Search


Bid Tabulations for the Letting of 12/11/2019 LA DOTD Headquarters

Proposal:H.012997.6
Parish:Lafayette
Routes:LA 343
Description:LA 343: LA 342 - US 90
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, THIN ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$915,946.57
Rank License BidderConstruction Bid
151821Elliott Construction, LLC$1,208,489.02
234356Prairie Contractors LLC$1,243,292.79


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Elliott Construction, LLC
- 2 -
Prairie Contractors LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-14500Removal of Guard Rail 295     LNFT30.008,850.0018.005,310.00
0002202-02-32120Removal of Pipe (Side Drain) (36" CMP/PP)100     LNFT25.002,500.0015.001,500.00
0003203-07-00100Borrow (Vehicular Measurement) 150     CUYD30.004,500.0050.007,500.00
0004204-05-00100Temporary Sediment Check Dams (Hay) 40     EACH50.002,000.00150.006,000.00
0005401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 2,038     CUYD85.00173,230.0095.00193,610.00
0006402-03-00100Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 10     CUYD125.001,250.00100.001,000.00
0007501-02-00100Thin Asphalt Concrete (Coarse Mix) 4,329.4   TON140.00606,116.00105.00454,587.00
0008502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 23     TON175.004,025.00500.0011,500.00
0009509-01-00100Milling Asphalt Pavement 2,021     SQYD5.0010,105.0016.0032,336.00
0010509-02-00100Contractor Retained Reclaimed Asphalt Pavement -28     CUYD0.01-0.280.01-0.28
0011510-01-00260Pavement Patching (16 inch Minimum Thickness) 60     SQYD200.0012,000.00225.0013,500.00
0012701-05-02101Side Drain Pipe (Erosion) (36" RPVCP/CPEPDW/CMP) 110     LNFT110.0012,100.00160.0017,600.00
0013701-15-00100Concrete Collar 2     EACH1,500.003,000.00900.001,800.00
0014701-16-02040Plastic Pipe (Extension) (24" CPEPDW) 98     LNFT125.0012,250.00145.0014,210.00
0015701-16-02080Plastic Pipe (Extension) (36" CPEPDW) 24     LNFT150.003,600.00160.003,840.00
0016701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 110     LNFT15.001,650.005.00550.00
0017704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 175     LNFT57.009,975.0075.0013,125.00
0018704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 81.25  LNFT37.003,006.2530.002,437.50
0019704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 2     EACH5,300.0010,600.004,500.009,000.00
0020704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 2     EACH5,000.0010,000.004,000.008,000.00
0021711-01-04020Riprap (55 lb, 24" Thick) 55     SQYD125.006,875.0095.005,225.00
0022711-04-00100Geotextile Fabric 55     SQYD10.00550.005.00275.00
0023713-01-00100Temporary Signs and Barricades 1     LUMP50,000.0050,000.00115,000.00115,000.00
0024713-02-00500Temporary Pavement Markings (24" Width) 204     LNFT1.50306.000.012.04
0025713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 5.211 MILE750.003,908.25600.003,126.60
0026713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 4.754 MILE700.003,327.801.004.75
0027713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 11.675 MILE850.009,923.751.0011.68
0028724-01-00100Rumble Strips (Centerline) 5.21  MILE300.001,563.001,200.006,252.00
0029724-02-00100Rumble Strips (Shoulder/Edge) 10.42  MILE300.003,126.001,200.0012,504.00
0030726-01-00100Bedding Material 25     CUYD100.002,500.00110.002,750.00
0031727-01-00100Mobilization 1     LUMP120,000.00120,000.00200,000.00200,000.00
0032729-16-00300Object Marker Assembly (Type 3) 6     EACH150.00900.00120.00720.00
0033731-02-00100Reflectorized Raised Pavement Markers 690     EACH8.005,520.007.505,175.00
0034732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 204     LNFT8.001,632.008.001,632.00
0035732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 11.675 MILE3,700.0043,197.503,500.0040,862.50
0036732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 4.754 MILE1,375.006,536.751,500.007,131.00
0037732-04-18000Plastic Pavement Legends and Symbols (RR Crossing) 1     EACH600.00600.00750.00750.00
0038732-04-19100Plastic Pavement Legends and Symbols (STOP AHEAD) 2     EACH500.001,000.00600.001,200.00
0039732-05-00100Removal of Existing Markings 5.211 MILE6,000.0031,266.006,000.0031,266.00
0040740-01-00100Construction Layout 1     LUMP25,000.0025,000.0012,000.0012,000.00
         
  CONTRACTOR TOTAL   1,208,489.02 1,243,292.79