Bid Tabulations for the Letting of 10/9/2019 LA DOTD Headquarters

Proposal:H.010890.6
Parish:Terrebonne
Routes:LA 182
Description:LA 182: ROUNDABOUT AT HOLLYWOOD RD
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, MILLING ASPHALT CONCRETE, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK..
Estimated Construction Cost:$1,545,702.80
Rank License BidderConstruction Bid
134263La Contracting Enterprise LLC$1,533,144.37
206276Barriere Construction Co., LLC$1,596,597.70


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
La Contracting Enterprise LLC
- 2 -
Barriere Construction Co., LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 2     LUMP13,000.0013,000.00500.00500.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP10,000.0010,000.000.000.00
0003202-02-00040Removal of Signal Mast Arm Foundation4     CUYD1,300.005,200.00510.002,040.00
0004202-02-02020Removal of Asphalt Pavement 3,100     SQYD11.0034,100.0012.0037,200.00
0005202-02-03010Removal of Base – Recycled PCC or Stone 2,024     SQYD10.0020,240.0012.0024,288.00
0006202-02-06100Removal of Concrete Walks and Drives 1,331     SQYD12.0015,972.0012.0015,972.00
0007202-02-32500Removal of Portland Cement Concrete Pavement 2,495     SQYD11.0027,445.0015.0037,425.00
0008202-02-40100Removal of Traffic Signal Equipment 1     LUMP6,700.006,700.0010,000.0010,000.00
0009203-01-00100General Excavation 1,487     CUYD13.0019,331.0012.0017,844.00
0010203-03-00100Embankment 1,661     CUYD22.0036,542.0040.0066,440.00
0011203-10-00100Cleaning Existing Ditches 175     LNFT14.002,450.005.00875.00
0012204-02-00100Temporary Hay Bales 92     EACH23.002,116.0020.001,840.00
0013204-06-00100Temporary Silt Fencing 2,544     LNFT1.804,579.203.508,904.00
0014302-02-06000Class II Base Course (6" Thick) 516.6   SQYD27.0013,948.2023.0011,881.80
0015302-02-10000Class II Base Course (10" Thick) 5,902.4   SQYD35.00206,584.0036.00212,486.40
0016304-01-00100Lime 83.67  TON240.0020,080.8050.004,183.50
0017304-04-00400Lime Treatment (Type D) (12" Thick) 2,438     SQYD5.0012,190.002.004,876.00
0018304-05-00100Lime Treatment (Type E) 3,464     SQYD4.0013,856.001.003,464.00
0019402-03-00100Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 250     CUYD104.0026,000.0050.0012,500.00
0020502-01-00100Asphalt Concrete 2,455.9   TON141.00346,281.90118.00289,796.20
0021509-01-00100Milling Asphalt Pavement 2,242     SQYD3.507,847.004.7510,649.50
0022509-02-00100Contractor Retained Reclaimed Asphalt Pavement -93     CUYD0.01-0.930.01-0.93
0023601-01-10000Portland Cement Concrete Pavement (Colored) 11"478.1   SQYD124.0059,284.40160.0076,496.00
0024701-14-00100Cleaning Existing Pipes 145     LNFT20.002,900.005.00725.00
0025706-02-00300Concrete Drive (8" Thick) 307.5   SQYD72.0022,140.00110.0033,825.00
0026706-03-00200Incidental Concrete Paving (5" Thick) 220     SQYD64.0014,080.00100.0022,000.00
0027706-03-10000Incidental Concrete Paving (Colored)(inch Thick) 5"384.5   SQYD74.0028,453.00120.0046,140.00
0028707-01-00200Concrete Curb (Barrier) 230.9   LNFT23.005,310.7035.008,081.50
0029707-03-00100Combination Concrete Curb and Gutter 1,079.9   LNFT36.0038,876.4040.0043,196.00
0030708-01-00100Right-of-Way Monument 14     EACH337.004,718.00250.003,500.00
0031713-01-00100Temporary Signs and Barricades 1     LUMP51,000.0051,000.00100,000.00100,000.00
0032713-02-00100Temporary Pavement Markings (4" Width) 10,512     LNFT0.202,102.400.505,256.00
0033713-02-00500Temporary Pavement Markings (24" Width) 49     LNFT2.80137.201.2561.25
0034714-01-00100Slab Sodding (Bermuda Grass) 465     SQYD10.004,650.0017.007,905.00
0035716-01-00100Mulch (Vegetative) 1.1   TON1,700.001,870.002,750.003,025.00
0036717-01-00100Seeding 47     LB35.001,645.0027.501,292.50
0037718-01-00100Fertilizer 1,560     LB1.001,560.001.251,950.00
0038720-01-01000Erosion Control System (Slope Protection) (Type A) 289     SQYD1.80520.201.00289.00
0039725-01-00100Temporary Detour Roads 2,506.1   SQYD67.00167,908.7059.00147,859.90
0040727-01-00100Mobilization 1     LUMP113,000.00113,000.00150,000.00150,000.00
0041729-01-00100Sign (Type A) 71.6   SQFT23.001,646.8025.001,790.00
0042729-02-00100Sign (Type B) 131.1   SQFT23.003,015.3035.004,588.50
0043729-22-00200Square Tubing Post with 2-1/4" Omni-Directional Anchor 22     EACH166.003,652.00130.002,860.00
0044731-02-00100Reflectorized Raised Pavement Markers 132     EACH11.001,452.007.00924.00
0045732-01-01000Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) 6,603     LNFT0.704,622.101.006,603.00
0046732-01-01040Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 450     LNFT2.301,035.003.001,350.00
0047732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 104     LNFT11.501,196.0020.002,080.00
0048732-03-02050Plastic Pavement Striping (Dotted Line)(12" W)(2' L)(Thermo 90 mil) 0.023 MILE9,400.00216.206,000.00138.00
0049732-05-00100Removal of Existing Markings 0.183 MILE8,200.001,500.606,000.001,098.00
0050736-16-00000Temporary Traffic Signal Installation (Intersection) 1     EACH45,000.0045,000.0045,000.0045,000.00
0051740-01-00100Construction Layout 1     LUMP33,000.0033,000.0030,000.0030,000.00
0052NS-500-00300Traffic Maintenance Asphalt Concrete 148.1   TON140.0020,734.00115.0017,031.50
0053NS-500-00340Saw Cutting Asphalt Concrete Pavement 13,128     INLF0.9011,815.200.01131.28
0054NS-600-00220Saw Cutting Portland Cement Concrete Pavement 1,840     INLF1.502,760.000.0236.80
0055NS-729-00031Breakaway Square Tubing Sign Support (Surface Mount) 11     EACH171.001,881.00200.002,200.00
0056NS-MSC-00120Drainage Structure Paved Gutter Drain14     EACH2,500.0035,000.004,000.0056,000.00
         
  CONTRACTOR TOTAL   1,533,144.37 1,596,597.70