Proposal:H.011824.6
Parish:Livingston
Routes:LA 1026
Description:LA 1026: ROUNDABOUT AT BUDDY ELLIS RD
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, TEMPORARY TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$3,746,181.80
| Rank | License | Bidder | Construction Bid |
| 1 | 54896 | Magee Excavation & Development LLC | $3,134,000.00 |
| 2 | 57931 | KCR CONTRACTORS, LLC | $3,169,060.79 |
| 3 | 14807 | Richard Price Contracting Co, Llc | $3,354,890.95 |
| 4 | 55950 | Brown Industrial Construction, LLC | $3,398,705.35 |
| 5 | 34263 | La Contracting Enterprise LLC | $3,403,300.89 |
| 6 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $3,530,376.83 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Magee Excavation & Development LLC | - 2 - KCR CONTRACTORS, LLC | - 3 - Richard Price Contracting Co, Llc | - 4 - Brown Industrial Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 43,000.00 | 43,000.00 | 300,899.11 | 300,899.11 | 45,000.00 | 45,000.00 | 250,000.00 | 250,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 4,750.00 | 4,750.00 | 25,875.00 | 25,875.00 | 50,000.00 | 50,000.00 | 8,000.00 | 8,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 669.4 | SQYD | 11.00 | 7,363.40 | 2.81 | 1,881.01 | 10.00 | 6,694.00 | 4.00 | 2,677.60 | | 0004 | 202-02-03010 | Removal of Base – Recycled PCC or Stone 10" | 12,166.1 | SQYD | 11.00 | 133,827.10 | 1.53 | 18,614.13 | 9.00 | 109,494.90 | 5.00 | 60,830.50 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 461 | SQYD | 11.00 | 5,071.00 | 11.29 | 5,204.69 | 11.00 | 5,071.00 | 11.00 | 5,071.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) Varies | 272 | LNFT | 10.00 | 2,720.00 | 8.63 | 2,347.36 | 20.00 | 5,440.00 | 12.00 | 3,264.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) Side Drain | 38 | LNFT | 14.50 | 551.00 | 11.12 | 422.56 | 24.00 | 912.00 | 13.00 | 494.00 | | 0008 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 11,018.8 | SQYD | 25.00 | 275,470.00 | 6.74 | 74,266.71 | 9.00 | 99,169.20 | 7.50 | 82,641.00 | | 0009 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 17,000.00 | 17,000.00 | 8,289.60 | 8,289.60 | 22,000.00 | 22,000.00 | 10,000.00 | 10,000.00 | | 0010 | 203-01-00100 | General Excavation | 4,205 | CUYD | 18.00 | 75,690.00 | 11.17 | 46,969.85 | 12.00 | 50,460.00 | 10.00 | 42,050.00 | | 0011 | 203-03-00100 | Embankment | 3,985 | CUYD | 25.00 | 99,625.00 | 34.66 | 138,120.10 | 21.00 | 83,685.00 | 30.00 | 119,550.00 | | 0012 | 203-10-00100 | Cleaning Existing Ditches | 217 | LNFT | 6.50 | 1,410.50 | 8.61 | 1,868.37 | 16.00 | 3,472.00 | 15.00 | 3,255.00 | | 0013 | 204-02-00100 | Temporary Hay Bales | 117 | EACH | 12.00 | 1,404.00 | 17.05 | 1,994.85 | 35.00 | 4,095.00 | 16.00 | 1,872.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 5,215 | LNFT | 1.50 | 7,822.50 | 1.61 | 8,396.15 | 2.95 | 15,384.25 | 1.75 | 9,126.25 | | 0015 | 302-02-10000 | Class II Base Course (10" Thick) | 11,255.2 | SQYD | 26.00 | 292,635.20 | 32.22 | 362,642.54 | 30.00 | 337,656.00 | 26.50 | 298,262.80 | | 0016 | 304-01-00100 | Lime | 159.54 | TON | 300.00 | 47,862.00 | 7.01 | 1,118.38 | 240.00 | 38,289.60 | 190.00 | 30,312.60 | | 0017 | 304-05-00100 | Lime Treatment (Type E) | 11,255 | SQYD | 3.35 | 37,704.25 | 0.17 | 1,913.35 | 2.75 | 30,951.25 | 1.20 | 13,506.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 432 | TON | 180.00 | 77,760.00 | 181.70 | 78,494.40 | 158.00 | 68,256.00 | 164.00 | 70,848.00 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 1,503 | SQYD | 12.00 | 18,036.00 | 14.95 | 22,469.85 | 16.00 | 24,048.00 | 11.00 | 16,533.00 | | 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -33 | CUYD | 0.01 | -0.33 | 0.10 | -3.30 | 1.00 | -33.00 | 0.01 | -0.33 | | 0021 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 7,902.2 | SQYD | 73.00 | 576,860.60 | 74.50 | 588,713.90 | 90.00 | 711,198.00 | 82.00 | 647,980.40 | | 0022 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) 10" | 1,608.3 | SQYD | 106.50 | 171,283.95 | 149.20 | 239,958.36 | 130.00 | 209,079.00 | 115.00 | 184,954.50 | | 0023 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) 13" | 741.5 | SQYD | 141.50 | 104,922.25 | 173.68 | 128,783.72 | 144.50 | 107,146.75 | 140.00 | 103,810.00 | | 0024 | 701-01-01024 | Cross Drain Pipe (30" RCP/RPVCP) | 249 | LNFT | 100.00 | 24,900.00 | 142.89 | 35,579.61 | 90.00 | 22,410.00 | 100.00 | 24,900.00 | | 0025 | 701-01-01043 | Cross Drain Pipe (36" RCP/RPVCP) | 244 | LNFT | 127.00 | 30,988.00 | 164.08 | 40,035.52 | 103.00 | 25,132.00 | 120.00 | 29,280.00 | | 0026 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 85 | LNFT | 155.00 | 13,175.00 | 156.10 | 13,268.50 | 137.00 | 11,645.00 | 125.00 | 10,625.00 | | 0027 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 78 | LNFT | 75.00 | 5,850.00 | 106.71 | 8,323.38 | 53.50 | 4,173.00 | 85.00 | 6,630.00 | | 0028 | 701-05-01045 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW) | 54 | LNFT | 75.00 | 4,050.00 | 81.79 | 4,416.66 | 53.50 | 2,889.00 | 75.00 | 4,050.00 | | 0029 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 254 | LNFT | 5.00 | 1,270.00 | 10.64 | 2,702.56 | 9.00 | 2,286.00 | 2.00 | 508.00 | | 0030 | 702-02-00200 | Manholes (R-CB-11) | 2 | EACH | 2,800.00 | 5,600.00 | 3,209.34 | 6,418.68 | 4,150.00 | 8,300.00 | 4,000.00 | 8,000.00 | | 0031 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,200.00 | 3,200.00 | 2,443.75 | 2,443.75 | 4,000.00 | 4,000.00 | 3,500.00 | 3,500.00 | | 0032 | 705-01-00100 | Barbed Wire Fence | 168 | LNFT | 14.00 | 2,352.00 | 13.75 | 2,310.00 | 14.50 | 2,436.00 | 12.50 | 2,100.00 | | 0033 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 77 | LNFT | 28.50 | 2,194.50 | 28.05 | 2,159.85 | 29.75 | 2,290.75 | 26.00 | 2,002.00 | | 0034 | 706-02-00200 | Concrete Drive (6" Thick) | 102.3 | SQYD | 60.00 | 6,138.00 | 64.59 | 6,607.56 | 54.50 | 5,575.35 | 72.00 | 7,365.60 | | 0035 | 706-02-00300 | Concrete Drive (8" Thick) | 450 | SQYD | 62.00 | 27,900.00 | 72.86 | 32,787.00 | 75.50 | 33,975.00 | 80.00 | 36,000.00 | | 0036 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) 3" | 430.1 | SQYD | 45.00 | 19,354.50 | 73.53 | 31,625.25 | 56.00 | 24,085.60 | 42.00 | 18,064.20 | | 0037 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) 4" | 218.6 | SQYD | 54.00 | 11,804.40 | 74.70 | 16,329.42 | 65.00 | 14,209.00 | 50.00 | 10,930.00 | | 0038 | 707-01-00200 | Concrete Curb (Barrier) | 235.6 | LNFT | 15.00 | 3,534.00 | 13.42 | 3,161.75 | 11.25 | 2,650.50 | 12.00 | 2,827.20 | | 0039 | 707-01-00300 | Concrete Curb (Mountable) | 3,674.2 | LNFT | 15.00 | 55,113.00 | 22.42 | 82,375.56 | 15.00 | 55,113.00 | 15.00 | 55,113.00 | | 0040 | 708-01-00100 | Right-of-Way Monument | 12 | EACH | 400.00 | 4,800.00 | 208.33 | 2,499.96 | 225.00 | 2,700.00 | 350.00 | 4,200.00 | | 0041 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 45,000.00 | 45,000.00 | 66,125.00 | 66,125.00 | 57,000.00 | 57,000.00 | 50,000.00 | 50,000.00 | | 0042 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 7,352 | LNFT | 0.25 | 1,838.00 | 0.39 | 2,867.28 | 0.40 | 2,940.80 | 0.22 | 1,617.44 | | 0043 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 762 | LNFT | 1.40 | 1,066.80 | 0.83 | 632.46 | 0.90 | 685.80 | 1.25 | 952.50 | | 0044 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 185 | LNFT | 2.25 | 416.25 | 1.65 | 305.25 | 1.75 | 323.75 | 2.00 | 370.00 | | 0045 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.569 | MILE | 1,350.00 | 768.15 | 301.37 | 171.48 | 2,300.00 | 1,308.70 | 400.00 | 227.60 | | 0046 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 128 | EACH | 5.50 | 704.00 | 7.15 | 915.20 | 7.50 | 960.00 | 5.00 | 640.00 | | 0047 | 713-11-00100 | Portable Changeable Message Signs | 6 | EACH | 5,850.00 | 35,100.00 | 6,900.00 | 41,400.00 | 5,500.00 | 33,000.00 | 3,000.00 | 18,000.00 | | 0048 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 491 | SQYD | 9.50 | 4,664.50 | 9.35 | 4,590.85 | 9.75 | 4,787.25 | 8.50 | 4,173.50 | | 0049 | 716-01-00100 | Mulch (Vegetative) | 18.2 | TON | 600.00 | 10,920.00 | 610.44 | 11,110.01 | 650.00 | 11,830.00 | 550.00 | 10,010.00 | | 0050 | 717-01-00100 | Seeding | 272 | LB | 20.00 | 5,440.00 | 19.80 | 5,385.60 | 21.00 | 5,712.00 | 18.00 | 4,896.00 | | 0051 | 718-01-00100 | Fertilizer | 9,080 | LB | 0.70 | 6,356.00 | 0.72 | 6,537.60 | 0.75 | 6,810.00 | 0.65 | 5,902.00 | | 0052 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 89 | SQYD | 2.75 | 244.75 | 2.75 | 244.75 | 2.95 | 262.55 | 2.50 | 222.50 | | 0053 | 725-01-00100 | Temporary Detour Roads | 6,028.9 | SQYD | 80.00 | 482,312.00 | 45.60 | 274,917.84 | 70.00 | 422,023.00 | 78.00 | 470,254.20 | | 0054 | 726-01-00100 | Bedding Material | 78 | CUYD | 65.00 | 5,070.00 | 86.25 | 6,727.50 | 50.00 | 3,900.00 | 95.00 | 7,410.00 | | 0055 | 727-01-00100 | Mobilization | 1 | LUMP | 49,990.71 | 49,990.71 | 108,124.50 | 108,124.50 | 150,000.00 | 150,000.00 | 330,000.00 | 330,000.00 | | 0056 | 729-01-00100 | Sign (Type A) | 91.2 | SQFT | 20.00 | 1,824.00 | 27.50 | 2,508.00 | 29.25 | 2,667.60 | 18.00 | 1,641.60 | | 0057 | 729-02-00100 | Sign (Type B) | 178.8 | SQFT | 20.00 | 3,576.00 | 33.00 | 5,900.40 | 35.00 | 6,258.00 | 18.00 | 3,218.40 | | 0058 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 30 | EACH | 95.00 | 2,850.00 | 99.00 | 2,970.00 | 99.50 | 2,985.00 | 85.00 | 2,550.00 | | 0059 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 3 | EACH | 134.00 | 402.00 | 115.50 | 346.50 | 119.50 | 358.50 | 120.00 | 360.00 | | 0060 | 731-02-00100 | Reflectorized Raised Pavement Markers | 116 | EACH | 6.70 | 777.20 | 7.15 | 829.40 | 7.50 | 870.00 | 6.00 | 696.00 | | 0061 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 6,569 | LNFT | 0.73 | 4,795.37 | 1.10 | 7,225.90 | 1.15 | 7,554.35 | 0.65 | 4,269.85 | | 0062 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 736 | LNFT | 1.56 | 1,148.16 | 3.30 | 2,428.80 | 4.00 | 2,944.00 | 1.40 | 1,030.40 | | 0063 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 582 | LNFT | 2.79 | 1,623.78 | 4.40 | 2,560.80 | 5.00 | 2,910.00 | 2.50 | 1,455.00 | | 0064 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 445 | LNFT | 3.91 | 1,739.95 | 6.60 | 2,937.00 | 7.00 | 3,115.00 | 3.50 | 1,557.50 | | 0065 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 283 | LNFT | 7.83 | 2,215.89 | 13.20 | 3,735.60 | 14.00 | 3,962.00 | 7.00 | 1,981.00 | | 0066 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.24 | MILE | 2,065.00 | 495.60 | 2,750.00 | 660.00 | 3,000.00 | 720.00 | 1,850.00 | 444.00 | | 0067 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.022 | MILE | 2,233.00 | 49.13 | 5,500.00 | 121.00 | 6,000.00 | 132.00 | 1,820.00 | 40.04 | | 0068 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 307.04 | 307.04 | 550.00 | 550.00 | 585.00 | 585.00 | 275.00 | 275.00 | | 0069 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 446.60 | 446.60 | 550.00 | 550.00 | 585.00 | 585.00 | 400.00 | 400.00 | | 0070 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 245.63 | 982.52 | 550.00 | 2,200.00 | 585.00 | 2,340.00 | 220.00 | 880.00 | | 0071 | 732-04-01131 | PlstcPvmtLgnds&Sym(DirArrRndbt-Fshk)(Type LTC) | 6 | EACH | 1,116.50 | 6,699.00 | 825.00 | 4,950.00 | 875.00 | 5,250.00 | 1,000.00 | 6,000.00 | | 0072 | 732-04-01132 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type TRC) | 2 | EACH | 1,116.50 | 2,233.00 | 825.00 | 1,650.00 | 875.00 | 1,750.00 | 1,000.00 | 2,000.00 | | 0073 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 446.60 | 1,786.40 | 550.00 | 2,200.00 | 585.00 | 2,340.00 | 400.00 | 1,600.00 | | 0074 | 735-01-00100 | Mailboxes | 4 | EACH | 5.58 | 22.32 | 16.50 | 66.00 | 18.00 | 72.00 | 10.00 | 40.00 | | 0075 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 161.89 | 647.56 | 126.50 | 506.00 | 135.00 | 540.00 | 150.00 | 600.00 | | 0076 | 736-16-00000 | Temporary Traffic Signal Installation (Intersection) | 2 | EACH | 77,600.00 | 155,200.00 | 64,995.14 | 129,990.28 | 83,500.00 | 167,000.00 | 70,000.00 | 140,000.00 | | 0077 | 740-01-00100 | Construction Layout | 1 | LUMP | 22,000.00 | 22,000.00 | 27,500.00 | 27,500.00 | 110,500.00 | 110,500.00 | 30,000.00 | 30,000.00 | | 0078 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 6,045 | INLF | 1.50 | 9,067.50 | 0.51 | 3,082.95 | 0.90 | 5,440.50 | 0.70 | 4,231.50 | | 0079 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 504 | INLF | 1.50 | 756.00 | 1.15 | 579.60 | 1.00 | 504.00 | 1.50 | 756.00 | | 0080 | NS-702-00100 | Paved Gutter Drain | 13 | EACH | 1,950.00 | 25,350.00 | 3,735.58 | 48,562.54 | 2,800.00 | 36,400.00 | 6,500.00 | 84,500.00 | | 0081 | NS-729-00030 | Breakaway Square Tubing Sign Support (Wet Concrete) | 13 | EACH | 190.00 | 2,470.00 | 605.00 | 7,865.00 | 645.00 | 8,385.00 | 250.00 | 3,250.00 | | 0082 | NS-744-00600 | Lane Separator System (Furnish and Install) | 152 | LNFT | 63.50 | 9,652.00 | 159.50 | 24,244.00 | 170.00 | 25,840.00 | 60.00 | 9,120.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,134,000.00 | | 3,169,060.79 | | 3,354,890.95 | | 3,398,705.35 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - La Contracting Enterprise LLC | - 6 - KORT's CONSTRUCTION SERVICES, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 18,000.00 | 18,000.00 | 135,000.00 | 135,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 9,000.00 | 9,000.00 | 20,000.00 | 20,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 669.4 | SQYD | 11.00 | 7,363.40 | 5.00 | 3,347.00 | | 0004 | 202-02-03010 | Removal of Base – Recycled PCC or Stone 10" | 12,166.1 | SQYD | 1.60 | 19,465.76 | 9.00 | 109,494.90 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 461 | SQYD | 17.00 | 7,837.00 | 7.00 | 3,227.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) Varies | 272 | LNFT | 29.00 | 7,888.00 | 7.00 | 1,904.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) Side Drain | 38 | LNFT | 19.00 | 722.00 | 5.00 | 190.00 | | 0008 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 11,018.8 | SQYD | 6.00 | 66,112.80 | 7.00 | 77,131.60 | | 0009 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 8,900.00 | 8,900.00 | 9,000.00 | 9,000.00 | | 0010 | 203-01-00100 | General Excavation | 4,205 | CUYD | 8.25 | 34,691.25 | 15.00 | 63,075.00 | | 0011 | 203-03-00100 | Embankment | 3,985 | CUYD | 28.00 | 111,580.00 | 27.00 | 107,595.00 | | 0012 | 203-10-00100 | Cleaning Existing Ditches | 217 | LNFT | 12.00 | 2,604.00 | 6.00 | 1,302.00 | | 0013 | 204-02-00100 | Temporary Hay Bales | 117 | EACH | 18.00 | 2,106.00 | 16.00 | 1,872.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 5,215 | LNFT | 1.85 | 9,647.75 | 1.75 | 9,126.25 | | 0015 | 302-02-10000 | Class II Base Course (10" Thick) | 11,255.2 | SQYD | 32.00 | 360,166.40 | 32.00 | 360,166.40 | | 0016 | 304-01-00100 | Lime | 159.54 | TON | 265.00 | 42,278.10 | 200.00 | 31,908.00 | | 0017 | 304-05-00100 | Lime Treatment (Type E) | 11,255 | SQYD | 5.75 | 64,716.25 | 2.00 | 22,510.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 432 | TON | 192.00 | 82,944.00 | 160.00 | 69,120.00 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 1,503 | SQYD | 12.50 | 18,787.50 | 14.00 | 21,042.00 | | 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -33 | CUYD | 0.01 | -0.33 | 1.00 | -33.00 | | 0021 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 7,902.2 | SQYD | 100.00 | 790,220.00 | 88.00 | 695,393.60 | | 0022 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) 10" | 1,608.3 | SQYD | 119.00 | 191,387.70 | 135.00 | 217,120.50 | | 0023 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) 13" | 741.5 | SQYD | 140.00 | 103,810.00 | 165.00 | 122,347.50 | | 0024 | 701-01-01024 | Cross Drain Pipe (30" RCP/RPVCP) | 249 | LNFT | 110.00 | 27,390.00 | 133.00 | 33,117.00 | | 0025 | 701-01-01043 | Cross Drain Pipe (36" RCP/RPVCP) | 244 | LNFT | 120.00 | 29,280.00 | 155.00 | 37,820.00 | | 0026 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 85 | LNFT | 135.00 | 11,475.00 | 142.00 | 12,070.00 | | 0027 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 78 | LNFT | 58.00 | 4,524.00 | 68.00 | 5,304.00 | | 0028 | 701-05-01045 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW) | 54 | LNFT | 71.00 | 3,834.00 | 73.00 | 3,942.00 | | 0029 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 254 | LNFT | 17.00 | 4,318.00 | 2.00 | 508.00 | | 0030 | 702-02-00200 | Manholes (R-CB-11) | 2 | EACH | 6,400.00 | 12,800.00 | 5,000.00 | 10,000.00 | | 0031 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 6,000.00 | 6,000.00 | 3,500.00 | 3,500.00 | | 0032 | 705-01-00100 | Barbed Wire Fence | 168 | LNFT | 15.00 | 2,520.00 | 15.00 | 2,520.00 | | 0033 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 77 | LNFT | 30.00 | 2,310.00 | 37.00 | 2,849.00 | | 0034 | 706-02-00200 | Concrete Drive (6" Thick) | 102.3 | SQYD | 70.00 | 7,161.00 | 70.00 | 7,161.00 | | 0035 | 706-02-00300 | Concrete Drive (8" Thick) | 450 | SQYD | 72.00 | 32,400.00 | 78.00 | 35,100.00 | | 0036 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) 3" | 430.1 | SQYD | 54.00 | 23,225.40 | 57.00 | 24,515.70 | | 0037 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) 4" | 218.6 | SQYD | 66.00 | 14,427.60 | 70.00 | 15,302.00 | | 0038 | 707-01-00200 | Concrete Curb (Barrier) | 235.6 | LNFT | 5.70 | 1,342.92 | 11.00 | 2,591.60 | | 0039 | 707-01-00300 | Concrete Curb (Mountable) | 3,674.2 | LNFT | 6.75 | 24,800.85 | 11.00 | 40,416.20 | | 0040 | 708-01-00100 | Right-of-Way Monument | 12 | EACH | 530.00 | 6,360.00 | 500.00 | 6,000.00 | | 0041 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 72,000.00 | 72,000.00 | 80,000.00 | 80,000.00 | | 0042 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 7,352 | LNFT | 0.25 | 1,838.00 | 0.50 | 3,676.00 | | 0043 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 762 | LNFT | 1.50 | 1,143.00 | 0.75 | 571.50 | | 0044 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 185 | LNFT | 2.30 | 425.50 | 1.50 | 277.50 | | 0045 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.569 | MILE | 415.00 | 236.14 | 0.50 | 0.28 | | 0046 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 128 | EACH | 6.00 | 768.00 | 0.70 | 89.60 | | 0047 | 713-11-00100 | Portable Changeable Message Signs | 6 | EACH | 5,700.00 | 34,200.00 | 600.00 | 3,600.00 | | 0048 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 491 | SQYD | 10.00 | 4,910.00 | 9.00 | 4,419.00 | | 0049 | 716-01-00100 | Mulch (Vegetative) | 18.2 | TON | 650.00 | 11,830.00 | 600.00 | 10,920.00 | | 0050 | 717-01-00100 | Seeding | 272 | LB | 21.00 | 5,712.00 | 20.00 | 5,440.00 | | 0051 | 718-01-00100 | Fertilizer | 9,080 | LB | 0.75 | 6,810.00 | 1.00 | 9,080.00 | | 0052 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 89 | SQYD | 3.00 | 267.00 | 3.00 | 267.00 | | 0053 | 725-01-00100 | Temporary Detour Roads | 6,028.9 | SQYD | 110.00 | 663,179.00 | 105.00 | 633,034.50 | | 0054 | 726-01-00100 | Bedding Material | 78 | CUYD | 130.00 | 10,140.00 | 95.00 | 7,410.00 | | 0055 | 727-01-00100 | Mobilization | 1 | LUMP | 116,000.00 | 116,000.00 | 200,000.00 | 200,000.00 | | 0056 | 729-01-00100 | Sign (Type A) | 91.2 | SQFT | 21.00 | 1,915.20 | 8.00 | 729.60 | | 0057 | 729-02-00100 | Sign (Type B) | 178.8 | SQFT | 21.00 | 3,754.80 | 13.00 | 2,324.40 | | 0058 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 30 | EACH | 100.00 | 3,000.00 | 130.00 | 3,900.00 | | 0059 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 3 | EACH | 140.00 | 420.00 | 110.00 | 330.00 | | 0060 | 731-02-00100 | Reflectorized Raised Pavement Markers | 116 | EACH | 7.00 | 812.00 | 7.00 | 812.00 | | 0061 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 6,569 | LNFT | 0.75 | 4,926.75 | 1.00 | 6,569.00 | | 0062 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 736 | LNFT | 1.70 | 1,251.20 | 3.50 | 2,576.00 | | 0063 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 582 | LNFT | 3.00 | 1,746.00 | 4.50 | 2,619.00 | | 0064 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 445 | LNFT | 4.00 | 1,780.00 | 6.50 | 2,892.50 | | 0065 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 283 | LNFT | 8.25 | 2,334.75 | 12.50 | 3,537.50 | | 0066 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.24 | MILE | 2,200.00 | 528.00 | 2,600.00 | 624.00 | | 0067 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.022 | MILE | 2,350.00 | 51.70 | 4,600.00 | 101.20 | | 0068 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 325.00 | 325.00 | 550.00 | 550.00 | | 0069 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 470.00 | 470.00 | 550.00 | 550.00 | | 0070 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 260.00 | 1,040.00 | 550.00 | 2,200.00 | | 0071 | 732-04-01131 | PlstcPvmtLgnds&Sym(DirArrRndbt-Fshk)(Type LTC) | 6 | EACH | 1,200.00 | 7,200.00 | 775.00 | 4,650.00 | | 0072 | 732-04-01132 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type TRC) | 2 | EACH | 1,200.00 | 2,400.00 | 775.00 | 1,550.00 | | 0073 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 470.00 | 1,880.00 | 550.00 | 2,200.00 | | 0074 | 735-01-00100 | Mailboxes | 4 | EACH | 6.00 | 24.00 | 25.00 | 100.00 | | 0075 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 170.00 | 680.00 | 120.00 | 480.00 | | 0076 | 736-16-00000 | Temporary Traffic Signal Installation (Intersection) | 2 | EACH | 70,000.00 | 140,000.00 | 65,000.00 | 130,000.00 | | 0077 | 740-01-00100 | Construction Layout | 1 | LUMP | 58,598.10 | 58,598.10 | 25,000.00 | 25,000.00 | | 0078 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 6,045 | INLF | 0.80 | 4,836.00 | 1.00 | 6,045.00 | | 0079 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 504 | INLF | 0.85 | 428.40 | 1.00 | 504.00 | | 0080 | NS-702-00100 | Paved Gutter Drain | 13 | EACH | 3,500.00 | 45,500.00 | 2,500.00 | 32,500.00 | | 0081 | NS-729-00030 | Breakaway Square Tubing Sign Support (Wet Concrete) | 13 | EACH | 200.00 | 2,600.00 | 375.00 | 4,875.00 | | 0082 | NS-744-00600 | Lane Separator System (Furnish and Install) | 152 | LNFT | 72.00 | 10,944.00 | 58.00 | 8,816.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,403,300.89 | | 3,530,376.83 |
|