Proposal:H.002375.6
Parish:Livingston
Routes:LA 16
Description:AMITE R. BR. NEAR FRENCH SETTLEMENT
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, SUBGRADE LAYER (TREATED), CLASS II BASE COURSE, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, CONCRETE GIRDER SPAN BRIDGE, PRECAST CONCRETE PILES, STEEL PILES, TREATED TIMBER PILES (NONCOASTAL TREATMENT), AND RELATED WORK.
Estimated Construction Cost:$22,531,983.93
Maximum Number of Days Allowed for Construction:9999
Calculated Daily User Cost:$500.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 63897 | TL Hawk, LLC | $19,727,849.61 | 946.00 | $20,200,849.61 |
| 2 | 34567 | James Construction Group LLC | $20,037,631.39 | 578.00 | $20,326,631.39 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $21,284,378.41 | 490.00 | $21,529,378.41 |
| 4 | 64574 | INFRASTRUCTURE AND INDUSTRIAL CONSTRUCTORS SOUTHEAST, INC. | $21,886,265.10 | 540.00 | $22,156,265.10 |
| 5 | 55950 | Brown Industrial Construction, LLC | $22,585,946.24 | 720.00 | $22,945,946.24 |
| 6 | 12395 | Jensen Construction Co. | $22,509,036.69 | 975.00 | $22,996,536.69 |
| 7 | 39462 | JB JAMES CONSTRUCTION LLC | $22,865,370.15 | 900.00 | $23,315,370.15 |
| 8 | 00755 | L & A Contracting Co. | $25,959,397.88 | 912.00 | $26,415,397.88 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - TL Hawk, LLC | - 2 - James Construction Group LLC | - 3 - Boh Bros. Construction Co., LLC. | - 4 - INFRASTRUCTURE AND INDUSTRIAL CONSTRUCTORS SOUTHEAST, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 11 | LUMP | 295,000.00 | 295,000.00 | 200,000.00 | 200,000.00 | 100,000.00 | 100,000.00 | 262,800.00 | 262,800.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 100,000.00 | 100,000.00 | 7,100.00 | 7,100.00 | 35,000.00 | 35,000.00 | 6,750.00 | 6,750.00 | | 0003 | 202-02-00010 | Removal of 2 Billboard at sta. 99+62.00 | 2 | EACH | 2,000.00 | 4,000.00 | 5,000.00 | 10,000.00 | 3,000.00 | 6,000.00 | 3,000.00 | 6,000.00 | | 0004 | 202-02-00010 | Removal of Billboard at sta. 102+65.00 | 1 | EACH | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 | 4,000.00 | 4,000.00 | | 0005 | 202-02-00050 | Removal of signs | 1 | LUMP | 3,010.00 | 3,010.00 | 1,800.00 | 1,800.00 | 16,000.00 | 16,000.00 | 180.00 | 180.00 | | 0006 | 202-02-02020 | Removal of Asphalt Pavement | 9,712.6 | SQYD | 7.85 | 76,243.91 | 5.00 | 48,563.00 | 9.00 | 87,413.40 | 6.00 | 58,275.60 | | 0007 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 9,712.6 | SQYD | 8.00 | 77,700.80 | 2.00 | 19,425.20 | 11.00 | 106,838.60 | 6.00 | 58,275.60 | | 0008 | 202-02-04501 | Removal of Bridge Removal of 28.5' X 931' Steel Low Truss Swing Bridge | 1 | LUMP | 202,485.00 | 202,485.00 | 900,000.00 | 900,000.00 | 800,000.00 | 800,000.00 | 330,000.00 | 330,000.00 | | 0009 | 202-02-04501 | Removal of Bridge Removal of 29.4' x 80' Slab Span | 1 | LUMP | 15,000.00 | 15,000.00 | 70,000.00 | 70,000.00 | 50,000.00 | 50,000.00 | 35,000.00 | 35,000.00 | | 0010 | 202-02-12300 | Removal of Fender System 392 ft total length | 1 | EACH | 28,000.00 | 28,000.00 | 135,000.00 | 135,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | | 0011 | 202-02-12300 | Removal of Fender System Partial removal during construction. 59 ft total length | 1 | EACH | 15,000.00 | 15,000.00 | 40,000.00 | 40,000.00 | 49,600.00 | 49,600.00 | 30,000.00 | 30,000.00 | | 0012 | 202-02-14500 | Removal of Guard Rail | 1,025 | LNFT | 7.00 | 7,175.00 | 7.00 | 7,175.00 | 8.00 | 8,200.00 | 7.00 | 7,175.00 | | 0013 | 203-01-00100 | General Excavation | 11,842.2 | CUYD | 17.00 | 201,317.40 | 7.00 | 82,895.40 | 15.00 | 177,633.00 | 12.00 | 142,106.40 | | 0014 | 203-03-00100 | Embankment | 16,487.72 | CUYD | 22.00 | 362,729.84 | 30.00 | 494,631.60 | 22.00 | 362,729.84 | 34.00 | 560,582.48 | | 0015 | 203-04-00100 | Nonplastic Embankment | 19 | CUYD | 115.00 | 2,185.00 | 500.00 | 9,500.00 | 80.00 | 1,520.00 | 325.00 | 6,175.00 | | 0016 | 203-08-00100 | Geotextile Fabric | 6 | SQYD | 5.00 | 30.00 | 30.00 | 180.00 | 3.00 | 18.00 | 5.00 | 30.00 | | 0017 | 203-11-00100 | Settlement Plate Installation and Monitoring | 13 | EACH | 1,500.00 | 19,500.00 | 1,800.00 | 23,400.00 | 3,500.00 | 45,500.00 | 1,125.00 | 14,625.00 | | 0018 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 150.00 | 1,500.00 | 250.00 | 2,500.00 | 20.00 | 200.00 | 135.00 | 1,350.00 | | 0019 | 204-06-00100 | Temporary Silt Fencing | 8,215 | LNFT | 2.20 | 18,073.00 | 2.50 | 20,537.50 | 1.75 | 14,376.25 | 3.50 | 28,752.50 | | 0020 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 2,732.5 | SQYD | 25.00 | 68,312.50 | 25.00 | 68,312.50 | 25.00 | 68,312.50 | 27.00 | 73,777.50 | | 0021 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 6,384.6 | SQYD | 32.00 | 204,307.20 | 30.00 | 191,538.00 | 35.00 | 223,461.00 | 40.00 | 255,384.00 | | 0022 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 10,162.8 | SQYD | 16.51 | 167,787.83 | 7.00 | 71,139.60 | 25.00 | 254,070.00 | 35.00 | 355,698.00 | | 0023 | 401-01-00100 | Aggregate Surface Course (Net Section) | 129.3 | CUYD | 115.00 | 14,869.50 | 100.00 | 12,930.00 | 95.00 | 12,283.50 | 140.00 | 18,102.00 | | 0024 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 145.96 | CUYD | 90.00 | 13,136.40 | 80.00 | 11,676.80 | 95.00 | 13,866.20 | 165.00 | 24,083.40 | | 0025 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 300 | CUYD | 90.00 | 27,000.00 | 100.00 | 30,000.00 | 95.00 | 28,500.00 | 140.00 | 42,000.00 | | 0026 | 502-01-00100 | Asphalt Concrete | 3,432.8 | TON | 116.05 | 398,376.44 | 110.00 | 377,608.00 | 130.00 | 446,264.00 | 120.00 | 411,936.00 | | 0027 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 309.4 | TON | 151.58 | 46,898.85 | 150.00 | 46,410.00 | 170.00 | 52,598.00 | 265.00 | 81,991.00 | | 0028 | 509-01-00100 | Milling Asphalt Pavement | 4,252 | SQYD | 5.06 | 21,515.12 | 5.00 | 21,260.00 | 6.00 | 25,512.00 | 8.00 | 34,016.00 | | 0029 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -71.4 | CUYD | 1.00 | -71.40 | 4.00 | -285.60 | 0.11 | -7.85 | 19.00 | -1,356.60 | | 0030 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 102 | SQYD | 199.49 | 20,347.98 | 200.00 | 20,400.00 | 225.00 | 22,950.00 | 179.50 | 18,309.00 | | 0031 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 12 | SQYD | 255.25 | 3,063.00 | 255.00 | 3,060.00 | 285.00 | 3,420.00 | 289.00 | 3,468.00 | | 0032 | 701-01-01004 | Cross Drain Pipe (24" RCP/RPVCP) (For Temporary Drainage at Sta. 132+00) | 40 | LNFT | 150.00 | 6,000.00 | 210.00 | 8,400.00 | 195.00 | 7,800.00 | 425.00 | 17,000.00 | | 0033 | 701-01-01043 | Cross Drain Pipe (36" RCP/RPVCP) | 140 | LNFT | 150.00 | 21,000.00 | 150.00 | 21,000.00 | 185.00 | 25,900.00 | 200.00 | 28,000.00 | | 0034 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 42 | LNFT | 60.00 | 2,520.00 | 200.00 | 8,400.00 | 120.00 | 5,040.00 | 125.00 | 5,250.00 | | 0035 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 60 | LNFT | 10.00 | 600.00 | 6.00 | 360.00 | 85.00 | 5,100.00 | 35.00 | 2,100.00 | | 0036 | 702-03-00100 | Catch Basins (CB-01) For Temporary Drainage at sta. 132+00.00 | 1 | EACH | 3,500.00 | 3,500.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 8,900.00 | 8,900.00 | | 0037 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 237.5 | LNFT | 22.00 | 5,225.00 | 23.00 | 5,462.50 | 35.00 | 8,312.50 | 22.00 | 5,225.00 | | 0038 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 95.00 | 9,500.00 | 90.00 | 9,000.00 | 125.00 | 12,500.00 | 95.00 | 9,500.00 | | 0039 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 2,300.00 | 9,200.00 | 2,650.00 | 10,600.00 | 2,550.00 | 10,200.00 | 2,300.00 | 9,200.00 | | 0040 | 708-01-00100 | Right-of-Way Monument | 22 | EACH | 300.00 | 6,600.00 | 210.00 | 4,620.00 | 365.00 | 8,030.00 | 210.00 | 4,620.00 | | 0041 | 708-02-00100 | Right-of-Way Monument Witness Post | 22 | EACH | 125.00 | 2,750.00 | 210.00 | 4,620.00 | 365.00 | 8,030.00 | 140.00 | 3,080.00 | | 0042 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 931 | SQYD | 81.00 | 75,411.00 | 90.00 | 83,790.00 | 145.00 | 134,995.00 | 90.00 | 83,790.00 | | 0043 | 711-04-00100 | Geotextile Fabric | 931 | SQYD | 9.00 | 8,379.00 | 5.00 | 4,655.00 | 3.00 | 2,793.00 | 6.00 | 5,586.00 | | 0044 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 28,000.00 | 28,000.00 | 300,000.00 | 300,000.00 | 25,000.00 | 25,000.00 | | 0045 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.476 | MILE | 274.53 | 954.27 | 275.00 | 955.90 | 835.00 | 2,902.46 | 380.00 | 1,320.88 | | 0046 | 716-01-00100 | Mulch (Vegetative) | 11.29 | TON | 501.32 | 5,659.90 | 700.00 | 7,903.00 | 1,000.00 | 11,290.00 | 925.00 | 10,443.25 | | 0047 | 717-01-00100 | Seeding | 225.6 | LB | 30.41 | 6,860.50 | 18.00 | 4,060.80 | 40.00 | 9,024.00 | 25.00 | 5,640.00 | | 0048 | 718-01-00100 | Fertilizer | 7,520 | LB | 0.62 | 4,662.40 | 1.00 | 7,520.00 | 1.50 | 11,280.00 | 1.25 | 9,400.00 | | 0049 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 60,000.00 | 60,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 35,000.00 | 35,000.00 | | 0050 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.93 | MILE | 257.20 | 239.20 | 260.00 | 241.80 | 5,000.00 | 4,650.00 | 4,300.00 | 3,999.00 | | 0051 | 726-01-00100 | Bedding Material | 39 | CUYD | 100.00 | 3,900.00 | 90.00 | 3,510.00 | 95.00 | 3,705.00 | 100.00 | 3,900.00 | | 0052 | 727-01-00100 | Mobilization | 1 | LUMP | 1,890,000.00 | 1,890,000.00 | 2,003,120.30 | 2,003,120.30 | 1,644,000.00 | 1,644,000.00 | 2,185,000.00 | 2,185,000.00 | | 0053 | 729-01-00100 | Sign (Type A) | 24.25 | SQFT | 24.00 | 582.00 | 22.00 | 533.50 | 25.00 | 606.25 | 24.00 | 582.00 | | 0054 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 60.00 | 360.00 | 50.00 | 300.00 | 65.00 | 390.00 | 60.00 | 360.00 | | 0056 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 5 | EACH | 125.00 | 625.00 | 95.00 | 475.00 | 140.00 | 700.00 | 125.00 | 625.00 | | 0057 | 731-02-00100 | Reflectorized Raised Pavement Markers | 114 | EACH | 7.00 | 798.00 | 7.00 | 798.00 | 11.00 | 1,254.00 | 7.00 | 798.00 | | 0058 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.474 | MILE | 3,141.05 | 10,912.01 | 3,000.00 | 10,422.00 | 3,550.00 | 12,332.70 | 2,825.00 | 9,814.05 | | 0059 | 735-01-00100 | Mailboxes | 4 | EACH | 5.00 | 20.00 | 15.00 | 60.00 | 30.00 | 120.00 | 5.00 | 20.00 | | 0060 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 150.00 | 600.00 | 115.00 | 460.00 | 165.00 | 660.00 | 150.00 | 600.00 | | 0061 | 740-01-00100 | Construction Layout | 1 | LUMP | 300,000.00 | 300,000.00 | 135,000.00 | 135,000.00 | 350,000.00 | 350,000.00 | 302,400.00 | 302,400.00 | | 0062 | 802-01-00200 | Structural Excavation (Piers)(Dry) Footing | 72 | CUYD | 50.00 | 3,600.00 | 150.00 | 10,800.00 | 75.00 | 5,400.00 | 20.00 | 1,440.00 | | 0063 | 804-01-00200 | Precast Concrete Piles (14") | 128 | LNFT | 150.00 | 19,200.00 | 350.00 | 44,800.00 | 128.60 | 16,460.80 | 150.00 | 19,200.00 | | 0064 | 804-01-00700 | Precast Concrete Piles (30") | 6,655 | LNFT | 255.00 | 1,697,025.00 | 213.00 | 1,417,515.00 | 220.30 | 1,466,096.50 | 250.00 | 1,663,750.00 | | 0065 | 804-01-00800 | Precast Concrete Piles (36") | 5,150 | LNFT | 265.00 | 1,364,750.00 | 210.00 | 1,081,500.00 | 246.00 | 1,266,900.00 | 265.00 | 1,364,750.00 | | 0066 | 804-03-01900 | Steel Piles (30" Pipe) 0.5 in wall thickness | 435 | LNFT | 150.00 | 65,250.00 | 360.00 | 156,600.00 | 236.00 | 102,660.00 | 225.21 | 97,965.92 | | 0067 | 804-10-00700 | Precast Concrete Indicator Piles (30") | 1 | EACH | 75,000.00 | 75,000.00 | 45,000.00 | 45,000.00 | 67,800.00 | 67,800.00 | 75,000.00 | 75,000.00 | | 0068 | 804-10-00800 | Precast Concrete Indicator Piles (36") | 2 | EACH | 85,000.00 | 170,000.00 | 50,000.00 | 100,000.00 | 47,500.00 | 95,000.00 | 75,000.00 | 150,000.00 | | 0069 | 804-14-00100 | Dynamic Monitoring Assistance | 153 | EACH | 1,600.00 | 244,800.00 | 1,100.00 | 168,300.00 | 1,690.00 | 258,570.00 | 600.00 | 91,800.00 | | 0070 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 3,000.00 | 3,000.00 | | 0071 | 804-18-00100 | Vibration Monitoring | 30 | DAY | 900.00 | 27,000.00 | 900.00 | 27,000.00 | 700.00 | 21,000.00 | 150.00 | 4,500.00 | | 0072 | 805-01-00200 | Class A1 Concrete (Deck) | 2,826.35 | CUYD | 750.00 | 2,119,762.50 | 800.00 | 2,261,080.00 | 785.00 | 2,218,684.75 | 850.00 | 2,402,397.50 | | 0073 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 580.51 | CUYD | 1,190.00 | 690,806.90 | 900.00 | 522,459.00 | 1,315.00 | 763,370.65 | 1,250.00 | 725,637.50 | | 0074 | 805-04-00100 | Class MASS(A1) Concrete (Bent Cap) | 139.84 | CUYD | 1,500.00 | 209,760.00 | 1,300.00 | 181,792.00 | 1,280.00 | 178,995.20 | 1,350.00 | 188,784.00 | | 0075 | 805-04-00200 | Class MASS(A1) Concrete (Column) | 83.36 | CUYD | 1,700.00 | 141,712.00 | 1,575.00 | 131,292.00 | 1,570.00 | 130,875.20 | 1,550.00 | 129,208.00 | | 0076 | 805-04-00300 | Class MASS(A1) Concrete (Footing) | 494.88 | CUYD | 850.00 | 420,648.00 | 800.00 | 395,904.00 | 885.00 | 437,968.80 | 1,375.00 | 680,460.00 | | 0077 | 805-08-01300 | Precast-Prestressed Concrete Girders (Type LG-45) | 8,055 | LNFT | 240.00 | 1,933,200.00 | 250.00 | 2,013,750.00 | 260.00 | 2,094,300.00 | 310.00 | 2,497,050.00 | | 0078 | 805-08-01400 | Precast-Prestressed Concrete Girder (Type LG-54) | 3,086 | LNFT | 255.00 | 786,930.00 | 280.00 | 864,080.00 | 270.00 | 833,220.00 | 330.00 | 1,018,380.00 | | 0079 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 26,036.8 | SQFT | 1.75 | 45,564.40 | 2.00 | 52,073.60 | 2.70 | 70,299.36 | 1.75 | 45,564.40 | | 0080 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 110,402.77 | SQFT | 1.50 | 165,604.16 | 0.50 | 55,201.39 | 5.00 | 552,013.85 | 0.60 | 66,241.66 | | 0081 | 806-01-00100 | Deformed Reinforcing Steel | 822,820 | LB | 1.10 | 905,102.00 | 1.00 | 822,820.00 | 1.00 | 822,820.00 | 1.35 | 1,110,807.00 | | 0082 | 806-03-00100 | Deformed Reinforcing Steel Mechanical Splice For No. 10 Bars | 540 | EACH | 130.00 | 70,200.00 | 100.00 | 54,000.00 | 160.00 | 86,400.00 | 200.00 | 108,000.00 | | 0083 | 807-01-00100 | Structural Metalwork (Grade 36) | 2,262 | LUMP | 35,000.00 | 35,000.00 | 15,000.00 | 15,000.00 | 18,500.00 | 18,500.00 | 13,500.00 | 13,500.00 | | 0084 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 46 | LUMP | 10,500.00 | 10,500.00 | 4,000.00 | 4,000.00 | 420.00 | 420.00 | 3,000.00 | 3,000.00 | | 0085 | 810-01-00100 | Concrete Bridge Railing (Standard) | 1,236 | LNFT | 105.00 | 129,780.00 | 50.00 | 61,800.00 | 145.00 | 179,220.00 | 80.00 | 98,880.00 | | 0086 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 3,124 | LNFT | 106.00 | 331,144.00 | 50.00 | 156,200.00 | 105.00 | 328,020.00 | 90.00 | 281,160.00 | | 0087 | 811-03-00100 | Navigation Clearance Gauge (Painted) | 2 | EACH | 5,000.00 | 10,000.00 | 7,000.00 | 14,000.00 | 6,200.00 | 12,400.00 | 9,000.00 | 18,000.00 | | 0088 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 65.00 | 208,000.00 | 70.00 | 224,000.00 | 80.00 | 256,000.00 | 70.00 | 224,000.00 | | 0089 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 1,547 | SFIN | 60.00 | 92,820.00 | 70.00 | 108,290.00 | 55.00 | 85,085.00 | 85.00 | 131,495.00 | | 0090 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 200 | LNFT | 215.00 | 43,000.00 | 250.00 | 50,000.00 | 275.00 | 55,000.00 | 400.00 | 80,000.00 | | 0091 | 815-02-00200 | Sealed Expansion Joint (End Dams and Preformed Silicone Seal) | 160 | LNFT | 185.00 | 29,600.00 | 200.00 | 32,000.00 | 220.00 | 35,200.00 | 225.00 | 36,000.00 | | 0092 | 816-02-00100 | Bridge End Drain System (Open Drain) | 4 | EACH | 6,000.00 | 24,000.00 | 9,000.00 | 36,000.00 | 22,000.00 | 88,000.00 | 6,500.00 | 26,000.00 | | 0093 | 818-01-00100 | Pier Protection System (Marine) Temporary fender system necessary for construction of pier 2 | 1 | LUMP | 60,000.00 | 60,000.00 | 90,000.00 | 90,000.00 | 185,400.00 | 185,400.00 | 75,000.00 | 75,000.00 | | 0094 | 822-09-00100 | Electrical System Navigation Lighting | 1 | LUMP | 135,000.00 | 135,000.00 | 114,500.00 | 114,500.00 | 160,000.00 | 160,000.00 | 77,000.00 | 77,000.00 | | 0095 | NS-203-00100 | Geosynthetic Load Transfer Platform | 46,515 | SQFT | 18.00 | 837,270.00 | 14.00 | 651,210.00 | 18.65 | 867,504.75 | 19.00 | 883,785.00 | | 0096 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 400 | LNFT | 10.00 | 4,000.00 | 11.00 | 4,400.00 | 12.00 | 4,800.00 | 1.45 | 580.00 | | 0097 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 150 | LNFT | 3.00 | 450.00 | 10.00 | 1,500.00 | 11.00 | 1,650.00 | 0.75 | 112.50 | | 0098 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 4,116 | INLF | 2.00 | 8,232.00 | 0.60 | 2,469.60 | 0.75 | 3,087.00 | 0.66 | 2,716.56 | | 0099 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 1 | EACH | 5,500.00 | 5,500.00 | 7,800.00 | 7,800.00 | 7,800.00 | 7,800.00 | 8,400.00 | 8,400.00 | | 0100 | 804-02-00100 | Treated Timber Piles (Noncoastal Treatment) | 125,826 | LNFT | 12.00 | 1,509,912.00 | 20.00 | 2,516,520.00 | 10.70 | 1,346,338.20 | 11.00 | 1,384,086.00 | | 0101 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 775.00 | 775.00 | 850.00 | 850.00 | 865.00 | 865.00 | 775.00 | 775.00 | | 0102 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 114 | EACH | 400.00 | 45,600.00 | 650.00 | 74,100.00 | 960.00 | 109,440.00 | 800.00 | 91,200.00 | | 0103 | 802-03-00100 | Temporary Sheeting (Steel) | 8,400 | SQFT | 20.00 | 168,000.00 | 15.00 | 126,000.00 | 27.85 | 233,940.00 | 25.00 | 210,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 19,727,849.61 | | 20,037,631.39 | | 21,284,378.41 | | 21,886,265.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Brown Industrial Construction, LLC | - 6 - Jensen Construction Co. | - 7 - JB JAMES CONSTRUCTION LLC | - 8 - L & A Contracting Co. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 11 | LUMP | 900,000.00 | 900,000.00 | 2,200,000.00 | 2,200,000.00 | 1,000,000.00 | 1,000,000.00 | 1,312,881.04 | 1,312,881.04 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 7,290.00 | 7,290.00 | 50,000.00 | 50,000.00 | 7,534.99 | 7,534.99 | | 0003 | 202-02-00010 | Removal of 2 Billboard at sta. 99+62.00 | 2 | EACH | 2,000.00 | 4,000.00 | 936.00 | 1,872.00 | 5,000.00 | 10,000.00 | 2,267.58 | 4,535.16 | | 0004 | 202-02-00010 | Removal of Billboard at sta. 102+65.00 | 1 | EACH | 3,000.00 | 3,000.00 | 936.00 | 936.00 | 5,000.00 | 5,000.00 | 2,267.58 | 2,267.58 | | 0005 | 202-02-00050 | Removal of signs | 1 | LUMP | 2,000.00 | 2,000.00 | 500.00 | 500.00 | 1,000.00 | 1,000.00 | 3,300.00 | 3,300.00 | | 0006 | 202-02-02020 | Removal of Asphalt Pavement | 9,712.6 | SQYD | 2.90 | 28,166.54 | 7.85 | 76,243.91 | 4.00 | 38,850.40 | 9.48 | 92,075.45 | | 0007 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 9,712.6 | SQYD | 3.60 | 34,965.36 | 8.00 | 77,700.80 | 6.00 | 58,275.60 | 9.05 | 87,899.03 | | 0008 | 202-02-04501 | Removal of Bridge Removal of 28.5' X 931' Steel Low Truss Swing Bridge | 1 | LUMP | 500,000.00 | 500,000.00 | 250,000.00 | 250,000.00 | 350,000.00 | 350,000.00 | 1,258,913.52 | 1,258,913.52 | | 0009 | 202-02-04501 | Removal of Bridge Removal of 29.4' x 80' Slab Span | 1 | LUMP | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | 35,000.00 | 35,000.00 | 921,982.32 | 921,982.32 | | 0010 | 202-02-12300 | Removal of Fender System 392 ft total length | 1 | EACH | 100,000.00 | 100,000.00 | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | 118,404.42 | 118,404.42 | | 0011 | 202-02-12300 | Removal of Fender System Partial removal during construction. 59 ft total length | 1 | EACH | 80,000.00 | 80,000.00 | 100,000.00 | 100,000.00 | 40,000.00 | 40,000.00 | 265,264.38 | 265,264.38 | | 0012 | 202-02-14500 | Removal of Guard Rail | 1,025 | LNFT | 7.00 | 7,175.00 | 7.00 | 7,175.00 | 7.00 | 7,175.00 | 9.24 | 9,471.00 | | 0013 | 203-01-00100 | General Excavation | 11,842.2 | CUYD | 10.00 | 118,422.00 | 7.43 | 87,987.55 | 15.00 | 177,633.00 | 11.54 | 136,658.99 | | 0014 | 203-03-00100 | Embankment | 16,487.72 | CUYD | 24.00 | 395,705.28 | 17.42 | 287,216.08 | 45.00 | 741,947.40 | 26.28 | 433,297.28 | | 0015 | 203-04-00100 | Nonplastic Embankment | 19 | CUYD | 200.00 | 3,800.00 | 100.00 | 1,900.00 | 400.00 | 7,600.00 | 237.65 | 4,515.35 | | 0016 | 203-08-00100 | Geotextile Fabric | 6 | SQYD | 3.00 | 18.00 | 10.00 | 60.00 | 50.00 | 300.00 | 177.65 | 1,065.90 | | 0017 | 203-11-00100 | Settlement Plate Installation and Monitoring | 13 | EACH | 2,200.00 | 28,600.00 | 1,000.00 | 13,000.00 | 2,500.00 | 32,500.00 | 660.00 | 8,580.00 | | 0018 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 130.00 | 1,300.00 | 150.00 | 1,500.00 | 150.00 | 1,500.00 | 33.00 | 330.00 | | 0019 | 204-06-00100 | Temporary Silt Fencing | 8,215 | LNFT | 1.80 | 14,787.00 | 3.00 | 24,645.00 | 4.00 | 32,860.00 | 13.20 | 108,438.00 | | 0020 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 2,732.5 | SQYD | 23.00 | 62,847.50 | 28.10 | 76,783.25 | 28.00 | 76,510.00 | 35.19 | 96,156.68 | | 0021 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 6,384.6 | SQYD | 31.00 | 197,922.60 | 38.60 | 246,445.56 | 40.00 | 255,384.00 | 49.05 | 313,164.63 | | 0022 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 10,162.8 | SQYD | 10.50 | 106,709.40 | 22.17 | 225,309.28 | 11.00 | 111,790.80 | 29.26 | 297,363.53 | | 0023 | 401-01-00100 | Aggregate Surface Course (Net Section) | 129.3 | CUYD | 100.00 | 12,930.00 | 60.00 | 7,758.00 | 140.00 | 18,102.00 | 170.06 | 21,988.76 | | 0024 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 145.96 | CUYD | 100.00 | 14,596.00 | 60.00 | 8,757.60 | 133.00 | 19,412.68 | 157.26 | 22,953.67 | | 0025 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 300 | CUYD | 100.00 | 30,000.00 | 60.00 | 18,000.00 | 132.00 | 39,600.00 | 154.99 | 46,497.00 | | 0026 | 502-01-00100 | Asphalt Concrete | 3,432.8 | TON | 118.00 | 405,070.40 | 116.05 | 398,376.44 | 120.00 | 411,936.00 | 153.19 | 525,870.63 | | 0027 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 309.4 | TON | 152.00 | 47,028.80 | 151.58 | 46,898.85 | 150.00 | 46,410.00 | 200.09 | 61,907.85 | | 0028 | 509-01-00100 | Milling Asphalt Pavement | 4,252 | SQYD | 5.50 | 23,386.00 | 5.06 | 21,515.12 | 5.00 | 21,260.00 | 6.68 | 28,403.36 | | 0029 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -71.4 | CUYD | 0.01 | -0.71 | 1.00 | -71.40 | 1.00 | -71.40 | 0.00 | 0.00 | | 0030 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 102 | SQYD | 200.00 | 20,400.00 | 199.49 | 20,347.98 | 200.00 | 20,400.00 | 263.33 | 26,859.66 | | 0031 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 12 | SQYD | 255.00 | 3,060.00 | 255.25 | 3,063.00 | 255.00 | 3,060.00 | 336.93 | 4,043.16 | | 0032 | 701-01-01004 | Cross Drain Pipe (24" RCP/RPVCP) (For Temporary Drainage at Sta. 132+00) | 40 | LNFT | 95.00 | 3,800.00 | 44.00 | 1,760.00 | 260.00 | 10,400.00 | 94.12 | 3,764.80 | | 0033 | 701-01-01043 | Cross Drain Pipe (36" RCP/RPVCP) | 140 | LNFT | 145.00 | 20,300.00 | 68.00 | 9,520.00 | 240.00 | 33,600.00 | 112.49 | 15,748.60 | | 0034 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 42 | LNFT | 98.00 | 4,116.00 | 44.00 | 1,848.00 | 170.00 | 7,140.00 | 90.96 | 3,820.32 | | 0035 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 60 | LNFT | 25.00 | 1,500.00 | 32.00 | 1,920.00 | 5.00 | 300.00 | 37.33 | 2,239.80 | | 0036 | 702-03-00100 | Catch Basins (CB-01) For Temporary Drainage at sta. 132+00.00 | 1 | EACH | 3,500.00 | 3,500.00 | 3,120.00 | 3,120.00 | 7,500.00 | 7,500.00 | 4,090.73 | 4,090.73 | | 0037 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 237.5 | LNFT | 22.00 | 5,225.00 | 22.00 | 5,225.00 | 23.00 | 5,462.50 | 30.36 | 7,210.50 | | 0038 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 95.00 | 9,500.00 | 95.00 | 9,500.00 | 90.00 | 9,000.00 | 120.78 | 12,078.00 | | 0039 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 2,300.00 | 9,200.00 | 3,000.00 | 12,000.00 | 2,500.00 | 10,000.00 | 3,498.00 | 13,992.00 | | 0040 | 708-01-00100 | Right-of-Way Monument | 22 | EACH | 220.00 | 4,840.00 | 250.00 | 5,500.00 | 200.00 | 4,400.00 | 280.50 | 6,171.00 | | 0041 | 708-02-00100 | Right-of-Way Monument Witness Post | 22 | EACH | 220.00 | 4,840.00 | 350.00 | 7,700.00 | 200.00 | 4,400.00 | 280.50 | 6,171.00 | | 0042 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 931 | SQYD | 70.00 | 65,170.00 | 70.00 | 65,170.00 | 85.00 | 79,135.00 | 87.34 | 81,313.54 | | 0043 | 711-04-00100 | Geotextile Fabric | 931 | SQYD | 2.00 | 1,862.00 | 3.00 | 2,793.00 | 3.50 | 3,258.50 | 18.20 | 16,944.20 | | 0044 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 180,000.00 | 180,000.00 | 40,000.00 | 40,000.00 | 150,000.00 | 150,000.00 | 19,800.00 | 19,800.00 | | 0045 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.476 | MILE | 900.00 | 3,128.40 | 750.00 | 2,607.00 | 1,250.00 | 4,345.00 | 1,120.06 | 3,893.33 | | 0046 | 716-01-00100 | Mulch (Vegetative) | 11.29 | TON | 550.00 | 6,209.50 | 700.00 | 7,903.00 | 700.00 | 7,903.00 | 1,188.00 | 13,412.52 | | 0047 | 717-01-00100 | Seeding | 225.6 | LB | 31.00 | 6,993.60 | 18.00 | 4,060.80 | 18.00 | 4,060.80 | 46.20 | 10,422.72 | | 0048 | 718-01-00100 | Fertilizer | 7,520 | LB | 0.62 | 4,662.40 | 0.50 | 3,760.00 | 0.50 | 3,760.00 | 1.78 | 13,385.60 | | 0049 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 80,000.00 | 80,000.00 | 100,800.00 | 100,800.00 | | 0050 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.93 | MILE | 4,600.00 | 4,278.00 | 4,900.00 | 4,557.00 | 260.00 | 241.80 | 660.00 | 613.80 | | 0051 | 726-01-00100 | Bedding Material | 39 | CUYD | 95.00 | 3,705.00 | 60.00 | 2,340.00 | 210.00 | 8,190.00 | 244.81 | 9,547.59 | | 0052 | 727-01-00100 | Mobilization | 1 | LUMP | 2,250,000.00 | 2,250,000.00 | 2,200,000.00 | 2,200,000.00 | 2,200,000.00 | 2,200,000.00 | 1,558,248.65 | 1,558,248.65 | | 0053 | 729-01-00100 | Sign (Type A) | 24.25 | SQFT | 25.00 | 606.25 | 24.00 | 582.00 | 25.00 | 606.25 | 29.04 | 704.22 | | 0054 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 90.00 | 540.00 | 60.00 | 360.00 | 75.00 | 450.00 | 66.00 | 396.00 | | 0056 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 5 | EACH | 125.00 | 625.00 | 125.00 | 625.00 | 95.00 | 475.00 | 125.40 | 627.00 | | 0057 | 731-02-00100 | Reflectorized Raised Pavement Markers | 114 | EACH | 6.50 | 741.00 | 10.00 | 1,140.00 | 10.00 | 1,140.00 | 8.58 | 978.12 | | 0058 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.474 | MILE | 3,200.00 | 11,116.80 | 3,200.00 | 11,116.80 | 4,000.00 | 13,896.00 | 4,219.14 | 14,657.29 | | 0059 | 735-01-00100 | Mailboxes | 4 | EACH | 10.00 | 40.00 | 25.00 | 100.00 | 25.00 | 100.00 | 66.00 | 264.00 | | 0060 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 150.00 | 600.00 | 200.00 | 800.00 | 200.00 | 800.00 | 151.80 | 607.20 | | 0061 | 740-01-00100 | Construction Layout | 1 | LUMP | 400,000.00 | 400,000.00 | 250,000.00 | 250,000.00 | 250,000.00 | 250,000.00 | 604,563.00 | 604,563.00 | | 0062 | 802-01-00200 | Structural Excavation (Piers)(Dry) Footing | 72 | CUYD | 100.00 | 7,200.00 | 35.00 | 2,520.00 | 100.00 | 7,200.00 | 144.96 | 10,437.12 | | 0063 | 804-01-00200 | Precast Concrete Piles (14") | 128 | LNFT | 140.00 | 17,920.00 | 75.00 | 9,600.00 | 150.00 | 19,200.00 | 518.71 | 66,394.88 | | 0064 | 804-01-00700 | Precast Concrete Piles (30") | 6,655 | LNFT | 250.00 | 1,663,750.00 | 160.00 | 1,064,800.00 | 215.00 | 1,430,825.00 | 215.78 | 1,436,015.90 | | 0065 | 804-01-00800 | Precast Concrete Piles (36") | 5,150 | LNFT | 290.00 | 1,493,500.00 | 200.00 | 1,030,000.00 | 250.00 | 1,287,500.00 | 256.01 | 1,318,451.50 | | 0066 | 804-03-01900 | Steel Piles (30" Pipe) 0.5 in wall thickness | 435 | LNFT | 280.00 | 121,800.00 | 300.00 | 130,500.00 | 400.00 | 174,000.00 | 377.09 | 164,034.15 | | 0067 | 804-10-00700 | Precast Concrete Indicator Piles (30") | 1 | EACH | 90,000.00 | 90,000.00 | 50,000.00 | 50,000.00 | 120,000.00 | 120,000.00 | 39,522.83 | 39,522.83 | | 0068 | 804-10-00800 | Precast Concrete Indicator Piles (36") | 2 | EACH | 90,000.00 | 180,000.00 | 50,000.00 | 100,000.00 | 90,000.00 | 180,000.00 | 46,462.55 | 92,925.10 | | 0069 | 804-14-00100 | Dynamic Monitoring Assistance | 153 | EACH | 1,000.00 | 153,000.00 | 500.00 | 76,500.00 | 2,000.00 | 306,000.00 | 1,838.15 | 281,236.95 | | 0070 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 20,000.00 | 20,000.00 | 150,000.00 | 150,000.00 | 100,000.00 | 100,000.00 | 198,000.00 | 198,000.00 | | 0071 | 804-18-00100 | Vibration Monitoring | 30 | DAY | 2,000.00 | 60,000.00 | 200.00 | 6,000.00 | 2,500.00 | 75,000.00 | 5,016.00 | 150,480.00 | | 0072 | 805-01-00200 | Class A1 Concrete (Deck) | 2,826.35 | CUYD | 920.00 | 2,600,242.00 | 850.00 | 2,402,397.50 | 785.00 | 2,218,684.75 | 1,360.37 | 3,844,881.75 | | 0073 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 580.51 | CUYD | 1,000.00 | 580,510.00 | 1,200.00 | 696,612.00 | 1,650.00 | 957,841.50 | 1,021.52 | 593,002.58 | | 0074 | 805-04-00100 | Class MASS(A1) Concrete (Bent Cap) | 139.84 | CUYD | 2,500.00 | 349,600.00 | 1,200.00 | 167,808.00 | 1,700.00 | 237,728.00 | 1,407.05 | 196,761.87 | | 0075 | 805-04-00200 | Class MASS(A1) Concrete (Column) | 83.36 | CUYD | 2,000.00 | 166,720.00 | 1,200.00 | 100,032.00 | 1,550.00 | 129,208.00 | 1,731.59 | 144,345.34 | | 0076 | 805-04-00300 | Class MASS(A1) Concrete (Footing) | 494.88 | CUYD | 2,000.00 | 989,760.00 | 1,200.00 | 593,856.00 | 600.00 | 296,928.00 | 443.39 | 219,424.84 | | 0077 | 805-08-01300 | Precast-Prestressed Concrete Girders (Type LG-45) | 8,055 | LNFT | 250.00 | 2,013,750.00 | 260.00 | 2,094,300.00 | 350.00 | 2,819,250.00 | 264.24 | 2,128,453.20 | | 0078 | 805-08-01400 | Precast-Prestressed Concrete Girder (Type LG-54) | 3,086 | LNFT | 260.00 | 802,360.00 | 260.00 | 802,360.00 | 360.00 | 1,110,960.00 | 323.22 | 997,456.92 | | 0079 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 26,036.8 | SQFT | 1.00 | 26,036.80 | 1.00 | 26,036.80 | 1.00 | 26,036.80 | 2.46 | 64,050.53 | | 0080 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 110,402.77 | SQFT | 1.20 | 132,483.32 | 1.00 | 110,402.77 | 1.00 | 110,402.77 | 2.72 | 300,295.53 | | 0081 | 806-01-00100 | Deformed Reinforcing Steel | 822,820 | LB | 1.30 | 1,069,666.00 | 1.00 | 822,820.00 | 1.30 | 1,069,666.00 | 1.14 | 938,014.80 | | 0082 | 806-03-00100 | Deformed Reinforcing Steel Mechanical Splice For No. 10 Bars | 540 | EACH | 140.00 | 75,600.00 | 100.00 | 54,000.00 | 130.00 | 70,200.00 | 156.84 | 84,693.60 | | 0083 | 807-01-00100 | Structural Metalwork (Grade 36) | 2,262 | LUMP | 45,000.00 | 45,000.00 | 10,000.00 | 10,000.00 | 60,000.00 | 60,000.00 | 21,166.76 | 21,166.76 | | 0084 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 46 | LUMP | 4,000.00 | 4,000.00 | 200.00 | 200.00 | 15,000.00 | 15,000.00 | 21,166.76 | 21,166.76 | | 0085 | 810-01-00100 | Concrete Bridge Railing (Standard) | 1,236 | LNFT | 95.00 | 117,420.00 | 110.00 | 135,960.00 | 80.00 | 98,880.00 | 87.69 | 108,384.84 | | 0086 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 3,124 | LNFT | 96.00 | 299,904.00 | 110.00 | 343,640.00 | 80.00 | 249,920.00 | 91.61 | 286,189.64 | | 0087 | 811-03-00100 | Navigation Clearance Gauge (Painted) | 2 | EACH | 3,000.00 | 6,000.00 | 60,000.00 | 120,000.00 | 500.00 | 1,000.00 | 2,192.16 | 4,384.32 | | 0088 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 50.00 | 160,000.00 | 45.00 | 144,000.00 | 75.00 | 240,000.00 | 31.60 | 101,120.00 | | 0089 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 1,547 | SFIN | 80.00 | 123,760.00 | 250.00 | 386,750.00 | 67.00 | 103,649.00 | 170.87 | 264,335.89 | | 0090 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 200 | LNFT | 270.00 | 54,000.00 | 250.00 | 50,000.00 | 400.00 | 80,000.00 | 165.83 | 33,166.00 | | 0091 | 815-02-00200 | Sealed Expansion Joint (End Dams and Preformed Silicone Seal) | 160 | LNFT | 210.00 | 33,600.00 | 250.00 | 40,000.00 | 400.00 | 64,000.00 | 150.04 | 24,006.40 | | 0092 | 816-02-00100 | Bridge End Drain System (Open Drain) | 4 | EACH | 7,000.00 | 28,000.00 | 7,500.00 | 30,000.00 | 10,000.00 | 40,000.00 | 2,830.73 | 11,322.92 | | 0093 | 818-01-00100 | Pier Protection System (Marine) Temporary fender system necessary for construction of pier 2 | 1 | LUMP | 300,000.00 | 300,000.00 | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | 150,809.76 | 150,809.76 | | 0094 | 822-09-00100 | Electrical System Navigation Lighting | 1 | LUMP | 110,000.00 | 110,000.00 | 220,000.00 | 220,000.00 | 150,000.00 | 150,000.00 | 211,200.00 | 211,200.00 | | 0095 | NS-203-00100 | Geosynthetic Load Transfer Platform | 46,515 | SQFT | 20.00 | 930,300.00 | 19.00 | 883,785.00 | 14.00 | 651,210.00 | 17.79 | 827,501.85 | | 0096 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 400 | LNFT | 4.00 | 1,600.00 | 20.00 | 8,000.00 | 10.00 | 4,000.00 | 13.20 | 5,280.00 | | 0097 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 150 | LNFT | 4.00 | 600.00 | 20.00 | 3,000.00 | 10.00 | 1,500.00 | 13.20 | 1,980.00 | | 0098 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 4,116 | INLF | 1.00 | 4,116.00 | 6.00 | 24,696.00 | 1.25 | 5,145.00 | 1.32 | 5,433.12 | | 0099 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 1 | EACH | 9,000.00 | 9,000.00 | 8,400.00 | 8,400.00 | 8,000.00 | 8,000.00 | 10,296.00 | 10,296.00 | | 0100 | 804-02-00100 | Treated Timber Piles (Noncoastal Treatment) | 125,826 | LNFT | 10.00 | 1,258,260.00 | 18.00 | 2,264,868.00 | 11.00 | 1,384,086.00 | 12.58 | 1,582,891.08 | | 0101 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 800.00 | 800.00 | 775.00 | 775.00 | 750.00 | 750.00 | 6,600.00 | 6,600.00 | | 0102 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 114 | EACH | 550.00 | 62,700.00 | 300.00 | 34,200.00 | 400.00 | 45,600.00 | 62.02 | 7,070.28 | | 0103 | 802-03-00100 | Temporary Sheeting (Steel) | 8,400 | SQFT | 25.00 | 210,000.00 | 20.00 | 168,000.00 | 30.00 | 252,000.00 | 30.61 | 257,124.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 22,585,946.24 | | 22,509,036.69 | | 22,865,370.15 | | 25,959,397.88 |
|