (4" Thick) | 2,484.7 | SQYD | 59.16 | 146,994.85 | 78.00 | 193,806.60 | | 0033 | 706-02-00200 | Concrete Drive (6" Thick) | 975.8 | SQYD | 88.78 | 86,631.52 | 90.00 | 87,822.00 | | 0034 | 706-02-00400 | Concrete Drive (10" Thick) | 558.4 | SQYD | 99.87 | 55,767.41 | 115.00 | 64,216.00 | | 0035 | 706-04-00100 | Handicapped Curb Ramps | 16 | EACH | 1,843.17 | 29,490.72 | 1,253.00 | 20,048.00 | | 0036 | 707-01-00200 | Concrete Curb (Barrier) | 355.1 | LNFT | 28.80 | 10,226.88 | 15.00 | 5,326.50 | | 0037 | 707-01-00300 | Concrete Curb (Mountable) | 17 | LNFT | 46.08 | 783.36 | 17.00 | 289.00 | | 0038 | 707-03-00100 | Combination Concrete Curb and Gutter | 193.5 | LNFT | 41.47 | 8,024.45 | 25.00 | 4,837.50 | | 0039 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 17,279.74 | 17,279.74 | 35,000.00 | 35,000.00 | | 0040 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 1,850 | SQYD | 7.14 | 13,209.00 | 13.00 | 24,050.00 | | 0041 | 726-01-00100 | Bedding Material | 183.6 | CUYD | 158.13 | 29,032.67 | 110.00 | 20,196.00 | | 0042 | 727-01-00100 | Mobilization | 1 | LUMP | 110,000.00 | 110,000.00 | 70,000.00 | 70,000.00 | | 0043 | 729-01-00100 | Sign (Type A) | 117 | SQFT | 46.08 | 5,391.36 | 23.50 | 2,749.50 | | 0044 | 729-21-00100 | U-Channel Post | 21 | EACH | 126.72 | 2,661.12 | 90.00 | 1,890.00 | | 0045 | 735-01-00100 | Mailboxes | 4 | EACH | 224.01 | 896.04 | 25.00 | 100.00 | | 0046 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 270.72 | 1,082.88 | 137.50 | 550.00 | | 0047 | 739-01-00100 | Hydro-Seeding | 0.85 | ACRE | 6,911.91 | 5,875.12 | 1,925.00 | 1,636.25 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,735.70 | 20,735.70 | 25,000.00 | 25,000.00 | | 0049 | 741-11-00100 | Adjusting Water Valve | 4 | EACH | 604.79 | 2,419.16 | 1,094.00 | 4,376.00 | | 0050 | 741-11-00200 | Adjusting Water Valve and Meter Box | 4 | EACH | 403.20 | 1,612.80 | 1,851.00 | 7,404.00 | | 0051 | 805-01-00900 | Class A1 Concrete Pipe Headwall | 4.96 | CUYD | 1,267.18 | 6,285.21 | 2,250.00 | 11,160.00 | | 0052 | 806-01-00100 | Deformed Reinforcing Steel | 292 | LB | 11.52 | 3,363.84 | 3.00 | 876.00 | | 0053 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 2 | EACH | 3,225.55 | 6,451.10 | 2,500.00 | 5,000.00 | | 0054 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,178 | INLF | 4.90 | 5,772.20 | 1.00 | 1,178.00 | | 0055 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 770 | INLF | 6.91 | 5,320.70 | 0.75 | 577.50 | | 0056 | NS-700-00100 | Trench Drains | 1 | EACH | 2,879.96 | 2,879.96 | 1,750.00 | 1,750.00 | | 0057 | NS-719-00002 | Tree Trimming | 1 | LUMP | 9,215.87 | 9,215.87 | 2,818.00 | 2,818.00 | | 0058 | NS-MSC-00120 | Drainage Structure Convert C.B. to M.H. | 1 | EACH | 11,519.83 | 11,519.83 | 2,500.00 | 2,500.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,008,769.89 | | 1,072,550.43 |
|