Proposal:H.013452.6
Parish:Rapides
Description:HORSESHOE DRIVE ROADWAY IMPROVEMENTS
Type Construction:GRADING, MILLING ASPHALT PAVEMENT, ASPHALT CONCRETE OVERLAY, PAVEMENT PATCHING, PAVEMENT WIDENING AND RELATED WORK.
Estimated Construction Cost:$1,644,756.68
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,348,754.82 |
| 2 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $1,472,958.05 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,500.00 | 3,500.00 | 7,500.00 | 7,500.00 | | 0002 | 203-06-00100 | Excavation and Embankment | 145 | LNFT | 300.00 | 43,500.00 | 150.00 | 21,750.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,050 | CUYD | 1.00 | 1,050.00 | 40.00 | 42,000.00 | | 0004 | 203-10-00100 | Cleaning Existing Ditches | 500 | LNFT | 7.00 | 3,500.00 | 7.00 | 3,500.00 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 500 | LNFT | 2.00 | 1,000.00 | 2.50 | 1,250.00 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 100 | CUYD | 68.00 | 6,800.00 | 100.00 | 10,000.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 7,173.6 | TON | 79.00 | 566,714.40 | 90.00 | 645,624.00 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 589 | TON | 164.00 | 96,596.00 | 90.00 | 53,010.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 34,095 | SQYD | 2.85 | 97,170.75 | 2.50 | 85,237.50 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,494 | CUYD | 1.00 | -1,494.00 | 1.00 | -1,494.00 | | 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,251 | SQYD | 115.00 | 143,865.00 | 100.00 | 125,100.00 | | 0012 | 510-02-00100 | Pavement Widening (12" Minimum Thickness) | 477 | SQYD | 115.00 | 54,855.00 | 140.00 | 66,780.00 | | 0013 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 235 | SQYD | 215.00 | 50,525.00 | 250.00 | 58,750.00 | | 0014 | 701-14-00100 | Cleaning Existing Pipes | 500 | LNFT | 13.00 | 6,500.00 | 11.00 | 5,500.00 | | 0015 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 2,900.00 | 14,500.00 | 3,000.00 | 15,000.00 | | 0016 | 702-04-00200 | Adjusting Catch Basins | 2 | EACH | 4,000.00 | 8,000.00 | 4,000.00 | 8,000.00 | | 0017 | 707-01-00300 | Concrete Curb (Mountable) | 70 | LNFT | 32.00 | 2,240.00 | 35.00 | 2,450.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 26,000.00 | 26,000.00 | 24,000.00 | 24,000.00 | | 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 24 | MILE | 154.00 | 3,696.00 | 225.00 | 5,400.00 | | 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 16 | MILE | 800.00 | 12,800.00 | 1.00 | 16.00 | | 0021 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 15 | EACH | 25.00 | 375.00 | 60.00 | 900.00 | | 0022 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 15 | EACH | 30.00 | 450.00 | 70.00 | 1,050.00 | | 0023 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 12 | EACH | 25.00 | 300.00 | 60.00 | 720.00 | | 0024 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 4,750.00 | 9,500.00 | 3,500.00 | 7,000.00 | | 0025 | 724-01-00100 | Rumble Strips (Centerline) | 2.685 | MILE | 900.00 | 2,416.50 | 1,100.00 | 2,953.50 | | 0026 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 5.369 | MILE | 635.00 | 3,409.32 | 750.00 | 4,026.75 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 85,000.00 | 85,000.00 | 140,000.00 | 140,000.00 | | 0028 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 514 | SQFT | 27.00 | 13,878.00 | 30.00 | 15,420.00 | | 0029 | 729-16-00200 | Object Marker Assembly (Type 2) | 240 | EACH | 15.00 | 3,600.00 | 18.00 | 4,320.00 | | 0030 | 729-16-00300 | Object Marker Assembly (Type 3) | 20 | EACH | 95.00 | 1,900.00 | 100.00 | 2,000.00 | | 0031 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 92 | EACH | 120.00 | 11,040.00 | 125.00 | 11,500.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 818 | EACH | 6.25 | 5,112.50 | 8.00 | 6,544.00 | | 0033 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 2,430 | LNFT | 7.75 | 18,832.50 | 7.00 | 17,010.00 | | 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 62 | LNFT | 10.00 | 620.00 | 13.00 | 806.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.739 | MILE | 3,150.00 | 33,827.85 | 3,700.00 | 39,734.30 | | 0036 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 5 | EACH | 435.00 | 2,175.00 | 450.00 | 2,250.00 | | 0037 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 5 | EACH | 300.00 | 1,500.00 | 350.00 | 1,750.00 | | 0038 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 325.00 | 1,300.00 | 350.00 | 1,400.00 | | 0039 | 739-01-00100 | Hydro-Seeding | 2 | ACRE | 2,100.00 | 4,200.00 | 2,100.00 | 4,200.00 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | 20,000.00 | 20,000.00 | | 0041 | 741-11-00100 | Adjusting Water Valve | 5 | EACH | 100.00 | 500.00 | 2,000.00 | 10,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,348,754.82 | | 1,472,958.05 |
|