Proposal:H.011835.6
Parish:Washington
Routes:LA 10, LA 16, LA 25
Description:LA 25: WASHINGTON PARISH SW, SEG B AND C
Type Construction:DRAINAGE STRUCTURES, CONCRETE SIDEWALKS, AND RELATED WORK.
Estimated Construction Cost:$360,762.20
| Rank | License | Bidder | Construction Bid |
| 1 | 68237 | GULF STATES SERVICES, LLC | $452,593.18 |
| 2 | 63313 | BRIGGS BROTHERS ENTERPRISES CORPORATION | $540,832.50 |
| 3 | 54896 | Magee Excavation & Development LLC | $693,650.00 |
| 4 | 39001 | JD's Rebar & Construction Inc. | $731,797.60 |
| 5 | 16378 | Mcdonald Const. Inc. of Slidell | $929,127.84 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GULF STATES SERVICES, LLC | - 2 - BRIGGS BROTHERS ENTERPRISES CORPORATION | - 3 - Magee Excavation & Development LLC | - 4 - JD's Rebar & Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 11,000.00 | 11,000.00 | | 0002 | 202-02-00020 | Removal of Asphalt Concrete Pavement over Portland Cement Composite Pavement | 97 | SQYD | 65.00 | 6,305.00 | 40.00 | 3,880.00 | 42.00 | 4,074.00 | 125.00 | 12,125.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 165 | SQYD | 25.00 | 4,125.00 | 40.00 | 6,600.00 | 27.00 | 4,455.00 | 30.00 | 4,950.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 113.9 | SQYD | 30.00 | 3,417.00 | 40.00 | 4,556.00 | 52.50 | 5,979.75 | 25.00 | 2,847.50 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 686 | LNFT | 15.00 | 10,290.00 | 30.00 | 20,580.00 | 3.00 | 2,058.00 | 15.00 | 10,290.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,677 | SQYD | 25.00 | 41,925.00 | 30.00 | 50,310.00 | 30.00 | 50,310.00 | 21.00 | 35,217.00 | | 0007 | 202-02-06140 | Removal of Curbs (Concrete) | 362 | LNFT | 20.00 | 7,240.00 | 50.00 | 18,100.00 | 8.00 | 2,896.00 | 12.00 | 4,344.00 | | 0008 | 202-02-38240 | Removal of Signs and Supports | 20 | EACH | 25.00 | 500.00 | 20.00 | 400.00 | 30.00 | 600.00 | 90.00 | 1,800.00 | | 0009 | 203-10-00100 | Cleaning Existing Ditches | 110 | LNFT | 3.00 | 330.00 | 25.00 | 2,750.00 | 30.00 | 3,300.00 | 20.00 | 2,200.00 | | 0010 | 204-02-00100 | Temporary Hay Bales | 154 | EACH | 1.00 | 154.00 | 30.00 | 4,620.00 | 12.00 | 1,848.00 | 20.00 | 3,080.00 | | 0011 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 55.00 | 5,500.00 | 90.00 | 9,000.00 | 70.00 | 7,000.00 | 55.00 | 5,500.00 | | 0012 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 114 | LNFT | 125.00 | 14,250.00 | 142.00 | 16,188.00 | 256.00 | 29,184.00 | 85.00 | 9,690.00 | | 0013 | 701-05-01046 | Side Drain Pipe (18" RCP/RPVCP) | 8 | LNFT | 175.00 | 1,400.00 | 100.00 | 800.00 | 1,137.00 | 9,096.00 | 72.00 | 576.00 | | 0014 | 701-07-00100 | Yard Drain Pipe (4") | 6 | LNFT | 50.00 | 300.00 | 22.00 | 132.00 | 160.00 | 960.00 | 35.00 | 210.00 | | 0015 | 701-07-00300 | Yard Drain Pipe (8") | 10 | LNFT | 50.00 | 500.00 | 110.50 | 1,105.00 | 94.00 | 940.00 | 75.00 | 750.00 | | 0016 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 6 | LNFT | 150.00 | 900.00 | 86.90 | 521.40 | 220.00 | 1,320.00 | 275.00 | 1,650.00 | | 0017 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,300.00 | 1,300.00 | 3,500.00 | 3,500.00 | 150.00 | 150.00 | 2,200.00 | 2,200.00 | | 0018 | 702-02-00100 | Manholes (MH-06) | 3 | EACH | 4,500.00 | 13,500.00 | 4,000.00 | 12,000.00 | 3,300.00 | 9,900.00 | 14,000.00 | 42,000.00 | | 0019 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 3,200.00 | 6,400.00 | 4,500.00 | 9,000.00 | 4,130.00 | 8,260.00 | 3,500.00 | 7,000.00 | | 0020 | 702-03-00300 | Catch Basins (CB-04) | 2 | EACH | 2,400.00 | 4,800.00 | 4,325.00 | 8,650.00 | 3,000.00 | 6,000.00 | 4,000.00 | 8,000.00 | | 0021 | 702-03-00400 | Catch Basins (CB-05) | 2 | EACH | 1,250.00 | 2,500.00 | 2,362.50 | 4,725.00 | 1,950.00 | 3,900.00 | 3,200.00 | 6,400.00 | | 0022 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,200.00 | 1,200.00 | 1,600.00 | 1,600.00 | 2,735.00 | 2,735.00 | 2,000.00 | 2,000.00 | | 0023 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 1,000.00 | 3,000.00 | 3,500.00 | 10,500.00 | 1,200.00 | 3,600.00 | 2,500.00 | 7,500.00 | | 0024 | 706-01-10000 | Concrete Walk (Colored)(inch Thick) (5") | 1,471.3 | SQYD | 90.00 | 132,417.00 | 61.00 | 89,749.30 | 150.00 | 220,695.00 | 85.00 | 125,060.50 | | 0025 | 706-01-10000 | Concrete Walk (Colored)(inch Thick) (6") | 272.3 | SQYD | 90.00 | 24,507.00 | 105.00 | 28,591.50 | 213.00 | 57,999.90 | 80.00 | 21,784.00 | | 0026 | 706-02-00200 | Concrete Drive (6" Thick) | 100.5 | SQYD | 90.00 | 9,045.00 | 90.00 | 9,045.00 | 185.00 | 18,592.50 | 60.00 | 6,030.00 | | 0027 | 706-04-00100 | Handicapped Curb Ramps | 32 | EACH | 1,100.00 | 35,200.00 | 1,500.00 | 48,000.00 | 1,840.00 | 58,880.00 | 1,800.00 | 57,600.00 | | 0028 | 707-01-00200 | Concrete Curb (Barrier) | 111.5 | LNFT | 25.00 | 2,787.50 | 24.00 | 2,676.00 | 13.00 | 1,449.50 | 20.00 | 2,230.00 | | 0029 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,019.8 | LNFT | 35.00 | 35,693.00 | 25.00 | 25,495.00 | 15.00 | 15,297.00 | 32.00 | 32,633.60 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 12,500.00 | 12,500.00 | 7,500.00 | 7,500.00 | 12,000.00 | 12,000.00 | | 0031 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 692 | SQYD | 5.00 | 3,460.00 | 26.00 | 17,992.00 | 5.50 | 3,806.00 | 12.00 | 8,304.00 | | 0032 | 726-01-00100 | Bedding Material | 18.08 | CUYD | 1.00 | 18.08 | 110.00 | 1,988.80 | 60.00 | 1,084.80 | 100.00 | 1,808.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 18,000.00 | 18,000.00 | 45,000.00 | 45,000.00 | 70,000.00 | 70,000.00 | 180,000.00 | 180,000.00 | | 0034 | 729-01-00100 | Sign (Type A) | 45.5 | SQFT | 30.00 | 1,365.00 | 29.00 | 1,319.50 | 20.00 | 910.00 | 32.00 | 1,456.00 | | 0035 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 12 | EACH | 110.00 | 1,320.00 | 90.00 | 1,080.00 | 134.00 | 1,608.00 | 110.00 | 1,320.00 | | 0036 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 32 | LNFT | 97.00 | 3,104.00 | 50.00 | 1,600.00 | 33.50 | 1,072.00 | 125.00 | 4,000.00 | | 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 5,208.85 | 5,208.85 | 18,000.00 | 18,000.00 | | 0038 | 741-06-00100 | Relocating Fire Hydrant | 1 | EACH | 3,500.00 | 3,500.00 | 7,500.00 | 7,500.00 | 9,700.00 | 9,700.00 | 5,000.00 | 5,000.00 | | 0039 | 741-11-00200 | Adjusting Water Valve and Meter Box | 5 | EACH | 200.00 | 1,000.00 | 1,851.00 | 9,255.00 | 2,150.00 | 10,750.00 | 225.00 | 1,125.00 | | 0040 | NS-201-00005 | Arborist Services (Branches and Roots) | 1 | LUMP | 2,000.00 | 2,000.00 | 11,000.00 | 11,000.00 | 300.00 | 300.00 | 15,000.00 | 15,000.00 | | 0041 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 5,766 | INLF | 1.50 | 8,649.00 | 1.00 | 5,766.00 | 3.35 | 19,316.10 | 4.50 | 25,947.00 | | 0042 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 4,744 | INLF | 1.65 | 7,827.60 | 0.75 | 3,558.00 | 3.35 | 15,892.40 | 4.00 | 18,976.00 | | 0043 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 932 | INLF | 2.00 | 1,864.00 | 0.75 | 699.00 | 3.35 | 3,122.20 | 4.50 | 4,194.00 | | 0044 | TS-MSC-01040 | Adjusting Utility Boxes (Electrical) | 1 | EACH | 1,000.00 | 1,000.00 | 3,500.00 | 3,500.00 | 1,900.00 | 1,900.00 | 8,000.00 | 8,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 452,593.18 | | 540,832.50 | | 693,650.00 | | 731,797.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Mcdonald Const. Inc. of Slidell | | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | | 0002 | 202-02-00020 | Removal of Asphalt Concrete Pavement over Portland Cement Composite Pavement | 97 | SQYD | 20.00 | 1,940.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 165 | SQYD | 18.00 | 2,970.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 113.9 | SQYD | 18.00 | 2,050.20 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 686 | LNFT | 14.00 | 9,604.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,677 | SQYD | 14.00 | 23,478.00 | | 0007 | 202-02-06140 | Removal of Curbs (Concrete) | 362 | LNFT | 12.00 | 4,344.00 | | 0008 | 202-02-38240 | Removal of Signs and Supports | 20 | EACH | 50.00 | 1,000.00 | | 0009 | 203-10-00100 | Cleaning Existing Ditches | 110 | LNFT | 9.00 | 990.00 | | 0010 | 204-02-00100 | Temporary Hay Bales | 154 | EACH | 8.00 | 1,232.00 | | 0011 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 82.00 | 8,200.00 | | 0012 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 114 | LNFT | 68.00 | 7,752.00 | | 0013 | 701-05-01046 | Side Drain Pipe (18" RCP/RPVCP) | 8 | LNFT | 120.00 | 960.00 | | 0014 | 701-07-00100 | Yard Drain Pipe (4") | 6 | LNFT | 20.00 | 120.00 | | 0015 | 701-07-00300 | Yard Drain Pipe (8") | 10 | LNFT | 20.00 | 200.00 | | 0016 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 6 | LNFT | 120.00 | 720.00 | | 0017 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,800.00 | 1,800.00 | | 0018 | 702-02-00100 | Manholes (MH-06) | 3 | EACH | 8,200.00 | 24,600.00 | | 0019 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 3,200.00 | 6,400.00 | | 0020 | 702-03-00300 | Catch Basins (CB-04) | 2 | EACH | 2,100.00 | 4,200.00 | | 0021 | 702-03-00400 | Catch Basins (CB-05) | 2 | EACH | 2,100.00 | 4,200.00 | | 0022 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,800.00 | 1,800.00 | | 0023 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 1,600.00 | 4,800.00 | | 0024 | 706-01-10000 | Concrete Walk (Colored)(inch Thick) (5") | 1,471.3 | SQYD | 338.00 | 497,299.40 | | 0025 | 706-01-10000 | Concrete Walk (Colored)(inch Thick) (6") | 272.3 | SQYD | 338.00 | 92,037.40 | | 0026 | 706-02-00200 | Concrete Drive (6" Thick) | 100.5 | SQYD | 80.00 | 8,040.00 | | 0027 | 706-04-00100 | Handicapped Curb Ramps | 32 | EACH | 1,500.00 | 48,000.00 | | 0028 | 707-01-00200 | Concrete Curb (Barrier) | 111.5 | LNFT | 40.00 | 4,460.00 | | 0029 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,019.8 | LNFT | 42.00 | 42,831.60 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,000.00 | 12,000.00 | | 0031 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 692 | SQYD | 14.00 | 9,688.00 | | 0032 | 726-01-00100 | Bedding Material | 18.08 | CUYD | 78.00 | 1,410.24 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 25,000.00 | 25,000.00 | | 0034 | 729-01-00100 | Sign (Type A) | 45.5 | SQFT | 30.00 | 1,365.00 | | 0035 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 12 | EACH | 200.00 | 2,400.00 | | 0036 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 32 | LNFT | 86.00 | 2,752.00 | | 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | | 0038 | 741-06-00100 | Relocating Fire Hydrant | 1 | EACH | 5,600.00 | 5,600.00 | | 0039 | 741-11-00200 | Adjusting Water Valve and Meter Box | 5 | EACH | 300.00 | 1,500.00 | | 0040 | NS-201-00005 | Arborist Services (Branches and Roots) | 1 | LUMP | 3,500.00 | 3,500.00 | | 0041 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 5,766 | INLF | 2.00 | 11,532.00 | | 0042 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 4,744 | INLF | 2.00 | 9,488.00 | | 0043 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 932 | INLF | 2.00 | 1,864.00 | | 0044 | TS-MSC-01040 | Adjusting Utility Boxes (Electrical) | 1 | EACH | 5,000.00 | 5,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 929,127.84 |
|