Proposal:H.011152.6
Parish:St. Tammany
Routes:I-12
Description:I-12: US 190 TO LA 59
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE COMPONENTS, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, THIN ASPHALT CONCRETE (OGFC), PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE WIDENING, CONCRETE ROADWAY BARRIER, CONCRETE APPROACH SLABS (CAST IN PLACE), SIGNS, LIGHTING, INTELLIGENT TRANSPORTATION SYSTEM, AND RELATED WORK.
Estimated Construction Cost:$56,515,588.41
Maximum Number of Days Allowed for Construction:9999
Calculated Daily User Cost:$20,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 34567 | James Construction Group LLC | $54,508,158.47 | 777.00 | $70,048,158.47 |
| 2 | 39462 | JB JAMES CONSTRUCTION LLC | $59,246,647.11 | 780.00 | $74,846,647.11 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $62,191,847.64 | 730.00 | $76,791,847.64 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - James Construction Group LLC | - 2 - JB JAMES CONSTRUCTION LLC | - 3 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 8 | LUMP | 400,000.00 | 400,000.00 | 1,800,000.00 | 1,800,000.00 | 150,000.00 | 150,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 26,000.00 | 26,000.00 | 783,000.00 | 783,000.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-00020 | Removal of Concrete Revetment | 3,869 | SQYD | 15.00 | 58,035.00 | 40.00 | 154,760.00 | 14.00 | 54,166.00 | | 0004 | 202-02-00020 | Removal of Incidental Concrete Pavement | 859.8 | SQYD | 45.00 | 38,691.00 | 20.00 | 17,196.00 | 8.00 | 6,878.40 | | 0005 | 202-02-00030 | Removal of Cable Barrier | 9,803 | LNFT | 15.00 | 147,045.00 | 20.00 | 196,060.00 | 5.50 | 53,916.50 | | 0006 | 202-02-02020 | Removal of Asphalt Pavement | 36,602.7 | SQYD | 6.00 | 219,616.20 | 11.50 | 420,931.05 | 8.00 | 292,821.60 | | 0007 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 33,500.1 | SQYD | 2.00 | 67,000.20 | 7.00 | 234,500.70 | 7.00 | 234,500.70 | | 0008 | 202-02-04505 | Removal of Bridge Deck (Full Depth) (Str. No. 4540410061 & 4540410062) | 30,498 | SQFT | 11.00 | 335,478.00 | 12.00 | 365,976.00 | 3.00 | 91,494.00 | | 0009 | 202-02-04505 | Removal of Bridge Deck (Full Depth) (Structure No. 4540410861 & 4540410862) | 3,615.4 | SQFT | 25.00 | 90,385.00 | 28.00 | 101,231.20 | 5.00 | 18,077.00 | | 0010 | 202-02-04505 | Removal of Bridge Deck (Full Depth) (Structure No. 4540412601 & 4540412602) | 9,614.7 | SQFT | 20.00 | 192,294.00 | 21.00 | 201,908.70 | 3.00 | 28,844.10 | | 0011 | 202-02-04520 | Removal of Bridge Component - Bent (Str. No. 4540410061 & 4540410062) | 222 | LNFT | 100.00 | 22,200.00 | 260.00 | 57,720.00 | 100.00 | 22,200.00 | | 0012 | 202-02-04520 | Removal of Bridge Component - Bent (Structure No. 4540410861 & 4540410862) | 42 | LNFT | 255.00 | 10,710.00 | 800.00 | 33,600.00 | 250.00 | 10,500.00 | | 0013 | 202-02-04520 | Removal of Bridge Component - Bent (Structure No. 4540412601 & 4540412602) | 206 | LNFT | 105.00 | 21,630.00 | 245.00 | 50,470.00 | 100.00 | 20,600.00 | | 0014 | 202-02-04520 | Removal of Bridge Component - Concrete Barrier | 5,090 | LNFT | 40.00 | 203,600.00 | 25.00 | 127,250.00 | 75.00 | 381,750.00 | | 0015 | 202-02-04540 | Removal of Bridge Component - Wingwall (Str. No. 4540410061 & 4540410062) | 8 | EACH | 2,750.00 | 22,000.00 | 2,800.00 | 22,400.00 | 2,000.00 | 16,000.00 | | 0016 | 202-02-04540 | Removal of Bridge Component - Wingwall (Structure No. 4540410861 & 4540410862) | 8 | EACH | 2,750.00 | 22,000.00 | 2,000.00 | 16,000.00 | 2,000.00 | 16,000.00 | | 0017 | 202-02-04540 | Removal of Bridge Component - Wingwall (Structure No. 4540412601 & 4540412602) | 8 | EACH | 2,750.00 | 22,000.00 | 2,800.00 | 22,400.00 | 2,000.00 | 16,000.00 | | 0018 | 202-02-06000 | Removal of Concrete Approach Slabs | 2,158.8 | SQYD | 30.00 | 64,764.00 | 80.00 | 172,704.00 | 25.00 | 53,970.00 | | 0019 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 575.00 | 575.00 | 5,400.00 | 5,400.00 | 1,000.00 | 1,000.00 | | 0020 | 202-02-14500 | Removal of Guard Rail | 5,624.9 | LNFT | 2.00 | 11,249.80 | 2.00 | 11,249.80 | 2.00 | 11,249.80 | | 0021 | 202-02-32180 | Removal of Pipe Headwalls | 4 | EACH | 2,000.00 | 8,000.00 | 3,000.00 | 12,000.00 | 560.00 | 2,240.00 | | 0022 | 202-02-38220 | Removal of Sign Supports | 64 | EACH | 250.00 | 16,000.00 | 150.00 | 9,600.00 | 275.00 | 17,600.00 | | 0023 | 202-02-38280 | Removal of Sign Fascia Mountings | 2 | EACH | 1,500.00 | 3,000.00 | 1,500.00 | 3,000.00 | 1,650.00 | 3,300.00 | | 0024 | 202-02-38300 | Removal of Sign and U-Channel Post | 6 | EACH | 1.00 | 6.00 | 10.00 | 60.00 | 1.00 | 6.00 | | 0025 | 202-02-38360 | Removal of Sign Faces | 64 | EACH | 10.00 | 640.00 | 50.00 | 3,200.00 | 11.00 | 704.00 | | 0026 | 202-02-38380 | Removal of Sign Truss and Footings | 3 | EACH | 12,000.00 | 36,000.00 | 5,600.00 | 16,800.00 | 5,500.00 | 16,500.00 | | 0027 | 203-01-00100 | General Excavation | 36,615 | CUYD | 12.00 | 439,380.00 | 15.00 | 549,225.00 | 8.00 | 292,920.00 | | 0028 | 203-03-00100 | Embankment | 55,120 | CUYD | 32.00 | 1,763,840.00 | 30.00 | 1,653,600.00 | 15.00 | 826,800.00 | | 0029 | 204-02-00100 | Temporary Hay Bales | 444 | EACH | 25.00 | 11,100.00 | 20.00 | 8,880.00 | 15.50 | 6,882.00 | | 0030 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 37 | EACH | 150.00 | 5,550.00 | 125.00 | 4,625.00 | 132.00 | 4,884.00 | | 0031 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 36 | EACH | 630.00 | 22,680.00 | 1,100.00 | 39,600.00 | 330.00 | 11,880.00 | | 0032 | 204-06-00100 | Temporary Silt Fencing | 41,729 | LNFT | 2.50 | 104,322.50 | 3.00 | 125,187.00 | 1.50 | 62,593.50 | | 0033 | 204-07-00100 | Temporary Stone Construction Entrance | 5 | EACH | 3,000.00 | 15,000.00 | 6,000.00 | 30,000.00 | 13,500.00 | 67,500.00 | | 0034 | 302-02-12000 | Class II Base Course (12" Thick) (Soil Cement or Asphalt Concrete Base on Embankment Layer) | 113,841.54 | SQYD | 18.00 | 2,049,147.72 | 20.00 | 2,276,830.80 | 18.00 | 2,049,147.72 | | 0035 | 302-02-12020 | Class II Base Course (12" Thick) (Crushed Stone) | 7,350 | SQYD | 50.00 | 367,500.00 | 40.00 | 294,000.00 | 32.00 | 235,200.00 | | 0036 | 304-01-00100 | Lime | 1,613.72 | TON | 25.00 | 40,343.00 | 250.00 | 403,430.00 | 255.00 | 411,498.60 | | 0037 | 304-05-00100 | Lime Treatment (Type E) | 113,842 | SQYD | 0.15 | 17,076.30 | 1.80 | 204,915.60 | 2.00 | 227,684.00 | | 0038 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 7,350 | SQYD | 11.00 | 80,850.00 | 10.00 | 73,500.00 | 25.00 | 183,750.00 | | 0039 | 501-03-00100 | Thin Asphalt Concrete (OGFC) | 10,240.9 | TON | 97.00 | 993,367.30 | 150.00 | 1,536,135.00 | 150.00 | 1,536,135.00 | | 0040 | 502-01-00100 | Asphalt Concrete | 94,648.4 | TON | 97.00 | 9,180,894.80 | 82.00 | 7,761,168.80 | 105.00 | 9,938,082.00 | | 0041 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,477.8 | TON | 150.00 | 371,670.00 | 105.00 | 260,169.00 | 120.00 | 297,336.00 | | 0042 | 509-01-00100 | Milling Asphalt Pavement | 104,280.3 | SQYD | 3.00 | 312,840.90 | 2.80 | 291,984.84 | 4.00 | 417,121.20 | | 0043 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -7,061 | CUYD | 15.00 | -105,915.00 | 0.01 | -70.61 | 0.05 | -353.05 | | 0044 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 1,089 | SQYD | 85.00 | 92,565.00 | 65.00 | 70,785.00 | 100.00 | 108,900.00 | | 0045 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 136 | LNFT | 160.00 | 21,760.00 | 120.00 | 16,320.00 | 80.00 | 10,880.00 | | 0046 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 152 | LNFT | 260.00 | 39,520.00 | 210.00 | 31,920.00 | 200.00 | 30,400.00 | | 0047 | 701-14-00100 | Cleaning Existing Pipes | 2,304 | LNFT | 35.00 | 80,640.00 | 23.00 | 52,992.00 | 20.00 | 46,080.00 | | 0048 | 701-15-00100 | Concrete Collar | 6 | EACH | 2,400.00 | 14,400.00 | 2,300.00 | 13,800.00 | 675.00 | 4,050.00 | | 0049 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 288 | LNFT | 1.00 | 288.00 | 4.50 | 1,296.00 | 20.00 | 5,760.00 | | 0050 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 4,000.00 | 4,000.00 | 4,700.00 | 4,700.00 | 4,300.00 | 4,300.00 | | 0051 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 4,500.00 | 4,500.00 | 5,300.00 | 5,300.00 | 6,700.00 | 6,700.00 | | 0052 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 4,400.00 | 4,400.00 | 7,000.00 | 7,000.00 | 6,500.00 | 6,500.00 | | 0053 | 702-07-00100 | Cross Drain Safety End (Type 1) | 1 | EACH | 2,700.00 | 2,700.00 | 3,500.00 | 3,500.00 | 3,800.00 | 3,800.00 | | 0054 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,475.1 | LNFT | 25.00 | 36,877.50 | 25.00 | 36,877.50 | 39.00 | 57,528.90 | | 0055 | 704-03-00300 | Blocked Out Guard Rail – 31”, (3’-1 ½ ” Post Spacing) | 353.2 | LNFT | 30.00 | 10,596.00 | 30.00 | 10,596.00 | 52.00 | 18,366.40 | | 0056 | 704-04-00200 | Blocked Out Guard Rail – 31”, (Double Faced, 6’-3” Post Spacing) | 125 | LNFT | 35.00 | 4,375.00 | 35.00 | 4,375.00 | 65.00 | 8,125.00 | | 0057 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 69.3 | LNFT | 110.00 | 7,623.00 | 110.00 | 7,623.00 | 140.00 | 9,702.00 | | 0058 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 350 | LNFT | 90.00 | 31,500.00 | 90.00 | 31,500.00 | 115.00 | 40,250.00 | | 0059 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 15 | EACH | 2,500.00 | 37,500.00 | 2,500.00 | 37,500.00 | 3,200.00 | 48,000.00 | | 0060 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 2,850.00 | 5,700.00 | 2,900.00 | 5,800.00 | 3,700.00 | 7,400.00 | | 0061 | 704-10-00305 | Guard Rail End Treatment, MASH, (TL-3 Bi-Directional) | 4 | EACH | 10,000.00 | 40,000.00 | 10,000.00 | 40,000.00 | 13,000.00 | 52,000.00 | | 0062 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 1,500 | LNFT | 12.00 | 18,000.00 | 5.00 | 7,500.00 | 22.00 | 33,000.00 | | 0063 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 369.6 | SQYD | 65.00 | 24,024.00 | 90.00 | 33,264.00 | 75.00 | 27,720.00 | | 0064 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 922.6 | SQYD | 55.00 | 50,743.00 | 100.00 | 92,260.00 | 105.00 | 96,873.00 | | 0065 | 710-01-00100 | Flowable Fill | 80 | CUYD | 190.00 | 15,200.00 | 300.00 | 24,000.00 | 225.00 | 18,000.00 | | 0066 | 711-01-02020 | Riprap (10 lb, 12" Thick) | 117 | SQYD | 80.00 | 9,360.00 | 120.00 | 14,040.00 | 50.00 | 5,850.00 | | 0067 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 929 | SQYD | 105.00 | 97,545.00 | 100.00 | 92,900.00 | 93.00 | 86,397.00 | | 0068 | 711-04-00100 | Geotextile Fabric | 1,046 | SQYD | 35.00 | 36,610.00 | 4.00 | 4,184.00 | 2.00 | 2,092.00 | | 0069 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 4,512 | SQYD | 90.00 | 406,080.00 | 100.00 | 451,200.00 | 90.00 | 406,080.00 | | 0070 | 712-04-00100 | Flexible Revetment | 695 | SQYD | 125.00 | 86,875.00 | 100.00 | 69,500.00 | 75.00 | 52,125.00 | | 0071 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 850,000.00 | 850,000.00 | 1,000,000.00 | 1,000,000.00 | 1,250,000.00 | 1,250,000.00 | | 0072 | 713-02-00100 | Temporary Pavement Markings (4" Width) (Construction Access) | 36,000 | LNFT | 0.20 | 7,200.00 | 0.15 | 5,400.00 | 0.25 | 9,000.00 | | 0073 | 713-02-00300 | Temporary Pavement Markings (8" Width) (Construction Access) | 6,120 | LNFT | 0.35 | 2,142.00 | 0.25 | 1,530.00 | 0.45 | 2,754.00 | | 0074 | 713-02-00300 | Temporary Pavement Markings (8" Width) (Dotted) | 13,374.24 | LNFT | 0.35 | 4,680.98 | 0.25 | 3,343.56 | 0.45 | 6,018.41 | | 0075 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 9.92 | MILE | 700.00 | 6,944.00 | 500.00 | 4,960.00 | 910.00 | 9,027.20 | | 0076 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 39.037 | MILE | 900.00 | 35,133.30 | 900.00 | 35,133.30 | 1,175.00 | 45,868.48 | | 0077 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 16,315 | EACH | 6.50 | 106,047.50 | 4.00 | 65,260.00 | 8.00 | 130,520.00 | | 0078 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 4,359 | EACH | 280.00 | 1,220,520.00 | 500.00 | 2,179,500.00 | 785.00 | 3,421,815.00 | | 0079 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 5,312 | EACH | 45.00 | 239,040.00 | 8.00 | 42,496.00 | 125.00 | 664,000.00 | | 0080 | 713-11-00100 | Portable Changeable Message Signs | 12 | EACH | 18,000.00 | 216,000.00 | 12,000.00 | 144,000.00 | 21,420.00 | 257,040.00 | | 0081 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 55,000.00 | 55,000.00 | 100,000.00 | 100,000.00 | 250,000.00 | 250,000.00 | | 0082 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 12.092 | MILE | 260.00 | 3,143.92 | 260.00 | 3,143.92 | 2,145.00 | 25,937.34 | | 0083 | 725-01-00100 | Temporary Detour Roads | 695.2 | SQYD | 270.00 | 187,704.00 | 440.00 | 305,888.00 | 210.00 | 145,992.00 | | 0084 | 726-01-00100 | Bedding Material | 102.5 | CUYD | 100.00 | 10,250.00 | 135.00 | 13,837.50 | 65.00 | 6,662.50 | | 0085 | 727-01-00100 | Mobilization | 1 | LUMP | 5,500,000.00 | 5,500,000.00 | 5,500,000.00 | 5,500,000.00 | 6,300,000.00 | 6,300,000.00 | | 0086 | 728-01-01000 | Jacked or Bored Pipe (24") (Sta. 172+46.84 and Sta. 610+17.93; Smooth Wall Steel Pipe) | 192 | LNFT | 200.00 | 38,400.00 | 500.00 | 96,000.00 | 1,125.00 | 216,000.00 | | 0087 | 729-01-00100 | Sign (Type A) | 680.3 | SQFT | 25.00 | 17,007.50 | 28.00 | 19,048.40 | 28.00 | 19,048.40 | | 0088 | 729-04-00100 | Sign (Type D) | 866.5 | SQFT | 25.00 | 21,662.50 | 35.00 | 30,327.50 | 28.00 | 24,262.00 | | 0089 | 729-05-00100 | Sign (Type E) | 246 | SQFT | 25.00 | 6,150.00 | 35.00 | 8,610.00 | 28.00 | 6,888.00 | | 0090 | 729-06-00100 | Sign (Overhead Mounted) | 1,918.5 | SQFT | 25.00 | 47,962.50 | 37.00 | 70,984.50 | 28.00 | 53,718.00 | | 0091 | 729-08-00200 | Mounting (3 1/2" Size Post) | 16 | EACH | 2,500.00 | 40,000.00 | 1,200.00 | 19,200.00 | 2,755.00 | 44,080.00 | | 0092 | 729-08-00210 | Mounting (3 1/2" Size Post)(Structure Mount) | 1 | EACH | 5,000.00 | 5,000.00 | 4,500.00 | 4,500.00 | 5,500.00 | 5,500.00 | | 0093 | 729-08-00220 | Mounting (3 1/2" Size Post)(Median Barrier Mount) | 9 | EACH | 2,500.00 | 22,500.00 | 1,800.00 | 16,200.00 | 2,755.00 | 24,795.00 | | 0094 | 729-08-00300 | Mounting (5" Size Post) | 9 | EACH | 2,500.00 | 22,500.00 | 1,500.00 | 13,500.00 | 2,755.00 | 24,795.00 | | 0095 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 6 | EACH | 2,500.00 | 15,000.00 | 1,300.00 | 7,800.00 | 2,755.00 | 16,530.00 | | 0096 | 729-08-00700 | Mounting (W8 x 18 Size Post) | 2 | EACH | 3,000.00 | 6,000.00 | 1,800.00 | 3,600.00 | 3,300.00 | 6,600.00 | | 0097 | 729-08-00800 | Mounting (W8 x 24 Size Post) | 6 | EACH | 4,000.00 | 24,000.00 | 2,500.00 | 15,000.00 | 4,400.00 | 26,400.00 | | 0098 | 729-09-00400 | Mounting (Overhead Truss) (Ground Mounted) (78' Span) | 1 | EACH | 80,000.00 | 80,000.00 | 75,000.00 | 75,000.00 | 88,000.00 | 88,000.00 | | 0099 | 729-09-00500 | Mounting (Overhead Truss) (Ground Mounted) (84' Span) | 1 | EACH | 100,000.00 | 100,000.00 | 83,000.00 | 83,000.00 | 110,000.00 | 110,000.00 | | 0100 | 729-09-00600 | Mounting (Overhead Truss) (Ground Mounted) (90' Span) | 1 | EACH | 100,000.00 | 100,000.00 | 86,000.00 | 86,000.00 | 110,000.00 | 110,000.00 | | 0101 | 729-10-00300 | Mounting (Overhead Truss) (Structure Mounted) (72' Span) | 1 | EACH | 100,000.00 | 100,000.00 | 75,000.00 | 75,000.00 | 110,000.00 | 110,000.00 | | 0102 | 729-11-00100 | Mounting (Overhead Cantilever) (Ground Mounted) | 3 | EACH | 40,000.00 | 120,000.00 | 30,000.00 | 90,000.00 | 44,000.00 | 132,000.00 | | 0103 | 729-13-00100 | Mounting (Bridge Fascia Mounted) | 2 | EACH | 12,500.00 | 25,000.00 | 7,500.00 | 15,000.00 | 13,775.00 | 27,550.00 | | 0104 | 729-16-00200 | Object Marker Assembly (Type 2) | 19 | EACH | 150.00 | 2,850.00 | 125.00 | 2,375.00 | 165.00 | 3,135.00 | | 0105 | 729-16-00300 | Object Marker Assembly (Type 3) | 21 | EACH | 200.00 | 4,200.00 | 150.00 | 3,150.00 | 220.00 | 4,620.00 | | 0106 | 729-17-00100 | Milepost Assembly (Ground Mounted) | 10 | EACH | 550.00 | 5,500.00 | 175.00 | 1,750.00 | 605.00 | 6,050.00 | | 0107 | 729-18-00100 | Milepost Assembly (Structure Mounted) | 2 | EACH | 550.00 | 1,100.00 | 175.00 | 350.00 | 605.00 | 1,210.00 | | 0108 | 729-18-00200 | Milepost Assembly (Structure Mounted) (Secondary) | 2 | EACH | 550.00 | 1,100.00 | 200.00 | 400.00 | 605.00 | 1,210.00 | | 0109 | 729-20-00600 | Footings for Overhead Mountings (Cantilever) | 3 | EACH | 35,000.00 | 105,000.00 | 45,000.00 | 135,000.00 | 38,500.00 | 115,500.00 | | 0110 | 729-20-00700 | Footings for Overhead Mountings (Truss) | 6 | EACH | 35,000.00 | 210,000.00 | 52,000.00 | 312,000.00 | 38,500.00 | 231,000.00 | | 0111 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 5,175 | EACH | 10.00 | 51,750.00 | 7.00 | 36,225.00 | 13.00 | 67,275.00 | | 0112 | 731-02-00100 | Reflectorized Raised Pavement Markers | 10,426 | EACH | 6.50 | 67,769.00 | 5.00 | 52,130.00 | 8.00 | 83,408.00 | | 0113 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.566 | MILE | 3,250.00 | 37,589.50 | 3,500.00 | 40,481.00 | 4,200.00 | 48,577.20 | | 0114 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 1.488 | MILE | 7,500.00 | 11,160.00 | 12,000.00 | 17,856.00 | 9,750.00 | 14,508.00 | | 0115 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.298 | MILE | 48,000.00 | 14,304.00 | 58,000.00 | 17,284.00 | 63,500.00 | 18,923.00 | | 0116 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 9.638 | MILE | 1,500.00 | 14,457.00 | 1,200.00 | 11,565.60 | 1,955.00 | 18,842.29 | | 0117 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 1.455 | MILE | 4,000.00 | 5,820.00 | 5,500.00 | 8,002.50 | 5,200.00 | 7,566.00 | | 0118 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) | 0.766 | MILE | 6,500.00 | 4,979.00 | 3,500.00 | 2,681.00 | 8,520.00 | 6,526.32 | | 0119 | 732-04-05040 | Plastic Pavement Legends and Symbols (EXIT ONLY) | 4 | EACH | 525.00 | 2,100.00 | 1,500.00 | 6,000.00 | 685.00 | 2,740.00 | | 0120 | 732-05-00100 | Removal of Existing Markings | 7.355 | MILE | 5,000.00 | 36,775.00 | 2,500.00 | 18,387.50 | 6,445.00 | 47,402.98 | | 0121 | 736-01-00100 | Trenching and Backfilling | 1,620 | LNFT | 4.00 | 6,480.00 | 5.00 | 8,100.00 | 6.00 | 9,720.00 | | 0123 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 3,275 | LNFT | 5.00 | 16,375.00 | 1.40 | 4,585.00 | 6.50 | 21,287.50 | | 0124 | 736-12-01006 | Conductor (1c, #6 awg) | 370 | LNFT | 5.00 | 1,850.00 | 2.30 | 851.00 | 6.50 | 2,405.00 | | 0125 | 739-01-00100 | Hydro-Seeding | 26.8 | ACRE | 1,850.00 | 49,580.00 | 1,850.00 | 49,580.00 | 1,625.00 | 43,550.00 | | 0126 | 740-01-00100 | Construction Layout | 1 | LUMP | 680,000.00 | 680,000.00 | 500,000.00 | 500,000.00 | 1,500,000.00 | 1,500,000.00 | | 0127 | 802-01-00100 | Structural Excavation (Bents) | 2,609 | CUYD | 100.00 | 260,900.00 | 40.00 | 104,360.00 | 110.00 | 286,990.00 | | 0128 | 802-03-00100 | Temporary Sheeting (Steel) | 154,448 | SQFT | 25.00 | 3,861,200.00 | 24.00 | 3,706,752.00 | 22.00 | 3,397,856.00 | | 0129 | 804-01-00200 | Precast Concrete Piles (14") | 4,505 | LNFT | 100.00 | 450,500.00 | 75.00 | 337,875.00 | 45.00 | 202,725.00 | | 0130 | 804-01-00300 | Precast Concrete Piles (16") | 9,792 | LNFT | 100.00 | 979,200.00 | 70.00 | 685,440.00 | 56.25 | 550,800.00 | | 0131 | 804-01-00400 | Precast Concrete Piles (18") | 3,780 | LNFT | 110.00 | 415,800.00 | 110.00 | 415,800.00 | 123.50 | 466,830.00 | | 0132 | 804-01-00700 | Precast Concrete Piles (30") | 3,750 | LNFT | 205.00 | 768,750.00 | 210.00 | 787,500.00 | 324.00 | 1,215,000.00 | | 0133 | 804-10-00300 | Precast Concrete Indicator Piles (16") | 1 | EACH | 32,000.00 | 32,000.00 | 100,000.00 | 100,000.00 | 45,500.00 | 45,500.00 | | 0134 | 804-10-00700 | Precast Concrete Indicator Piles (30") | 1 | EACH | 42,000.00 | 42,000.00 | 150,000.00 | 150,000.00 | 85,200.00 | 85,200.00 | | 0135 | 804-14-00100 | Dynamic Monitoring Assistance | 20 | EACH | 2,200.00 | 44,000.00 | 2,500.00 | 50,000.00 | 4,350.00 | 87,000.00 | | 0136 | 805-01-00100 | Class A1 Concrete (Slab Span) | 559.02 | CUYD | 1,350.00 | 754,677.00 | 1,200.00 | 670,824.00 | 1,105.00 | 617,717.10 | | 0137 | 805-01-00200 | Class A1 Concrete (Deck) | 2,286.73 | CUYD | 1,000.00 | 2,286,730.00 | 1,450.00 | 3,315,758.50 | 2,100.00 | 4,802,133.00 | | 0138 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 628.87 | CUYD | 1,750.00 | 1,100,522.50 | 1,800.00 | 1,131,966.00 | 2,025.00 | 1,273,461.75 | | 0139 | 805-01-00400 | Class A1 Concrete (Column) | 139.48 | CUYD | 1,200.00 | 167,376.00 | 1,500.00 | 209,220.00 | 1,425.00 | 198,759.00 | | 0140 | 805-01-00600 | Class A1 Concrete (Retaining Wall) | 479.05 | CUYD | 800.00 | 383,240.00 | 1,200.00 | 574,860.00 | 735.00 | 352,101.75 | | 0141 | 805-04-00300 | Class MASS(A1) Concrete (Footing) | 655.36 | CUYD | 800.00 | 524,288.00 | 900.00 | 589,824.00 | 530.00 | 347,340.80 | | 0142 | 805-08-00400 | Precast-Prestressed Concrete Girders (Type III) | 3,094 | LNFT | 220.00 | 680,680.00 | 300.00 | 928,200.00 | 170.00 | 525,980.00 | | 0143 | 805-08-00500 | Precast-Prestressed Concrete Girders (Type IV) | 4,078 | LNFT | 220.00 | 897,160.00 | 315.00 | 1,284,570.00 | 170.00 | 693,260.00 | | 0144 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall ((2) 36" RCP 8.37 CUYD, 519 LBS.) | 2 | EACH | 35,000.00 | 70,000.00 | 20,000.00 | 40,000.00 | 17,500.00 | 35,000.00 | | 0145 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (24" RCP 3.80 CUYD, 211 LBS.) | 1 | EACH | 35,000.00 | 35,000.00 | 13,000.00 | 13,000.00 | 16,800.00 | 16,800.00 | | 0146 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (36" RCP 8.57 CUYD, 540 LBS.) | 2 | EACH | 35,000.00 | 70,000.00 | 20,000.00 | 40,000.00 | 17,225.00 | 34,450.00 | | 0147 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 148,223 | SQFT | 1.00 | 148,223.00 | 1.00 | 148,223.00 | 1.00 | 148,223.00 | | 0148 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 256,975 | SQFT | 0.65 | 167,033.75 | 0.65 | 167,033.75 | 0.60 | 154,185.00 | | 0149 | 806-01-00100 | Deformed Reinforcing Steel | 1,106,994 | LB | 1.20 | 1,328,392.80 | 1.30 | 1,439,092.20 | 1.10 | 1,217,693.40 | | 0150 | 806-03-00100 | Deformed Reinforcing Steel Mechanical Splice (No. 4 Bars Bottom of Haunch) (Mechanical Butt Splice) | 24 | EACH | 35.00 | 840.00 | 33.00 | 792.00 | 35.00 | 840.00 | | 0151 | 806-03-00100 | Deformed Reinforcing Steel Mechanical Splice (No. 5 Bars Longitudinal in Cap) (Mechanical Butt Splice) | 8 | EACH | 40.00 | 320.00 | 40.00 | 320.00 | 38.00 | 304.00 | | 0152 | 806-03-00100 | Deformed Reinforcing Steel Mechanical Splice (No. 5 Bars Longitudinal in Cap) (Mechanical Lap Splice) | 8 | EACH | 40.00 | 320.00 | 40.00 | 320.00 | 38.00 | 304.00 | | 0153 | 806-03-00100 | Deformed Reinforcing Steel Mechanical Splice (No. 5 Bars Transverse in Sleeper Slab) (Mechanical Butt Splice) | 168 | EACH | 40.00 | 6,720.00 | 40.00 | 6,720.00 | 38.00 | 6,384.00 | | 0154 | 806-03-00100 | Deformed Reinforcing Steel Mechanical Splice (No. 8 Bars Longitudinal in Cap) (Mechanical Butt Splice) | 144 | EACH | 75.00 | 10,800.00 | 53.00 | 7,632.00 | 70.00 | 10,080.00 | | 0155 | 806-03-00100 | Deformed Reinforcing Steel Mechanical Splice (No. 8 Bars Longitudinal in Cap) (Mechanical Lap Splice) | 36 | EACH | 75.00 | 2,700.00 | 53.00 | 1,908.00 | 70.00 | 2,520.00 | | 0156 | 806-03-00100 | Deformed Reinforcing Steel Mechanical Splice (No. 8 Bars Transverse in Approach Slab) | 1,092 | EACH | 50.00 | 54,600.00 | 53.00 | 57,876.00 | 50.00 | 54,600.00 | | 0157 | 806-03-00100 | Deformed Reinforcing Steel Mechanical Splice (No. 8 Bars Transverse in Approach Slab) (Mechanical Butt Splice) | 1,932 | EACH | 50.00 | 96,600.00 | 53.00 | 102,396.00 | 50.00 | 96,600.00 | | 0158 | 807-04-00100 | Structural Metalwork (Estimated 8,068 lbs.) | 8,068 | LUMP | 30,000.00 | 30,000.00 | 90,000.00 | 90,000.00 | 30,000.00 | 30,000.00 | | 0159 | 810-01-00100 | Concrete Bridge Railing (Standard) | 3,644 | LNFT | 75.00 | 273,300.00 | 110.00 | 400,840.00 | 83.00 | 302,452.00 | | 0160 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 1,348 | LNFT | 75.00 | 101,100.00 | 110.00 | 148,280.00 | 100.00 | 134,800.00 | | 0161 | 810-05-00120 | Concrete Roadway Barrier (36 inch Height) | 785 | LNFT | 185.00 | 145,225.00 | 140.00 | 109,900.00 | 335.00 | 262,975.00 | | 0162 | 810-05-00300 | Concrete Roadway Barrier (Double Face ) | 8,880 | LNFT | 400.00 | 3,552,000.00 | 400.00 | 3,552,000.00 | 405.00 | 3,596,400.00 | | 0163 | 810-06-00100 | Concrete Pier Protection System (Vehicle) (Pier Protection) | 1,249 | LNFT | 600.00 | 749,400.00 | 450.00 | 562,050.00 | 700.00 | 874,300.00 | | 0164 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 34,686 | SQFT | 75.00 | 2,601,450.00 | 60.00 | 2,081,160.00 | 60.00 | 2,081,160.00 | | 0165 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 566 | SFIN | 100.00 | 56,600.00 | 90.00 | 50,940.00 | 375.00 | 212,250.00 | | 0166 | 815-02-00200 | Sealed Expansion Joint (End Dams and Preformed Silicone Seal) | 1,405 | LNFT | 200.00 | 281,000.00 | 300.00 | 421,500.00 | 200.00 | 281,000.00 | | 0167 | 815-03-00200 | Joint Seal (Preformed Silicone) | 1,279 | LNFT | 135.00 | 172,665.00 | 60.00 | 76,740.00 | 195.00 | 249,405.00 | | 0168 | 815-03-00300 | Joint Seal (Poured) | 1,109 | LNFT | 25.00 | 27,725.00 | 15.00 | 16,635.00 | 11.00 | 12,199.00 | | 0169 | 816-02-00100 | Bridge End Drain System (Open Drain) | 4 | EACH | 10,000.00 | 40,000.00 | 8,000.00 | 32,000.00 | 20,000.00 | 80,000.00 | | 0170 | 822-01-00100 | Trenching and Backfilling | 5,600 | LNFT | 5.00 | 28,000.00 | 5.00 | 28,000.00 | 6.50 | 36,400.00 | | 0171 | 822-02-00100 | Conduit w Conductors (PVC/HDPE) (3/4") (PVC, SCH. 40, UL listed; vertical section in concrete barrier for grounding; contains 1#2 BSG) | 375 | LNFT | 5.00 | 1,875.00 | 3.00 | 1,125.00 | 7.50 | 2,812.50 | | 0172 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (HDPE DUCT, SCH. 40, UL listed; horizontal section in concrete barrier between LT. pole stations) | 5,600 | LNFT | 5.00 | 28,000.00 | 2.00 | 11,200.00 | 6.50 | 36,400.00 | | 0173 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (PVC, SCH. 40, UL listed; horizontal & vertical section in concrete barrier at LT. pole stations) | 1,100 | LNFT | 5.00 | 5,500.00 | 2.00 | 2,200.00 | 6.50 | 7,150.00 | | 0174 | 822-02-01000 | Conduit w Conductors (PVC/HDPE) (6") (PVC, UL listed; vertical section in concrete barrier to JCT box at under road bore locations) | 110 | LNFT | 11.00 | 1,210.00 | 15.00 | 1,650.00 | 14.00 | 1,540.00 | | 0175 | 822-04-00200 | Jacked or Bored Casing (6" Dia) (PVC/HDPE) (HDPE DUCT, SCH. 80, UL Listed; Protective Casing for Electrical Conduits Traveling under Roadway) | 1,100 | LNFT | 30.00 | 33,000.00 | 42.00 | 46,200.00 | 40.00 | 44,000.00 | | 0176 | 822-05-02100 | Light Pole (Single Anchor Bolt Installed in Concrete Barrier for Future Light Pole; Four (4) Required per Pole Location) | 124 | EACH | 105.00 | 13,020.00 | 120.00 | 14,880.00 | 60.00 | 7,440.00 | | 0177 | 822-09-00100 | Electrical System (Includes Install Costs for PVC-to-HDPE Couplings, Ground Rods and Appurtenances) | 1 | LUMP | 12,500.00 | 12,500.00 | 6,700.00 | 6,700.00 | 16,400.00 | 16,400.00 | | 0178 | 822-16-00200 | Underground Junction Box (11" x 18") (Junction "BJB"; Median Barrier Mount) | 37 | EACH | 420.00 | 15,540.00 | 250.00 | 9,250.00 | 545.00 | 20,165.00 | | 0179 | 822-16-00300 | Underground Junction Box (13" x 24") (Junction Box "UJB"; Ground Mount at Under Road Median Bore Locations) | 12 | EACH | 900.00 | 10,800.00 | 550.00 | 6,600.00 | 1,145.00 | 13,740.00 | | 0180 | 822-21-00100 | Duct Marker (Concrete) | 12 | EACH | 400.00 | 4,800.00 | 280.00 | 3,360.00 | 530.00 | 6,360.00 | | 0181 | 830-07-00100 | Structural Concrete Patching | 12 | SQFT | 600.00 | 7,200.00 | 2,500.00 | 30,000.00 | 3,500.00 | 42,000.00 | | 0182 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 17,760 | LNFT | 1.50 | 26,640.00 | 1.00 | 17,760.00 | 1.65 | 29,304.00 | | 0183 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 2,564 | LNFT | 1.50 | 3,846.00 | 1.75 | 4,487.00 | 1.75 | 4,487.00 | | 0184 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 5,976 | LNFT | 1.00 | 5,976.00 | 2.00 | 11,952.00 | 1.10 | 6,573.60 | | 0185 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 881,010 | INLF | 0.25 | 220,252.50 | 0.50 | 440,505.00 | 0.45 | 396,454.50 | | 0186 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 27 | EACH | 7,000.00 | 189,000.00 | 8,000.00 | 216,000.00 | 10,000.00 | 270,000.00 | | 0187 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 14 | EACH | 500.00 | 7,000.00 | 500.00 | 7,000.00 | 650.00 | 9,100.00 | | 0188 | NS-830-01200 | Carbon Fiber Reinforced Polymer Repairs | 42 | SQFT | 710.00 | 29,820.00 | 1,000.00 | 42,000.00 | 785.00 | 32,970.00 | | 0189 | NS-ITS-01121 | CCTV Camera Assembly, Furnish and Install with PTZ, Digital | 5 | EACH | 7,500.00 | 37,500.00 | 6,800.00 | 34,000.00 | 8,500.00 | 42,500.00 | | 0190 | NS-ITS-02040 | Dynamic Message Sign, Furnish & Install, LED Full Matrix, Walk-in, Truss Mount | 1 | EACH | 311,500.00 | 311,500.00 | 480,000.00 | 480,000.00 | 415,000.00 | 415,000.00 | | 0191 | NS-ITS-04000 | Fiber Optic Marker | 4 | EACH | 92.00 | 368.00 | 230.00 | 920.00 | 120.00 | 480.00 | | 0192 | NS-ITS-04020 | Fiber Optic Cable, SM, Furnish & Install, 13-48 Fibers | 1,435 | LNFT | 4.00 | 5,740.00 | 2.50 | 3,587.50 | 5.75 | 8,251.25 | | 0193 | NS-ITS-04035 | Fiber Optic Fan Out Kits, SM, 12 Strand, Furnish & Install | 5 | EACH | 120.00 | 600.00 | 140.00 | 700.00 | 215.00 | 1,075.00 | | 0194 | NS-ITS-04180 | Fiber Optic Connection, Install, Splice | 64 | EACH | 105.00 | 6,720.00 | 34.00 | 2,176.00 | 125.00 | 8,000.00 | | 0195 | NS-ITS-04200 | Fiber Optic Connection, Termination, Furnish & Install | 28 | EACH | 85.00 | 2,380.00 | 40.00 | 1,120.00 | 75.00 | 2,100.00 | | 0196 | NS-ITS-04250 | Fiber Optic Drop Cable, SM, 12 Strand, Furnish & Install | 685 | LNFT | 2.00 | 1,370.00 | 2.30 | 1,575.50 | 3.00 | 2,055.00 | | 0197 | NS-ITS-04290 | Fiber Optic Patch Cord, SM, 2 Strand, Furnish & Install | 6 | EACH | 60.00 | 360.00 | 50.00 | 300.00 | 75.00 | 450.00 | | 0198 | NS-ITS-04360 | Fiber Optic Connection Splice Tray, Furnish & Install | 6 | EACH | 63.00 | 378.00 | 80.00 | 480.00 | 85.00 | 510.00 | | 0199 | NS-ITS-04420 | Fiber Optic Connection Patch Panel, Indoor, Furnish & Install | 1 | EACH | 1,100.00 | 1,100.00 | 840.00 | 840.00 | 1,450.00 | 1,450.00 | | 0200 | NS-ITS-04425 | Fiber Optic Connection Patch Panel, Outdoor, Furnish & Install | 4 | EACH | 1,100.00 | 4,400.00 | 525.00 | 2,100.00 | 1,450.00 | 5,800.00 | | 0201 | NS-ITS-05025 | Splice Closure, Outdoor, Furnish & Install | 4 | EACH | 920.00 | 3,680.00 | 775.00 | 3,100.00 | 1,200.00 | 4,800.00 | | 0202 | NS-ITS-06020 | Pullbox, In-ground, Furnish & Install - New Type K ITS Pullbox (Fiber Optic) | 5 | EACH | 3,000.00 | 15,000.00 | 650.00 | 3,250.00 | 2,900.00 | 14,500.00 | | 0203 | NS-ITS-06120 | Pullbox, Structure Mount, Furnish & Install - New - New Type L ITS Pullbox | 2 | EACH | 2,200.00 | 4,400.00 | 2,200.00 | 4,400.00 | 2,900.00 | 5,800.00 | | 0204 | NS-ITS-07020 | ITS Controller Cabinet, Pole Mount, Furnish & Install | 2 | EACH | 14,450.00 | 28,900.00 | 13,500.00 | 27,000.00 | 19,000.00 | 38,000.00 | | 0205 | NS-ITS-07220 | ITS Controller Cabinet, Pad Mount, Furnish & Install | 1 | EACH | 15,600.00 | 15,600.00 | 16,775.00 | 16,775.00 | 20,000.00 | 20,000.00 | | 0206 | NS-ITS-08101 | Pole, Foundation & Lowering Device, >= 100', Furnish & Install | 2 | EACH | 122,000.00 | 244,000.00 | 100,000.00 | 200,000.00 | 190,000.00 | 380,000.00 | | 0207 | NS-ITS-08220 | Lowering Device, Furnish & Install | 1 | EACH | 10,000.00 | 10,000.00 | 14,250.00 | 14,250.00 | 13,350.00 | 13,350.00 | | 0208 | NS-ITS-09080 | Local Ethernet Switch, Furnish & Install | 5 | EACH | 2,100.00 | 10,500.00 | 2,000.00 | 10,000.00 | 2,700.00 | 13,500.00 | | 0209 | NS-ITS-15320 | 2" Rigid Galvanized Steel Conduit | 350 | LNFT | 20.00 | 7,000.00 | 55.00 | 19,250.00 | 27.50 | 9,625.00 | | 0210 | NS-MSC-00120 | Drainage Structure (Cap CB-01) | 6 | EACH | 1,720.00 | 10,320.00 | 2,700.00 | 16,200.00 | 6,235.00 | 37,410.00 | | 0211 | NS-ITS-06020 | Pullbox, In-ground, Furnish & Install - New Type F ITS Pullbox (Electrical) | 5 | EACH | 890.00 | 4,450.00 | 1,000.00 | 5,000.00 | 1,160.00 | 5,800.00 | | 0212 | NS-ITS-12020 | TMC Integration | 1 | LUMP | 9,200.00 | 9,200.00 | 3,100.00 | 3,100.00 | 12,000.00 | 12,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 54,508,158.47 | | 59,246,647.11 | | 62,191,847.64 |
|