Proposal:H.012997.6
Parish:Lafayette
Routes:LA 343
Description:LA 343: LA 342 - US 90
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, THIN ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$915,946.57
| Rank | License | Bidder | Construction Bid |
| 1 | 51821 | Elliott Construction, LLC | $1,208,489.02 |
| 2 | 34356 | Prairie Contractors LLC | $1,243,292.79 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elliott Construction, LLC | - 2 - Prairie Contractors LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 295 | LNFT | 30.00 | 8,850.00 | 18.00 | 5,310.00 | | 0002 | 202-02-32120 | Removal of Pipe (Side Drain) (36" CMP/PP) | 100 | LNFT | 25.00 | 2,500.00 | 15.00 | 1,500.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 150 | CUYD | 30.00 | 4,500.00 | 50.00 | 7,500.00 | | 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 40 | EACH | 50.00 | 2,000.00 | 150.00 | 6,000.00 | | 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,038 | CUYD | 85.00 | 173,230.00 | 95.00 | 193,610.00 | | 0006 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 10 | CUYD | 125.00 | 1,250.00 | 100.00 | 1,000.00 | | 0007 | 501-02-00100 | Thin Asphalt Concrete (Coarse Mix) | 4,329.4 | TON | 140.00 | 606,116.00 | 105.00 | 454,587.00 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 23 | TON | 175.00 | 4,025.00 | 500.00 | 11,500.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 2,021 | SQYD | 5.00 | 10,105.00 | 16.00 | 32,336.00 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -28 | CUYD | 0.01 | -0.28 | 0.01 | -0.28 | | 0011 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 60 | SQYD | 200.00 | 12,000.00 | 225.00 | 13,500.00 | | 0012 | 701-05-02101 | Side Drain Pipe (Erosion) (36" RPVCP/CPEPDW/CMP) | 110 | LNFT | 110.00 | 12,100.00 | 160.00 | 17,600.00 | | 0013 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,500.00 | 3,000.00 | 900.00 | 1,800.00 | | 0014 | 701-16-02040 | Plastic Pipe (Extension) (24" CPEPDW) | 98 | LNFT | 125.00 | 12,250.00 | 145.00 | 14,210.00 | | 0015 | 701-16-02080 | Plastic Pipe (Extension) (36" CPEPDW) | 24 | LNFT | 150.00 | 3,600.00 | 160.00 | 3,840.00 | | 0016 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 110 | LNFT | 15.00 | 1,650.00 | 5.00 | 550.00 | | 0017 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 175 | LNFT | 57.00 | 9,975.00 | 75.00 | 13,125.00 | | 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 81.25 | LNFT | 37.00 | 3,006.25 | 30.00 | 2,437.50 | | 0019 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 5,300.00 | 10,600.00 | 4,500.00 | 9,000.00 | | 0020 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 2 | EACH | 5,000.00 | 10,000.00 | 4,000.00 | 8,000.00 | | 0021 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 55 | SQYD | 125.00 | 6,875.00 | 95.00 | 5,225.00 | | 0022 | 711-04-00100 | Geotextile Fabric | 55 | SQYD | 10.00 | 550.00 | 5.00 | 275.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 115,000.00 | 115,000.00 | | 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 204 | LNFT | 1.50 | 306.00 | 0.01 | 2.04 | | 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.211 | MILE | 750.00 | 3,908.25 | 600.00 | 3,126.60 | | 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.754 | MILE | 700.00 | 3,327.80 | 1.00 | 4.75 | | 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 11.675 | MILE | 850.00 | 9,923.75 | 1.00 | 11.68 | | 0028 | 724-01-00100 | Rumble Strips (Centerline) | 5.21 | MILE | 300.00 | 1,563.00 | 1,200.00 | 6,252.00 | | 0029 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 10.42 | MILE | 300.00 | 3,126.00 | 1,200.00 | 12,504.00 | | 0030 | 726-01-00100 | Bedding Material | 25 | CUYD | 100.00 | 2,500.00 | 110.00 | 2,750.00 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 120,000.00 | 120,000.00 | 200,000.00 | 200,000.00 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 150.00 | 900.00 | 120.00 | 720.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 690 | EACH | 8.00 | 5,520.00 | 7.50 | 5,175.00 | | 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 204 | LNFT | 8.00 | 1,632.00 | 8.00 | 1,632.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.675 | MILE | 3,700.00 | 43,197.50 | 3,500.00 | 40,862.50 | | 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.754 | MILE | 1,375.00 | 6,536.75 | 1,500.00 | 7,131.00 | | 0037 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 600.00 | 600.00 | 750.00 | 750.00 | | 0038 | 732-04-19100 | Plastic Pavement Legends and Symbols (STOP AHEAD) | 2 | EACH | 500.00 | 1,000.00 | 600.00 | 1,200.00 | | 0039 | 732-05-00100 | Removal of Existing Markings | 5.211 | MILE | 6,000.00 | 31,266.00 | 6,000.00 | 31,266.00 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 12,000.00 | 12,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,208,489.02 | | 1,243,292.79 |
|